Document q7BGLGM9z25wzj3Bpk3BbKzG
I
' A ,'i e r ,, pC ft- WOftfsf
.>
iviofisnnto
COkriDE^TIAL
*. w. C. Enynan, V/, G. Krumrich
TO :
April 24, 1972
cc F, J, Holzapfel - G.O.
D. B. Hosmer - G.O.
PROGRAM TO REDUCE PCB LOSSES
P. B. Hodges
- C.O,
FROM MANUFACTURING FACILITIES
W. B. Papageorge - G.O.
J. R. Savage
- G.O,
G, A, Hippe
- WGK
0. L.. Bratsch
A. E. Leisy
- WOK
Attached is the program for reducing and/or eliminating
sources of PCB sever losses from manufacturing facilities.
Completion of all items, except for HC1 off-gas scrubbing
facilities, will reduce losses at the Aroclor Department
to less than 0.1 #/day by mid June. External losses
(Incinerator and Rip Track) will range from 0.01 to 0.35 #/da,v.
Cost is roughly $lb,000 expense' and about 3 man-months
`
technical effort is required. The above assumes PCB
losses at the C/S Department are negligible. Sewer samples
are being taken to confirm.
Installation of an HC1 off-gas scrubber will allow operation of Aroclor Dept, when C/S Dept, is shut down. Additional losses assuming drowning 5# of the time will be 0.1 to 0.15 #/day on the average.
Monitoring will consist of composite samples taken twice per week at:
1. Treatment Plant Influent
2. Treatment Plant Effluent
3. Aroclor Dept. Parshall Flume (project to be completed
by 5/15/72)
'
4. Incinerator sewer
5. Rip track washes (10 per month)
Cost of the sampling program will be about $2,500 per month.
/tm att.
/
W, C. Fngman Technical Services Department
MONS 09U257
Source or Loss I. HCl Off-gas
Current Loss
20-30 fr/day with all gas drowned. Unknown when all going to C/S Dept.
Plan for ! Reduction
Eliminate crowning
Develop HCl scrubber in Dept. 246
! Resulting Loss
i bn.tnot.-n at C/S Dept.
Cost
5,coo Expense
2-3 #/day with --150,009 all gas drowned Capital
2. 31ow tank off-gas
0.5 to 1.5 #/day
Eliminate blowing - re
place with extra lime treatment
0 #/day
3,000 Expense
3. Aroclor Dept. Catch basins
4. Incinerator Scrubber
0.1 to 0.3 #/day
0.01 to 0.05 rr/day
Minor projects to reduce water flow.
None
0.02 to 0.05 #/day
0.01 to 0.05 #/day
5,000 Expense
EDO 4/28/72
Technical ' i gantsouer
1/2 man-month
Research
5/1/72 Design 6/1/72 Construct 10/1/72
5 man-months
Process Amend.
5/15/72 Testing Complete 6/15/72
1/2 man-month
6/1/72
1 man-month
5. Incinerator Catch basin
6. Rip Track hashes
None to 0.3 #/day
Average 0.1 #/day
0.5 #/wash 10 washes/ month.
MUNS 098258 1
None at present None to 0.3 #/d y
May consider car ton treatment later. Develop emulsion 0.01 #/wash breaker.
ii
Unknown
5/15/72
i i
I
j i i < i
1 man-month