Document q33QZ80je46xMLYGq60Rq6pDx
[;%3;
riJVUVJOM OOlMSXFtUOTIOINI CO., INC.
P.O. BOX 27169
EL PASO, TEXAS 79926
> Cfl>i oHrt P
3 oi
rt
Paoc
rt-
O0fiP>)
P
W tf o
H-* (D*
0l oC'O *
W 'OH< NO 13
- tsi(rj
H M
iP[XnDMOOow>
VI
VD H
VO VO
OP
CO
I
i/
PLAINTIFF'S EXHIBIT CHV-494
CHEVB8 5809
-rirvsrvior\!S construction co,, inc.
P. O. BOX 27169 EL PASO, TEXAS 79925
(915) 778-0676
(915f 778-0532
Industrial Maintenance
and Construction
August 10, 1982
Chevron U.S.A., Inc. P.O. Box 20002 El Paso, Texas 79998
' Attention: Mr. Marty Countegan
'
Re: Bid D-3509 Liner Replacement
Gentlemen:
We propose to furnish all necessary labor, equipment, materials and supervision to perform the following work on D-3509.
1. Remove all existing Saran Lining 100% interior, including noaizles.
2. Sandblast to white metal and apply one (1) coat of Polyester primer to 100% interior.
3. Grind all sharp corners to radius and apply Polyster putty to sharp angles to form a coved radius.
4. Apply two (2) layers of 1% oz. Fiberglass mat, impregnated
: 100% with Vinyl Ester Resin to 100% interior, including nozzles, manways, and boilermakers.
5. Apply a Gel coat of Vinyl Ester, cure, Electric-Holiday Jeep, grind, and patch all voids, re-Jeep and apply a 5% wax-Vinyl Ester Top Coat for a total finish of approximately 100-125 mils.
All of the above for the lump sum of
.
Trusting the foregoing meets with your approval, we are
Sincerely, TIMMONS CONSTRUCTION COMPANY, INC.
GET/fh
Garland E. Timmons President
CHEVB8 5810
ftp TirviivioiM ccwNisnnRucTioisi co., irsic.
P, 0. BOX 27169
EL PASO, TEXAS 79926
(915) 778-0676
(915) 778-0532
Industrial Maintenance
and Construction
August 10, 1982
Chevron U.S.A., Inc. P.0. Box 20002 El Paso, Texas 79998
Attention: Mr. Marty Countegan
Re: Bid D-3509 Liner Replacement
Gentlemen:
We propose to furnish all necessary labor, equipment, materials and supervision to perform the following work on D-3509.
1. Remove all existing Saran Lining 100% interior, including nozzles.
2. Sandblast to white metal and apply one (1) coat of Polyester primer to 100% interior.
3. Grind all sharp corners to radius and apply Polyster putty to sharp angles to form a coved radius.
4. Apply two (2) layers of 1% oz. Fiberglass mat, impregnated ' 100% with Vinyl Ester Resin to 100% interior, including nozzles, manways, and boilermakers.
5. Apply a Gel coat of Vinyl Ester, cure, Electric-Holiday Jeep, grind, and patch all voids, re-Jeep and apply a 5% wax-Vinyl Ester Top Coat for a total finish of approximately 100-125 mils.
All of the above for the lump sum of
THREE THOUSAND SIX HUNDRED EIGHTY TWO DOLLARS ( $ 3,682.00 )
Trusting the foregoing meets with your approval, we are
,
Sincerely, TIMMONS CONSTRUCTION COMPANY, INC.
GET/fh
Garland E. Timmons President
CHEVB8 5811
Contract No. 015-022-81
T&R Mechanical Contractors, Inc. 4013 Taylor Street El Paso, Texas 79930
Attention: Mr. R. H. Youngblood
Gentlemen:
Two copies of our proposed Contract No. C-15-022-81, which covers "Pipe Work - Plant 33 Isolation" at the El Paso Refinery, are attached.
If you are in agreement with the terms of this contract, please
indicate your acceptance by signing and affixing your corporate
seal, or have witnessed in accordance with instructions on the
face of the contract, and return one copy.
Very truly yours,
RRK/gs
L. R. Shanks Chief Engineer
fa*
-J