Document q3B969oVxBBvgR24LGywOxvqn

otNNtr ^ niou'w 8/1 /93 VC Net Map Revisions Events Analysis, Inc._____________________ Advanced Safety Services 12101 Toreador Lane, Oakton, VA 22124-2217 USA (703)620 3648 PAX MESSAGE TO: Has Shah PhD CMA 202 887 1192 August 16. 1993 FAX 202 887 1237 FROM: Ludwig Benner, Jr. Total Pages: Subject: VC Panel Updated Maps/support documents A mailing tube containing the revised VC Net map sets and support tables described on the attached, was couriered to you today. This work has exhausted all the funds allocated to Events Analysis. Inc. for 1993 for this work. CMA 111507 Revisions to 8/1/93 VC Net Map To: Dr. Shah From: L. Benner Report of additional carrier contacts since May meeting. CanadianJfatlonal Railroad Contacts: Mr. Jean Oulette and Mr. Bryan Pullen (514-399-6623) The Canadian National Railroad reported that It has 7-9 special officers trained and experienced in hazmat responses on their line, supported by over 500 trained operating personnel. The CN has C-l hardware kits for handling chlorine leaks, but no kits for Midland valves. They report having hazmat handling equipment and suits In "all major cities'' on their line, including trucks that they dispatch to emergency sites. During our conversation, we discussed the difficulties with showing where equipment might be located because the CN apparently moves it from one location to another frequently. CN relies on shippers to arrange for transfers, and does not normally use contractors because of past problems. They will work with shipperdesignated contractors, but indicated they reserve the right to turn them away because of their past experience. After discussing the placement of their capabilities on a map, we agreed that I would not place any CN capabilities on the VCNET map. If any response capability locations are verified by the interested VC Net shipper(s), they could be added. No CN response capabilities were added to the mao. I believe this is consistent with what Dow has indicated the map should show. You may wish to reconfirm this position with DOW Kansas City Southern. Contact: Mike Carpenter (816 556 0343) KCS has no specific VC product response capabilities. The KCS system has provided its VC customers with its response plans. In the absence of a specific preference by a shipper, the KCS will select a pre qualified contractor with the needed capability to handle the emergency. I did not discuss specific VC shipper names with Carpenter. If it has not already been done, shippers using the KCS should communicate their contractor preferences to the KCS, or satisfy themselves that the KCS's "qualified contractors" who meet KCS's qualification criteria also meet their criteria. CMA 111508 _ rl^OU'w Revisions to 8/1/93 VC Net Map r i_ Nfl.KCS.or contractorjeaoabllities were added to the map. Perhaps some additional contractors could be added after they have been checked out by VC shippers using the KCS. Contact: Gary Rhodes (904 359 1589. In the absence of a specific preference by a shipper, CSX will select one of several pre-quallfied contractors (which include OHM) with the needed capability to handle the emergency. No-CSX contractor capabilities will be added to the map. Perhaps some additional contractors could be added after they have been checked out by VC shippers using CSX. XF Contact: Ettinger(spelling?) 913 357 3570 Contact reported 70 personnel available to help local officials in emergencies but would not handle VC transfers, leaks. Would look to shipper to engage contractor, or would furnish qualified contractors like Hulscher if none specified. Others None of the other carriers shown on the map offer response capability according to Mr. Donahue at Chemtrec. SUMMARY. From the carriers* responses. I would urge VC panel members to contact carriers using the Panel's evaluation criteria when they are adopted, to determine what contractors the Panel wishes to include in its response plans, and add them to the Maps. CMA111509 8/1/93 VC Net Map Revisions PACKING LIST CMA VC Panel Materials Note: All information updated to 8/1/93. Anticipated future changes not shown. Item Quantity Description 1 1 copy 24"x33" full color VC Net map 2. 1 copy set of 2 8-l/2"x 11" full color reduction of VC Net map, for reproduction and assembly by CMA into 11 x 17 handout for Panel Members 3. 1 copy 11x17" full color enlargement of Gulf Coast area of VC Net map 4 1 copy' Table showing Railroad response capabilities shown on VC Net maps, for reproduction on the back of Item 2 above. 5 1 copy' Table showing VC shipper response capabilities shown on VC Net maps, for reproduction on the back of Item 2 above. 6 1 copy Summary of changes from previous Maps. CMA 111510 8/1/93 VC Net Map Revisions Item 6. Summary of changes in 8/1/93 revision. 1. Changed traffic flow symbols to reduce map clutter as follows: a. Routes with heavy traffic flows (>7 cars per day) are traced with darkest shading b. Routes with medium traffic flows (3-7 cars per day) shown with striped shading c. Routes with 0-3 cars per day shown with no shading. Note that routes with no shading mav be inactive from time to time, depending on supply and demand fluctuations. 2. Added numerous routes and changed traffic densities as supplied by Panel members. 3. Replaced previously used symbols for response capability with company codes and response capabilities in a red box near the location of the response capability. 4. Replaced company code at all sites previously operated by BFG to GEON. 5. Deleted all references to future or planned changes, and show only those changes in effect on August 1, 1993. 6. Added response radii for OHM and EMTECH, using data from their contracts. Note that OHM circles are for 4 hour response times, EMTECH circles for 3 hour response times. 7. Changed legend box and overprinted it on unused portion of map to reduce map space requirements. 8. Changed Map revision date. 9. Printed enlarged view (blowup) of Gulf Coast portion of map. Panel had suggested "city map blowup" on map, but with routing and other changes did not leave sufficient space on map for this approach, so a separate 11 x 17" enlargement was provided. 10. Added 100 mile radii for VISTA locations, corrected Illiopolis, other non-substantive appearance changes. 11. Contacted carriers shown on maps to update response capabilities for map. See separate report of the results of these contacts. 12. Created tables showing VC Net, Contractor and Railroad response capabilities for printing on back of VC net map, and provided file to CMA on disk for future updating. CMA 111511 8/1 /93 VC Net Map Revisions Item 6. Summary of changes in 8/1/93 revision. 1. Changed traffic flow symbols to reduce map clutter as follows: a. Routes with heavy traffic flows (>7 cars per day) are traced with darkest shading b. Routes with medium traffic flows (3-7 cars per day) shown with striped shading c. Routes with 0 - 3 cars per day shown with no shading. Note that , routes with no shading mav be Inactive from time to time, depending on supply and demand fluctuations. 2. Added numerous routes and changed traffic densities as supplied by Panel members. 3. Replaced previously used symbols for response capability with company codes and response capabilities in a red box near the location of the response capability. 4. Replaced company code at all sites previously operated by BFG to GEON. 5. Deleted all references to future or planned changes, and show only those changes in effect on August 1, 1993. 6. Added response radii for OHM and EMTECH, using data from their contracts. Note that OHM circles are for 4 hour response times, EMTECH circles for 3 hour response times. 7. Changed legend box and overprinted it on unused portion of map to reduce map space requirements. 8. Changed Map revision date. 9. Printed enlarged view (blowup) of Gulf Coast portion of map. Panel had suggested "city map blowup" on map, but with routing and other changes did not leave sufficient space on map for this approach, so a separate 11 x 17" enlargement was provided. 10. Added 100 mile radii for VISTA locations, corrected Illiopolis, other non-substantive appearance changes. 11. Contacted carriers shown on maps to update response capabilities for map. See separate report of the results of these contacts. 12. Created tables showing VC Net, Contractor and Railroad response capabilities for printing on back of VC net map, and provided file to CMA on disk for future updating. CMA 111512 Response Capability Categories for Railroads Team = more than one trained person with hardware and protective equipment, able to respond to VCM incident/accident with potential or actual release Capping Kit = one or more trained individuals with PPE, capping kit, available to stop a valve/safety valve leak. Transfer equipment = team + equpment to transfer VCM contents from one car to another. Advisory team = one or more trained persons available to assist local authorities/carrier with technical guidance during response; no suits, equipment. Southern Pacific Locations Lafayette Houston Pine Bluff San Antonio Los Angeles Sacramento Oakland Portland Kans City -potential Tuscon -potential Union Pacific Location Addis/ BatonRouge Avondale9/15 Cheyenne Fort Worth Kansas City Laredo LasVegas9/15 Los Angeles N Little Rock N Platt Omaha Pocatello Portland Reno Salt Lake City San Antonio Seattle Spring TX St Louis Stockton9/15 ST LA TX AR TX CA CA CA OR MO AZ ST LA LA WY rx KA rx NV CA A.R NE NE [D CR MV UT rx WA TX MO CA Team + Capklts Team + Caputs Team Advisory team only 8-5 M-F Y 318 261 3678 Y 223 6304 6305 Y 501 541 1784 Y 210 224 3547 Y 714 873 3092 Y 916 791 5241 Y 510 891 7729 Y 503 220 4424 (x) (x) Team only* CapUts only X P X X X P p X X X p X X X X p p X X p Cap Uts Transfer only equlpmt Transfer equlpmt X X Revised through 8/1/93 Page 1 CMA 111513 Response Capability categories for VCNET members xxx-T = team + equpment able to handle transfer of VCM contents from one car to another., xxx-K = one or more trained individuals with capping kit, able to stop a valve or sv leak: xxx-R= one or more trained individuals, with hardware and protective equipment, able to respond to VCM derailment/incident/accident with potential or actual release xxx-A = one or more trained persons available to assist local authorities/carrier with technical VCM information and guidance during non-derailment response. Company BCP BCP Location Geismar Illiopolis Map Response category BCP-K BCP-K Updated as of 8/1/93 8/1/93 Remarks DOW DOW DOW DOW DOW DOW DOW DOW DOW Freeport Ft Saskatchewan Joliet LaPorte Midland Pittsburg Plequamine Sarnia Torrance DOW-K DOW-K | DOW-A DOW-R DOW-K DOW-K DOW-K DOW-K DOW-R 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 FPC FPC FPC Baton Rouge Pt Comfort Reybold FPC-A FPC-A FPC-A 8/1/93 8/1/93 8/1/93 GEON GEON GEON GEON GEON Calvert City LaPorte Louisville Niagara Falls Pedricktown GEON-K GEON-K GEON-A GEON-A GEON-A 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 GGC GGC GGC Addis Plequamine Reybold GGC-K GGC-K GGC-A 8/1/93 8/1/93 8/1/93 OXY OXY OXY OXY OXY OXY Addils Burlington Pasadena Plequamine Pottston Deer Park OXY-K OXY-A OXY-A OXY-K OXY-R OXY-K 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 PPG Lake Charles PPG-R 8/1/93 VISTA VISTA VISTA Aberdeen Lake Charles OklahomaCity VISTA-A VISTA-A VISTA-A 8/1/93 8/1/93 8/1/93 Revised through 8/1/93 Page 1 CMA 111514 BCP = Borden'Chemicals DOW = DOW Chemical FPC = Formosa Plastics GGC= Georgia Gulf GEON = Geon OXY = Occidental PPG * PPG Industries VISTA = Vista Chemical Revised through 8/1/93 Page 2 CMA111515 Response Capability categories for VCNET Contractors T = team + equpment able to handle transfer of VCM contents from one car to another., K = one or more trained Individuals with capping kit,, able to stop a valve/safety valve leak. R= one or more trained Individuals, with hardware and protective equipment, able to respond to VCM derallment/incident/accident with potential or actual release A = one or more trained persons available to assist local authorities/carrier with technical VCM Information and guidance during non-derailment response. Company OHM OHM OHM OHN OHM OHM OHM OHM OHM OHM OHM OHM OHM OHM OHM OHM OHM EMTECH EMTECH Location Atlanta Baltimore BatonRouge Boston Chicago Denver Findlay Lansing Los Angeles Minneapolis Pittsburgh Princeton Redmond Richmond San Francisco St Louis Syracuse Houston Fort Worth Response category Updated as of 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 8/1/93 4 hr radius/ Remarks Revised through 8/1/93 Page 1 CMA 111516