Document qZjzgvN2vZgKJp9gnXQDVbXG
FILE NAME: Todd Shipyards (TODD) DATE: 1979 Nov 21 DOC#: TODD016 DOCUMENT DESCRIPTION: Unpublished Report of Inspection
certified testing laboratories, inc.
2905 EAST CENTURY BLVD. SOUTH GATE, CALIF. 90280 (213) 564-2641
LABORATORY NO. CLIENT
67186-A Todd Shipyards Corporation P. 0. Box #231 San Pedro, California 90733
SAMPLE
Air
REPORTED SAMPLED RECEIVED
11-21-79 11-16-79 11-16-79
MARKS
Pacific Princess-Marinte Panels in State Rooms
based on sample
Sampled
Investigation:
Determination of airborne asbestos levels aboard Pacific Princess during removal of marinite panels in staterooms.
Method:
Samples taken in operators breathing zone on millipore filters at flow rate of 1.6 1/minute. Fi1ters were analyzed by phase contrast microscopy, NI0SH Method P & CAM 239-
Results :
Employee's Name
Sarnpling Time
Result
Archiquette ner Shipwright lel removal in stateroom A1^7
68 minutes
1.6 fi bers/cc
Small - Joiner Shipwright iel removal in stateroom A1^7
68 minutes
1.3 fibers/cc
d Amundson - Joiner Shipwright el removal in stateroom A135
35 minutes
0.6 fibers/cc
avlokovich - Joiner Shipwright el removal in stateroom A13b
33 minutes
0.7 fibers/cc
1us ion :
The morphology of the observed fibers strongly indicates the presence of fiberglass and not asbestos, however, the above NI0SH Method does not dis tinguish between fiberglass and asbestos. The workers on the above job were completely protected with respirators and disposable impervious cover-alls.
Respectful ly submi tted,-/
CERTIFIED TESTING'l^&DRAf R IE S , INC.
?/*' - " x "
Stuart E. Sa fot , Ph.D.
is report applies only to the sample, or samples, investigated and is not necessarily indicative of the q u a ltJ\ Q y | ^ [icJ0 Q 0 ^ ^ a ^ n tly
*
1 ------ --- --
-- -- .I-- --
-- J . U. . . ' I
rhi r . n n r f is suhimrreiT and a c c e n t e d