Clean Water Act Inspection on August 23, 2022
Dear Ms. Kinkeade:
On August 23, 2022, the U.S. Environmental Protection Agency (" EPA ") conducted an announced
inspection at PCC Structurals, Inc. locations at 24 Granite Street in Northfield, New Hampshire,
and 35 Industrial Park in Franklin, New Hampshire.
The inspector reviewed and observed metal finishing, mold and casting operations and process
wastewater collection and treatment systems, industrial material and activities potentially exposed
to precipitation, and oil storage and transfer areas. The inspector also reviewed chemical storage
areas for potential slug load discharge / s into the municipal wastewater treatment works and / or
surface waters.
Attached is the inspection report and pictures taken during the inspection. EPA is requesting the
company address issues and deficiencies presented in the report and comments in pictures that are
noted in parenthesis. EPA is requesting you provide a written response within 30-days of receipt.
The response should be emailed to the inspector, Joseph Canzano at canzano.joseph@epa.gov.
The inspector observed industrial materials and activities not under cover and / or not fully within a
storm - resistant shelter and having potential to be exposed to rain. At the company's Northfield
plant, the inspector observed spilled industrial waste / solids from wastewater treatment in a roll - off
container comingling with stormwaters in an area that has potential to discharge to surface waters
and waste metal in a roll - off container not covered. At the company's Franklin plant, the inspector
observed waste roll - off containers not under cover and / or fully under cover and not sealed, and
industrial equipment not in use not fully under cover and corroding.
Based on the conditions of the company's plants during the inspection, the plants would not
qualify for a Conditional Exclusion for " no exposure " under 40 C.F.R. 122.26 (g). You must
immediately ensure that all industrial materials and activities are protected by a storm - resistant
shelter to prevent exposure to rain, snow, snowmelt and / or runoff. Please provide photo
documentation to Mr. Canzano if you believe you have taken steps to qualify for the Conditional
Exclusion for " no exposure. " If such site conditions cannot be achieved at each plant, you must
begin the process of developing a Stormwater Pollution Prevention Plan (" SWPPP ") and submit a
ED_019088A_00005190-00001
Notice of Intent (" NOI ") for coverage under EPA's NPDES Multi - Sector General Permit for
Stormwater Discharges Associated with Industrial Activity (" MSGP ").
The Oil Pollution Prevention Regulations (40 C.F.R Part 112) may also be applicable to your
plants. The inspector was informed by facility personnel that neither plant has an oil Spill
Prevention Control and Countermeasure (" SPCC ") plan but that one may need to be developed.
The inspector recommends the company consult a professional engineer to evaluate each plant's
applicability under the regulations.
Process wastewaters from the company's Northfield plant from metal mold and casting operations
may be above federal standards for oil and grease and total copper. The company is
mathematically averaging, on a quarterly basis, flow and production rate data when calculating
equivalent concentration - based limits. This method is not consistent with EPA guidance. EPA
guidance shows variability analysis yields a determination of the achievable maximum daily, or
maximum monthly average, concentration, or mass per day. This is then combined with the " long-
term " average production and flow rates to yield a production - based standard. The Northfield
plant's wastewaters may be in violation of categorical pretreatment standards at 40 C.F.R.
464.15 (f).
Upon your receipt of this letter (via email), EPA is requesting you provide an electronic reply to
Mr. Canzano acknowledging receipt of this letter and the inspection report. If you have any
questions about this letter or the inspection report, please email Mr. Canzano or you can reach him
by telephone at (617) 918-1763.
Sincerely,
Digitally signed by DENNY
DENNY DART DART Date: 2022.10.12 10:34:27
-04'00 '
Denny Dart, Branch Manager
Enforcement & Compliance Assurance Branch
Enclosures: (electronic)
Images and Pictures
1 Guidance Manual for the Use of Production - Based Pretreatment Standards and Combined Wastestream Formula,
September 1985, and Metal Molding and Casting Development Document, October 1985.
2
ED_019088A_00005190-00002