CONTRACT FOR
Scrubber Installation
(Insert naee of job)
Page 1 of 7
CostcrttctioB r Rtpir< Coatrtet Fora PD-19 Uador 1100,000.00
ORDER NO.
AMERICAN SMELTING AND REFINING COMPANY'S
El PM___________ Plant
at1 Paso. Tsaas
(Insert toon and state)
THIS AGREEMENT, made tha
5th_____day of_____ Fsbrmry___, -19 71 f
by and hatwaan
Southwestern Industrial Contractors and Rlgisrs, Inc., whose address is
P O. Bon 1611, El Paso, Texas 79948
fharainaftar called the
"Contractor") and AMERICAN SMELTING AND REFINING COMPANY, a corporation of the
State of New Jersey, whose address is 120 Broadway, New York 5, N. Y. and
P. O. Box 1111, 1 Paso, Texas 79999(hereinafter called the
(Insert address of plant or unit)
"Owner").
WITNESSETH:
The Contractor and Owner agree as follows:
Article 1. Scope of the work
The Contractor shall furnish all shop drawings, field engineering, labor, tools, equipment, transportation, materials and other facilities, except such items as are hereinafter listed as being furnished or furnished and installed by
the Owner, for Scrubber Installation(hereinafter called the "work")
(Insert ntne of job)
at the_____ El P*oplant of the Owner at____________________ El Pti>t Ttx____
"" (insert town & state)
in accordance with the drawings and specifications listed below, all of which are incorporated herein by reference and made a part hereof:
(List. Specificstions and Drivings)
Southwestern Proposal Dated 2-2-1971 -12956 - General Arrangement of Sinter Plant Scrubbers
DMART 153
Page 2 of 7
Article 2. Time of Completion The work shall be commenced March 1, 1971_and
shall be substantially completed3It--I97J---------------------------------------- ..
Article 5. Payment (to be deleted if progress payments are to be made)
The Owner shall pay the Contractor for the performance of this Contract,
the sura nf Thirteen Thuand Seven Hundred fe Seventy-Sixdollars,
ff 13,776_____________ ), lawful money of the United States of America within
15days after satisfactory completion of the work and sub
mission by the Contractor of evidence (including, if requested, complete releases of all liens arising out of or in connection with the work by all persons, firms or corporations on whose behalf such liens could be or were filed) satisfactory to the Owner that all charges for labor and material incorporated in the work and all other indebtedness connected with the work for which liens could be filed have been paid and that the work is free of all liens and encumbrances.
^Article 5- Payments (to be deleted if progress payments are not to be map
The Owner shall pay the Contractor for the performance of thi^contract,
the sum's's^f_
dollars,
.), lawful money of the Ufiited States, as
follows:
On or about'vh
day of each cal^Sar month, commencing
theydwner shall pay the Contractor
.per cent (_
<?) basgdf on the contract prices, of the
labor and materials incorporated'Xn the/"wcrk and of materials suitably stored at the site thereof up to the end o^^ne next preceding calendar month, as estimated by the Owner, less the aggregate of previous payments; and upon com pletion of the entire work, a spm sufficient to increase the total payments to
_____per cen/(of the contract price. Final
payment of the remaining Jl.%) crs^he contract price shall be due
__da/>s after comoletion of the w^rk.
Before eacp/such payment is due, the Contractor shall submit evidence
satisfactory to the Owner (including, if requested, pamtsml waivers, or in the
case of final jsayment, complete releases, of all liens ari^ng out of or in
connection wixh the work by all persons, firms or corporatiorta on whose behalf
such lien^could be or were filed) that all charges for labor ahd material in
corporated in the work and all other indebtedness (except, in theN\ase of pay
ments/other than final payment, indebtedness not then due) connecteo\with the
wcnfi for which liens could be filed have been paid and that the work
free of
Kl liens and encumbrances.
Article 4. Payments Withheld
The Owner may withhold all or parr, of any payment to the extent nec'-ssary to protect the Owner from loss or damage on account of (a) damaged or de fective work not remedied, (c) claims filed or reasonable evidence indicating probable filing of claims by other parties against the Contractor or the Own-;:' {e) failure of the Contractor to make payments properly to Subcontractors or for material or labor, (d) a reasonable doubt that this contract can be com pleted for the balance then unpaid, or (e) damage to the Owner's property or the work of another contractor. Article 5. Liens
If any lien remain unsatisfied after payment of the full contract trie-. ::us beer; made, the Contractor shall refund to the Owner all moneys that the latter may be compelled to pay in discharging such lien, including all costs end a reasonable attorney's fee. The Contractor shall, at any time requested bj the Owner, deliver a bond satisfactory to the Owner indemnifying it against any lien and expenses occasioned thereby.
Article 6. Title to the Work
Title to all work completed-or in the course of construction shall be :r. the Owner; and title to all machinery, equipment and materials to be in corporated in the work shall be in the Owner as soon as they are delivered on the site of the job.
Article 7. Inspection and Repair
The Contractor shall provide safe and proper facilities at all times for the inspection of the work by the Owner, and shall as soon as practicable after written notice from the Owner, at the Contractor's expense, replace and repair any materials or portions of the work which the Owner shall deem defec tive and make good all work damaged or destroyed thereby, whether or not there shall be a dispute with respect to any of the foregoing. Any such dispute shall be settled by arbitration.
Article 8. Protection by Contractor
The Contractor at all times shall maintain adequate protection of the work from damage and shall protect the Owner's property and all persons thereon from injury, damage or loss by reason of any act or omission of the Contractor or any Subcontractor. The Contractor shall be responsible, and reimburse the Owner, for any loss or expense to the Owner arising from damage to the work or other property of the Owner caused by the wrongful act or neglect of the Con tractor, any Subcontractor or the employees of the Contractor or any Subcon tractor. Where such damage includes damage to the work it shall be repaired at the expense of the Contractor.
The Contractor shall use its best judgement and skill in dealing with labor matters, and take all reasonable .steps to avoid labor dispute. In the event of any strike or threat of strike, slowdowns, featherbedding, or other like practices, the Contractor shall apprise the Owner of all relevent facts and implications of the particular labor problem involved, and shall consult in good faith with the Owner in an endeavor to reach a mutually satisfactory solu tion to such labor problem and, so far as reasonably possible, to protect the Owner against delays affecting the work or damage or losses to its other oper ations.
Page 4 of 7
Article 9. Contractor's Liability Insurance
The Contractor shall maintain such insurance as will indemnify it against claims under workmen's compensation acts and against any other claims for damages for personal injury, including death, which may arise from opera tions under this contract, whether such operations be by the Contractor or any Subcontractor or anyone directly or indirectly employed by either of them.
Prior to commencement of this work the Contractor shall file with the Owner completed certificates of insurance in form of "Insurance Certificate" attached and shall provide insurance coverage in amounts not less then those stated therein.
Article 10. Indemnity by Contractor
The Contractor shall save harmless and indemnify the Owner from and against any expense, loss or damage on account of any claim, demand or suit made by any person whomsoever, including any employee of the Owner, which is in any way caused by or connected with, or grows out of the execution and per formance of this contract by the Contractor or any Subcontractor; provided, however, that the Contractor shall not be required to indemnify the Owner against any loss caused solely by the negligence of willful fault of the Owner or its employees. The Contractor accepts all risk of injury or damage and all responsibility for any claims for damages whatsoever resulting from the use, misuse, or failure of any hoist, rigging, blocking, scaffolding, or other like or unlike equipment used by the Contractor or any Subcontractor, even though such equipment be furnished or loaned to the Contractor or any such Subcon tractor by the Owner, and shall indemnify the Owner against all such claims.
Article 11. Owner's Responsibility for Certain Casualties
The Owner shall be responsible for all damage to the work, and to material, temporary structures, and equipment (excluding construction equipment not owned by the Owner) at the site of the job, which is caused by fire, wind storm, smoke, hail, aircraft, explosion, vehicles, riot or civil commotion.
Article 12. Compliance with Laws and Ordinances
The Contractor shall give all notices and comply with all laws, ordinances, rules, and regulations, bearing on the conduct of the work as drawn and specified. If the Contractor performs any work contrary to any such law, ordinance, rule or regulation, he shall bear all costs arising therefrom.
If for any reason the Contractor's or any Subcontractor's employees or agents acquire a status imposing liability on the Owner for employer's con tributions or taxes under the Federal Insurance Contributions Act, the Federal Unemployment Tax Act, any State Unemployment Tax Act, or any other Act, the Contractor shall be exclusively liable for, and shall indemnify the Owner against, the same and agrees to comply with all such laws and regulations so as to relieve the Owner from any and all liability therefor and from the re sponsibility of making reports or keeping records with respect thereto.
Article 15. Patents
The Contractor shall indemnify and save harmless the Owner against and from any and all claims, losses, costs, damages, expenses, actions or other proceedings, growing out of or resulting from infringement of any patent by the Contractor or any Subcontractor in the performance of this contract, except that this provision shall not apply to patented articles or processes specified in drawing or specifications furnished by the Owner.
Article 14. Changes in the Work
Page ? of 7
The Owner, without invalidating this contract, may at any time order extra work or make changes by altering, adding to or deducting from the work.
Such order may be made the Owner on its own behalf or at the request of the Con tractor, upon discovery by the Contractor of any discrepancy between the plans and the physical conditions encountered. If such extra work or changes involve a change in cost, the contract price shall be increased or decreased by the fair value thereof. The Owner will itemize the changes to be made and upon receipt of written notice of same, the Contractor will submit promptly to the Owner, in triplicate, an itemized statement of his calculations of the adjustment in the contract price resulting from the changes or extra work. This must be done be fore work on the change is begun unless the Owner gives written order to proceed immediately. No work or change shall be made, except by written order of the Owner and no claim for an addition to the contract price shall be valid unless the additional work was so ordered. Any dispute under this Article shall be subject to arbitration.
Article 15. Owner's Right to Terminate Contract
If the Contractor should be adjudged a bankrupt, or make an assignment for the benefit of creditors, or if a receiver of the Contractor's property should be appointed or if the Contractor files a petition or if a trustee of the Contractor's property should be appointed under the reorganization or readjust ment provisions of the Bankruptcy Act, or if the Contractor at any time should refuse or neglect to supply enough properly skilled workmen or proper materials, or if he should fail to make prompt payments to Subcontractors or for material or labor, or disregard laws, ordinances or the instructions of the Owner, or otherwise be guilty of a substantial violation of any provision of the contract which he shall have failed to correct promptly after service of written notice thereof by the Owner, then the Owner may, without prejudice to any other right or remedy, terminate the employment of the Contractor for the Contractor's de fault and take possession of the premises and of all materials, tools and ap pliances thereon and finish the work by whatever method the Owner may deem ex pedient. In such case, the. Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the con tract price shall exceed all the general damages of the Owner caused by the Con tractor's default, including the expense of finishing the work and compensation to the Owner for the Owner's managerial and administrative service, such excess shall be paid to the Contractor. If such damages shall exceed such unpaid bal ance, the Contractor shall pay the difference to the Owner. In the event the Contractor and the Owner are unable to agree upon the amount to be paid or re imbursed the dispute shall be settled by arbitration.
Article 16. Correction of Work after Payment
Neither payment nor any provision in this contract shall relieve the Contractor of responsibility for faulty materials or workmanship and the Con tractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom which shall appear within one year from the date of completion of the Contractor's work hereunder. The Owner shall give notice of observed defects with reasonable promptness. Any dispute under this Article shall be subject to arbitration.
Page 6 of 7
Article 17. Arbitration
All disputes which are herein stated to be subject to arbitration shall be submitted to and determined by arbitration. Except as and to the extent otherwise provided by the controlling state law, no party may have recourse to legal proceedings (other than to enforce this arbitration Article) unless and until an arbitration award has been made. There shall be one arbitrator who shall be chosen by the American Arbitration Association, whose arbitration rules shall be followed.
Article 18. Subcontracts
The Contractor will not employ any Subcontractor without the prior written approval of the Owner and the Contractor shall require each Subcontractor to execute a contract in writing containing provisions similiar to all provisions of this contract which are in any way applicable to such Subcontractor and which will obligate such Subcontractor to comply with and perform all such provisions herein. Nothing herein shall create a contractual relationship between any Sub contractor and the Owner.
Article 19. Assignment
The Contractor shall not assign nor subcontract this contract in whole or part nor shall the Contractor assign any moneys due or to become due Contractor hereunder without the prior written consent of the Owner.
Article 20. Coordination of Work
The Contractor shall conduct the work hereunder so as to cause a minimum of interference with the Owner's operation. Where interference with the Owner's operations become absolutely necessary, permission shall be requested by the Contractor not less than seventy-two (72) hours in advance.
Article 21. Undertakings by the Owner
The Owner agrees to obtain and pay for any permits, licenses and ease
ments required for permanent structures or changes, and, to the extent practic
able without interference with operations, to furnish the Contractor, free of
charge, for its use during construction, electricity, water, steam and compress
ed air required for construction purposes, at the voltage and pressure currently
available at Owner's said plant, to a point adjacent to or within
feet of
the site, but the Contractor will be required to make the necessary connections,
provide approved shut-off and safety devices and furnish and install all tempo
rary lines required to bring them to the point of use.
Article 22. Applicable Law
This contract shall be construed and enforced in accordance with the laws of the state where the work hereunder is to be performed.
Article 23. Entirety Clause
This contract constitutes the entire agreement between the parties, and except as may be specifically set forth herein no changes can be made herein except by an agreement in writing duly executed by the parties or their duly authorized agents.
Article 24. Additional Provisions
(Add such additional provisions, if any, as the particular job requires).
Page 7 of 7 IN WITNESS WHEREOF, the parties have executed this contract the day and year first above written.
SOUTHWESTERN INDUSTRIAL CONTRACTORS AND RIGGERS. INC.
Contractor
Title___________ President
AMERICAN SMELTING AND REFINING COMPANY Owner
lurz*&s:-.g
AMERICAN SMELTING AND REFINING COMPANY FORM ft INSURANCE* 1 Revised 11/56
INSURANCE-CERTIFICATE
AMERICAN SMELTING AND REFINING COMPANY REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE DESCRIBED BELOW HAVE BEEN ISSUED TO _______________
aouttm--ftp industrial Qopufcfcoea mad
to.__________________________
THESE POLICIES ARE NOW IN FORCE. COVERING WORK BY THE ASSURED FOR AMERICAN SMELTING AND REFINING
COMPANY ON CONTRACT _ for crdbfcxr Inaflltiep________________ ________________________ atfil fan itncltlnr, Htodca.
IF THESE POLICIES ARE CANCELLED OR CHANGED IN ANY WAY THAT WILL AFFECT THIS CERTIFICATE. TEN DAYS' PRIOR WRITTEN NOTICE WILL BE GIVEN BY THIS COMPANY TO AMERICAN SMELTING AND REFINING COMPANY. SAMUEL METZGER. JR., 120 BROADWAY. NEW YORK. N.Y.
KIND OF INSURANCE
NUMBER
DESCRIPTION OF POLICY
EXPIRES
LIMITS OF LIABILITY
REOU IRED MINI MUM
CONTRACTOR S PUBLIC LIABILITY (COMPREHENSIVE INCLUDING CONTRACTUAL)*
BOO ILY- INJURY
PROPERTY.DAMAGE
CONTRACTOR S PROTECTIVE LIABILITY
BODILY-INJURY
PROPERTY.DAMAGE
AUTOMOB ILE BODILY-INJURY PROPERTY.DAMAGE
WORKMEN'S COMPENSATION AND
EMPLOYER S LIABILITY
DATE
C ITY
STATE
AUTHORIZED REPRESENTATIVE
The Contractor shall aare harmless and indemnify the Owner from and against any expense, loss or daaaje on account of any claim, demand or auit made by any person whomsoever, including any employee of the Owner, which ia in any way caused by or connected with, or grows out of the execution and performance of this contract by the Contractor or any Subcontractor; pro vided, however, that the Contractor shall not be required to indemnify the Owner against any loss caused solely by negli gence or willful fault of the Owner or its employees. The Contractor accepts ell risk of injury or damage^and all respon sibility for any claims for damages whatsoever resulting from the use, misuse, or failure of any hoist, rigging, blocking, scaffolding, or other like or unlike equipment used by the Contrector or sny Subcontractor, even though such equipment be furnished or loaned to the Contractor or any such Subcontractor by the Owner, and shall indemnify the Owner against all
such claims.
i m I tUlM
r nr;j; f*r*n
r\ r
t-5 v-.''^LJj u L il i/i.` L.itj t! 1.31 aiV'J
. INDUSTRIAL CONTRACTORS AND RIGGERS, INC.
Formerly: CONSTRUCTION DIVISION, SOUTHWESTERN TRANSFER CO., INC.
1730 Bcssc'l Avc. P. O. Box 1611
El Paso, Texas 79948
(915) 532-3491
American Smelting arid Refining Comnanv________________ P. 0. Boer Ull B1 Paso. Texas
DATE2 February 1973.
P R 0J EcT_
J_a
at
D&L Sintering Deport
i nrATiOM El Paso Works
We propose to furnish labor, equipment and itemised materials for the scrubber installation for $13,77b.00 as follows:
1. Concrete at column footings. We will furnish form material and concrete. ASA"'JO will furnish rebar and all other embedded steel items.
2. Erect supporting steel, scrubbers with fans and piping to sintering machines. Wc supply no material for this installation.
This proposal is based on the following conditions:
1. Removal and reinst-dlation of trolley wires, etc,, to gain crane access to the site to 1 e by others.
2. Hauling of new meterids to the site and removal of salvaged material from the cite to be by others,
3. Cleaning up of existing site for removal of salvaged material to be by others.
4. Proposal is based cn `..'orbing straight time hours only.
5. Painting is excluded.
Resvocti
GRII
Cv- * t/ > < listen
NORMAL COMDITIGMS OS: ACCKf'TAl.'CU. SALS AND T-AYML NT ARE STATSD 0:1 RE-VC Z SIDE OF THIS QUOTATION.
Hr. F. 0. Wittwer
EM
SI (mo Smiting Works SI PftSO, TWU
Ai Arranged Quotations, drawings, contracts 6 insurance forms attached.
This requisition is issued to record agreement entered into with southwestern Industrial Contractors and JUgger*, Inc. of 1730 Bassett Av*., El Paso, Texas to cover scrubber installation.
February 4, 1971
QUOTATION
. INDUSTRIAL CONTRACTORS AND RIGGERS, INC.
Formerly: CONSTRUCTION DIVISION, SOUTHWESTERN TRANSFER CO., INC.
1730 Eosicll Avc. P. 0. Box 1(11
El Paso, Texas 79948
(915) 532-3491
American Smelting and Refining Comoanv ?. 0. ? or 1111 E1._Pa s_o,_Texas
DATE______2 February 1971
PROJECT-S^ryhiarat
D&L Sinterinn Department
i nriATinM El Faso Works
We propose to furnish labor, equipment and itemized materials for the scrubber installation for $13,776.00 as follows:
1. Concrete at column footings. We will furnish form material and concrete. ASAIiCO will furnish rebar and all other embedded steel items.
2. Erect supporting steel, scrubbers with fans and piping to sintering machines. We supply no material for this installation.
This proposal is based on the following conditions:
1. Removal and reinstallation of trolley wires, etc., to gain crane access to the cite to l>e by others.
2. Hauling of new materials to the site and removal of salvaged material from the cite to he by others.
3. Cleaning up of existiiTg site for removal of salvaged material to be by others.
4. Proposal is based on T.'orhing straight time hours only.
5. Painting is excluded.
GIUI .4
Respectfully^submitted,
'-/'/`fT-TT-rV
'tl' \
w
G. R* Hatch
NORMAL CONDITIONS OT ACCEPTANCE, SALE AND PAYMENT ARE STATED ON REVERSE SIDE OF THIS QUOTATION.
QUOTATION
SOUTHWESTERN '
INDUSTRIAL CONTRACTORS AND RIGGERS, INC.
Fomtrly: CONSTRUCTION DIVISION, SOUTHWESTERN TRANSFER'CO-7 INC
1730 Result An. P. O. Rex 1611
El Paso, Texas 79948
(915) 533-3491
American Smelting and Refining Company______________ P. 0. Box 1111 pRfvimTScrubber Installation El Paso, Texas_________________________________________
nA-rc February 1. 1971
at D&L Sinterine Department i nr ATiniu El Paso Works
With reference to our quotation of 18 January 1971 relative
to Scrubber Installation we offer the following breakdown of
costs:
*091/
Concrete Pit Concrete Piers
Erection
$ 3,804.00 (11) 1,150.00
12,476.00 $17,430.00
(/ +1$t> -
_ oc ~/$00~T
All conditions of quotation apply.
Respectfully submitted,
SOUTHWESTERN INDUSTRIAL CONTRACTORS AND RIGGERS, INC.
RTW:iz
/2
/
/3 7 76 /
R. T. Wheatley J 7 C6&
NORMAL CONDITIONS OF ACCEPTANCE, SALE AND PAYMENT ARE STATED ON REVERSE SIDE OF THIS QUOTATION.
f- ^TERMS AND CONDITIONS f^ *"' *. r- . v .n't 'y*"* W
2. This proposal is based on a forty-hour week, Monday through.Friday. The premium - will be charged at our costs plus insurance and'taxes for any work authorized by
you, to be performed before 8:00 A.M. and after 4:30 P^M. or on Saturdays, Sundays or holidays. -
`3. `Unless otherwise noted, this price is based on the present hourly wage' rates of
. . ^Building and Construction Trades in the locality where the work is to be
" ' performed. In the event that an undue delay of the acceptance of this quotation or
in the start of the job causes a wage increase to be effective, this quotation will be
re-figured to include the increase.
;
4. The Company reserves the right to correct all typographical or clerical errors.
5. Should the Customer order any change in the work to be performed as outlined in
the proposal, the Contractor reserves the right to adjust this quotation, price
accordingly. `'
' ..
6. Unless otherwise specifically stipulated, the Customer is to maintain job site'free and clear of any equipment or material that may, in any way, interfere with the work to be performed under this proposal. This'shall be done without cost to us.
7. All agreements are contingent upon strikes, accidents, and other delays beyond our
control.
` ' 5 "
8. We shall not be liable for any-losses'the Customer incurs,' that may be'caused by delay in the completion of work to be performed under this quotation, when such delay is caused by conditions beyond our control.
9. The terms'of payment foT'any work covered by this quotation shall be net cash upon completion of work, except as may be provided by job specifications.
10:- All structural steel will'be erected in accordance with A.I.S.C. Manual of Steel Construction, latest edition.
Sold To Ship To
N C uir'tc . j
1507 W. 2ND ST. / A/C 915 PHONE 332-0293 / ODESSA. TEXAS 79760
1 Onto Nd_
p,j *<. ra oo fold_______
/merle? n Smelting and Eefininff'Co * 1 Paso Saelting Works Eranchj fm3t*____
^OX lilt"
J I'mloht Bill No
EX Paso, Tex, 79999
f Quanta O. , (
No.______
' "invoice Date
/- rs
trtr'A 03895
Same
O3** ?3t te Ptsaes j
3vOrde-t'.-N`-o1.7__2_ rs>1&q-rNo.i_
*
t.,
'//
Delivered By--__________________________________________
Received By
CUSTOMER COPY
hue
EPS 4-1
January 27, 1971
Mr. VI. R. Kelly
Reference: order 70-1881-3, Reqn. EP-52
Attached for your information is a copy of the purchase order and xerox copies of manufacturing order on the Krebs Gas Scrubbers. Also attached are copies of telegrams pertaining to their delivery.
I received a telephone call from Mr. sorage on January 25, 1970, advising that there v/ould be a delay on the delivery due to the fabrication of guards for the drives. He said that he was not advised from his superiors until approximately January 18, that guards were included with the scrubbers. Shipment is now scheduled for January 27 or 28, with transportation time from 7-10 days.
ROC:Ibc Enclosure
R. O. Covington
ENGINEERS 1205 CHRYSLER DRIVE MENLO PARK. CALIF. 94025 TEL- (4151 325-6711 TELEX: 34 8403 CABLE: KREBSENGRS MENLO PARK
January 26, 1971
Mr. W. Nasmyth AMERICAN SMELTING AND REFINING COMPANY Post Office Box 1111 El Paso, Texas 79999
Subject:
Erection & Operating Instructions Krebs Medusa Scrubbers Your Order 70-1881-3 Our Job GK 447
Dear Mr. Nasmyth:
We take pleasure in forwarding herewith three (3) sets of Erection and Operating Instructions for the above Medusa Scrub ber units.
We look forward to providing assistance when you are starting up these units. In the meantime, if any additional information would be helpful, please let us know.
Very truly yours.
KREBS ENGINEERS
DFG:bl Enclosures: Manuals (3 copies)
cc: Mr. Warren Meissner ASARCO, New York
Mr. C. Lagergren APPCOR, Tucson
QUOTATION
SOUTHWESTERN
INDUSTRIAL CONTRACTORS AND RIGGERS, INC.
Fomtwly: CONSTRUCTION - DIVISION, SOUTHWESTERN TRANSFER CO., INC
mil loutll Av.
P. O.
El Paso, Texas 79948
(915) 532-3491
American Smelting and Refining Company_____________ ctatc
18 January 1971
P. 0. Box 1111 El Paso. Texas
ppoipct Scrubber Installation at
____________________________________________ DSL-Sintering Department
LOCATION_____El Paso Works___
We propose to furnish labor, equipment and itemized materials for the scrubber installation for $17,430.00 as follows;
1. Concrete at sump pit and column footings. We will furnish form material and concrete. ASARC will excavate, back fill, and furnish rebar and all other embedded steel items.
2. Erect supporting steel, scrubbers with fans and piping to sintering machines. We supply no material for this installation.
This proposal is based on the following conditions:
1. Removal and reinstallation of trolley wires, etc., to gain crane access to the site to be by others.
2. Hauling of new materials to the site and removal of salvaged material from the site to be by others.
3. Cleaning up of existing site for removal of salvaged material to be by others.
4. Proposal is based on working straight time hours only.
5. Painting is excluded.
6. Should you install concrete and embedded steel items, you may deduct $4,954.00.
/7 'f'jO
9 St4 /v i- 7/
'*
Respectfully submitted.
lid.l(a
*/
GRH:iz
G. R. Hatch
NORMAL CONDITIONS OF ACCEPTANCE, SALE AND PAYMENT ARE STATED GN REVERSE SIDE OF THIS QUOTATION.
='-` TERMS AND CONDITIONS i ":
. * i.
,,V
'.
, .*
1., All quotations are subject to prompt acceptance and transmittal of order and toZ
confirmation at time of order.
2. This proposal is based on a forty-hour week, Monday through Friday. The premium will be charged at our costs plus insurance and taxes, for any work authorized by you, to be performed before 8:00 A.M. and after 4:30 P.M. or on Saturdays, Sundays or holidays.
3. Unless otherwise noted, this price is based on the present hourly wage fates of
. , Building and Construction Trades in the locality where the work is to be.
' performed. In the event that an undue delay of the acceptance of this quotation or
.in the start of the job causes a wage increase to be effective, this quotation will be
' " ` re-figured to include the increase.
' *' ;
4. The Company reserves the right to correct all typographical or clerical errors.
5. Should the Customer order any change in the work to be performed as outlined in
' " the proposal,; the Cohtr'actor reserves the right to' adjust' this quotation price
accordingly.
":
6. UnleSs otherwise' specifically stipulated, the' Cusfomer'is to maintain'job site free and clear; of any equipment Or material that'may, in any'way, interfere with the work to be performed under this proposal.'This sh'allbe done without cost to us.
7. All agreements are contingent upon strikes, accidents, and other delays.beyond our
control. " ' *'
......... `
.................
8. We shall not be liable for any losses the Customer incurs, that may be caused by delay in the completion of work to be performed under this quotation, when such delay is caused by conditions beyond our control. '
: :9. The' terms of payment for any work covered by this quotation shill be net cash upon completion of-work; except-as may be-provided by job specifications.
10. AD'-structural^ steel rw31 be erected-in-accordance with A.l.S.C. Manual of Steel Construction, la'test edition.
fiarseo lac* P. 0. Scot 2906 . Odt>M, Texas 797^0
k Vasts
Sat 30 Days
January 13, 1971 172