Document qa4XVQb5mX784124rj2XMEOej

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5 77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604 SUBJECT: FROM: THRU: TO: CLEAN AIR ACT INSPECTION REPORT S.H. Bell, Chicago, Illinois Patrick Miller, Environmental Engineer AECAB (MN/OH) Brian Dickens, Section Supervisor AECAB (MN/OH) File BASIC INFORMATION Facility Name: S.H. Bell Company (S.H. Bell) Facility Location: 10218 South Avenue O, Chicago, Illinois 60617 Date of Inspection: July 6, 2022 EPA Inspector(s): 1. Patrick Miller, Environmental Engineer (AECAB) 2. Meaghan Pashen, Environmental Engineer (AECAB) Other Attendees: 1. Paul Chepela, Terminal Manager, S.H. Bell Contact Email Address: pchepela@shbellco.com Purpose of Inspection: Determine compliance with applicable IL State Implementation Plan (SIP) requirements, including fugitive dust. Facility Type: Ferroalloy storage facility Regulations Central to Inspection: IL SIP Rule 201.141, no person shall cause the discharge or emissions of any contaminant into the environment...so as to cause or tend to cause air pollution in Illinois (paraphrased), 212.301, fugitive PM emissions cannot cross the property line of the facility (paraphrased); and Rule 212.306, cleaning and treating roadways with, among other things, chemical dust suppressants (paraphrased). Arrival Time: 9:20 AM Departure Time: 11:00 AM Inspection Type: Unannounced Inspection Announced Inspection OPENING CONFERENCE Presented Credentials Stated authority and purpose of inspection Small Business Resource Information Sheet not provided. Reason: Not a small business Provided CBI warning to facility The following information was obtained verbally from Mr. Chepela unless otherwise noted. Process Description: S.H. Bell owns and operates a ferroalloy storage facility. S.H. Bell receives, stores, handles, and ships ferroalloys used in the steelmaking industry. The ferroalloy is received by barge and truck as either loose bulk material or in supersacks. When bulk ferroalloy is received by barge the ferroalloy is watered prior to unloading with an excavator. The water is applied directly to the ferroalloy with an excavator bucket. The bulk ferroalloy is transferred to its storage location with a front-end loader. When bulk ferroalloy is received by truck, the truck dumps the ferroalloy into a partially enclosed dump pan connected to a portable baghouse. Front-end loaders then take the bulk ferroalloy to its storage location. Ferroalloy is shipped to the customers by trucks. Trucks are loaded in either the Ryerson or Norcon building depending on the order. Both the Ryerson and Norcon buildings have truck loadout areas that are controlled by baghouses. The truck drives in and is positioned under a canopy hood for the baghouse. An S.H. Bell employee operating a front-end loader closes the overhead doors with a remote. Each door is equipped with a switch which indicates whether it's opened or closed. The baghouse turns on when both switches on the doors indicate closed. Differential pressure is monitored on the baghouse. S.H. Bell has water misters that are used to control fugitive emissions if the ferroalloy cannot be watered. Watering bulk ferroalloy is the primary means of controlling fugitive emissions when unloading. Staff Interview: EPA discussed the monitoring data submitted for May 2022, specifically, May 2, 2022, which showed high concentrations of manganese, and May 20, 2022, which showed high PM10 concentrations as recorded by the S1 PM10 FEM monitor. Mr. Chepela indicated that normal operations took place on May 2, 2022. Mr. Chepela indicated that normal operations took place, and the winds were blowing from the south toward the facility on May 20, 2022. EPA requested Page 2 of 4 production information regarding operations taking place at the facility for the month of May 2022. TOUR INFORMATION EPA Tour of the Facility: Yes Data Collected and Observations: During the inspection, EPA observed barge unloading of ferroalloy in supersacks. No visible emissions were observed during supersack unloading. EPA observed truck loadout from the Ryerson building. The overhead doors closed and the baghouse turned on. The pressure drop for the Ryerson building baghouse was 3.2 psi. EPA observed truck loadout from the Norcon building. The overhead doors closed and the baghouse turned on. The pressure drop for the Norcon building baghouse was 2.8 psi. No visible emission were observed from the building or the baghouse stacks during truck loadout. During the inspection, EPA also observed a water truck spraying the roadways. Mr. Chepela indicated that a dust suppressant, calcium chloride, was being applied to the roadways. Photos and/or Videos: were taken during the inspection. Field Measurements: were not taken during this inspection. CLOSING CONFERENCE Provided U.S. EPA point of contact to the facility Requested documents: For each day of May 2022, EPA requested the following information: Type of material(s) unloaded and whether it was barge, truck or rail, if any; Type of material(s) loaded and the mode of transportation, in any; Type of material(s) processed through a screener, if any; and Type of material(s) processed through a crusher, if any. Page 3 of 4 Concerns: EPA reiterated its concerns regarding the monitoring data for May 2022, specifically, May 2, 2022, which showed high concentrations of manganese, and May 20, 2022, which showed high PM10 concentrations as recorded by the S1 PM10 FEM monitor. DIGITAL SIGNATURES PATRICK Digitally signed by PATRICK MILLER Report Author: _________M__IL_L__E_R_______12_:4_9:0_4_-0_5'_00_' ____ Date: 2022.07.25 Section Supervisor: Brian Digitally signed by Brian Dickens ____D__ic_k_e_n__s______1_3:2_5_:49_-_05_'0_0' __________ Date: 2022.07.25 Page 4 of 4 Facility Name: S.H. Bell Company Facility Location: 10218 South Avenue O, Chicago, Illinois 60617 Date of Inspection: July 6, 2022 APPENDICES AND ATTACHMENTS 1. Appendix A - Digital Image Log Page 5 of 4 Facility Name: S.H. Bell Company Facility Location: 10218 South Avenue O, Chicago, Illinois 60617 Date of Inspection: July 6, 2022 APPENDIX A: DIGITAL IMAGE LOG 1. Inspector Name: Patrick Miller 2. Archival Record Location: R5 Electronic Records Center Image Number 1 2 3 4 5 6 7 8 9 10 11 12 File Name IMG_0096.JPG IMG_0097.JPG IMG_0098.JPG IMG_0099.JPG IMG_0100.JPG IMG_0101.JPG IMG_0102.JPG IMG_0103.JPG IMG_0104.JPG IMG_0105.JPG IMG_0106.JPG IMG_0107.JPG Date and Time (incl. Time zone and DST) 07/06/2022 09:40 AM (central) 06/07/2022 09:41 AM (central) 06/07/2022 09:41 AM (central) 06/07/2022 09:41 AM (central) 06/07/2022 09:41 AM (central) 06/07/2022 09:57 AM (central) 06/07/2022 09:58 AM (central) 06/07/2022 10:04 AM (central) 06/07/2022 10:11 AM (central) 06/07/2022 10:11 AM (central) 06/07/2022 10:15 AM (central) 06/07/2022 10:17 AM (central) Latitude and Longitude Description of Image Barge unloading of supersacks Barge unloading of supersacks Barge unloading of supersacks Barge unloading of supersacks Barge unloading of supersacks S1 PM10 FEM monitor S1 PM10 FEM monitor New construction of enclosed Norcon Building Ryerson building with truck dump pans Ryerson building with truck dump pans Ryerson building with truck dump pans Ryerson truck loadout area with baghouse Appendices Page 1 of 1