Document q33QZ80je46xMLYGq60Rq6pDx

[;%3; riJVUVJOM OOlMSXFtUOTIOINI CO., INC. P.O. BOX 27169 EL PASO, TEXAS 79926 > Cfl>i oHrt P 3 oi rt Paoc rt- O0fiP>) P W tf o H-* (D* 0l oC'O * W 'OH< NO 13 - tsi(rj H M iP[XnDMOOow> VI VD H VO VO OP CO I i/ PLAINTIFF'S EXHIBIT CHV-494 CHEVB8 5809 -rirvsrvior\!S construction co,, inc. P. O. BOX 27169 EL PASO, TEXAS 79925 (915) 778-0676 (915f 778-0532 Industrial Maintenance and Construction August 10, 1982 Chevron U.S.A., Inc. P.O. Box 20002 El Paso, Texas 79998 ' Attention: Mr. Marty Countegan ' Re: Bid D-3509 Liner Replacement Gentlemen: We propose to furnish all necessary labor, equipment, materials and supervision to perform the following work on D-3509. 1. Remove all existing Saran Lining 100% interior, including noaizles. 2. Sandblast to white metal and apply one (1) coat of Polyester primer to 100% interior. 3. Grind all sharp corners to radius and apply Polyster putty to sharp angles to form a coved radius. 4. Apply two (2) layers of 1% oz. Fiberglass mat, impregnated : 100% with Vinyl Ester Resin to 100% interior, including nozzles, manways, and boilermakers. 5. Apply a Gel coat of Vinyl Ester, cure, Electric-Holiday Jeep, grind, and patch all voids, re-Jeep and apply a 5% wax-Vinyl Ester Top Coat for a total finish of approximately 100-125 mils. All of the above for the lump sum of . Trusting the foregoing meets with your approval, we are Sincerely, TIMMONS CONSTRUCTION COMPANY, INC. GET/fh Garland E. Timmons President CHEVB8 5810 ftp TirviivioiM ccwNisnnRucTioisi co., irsic. P, 0. BOX 27169 EL PASO, TEXAS 79926 (915) 778-0676 (915) 778-0532 Industrial Maintenance and Construction August 10, 1982 Chevron U.S.A., Inc. P.0. Box 20002 El Paso, Texas 79998 Attention: Mr. Marty Countegan Re: Bid D-3509 Liner Replacement Gentlemen: We propose to furnish all necessary labor, equipment, materials and supervision to perform the following work on D-3509. 1. Remove all existing Saran Lining 100% interior, including nozzles. 2. Sandblast to white metal and apply one (1) coat of Polyester primer to 100% interior. 3. Grind all sharp corners to radius and apply Polyster putty to sharp angles to form a coved radius. 4. Apply two (2) layers of 1% oz. Fiberglass mat, impregnated ' 100% with Vinyl Ester Resin to 100% interior, including nozzles, manways, and boilermakers. 5. Apply a Gel coat of Vinyl Ester, cure, Electric-Holiday Jeep, grind, and patch all voids, re-Jeep and apply a 5% wax-Vinyl Ester Top Coat for a total finish of approximately 100-125 mils. All of the above for the lump sum of THREE THOUSAND SIX HUNDRED EIGHTY TWO DOLLARS ( $ 3,682.00 ) Trusting the foregoing meets with your approval, we are , Sincerely, TIMMONS CONSTRUCTION COMPANY, INC. GET/fh Garland E. Timmons President CHEVB8 5811 Contract No. 015-022-81 T&R Mechanical Contractors, Inc. 4013 Taylor Street El Paso, Texas 79930 Attention: Mr. R. H. Youngblood Gentlemen: Two copies of our proposed Contract No. C-15-022-81, which covers "Pipe Work - Plant 33 Isolation" at the El Paso Refinery, are attached. If you are in agreement with the terms of this contract, please indicate your acceptance by signing and affixing your corporate seal, or have witnessed in accordance with instructions on the face of the contract, and return one copy. Very truly yours, RRK/gs L. R. Shanks Chief Engineer fa* -J CHEVB8 5817