Document q3b3EMEomeqLE8ndBYkXwdJNR
CUSTOMER & LOCATION.
ntlALb UiVibiUN - "LALlUKiA" ASBESTOS I PLAINTIFI=Sf 1
CUSTOMER CALL REPORT
I. EXHIBIT!
||
UC-5B4
3M - Traffic Control St. Paul, MM
INDUSTRY CLASSIFICATION Traffic Markers
sai fsman Edward J. KleberpgfiinN Midwest
oatf OF CALI____________ ^15/80
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
MSOS
Health & OSHA Information Blue Book
Dust Count Report
Other, specify below
PERSONS INTERVIEWED:
John Ethen - Sr. Product Development Engineer
CALL OBJECTIVE:
Explain plastic bag situation
RESULTS OF CALL:
We informed John that we would- not have the U-V stabilized bag available in 1980, but would like for Him to try the Standard Dellet bag at their compounder's plant (Colonial Rubber). John agreed to try one at 3M's lab and if that looks aood he will trv 4 or 5 bags during production batches at Colonial. If everything is O'K. at this point, they'll probably try a pallet. Assuming no problems, the next order would all be in P/E bags.
John feels that the P/E bags should work, his only concern is that we may not be able to fit 82 pounds in the bag. After looking at the bag, I told him not to worry, what he has was a 50 lb. bag and we had bigger ones which would certainly hold 82 lbs.
FOLLOW-UP ACTION REQUIRED:
EJK - Regular calls.
WBD - It would probably be a good idea to make a pallet of RG-100 in P/E bags, we should be able to include it in their next order.
COPIES TO: JRL:TPN:JEW:KC-FILE:NF-FILE
dal 2/25/80
NF PERMANENT FILE f~l
PAT-TUB TA CORPORATION
CUSTOMER CALL REPORT
CUSTOMER & LOCATION
3M COMPANY TRAFFIC CONTROL DIVISION WOODBURY, MINNESOTA
TRAFFIC MARKING MATERIALS
SALESMAN
T. P. NORRIS
INDUSTRY COMMERCIAL
DATE OF CALL 01/10/85
PERSONS INTERVIEWED:
JEAN B. SWEENEY, PRODUCT CONTROL SUPERVISOR BOB KEECH, PRODUCT DEVELOPMENT
CALL OBJECTIVE: Account maintenance.
RESULTS OF CALL:
With the increase in the ABB from 440 tons RG-100 to 868 tons, questions arose as to our ability in providing Colonial Rubber Works, Inc., with different size bags. We currently package in 82 lb. paper bags with a P. E. overwrap. They Inquired on the following possible changes:
1) 50 lb. P. E. bag, or 2) 86 lb. P. E. bag, or 3) 100 lb. P. E. bag, or 4) The least preferred would be 86 lb. paper bag.
The reason for this request is to utilize larger Banbury's at Colonial Rubber Works. Linda, would you please follow-up on this request and advise the answer.
FOLLOW-UP ACTION REQUIRED: Maintain periodic contact. COPIES TO: GLD, GML, JEW, KC-FILE, PITT-FILE, JTK (0410B)
METALS DIVISION - "CALIDRIA" ASBESTOS CUSTOMER CALL " jRT
CUSTOMER & LOCATION:
3 M COMPANY TRAFFIC CONTROL DIVISON WOODBURY, MINNESOTA
INDUSTRY CLASSIFICATION:
TRAFFIC MARKING MATERIALS
SALESMAN: T. P. NORRISREGION: COMMERCIALDATE OF CALL: 6/22/83
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
/ / MSDS
/ / Health & OSHA Information Blue Book
n Dust Count Report
7/~ ~ Other, specify below
PERSONS INTERVIEWED: J?anriy Tenro Process Engineer
Jim Burt -
Quality Control
Bob Keech - Product Development Specialist
^
(.
CALL OBJECTIVE:
Coordination between 3 M Company and their custom blender. Colonial Rubber, Dyersburg, Tennessee.
RESULTS OF CALL:
3 M Company sales of their Rubber Base Traffic Marking Materials using RG-100 are at 167% budget. Although sales continue to be strong, tKe realistic outlook, according to Randy Teare, is that an asbestos-free compound will be available within three years. At that time our sales of RG-100 will not cease, but 3 M Company would begin to offer both asbestos contained and asbestos-free compounds to their customers.
In the meantime, they are attempting to expand their sales to overseas markets, and had questions concerning negotiations in Sweden and Denmark. A copy of A. I.A. negotiations was mailed on June 24, 1983.
Bob Keech asked that we develop a list of specific properties for RG-100 so that Colonial Rubber is certain that the material they are receiving is actually RG-100. Once that data is received 3 M Company will then draw up a Purchased Material Specification similar to RG-144 (copy attached).
-0183z.l-
3 M COMPANY
-2-
6/28/83
3 M Company 3 M Center St. Paul, Minnesota
Walter Markin - Purchasing
Walt Is responsible for domestic and export purchases of asbestos fiber. He remarked that seldom, if ever, does he receive requests for Information on asbestos fiber from any of the 3 M research groups. To my knowledge Colonial Rubber and the 3 M plant at Wayne, Michigan, are the only domestic users of asbestos fiber. From an export point of view, 3 M Company purchases asbestos fiber that is shipped into St. Paul and reshlpped to various 3 M locations around the world. Only very small amounts are exported. Orders are generally LTL and in the range 5,000 lbs. each shipment. Most frequent request is for 7-RO-6.
F0LL0W-PP ACTION REQUIRED: GLD - lets discuss specific properties for RG-100.
COPIES TO: GLD, ML, JTK, WCT, JEW, KC-FILE -0183z.2-
Purchasing/SM
3M Center PO Box 33327 St. Paul, Minnesota 55133 612/7331110 Telex 29 7023 TWX 910 563 3712
Mr. T. P. Norris
Union Carbide Corporation
Metals Division
100. Ocean Gate. 'lOtlTPloor ^
....... ......................................... ....... c" ~
Long Beach, CA 90802
Dear Ton
Attached please find our revised specification for the following:
RM 11-0001-4681-8 "RG-144" (RESIN GRADE) ASBESTOS
This revision is in final form and is for your retention. We would appreciate receiving a reply this letter indicating receipt and acceptance by June 30, 1980.
to
If you are not now an active 3M supplier, we would still appreciate your reply in order that we might main tain a current log of approved sources for the future.
Sincerely
t. K. stepbens Divisional Purchasing Agent Chemical and Polymer Purchasing
CRS/lec
Attachments
P.S.
Tom, this is a letter such as was sent to Mr. Hassan Khatami on February 13, 1980. Per our conversation earlier today, your promised early response will be greatly appreciated. *./
-orm 6330 1 * *WO
1116
PURCHASE!) MATERIAL SPECIFICATION
PTOflUCI PEMfiMAUQM rg_iL4 (Resin Grade) Asbestos
. . .^
1U681 (11-OOG1-U681-8) ISSUE DATE 1/9/80
SUPERSEDES: 5/26/TO
t
REASON FOR REISSUE:-
.
To update the specification fornat.
I-PROPERTIES:
Acceptance Requirements:
PROPERTY
Moisture Content, % by weight Refractive Index at 25C.
LIMITS
2.0 maximum 1.5^-1.56
J t c i-- . C>
Typical (Descriptive):
PROPERTY
DESCRIPTION OR VALUE
Oil Absorption (DOP), Lbs./lOO Lbs. pH in Water Specific Gravity
Form Color Dry Bulk Density, Lbs./cu. ft. Shipping Density, Lbs./cu. ft.
100
9.5 2.U5 Fibrous powder Ligilt gray 4 12
n
--\
Should the supplier anticipate making or make any change(s) in product formulation, raw materials, basic methods of manufacturing, or approved manufacturing facilities of product, written approval must be obtained from 3M prior to acceptance of any 3M purchase order incorporating this specification by reference.
II-SHIPPING REQUIREMENTS:
Packaging:
Container - Multiwalled bag with sealed polyethylene overwrap, 35 Lbs. net.
It will be the Vendor's responsibility to conform to requirements of the Department of Transportation and all other agencies which may have Jurisdiction for packaging, marking and shipment of this material.
All infofiROtioR furniiht^ K^rswitH it eonlidtniiol on4 iholl not bo copiod, roprodwood of othorw**# disctoaod without prior conaont of tho Minnosofo Mining oni Monvfoeturing Compony
RM Ubdl Purchased Material Page 2
II-SHIPPING REQUIREMENTS: (Cont'd)
Freight Classification:
Desc.: Asbestos Shorts*
Packing List:
A packing list, protected from moisture, shall be securely attached to a container in each shipment*
Each bag is to be clearly identified, 1/2 inch or larger, on the side with the following information:
1. 3M Co. RM Number 2. 3M Co. Purchase Order Number 3* Vendor Lot Number
U. Weight-gross, tare & net 5* Name of Material 6. H-2-0-0
Issued by: Jan Clayton - Purchasing, 3M Center JC/mt
METALS DIVISION - "CALIDRIA" ASBESTOS
CUSTOMER CALL REPORT
CUSTOMER & LOCATION__24 .
INDUSTRY
, Y\--------- CLASSIFICATION
saiprman
T- p- Norrisregion Western
hate of CALL 3/y> l?d
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
["I MSDS
Q Health & OSHA Information Blue Book
I 1 Dust Count Report
Q Other, specify below
PERSONS INTERVIEWED:
- o KSO
CALL OBJECTIVE:
Q^-Ui .
^LL: <30- U_
ex
' //A&. CdU*
k|* wAo^Xjl^ tAj*
|vua-^, 0-0 VVLCt&^.
------ -
^ C*--C---- -
|^Oi>| -^c
Vvv^-C --^--'
FOLLOW-UP ACTION REQUIRED:
rnoiPCto- JRL:REB:1^P:JEM:KC-FILE:NF-FILE
NF PERMANENT FILE I~1
CUSTOMER & LOCATION
riLittLo ui v iolUiM - "LML1UK1A" Abbhii I US
CUSTOMER CALL REPORT
3M - Central Purchasing
INDUSTRY
St- Pau1> HN______________________ CLASSIFICATION
SALESMAN. Edward J. Kleber
.REGION. Midwest
.DATE OF CALL . 2/15/80
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
n MSDS
Q Health & OSHA Information Blue Book
Dust Count Report
Q Other, specify below
PERSONS INTERVIEWED:
Bob Stevens - Purchasing Agent
CALL OBJECTIVE:
Check on circulation of LTX literature
RESULTS OF CALL:
Bob was very apologetic because he had forgotten to spread the v/ord about LTX. He promised to send the blurbs around and let us know if there is any response.
He also kept him up-to-date on the bag/handling situation at the Traffic Control Division. He appreciated our brief rundown of the situation but confessed he knew little of the system.
FOLLOW-UP ACTION REQUIRED: EJK - Check with Bob on the circulation of the LTX literature by phone in 3-4 weeks.
COPIES TO: JRL:TPN:JEW:KC-FILE:NF-FILE
dal 2/25/80
NF PERMANENT FILE |~1
- MtlALS DIVISION - "CALIDRIA" ASBESTOS
CUSTOMER CALL REPORT
CUSTOMER & LOCATION
3M Company St. Paul, M.fi
INDUSTRY CLASSIFICATION___Markers
saifrman Edward J. Kleber
rpoion
Midwest
hate OF CALL
w/J. L. Myers, R. E. Byrne, J. E. Walsh
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
9/12/79
|~1 MSDS
Q Health & OSHA Information Blue Book
1**] Dust Count Report
Q Other, specify below
PERSONS INTERVIEWED: CALL OBJECTIVE:
Dave Jones -
John Ethan -
Paul ?
-
Lee Kendall -
Supervisor, Pavement Marking Lab Sr. Product Development Engineer Chemist Manager, Chemical Purchasing
Explore ways of keeping RG-100 in 3M's highway markers.
RESULTS OF CALL:
Background: Dave Jones had, through purchasing, requested we come in and discuss asbestos replacements in the traffic markers. We told him we had no replacements but were convinced that 3M could use RG-100 safely, and we wanted to meet and discuss ways of lowering exposure at their compounders plant.
Given 3M's penchant for secrecy, we were more than a little apprehensive about the call, because they had not indentified the compounder, who we knew was Colonial Rubber. Luckily, Dave Jones removed this obstacle by saying he did not see any reason to withold the name of the compounder.
Jack Walsh, who was present at both Colonial dust counts presented the Colonial dust counts to 3M noting the improvement in exposure levels. Jack also detailed the way asbestos was handled at Colonial, especially our willingness to provide 82 lb. bags for them as a means of controlling dust.
A few ideas were kicked around on further improvements, but the most obvious was to supply Colonial with 82 lb. bags of RG-100 in polyethylene bags. A bag will be sent to John Ethan for evaluation.
(OVER)
FOLLOW-UP ACTION REQUIRED:
JLM - Send P/E bag to John Ethan.
JEW/EJK - Maintain close contact with Colonial and 3M.
EJK - Check with John Ethan in a couple of weeks re polyethylene bags.
COPIES TO: JRL:TPN: JEW:KC-FILE :NF-FILENF PERMANENT FILE dal 9/28/79
. ..
fit i HU U1V1MUN - "CAL I DR I A" ASBESTOS
CUSTOMER CALL REPORT
CUSTOMER & i nrATinM
3M Company
INDUSTRY
St. Paul, MNCLASSIFICATION JBivement._Marki.ngs
SAI FSMAN Edward J. Kleberrfcioini Midwest
DATE OF CALL ___/.3j0/79
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
MSDS
Health & OSHA Information Blue Book
Dust Count Report
Other, specify below
PERSONS INTERVIEWED:
Bob Stephans - Chemical Purchasing John Ethen - Development Engineer David Jones - Supv. Pavement Lab.
CALL OBJECTIVE:
Respond to customer inquiry for "asbestos-free" RG-144
RESULTS OF CALL:
We are in very real danger of losing the RG-100 business at Colonial Rubber. 3M is worried about two areas, the incorporation of asbestos at Colonial and the potential for fiber release on the highway. Of these two the dustiness of the Colonial plant is of far greater concern, mainly because they have so little control over that situation. Another factor is that there have been some labor problems at Colonial and 3M wants none of that.
They would like to find a suitable asbestos substitute, but they would accept an asbestos product in a non-dusty form. We discussed oil-wetted pellets, paste form and bulk handling, and although they liked the idea of the paste, it is impractical for their application since they use only a small amount of liquid. The wetted pellets might have some value, but only if the counts are extraordinarily low (below 0.1 fiber/cc). They would have to be wetted with a chlorinated paraffin such as Chloroway-40.
FOLLOW-UP ACTION REQUIRED: REB - Please call 3M and see if you can get specifics on a way to cut the dust.
COPIES TO: JRL:TPN:JEW:KC-FILE:NF-FILE :REB
dal 9/5/79
NF PERMANENT FILE f~|
*, CUSTOMER & LOCATION
METALS DIVISION - "CALIDRIA" ASBESTOS
CUSTOMER CALL REPORT
U-
t.v.
INDUSTRY M ^_________ _ CLASSIFICATION
' -
sa fsman
T- p- Norrisrfoion Western
datp of r.AM
(go
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
I 1 MSDS
0 Health & OSHA Information Blue Book
0 Dust Count Report Ook-J
PERSONS INTERVIEWED:
0 Other, specify below
CALL OBJECTIVE:
RESULTS OF CALL, CO^-
^< a.
LxX_ 'ttuX
"to ^ C .
) o^47 L~j? L-- o^(
-4e. L
MA
A-
4-~-, i tvvJL.
r
0-^0 -
CrO>
CV.--4-*^ f?*--
E-Cv \o6 .-tL,' r
._
FOLLOW-UP ACTION REQUIRED:
rnotcc TO. JRL: REB:JS: JEW:KC-FILE:NF-FILE,
NF PERMANENT FILE 1~1
cc for
R. E. Byrne T. P. Norris
V/. C. Thurber J. E. Walsh KC-File*^
NF-File
UN IOH CARBIDE CORPORATION P.O. Box 579 Niagara Falls, N.Y. (4502
APR 21
E. J. Kleber with By T. P. Norris Date 3/12/75
Ful.l Name. 3M Company
Address
St. Paul, MN
Mfrs. of
- 1nterviewed
i Steve Mclnerney - Buyer C. Robert Stephanson - Purchasing Agent
- (Mclnerney's Boss)
OBJECTIVES
Turn over call with T. P. Norris. Check on RG-600 work by Gary Thill.
OBSERVATIONS
3M continues to be something of an enigma, it's almost impossible to find out anything. We were told in no uncertain terms that we are not to contact their -people directly, but come to Steve first. -Steve asked that we supply him with names of people we have sampled lately and he will track them down for us. We agreed and will write him a letter as quickly as possible. He did tell us that he didn't mind us seeing Thill, but he wasn't in today.
One good thing to come out of all this i^ that we will be allowed to run a seminar. The procedure is this: We will write a letter to Steve outlining the uses of our products, he will send a letter to the technical directors who TII in turn inform their subordinates. The feedback will tell Steve which areas are of interest to 3M's people and we will be requested to confine our remarks to those areas. Finally, a date will be set and we will be invited in 'to meet with these people al l at once (they-no doubt will be ussued glasses, big noses and moustaches). Depending on interest generated, we could be ..talking .with anywhere from 5 to 50 people. This could prove to be a very fruitful meeting, it would probably be in May.
The health question was touched on briefly, but 3M is very competent in this .area, is aware of their asbestos usages, and is keeping tabs on their own.
- -RECOMMENDED ACTION
EJK - Write Mclnerney a letter outlining our end uses and who we have sampled.
REB - Get ready to dazzle 3M in May.
\
Typed 4/7/75 ds
n>u_iMLd UIViOlUfNJ
CUSTOMER CALL REPORT
INDUSTRY CUSTOMER & i nrATinN 3M, St. Paul, MNCLASSIFICATION they make it.
You name
SALESMAN Edward J. Kleber_______ rfcion MidwestDATE OF CA i 3/18/76
Cr Mn Spec. SI CaC^ W V Asb. PRODUCTS DISCUSSED: QQ 0
Other _____
PERSONS INTERVIEWED: Steve Mclnerney Harold Nuechterlein
CALL OBJECTIVE: Routine call on this good RG-144 customer.
RESULTS OF CALL: Steve has gotten pretty excited about the possibility of using HPP to replace Canadian in their adhesive plants. He says it is being looked at and he will let us know how it is going.
Checked in with Harold regarding RG-144 and RG-244 in high-build coatings. He had some bad news for us. 3M management has decreed that no new asbestos materials be worked on until the OSHA regulations are finalized. They do not intend to remove it from existing formulations, however, all evaluation work has been stopped.
FOLLOW-UP ACTION REQUIRED: EJK - Not much we can do, except continue normal calls.
COPIES TO: Gen'I. Sales Mar. (2); Mktg. Services; Others: JRL:TPN:WCT:JEW:KC-FILE:NF-FI1 E
k. L. Schult
J.E.Lenahan
TvDed 3/19/76 cib
T. P; Horn's - Chicago
t# r *
for H. B. Rhodes - Niagara Falls
W. C. Thurber - NY 38
KC Files HF Files
UNION CAP31DE CORPORA! I ON
p.O. eox 579 Niagara Falls, VY. 14302
J. E. Walsh By. Date________3/28/7 4
Full Name Address - Mfrs. of
3-M Company Decatur, Ala. Building Products
1nterviewed Avery Thornhill - Purchasing Mgr.
Call made on moderate user of. RG-144. Thornhill commented that the new product containing our RG-144 hasn't really gotten off the ground and they expected to use only about 6-8M lbs. this year as opposed to the 24M lbs. we have them in the plan for.- Presented our price increase due 4/15 and Avery will check his stock and see if they want to place an order prior to the 15th. After a congenial lunch discussion on the CALIDRIA product line, toxicology and the Pitt Corning publicity, which also got to this outpost, we returned to the office. A most unusual occurrance, for 3M anyway, happened when Avery showed me a product purchasing sheet for a JM asbestos . fiber called 2 Paperbestos. Avery said the volume for this item was much more substantial than 144, but from what I could see, it looked to be a long fiber material.
HBR
Ever heard of 2 Paperbestos? Is it long fiber?
Left Avery with a toxicology packet for his records and also for source data should his safety people need information. Advised that I would get back to him if we had anything to compete with Paperbestos and thanked him for his past purchases.
TPN
3M has hired Lee Kendall, whom you may know--a 15 year plus Carbide employee who wTorked out of Minneapolis. Lee will start with them around 4/15 as a VP in purchasing.' He historically called on 3M and was Carbide's inside man there. If you are in the area later in the year, it might be worthwhile to stop in and see him. I'm sure Lee would give us the opportunity to get our products evaluated and would know w'here they might be tried.
JEW/cs Typed: 4/3/74
jjiuft H0DL0JU5
CUSTOMER CAUL REPORT
W - ^Tr2./a.(/L tv. OU
INDUSTRY
f /T^U^vc.
CUSTOMER & LOCATION^yf~-
<_ M ^___________CLASSIFICATION
SALESMAN_____ T. P. NorrisRFKtnN Western
date of r.Ai i Z (X^) f g c
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
tZ3 MSDS
Q Health & OSHA Information Blue Book
Dust Count Report
Q Other, specify below
PERSONS INTERVIEWED:
^/i^ -
oo
------"AjC. t,4
. "A-e)
CALL OBJECTIVE *
It --
-----
RESULTS OF CALL:
^. <?. .
LjlL "tM O-M^.
Lfi-. *t> ^ ^ C~"
J, O------
o-4Jj^_jzzju'
^e4L~ -wJ
.ywf-
-C v-v^T' * -> G^pO W^X 'Sv^. J/i,
<^=' Q_ ^ 0 -
O'Ci
Cx. \ o 6 .
FOLLOW-UP ACTION REQUIRED:
s_ < T-
r-r- -ro. .101 -Drp.isS:..iru-v'r_CTt r-MF_FTl r
MC PFnMAMFMT FT? F I I'
rmmLi imiaiUN - "lAUDRIA" ASBESTOS
customer caul report
CUSTOMER & LOCATION Srt .
. hi----------
----- Sr'
INDUSTRY
CLASSIFICATION
?At frman T- p- NorrisREGION Western
nATF OF rA< x 3 ly\ /fa,
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
I I USDS
Q Health & OSHA Information Blue Book
Dust Count Report
Other, specify below
PERSONS INTERVIEWED:
C-y-jt
CALL OBJECTIVE:
~
C^juQ..
RESULTS OF CALL: QUL-
|(3*-i--O-
JLX -to diskl w ^
' /A. ^ (L^taJ tU-O P Q- .
^ ~t*. /.T'X JfcjjcOi ^"
-v_/ a
OO 1Vvv^-C --^/jxJLo^Z*
VvuttU.
y
i^r
FOLLOW-UP ACTION REQUIRED:
CUSTOMER & nttATinN
* I
uru_iLaia MviDLOiUCi
CUSTOMER CALL REPORT
3?1 - Traffic Control
INDUSTRY
St- Paul '1fljCLASSIFICATION -.Jjf-figJla.Lt>g.C.s
satF^AM Edward J. Kleber
RFmnru Midwest
date OF CALL___ ^1571.
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
MSDS
Health & OSHA Information Blue Book
Dust Count Report
Other, specify below
PERSONS INTERVIEWED:
John Ethen - Sr. Product Development Engineer
CALL OBJECTIVE:
_ . . . +. .
.+ 4-.
Explain plastic bag situation
RESULTS OF CALL:
We informed John that we would" not have the U-V stabilized bag available in 1980, but would like for Him to try the Standard pellet bag at their compounder's plant (Colonial Rubber). John agreed to try one at 3M's lab and if that looks aood he will try 4 or 5 bags during production batches at Colonial. If everything is O.K. at this point, they'Tl probably try a pallet. Assuming no problems, the next order would all be in P/E bags.
John feels that the P/E bags should work, his only concern is that we may not be able to fit 82 pounds in the bag. After looking at the bag, I told him not to worry, what he has was a 50 lb. bag and we had bigger ones which would certainly hold 82 lbs.
FOLLOW-UP ACTION REQUIRED:
EJK - Regular calls.
IJBD - It would probably be a good idea to make a pallet of RG-100 in P/E bags, we should be able to include it in their next order.
COPIES TO: JRL:TPN:JEW:KC-FILE:NF-FILE
dal. 2/25/80
NF PERMANENT FILE |~1
CUSTOMER & LOCATION
CUSTOMER CAUL REPORT
3M - Central Purchasing St. Paul, MM
INDUSTRY CLASSIFICATION
raipsmam Edward J, Kleber
RFf:inw Midwest
date OF CALI______^l8/.80
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
t~l MSDS
Q Health & OSHA Information Blue Book
Dust Count Report
Other, specify below
PERSONS INTERVIEWED:
Bob Stevens - Purchasing Agent
CALL OBJECTIVE:
Check on circulation of LTX literature
RESULTS OF CALL:
Bob was very apologetic because he had forgotten to spread the word about LTX. He promised to send the blurbs around and let us know if there is any response.
We also kept him up-to-date on the bag/handling situation at the Traffic Control Division. He appreciated our brief rundown of the situation but confessed he knew little of the sys tern.
FOLLOW-UP ACTION REQUIRED: EJK - Check with Bob on the circulation of the LTX literature by phone in 3-4 weeks.
COPIES TO: JRL :TPN: JEW:KC-FILE :NF-FILE
dal 2/25/80
NF PERMANENT FILE [~1
METALS DIVISION - "CALIDR1A" ASBESTOS
CUSTOMER CALL REPORT
CUSTOMER & i nrATI ON
3M Company
INDUSTRY
St. Paul, MtiCLASSIFICATION_____________________________ !l9to^^arkers
sai fsman Edward J. Kleberrfhiom
Midwest
oatf OF call
w/J. L. Myers, R. E. Byrne, J. E. Walsh
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
9/12/79
| | MSDS
Q Health & OSHA Information Blue Book
Dust Count Report
Q Other, specify below
PERSONS INTERVIEWED: CALL OBJECTIVE:
Dave Jones -
John Ethan -
Paul ?
-
Lee Kendall -
Supervisor, Pavement Marking Lab Sr. Product Development Engineer Chemist Manager, Chemical Purchasing
Explore ways of keeping RG-100 in 3M's highway markers.
RESULTS OF CALL:
Background: Dave Jones had, through purchasing, requested we come in and discuss asbestos replacements in the traffic markers. We told him we had no replacements but were convinced that 3M could use RG-100 safely, and we wanted to meet and discuss ways of lowering exposure at their compounders plant.
Given 3M's penchant for secrecy, we were more than a little apprehensive about the call, because they had not indentified the compounder, who we knew was Colonial Rubber. Luckily, Dave Jones removed this obstacle by saying he did not see any reason to withold the name of the compounder.
Jack Walsh, who was present at both Colonial dust counts presented the Colonial dust counts to 3M noting the improvement in exposure levels. Jack also detailed the way asbestos was handled at Colonial, especially our willingness to provide 82 lb. bags for them as a means of controlling dust.
A few ideas were kicked around on further improvements, but the most obvious was to supply Colonial with 82 lb. bags of RG-100 in polyethylene bags. A bag will be sent to John Ethan for evaluation.
(OVER)
FOLLOW-UP ACTION REQUIRED:
JLM - Send P/E bag to John Ethan.
JEW/EJK - Maintain close contact with Colonial and 3M.
EJK - Check with John Ethan in a couple of weeks re polyethylene bags.
COPIES TO: JRL:TPN:JEW:KC-FILE:NF-FILE
Hal 0/?0/70
NF PERMANENT FILE
CUSTOMER & LOCATION
-''
** * * l O l\J*\
WnLiLHUM ttODLC) I (JC)
CUSTOMER CALL REPORT
3M Company St. Paul, MN
INDUSTRY CLASSIFICATION .Bavgment_Markj.ngs
sai F.qMAN Edward J, Kleberrfhiqn
MidwestDATE OF CALI______________________ ________________
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
| 1 MSDS
Q Health & OSHA Information Blue Book
Dust Count Report
Q Other, specify below
PERSONS INTERVIEWED:
Bob Stephans - Chemical Purchasing John Ethen - Development Engineer David Jones - Supv. Pavement Lab.
CALL OBJECTIVE:
Respond to customer inquiry for "asbestos-free" RG-144
RESULTS OF CALL:
We are in very real danger of losing the RG-100 business at Colonial Rubber. 3M is worried about two areas, the incorporation of asbestos at Colonial and the potential for fiber release on the highway. Of these two the dustiness of the Colonial plant is of far greater concern, mainly because they have so little control over that situation. Another factor is that there have been some labor problems at Colonial and 3M wants none of that.
They would like to find a suitable asbestos substitute, but they would accept an asbestos product in a non-dusty form. We discussed oil-wetted pellets, paste form and bulk handling, and although they liked the idea of the paste, it is impractical for their application since they use only a small amount of liquid. The wetted pellets might have some value, but only if the counts are extraordinarily low (below 0.1 fiber/cc). They would have to be wetted with a chlorinated paraffin such as Chloroway-40.
FOLLOW-UP ACTION REQUIRED: REB - Please call 3M and see if you can get specifics on a way to cut the dust.
COPIES TO: JRL:TPN:JEW:KC-FILE:NF-FILE :REB
dal 9/5/79
NF PERMANENT FILE |~|
CUSTOMER & LOCATION
CUSTOMER CALL REPORT
3M St. Paul, MN
INDUSTRY CLASSIFICATION
sai f<;man Edward J. Kleberrf^idn
Midwest
date OF CALI1/17/79
ASBESTOS HEALTH & REGULATORY DOCUMENTS PROVIDED:
| | MSDS
Q Health & OSHA Information Blue Book
Dust Count Report
Other, specify below
PERSONS INTERVIEWED:
Bob Stephens - Senior Buyer Steve Mclnerney - Buyer
CALL OBJECTIVE:
Introduce myself to Bob, the new asbestos buyer.
RESULTS OF CALL:
Bob has recently taken over asbestos pruchases from Steve and we spent an hour or so discussing "Calidria", from mine to finished product. As usual, not much info to be gotten except that there is a definite interest in RG-144 at their Alabama plant. Bob did emphasize that there is no point in calling there.
FOLLOW-UP ACTION REQUIRED: EJK - As always with 3M, we have to wait until they call.
COPIES TO: JRL'.TPN: JEM:KC-FILE :NF-FILE
dal 1/25/79
NF PERMANENT FILE _n
cc for
R. E.'Byrne T. P. Norris
W. C. Thurber 0. E. Walsh KC-File^
FF-File
ry ` r** 'r.'r* v.
UNION CARBIDE CORPORATION P.O. Box 579 Niagara Fa I Is, N.Y. 14502
hw;;. ~ :
E. J. Kleber with By T. P. Norris Date 3/12/75
Ful.l Name. 3M Company
Address St.
^N
Mfrs. of
Interviewed
Steve Mclnerney - Buyer C. Robert Stephanson - Purchasing Agent
(Mclnerney's Boss)
OBJECTIVES
...
Turn over call with T. P. Norris. Check on RG-600 work by Gary Thill.
OBSERVATIONS
,3M continues to be something of an enigma, it's almost impossible to find out anything. We were told in no uncertain terms that we are not to contact their -people directly, but come to Steve first. -Steve asked that we supply him with names of people we have sampled lately and he will track them down for us. We agreed and will write him a letter as quickly as possible. He did tell us that he didn't mind us seeing Thill, but he wasn't in today.
One good thing to come out of all this is that we will be allowed to run a seminar. The procedure is this: We will write a letter to Steve outlining the uses of our products, he will send a letter to the technical directors who will in turn inform their subordinates. The feedback will tell Steve which areas are of interest to 3M's people and we will be requested to confine our remarks to those areas. Finally, a date will be set and we will be invited in 'to meet with these people ail at once (they-no doubt will be ussued glasses', big noses and moustaches). Depending on interest generated, we could be ..talking .with anywhere from 5 to 50 people. This could prove +o be a very fruitful meeting, it would probably be in May.
The health question was touched on briefly, but 3M is very competent in this .area, is aware of their asbestos usages, and is keeping tabs on their own.
RECOMMENDED ACTION
EJK - Write Mclnerney a letter outlining our end uses and who we have sampled.
REB - Get .ready to dazzle 3M in May.
Typed 4/7/75 ds
T. P. Norris - Chicago
7.
for H. uE? Rhodes - Niagara Falls *t C. Tnurber - itY 38
KC Files NF Files
UNION CAPS ICE CORPORA I ION
P.O. Eox 579 Niagara Falls, N.Y. 14302
By. Date
J. E. Walsh 3/28/74
Full Name n(J d f'cSS I'.frs. of
3-M Company Decatur, Ala. Building Products
Interviewed Avery Thornhill - Purchasing Mgr.
Call made on moderate user of. RG-144. Thornhill commented that the new product containing our RG-144 hasn't really gotten off the ground and they expected to use only about 6-8M lbs. this year as opposed to the 24M lbs. we have them in the plan for.' Presented our price increase due 4/15 and /Avery will check his stock and see if they want to place an order prior to the 15th. After a congenial lunch discussion on the CALIDRIA product line, toxicology and the Pitt Corning publicity, which also got to this outpost, we returned to the office. A most unusual occurrance, for 3M anyway, happened when Avery showed me a product purchasing sheet for a JM asbestos . fiber called 2 Paperbestos Avery said the volume for this item was much more substantial than 144, but from what I could see, it looked to be a long fiber material.
HBR
Ever heard of 2 Paperbestos? Is it long fiber?
Left Avery with a toxicology packet for his records and also for source data should his safety people need information. Advised that I would get back to him if we had anything to compete with Paperbestos and thanked him for his past purchases.
3M has hired Lee Kendall, whom you may know--a 15 year plus Carbide employee who v.'orked out of Minneapolis. Lee will start with them around 4/15 as a VP in purchasing.' Re historically called on 3M and was Carbide's inside man there. If you are in the area later in the year, it might be worthwhile to stop in and see him. I'm sure Lee would give us the opportunity fo get our products evaluated and would know where they might be tried.
JEW/cs Typed: 4/3/74
CUSTOMER CALL REPORT
CUSTOMER & mrATinN 3M, St. Paul, MN
INDUSTRY
You name
CLASSIFICATION theyjnakejt.
SALESMAN Edward J. Kleberregion MidwestDATE OF pai i 3/18/76
Cr Mn Spec. Si CaCa W V Asb.
PRODUCTS DISCUSSED: Q ODDDDDIil
Other
_____
PERSONS INTERVIEWED: Steve Mclnerney Harold Nuechterlein
CALL OBJECTIVE: Routine call on this good RG-144 customer.
RESULTS OF CALL: Steve has gotten pretty excited about the possibility of using HPP to replace Canadian in their adhesive plants. He says it is being looked at and he will let us know how it is going.
Checked in with Harold regarding RG-144 and RG-244 in high-build coatings. He had some bad news for us. 3M management has decreed that no new asbestos materials be worked on until the OSHA regulations are finalized. They do not intend to remove it from existing formulations, however, all evaluation work has been stopped.
FOLLOW-UP ACTION REQUIRED: EJK - Not much we can do, except continue normal calls.
COPIES TO: Gen'I. Sales Mgr. (2); Mktg. Services; Others: JRL:TPN:WCT:JEW:KC-FILE:NF-FU_E
L. Schult
J.E.Lenahan
Typed 3/19/76 cjb