Document q7BGLGM9z25wzj3Bpk3BbKzG

I ' A ,'i e r ,, pC ft- WOftfsf .> iviofisnnto COkriDE^TIAL *. w. C. Enynan, V/, G. Krumrich TO : April 24, 1972 cc F, J, Holzapfel - G.O. D. B. Hosmer - G.O. PROGRAM TO REDUCE PCB LOSSES P. B. Hodges - C.O, FROM MANUFACTURING FACILITIES W. B. Papageorge - G.O. J. R. Savage - G.O, G, A, Hippe - WGK 0. L.. Bratsch A. E. Leisy - WOK Attached is the program for reducing and/or eliminating sources of PCB sever losses from manufacturing facilities. Completion of all items, except for HC1 off-gas scrubbing facilities, will reduce losses at the Aroclor Department to less than 0.1 #/day by mid June. External losses (Incinerator and Rip Track) will range from 0.01 to 0.35 #/da,v. Cost is roughly $lb,000 expense' and about 3 man-months ` technical effort is required. The above assumes PCB losses at the C/S Department are negligible. Sewer samples are being taken to confirm. Installation of an HC1 off-gas scrubber will allow operation of Aroclor Dept, when C/S Dept, is shut down. Additional losses assuming drowning 5# of the time will be 0.1 to 0.15 #/day on the average. Monitoring will consist of composite samples taken twice per week at: 1. Treatment Plant Influent 2. Treatment Plant Effluent 3. Aroclor Dept. Parshall Flume (project to be completed by 5/15/72) ' 4. Incinerator sewer 5. Rip track washes (10 per month) Cost of the sampling program will be about $2,500 per month. /tm att. / W, C. Fngman Technical Services Department MONS 09U257 Source or Loss I. HCl Off-gas Current Loss 20-30 fr/day with all gas drowned. Unknown when all going to C/S Dept. Plan for ! Reduction Eliminate crowning Develop HCl scrubber in Dept. 246 ! Resulting Loss i bn.tnot.-n at C/S Dept. Cost 5,coo Expense 2-3 #/day with --150,009 all gas drowned Capital 2. 31ow tank off-gas 0.5 to 1.5 #/day Eliminate blowing - re place with extra lime treatment 0 #/day 3,000 Expense 3. Aroclor Dept. Catch basins 4. Incinerator Scrubber 0.1 to 0.3 #/day 0.01 to 0.05 rr/day Minor projects to reduce water flow. None 0.02 to 0.05 #/day 0.01 to 0.05 #/day 5,000 Expense EDO 4/28/72 Technical ' i gantsouer 1/2 man-month Research 5/1/72 Design 6/1/72 Construct 10/1/72 5 man-months Process Amend. 5/15/72 Testing Complete 6/15/72 1/2 man-month 6/1/72 1 man-month 5. Incinerator Catch basin 6. Rip Track hashes None to 0.3 #/day Average 0.1 #/day 0.5 #/wash 10 washes/ month. MUNS 098258 1 None at present None to 0.3 #/d y May consider car ton treatment later. Develop emulsion 0.01 #/wash breaker. ii Unknown 5/15/72 i i I j i i < i 1 man-month