INDUSTRIAL HYGIENE REPORT
PERSONNEL MONITORING OF ASBESTOS FIBERS DURING DEMOLITION OF A-100 BLOCK
CHL0R ALKALI PLANT
FIE NO. DATE AUTHOR
Al-2772 August 12, 1985 J. A. Emmltte
^ /I
rueneen
date
20.
^
_____
Summary
Asbestos insulation was removed from two gas*turbine generators located at the Chlor-Alkali plant, A-100, which Is currently under demolition.
Asbestos was removed according to procedures outlined in the Texas Operations "Asbestos Handbook" (April, 1985), Section IV.
SPN Dismantling, Inc. employees eight-hour time-weighted average exposures to asbestos fibers did not exceed 0.11 flbers/cc. These results are well within the Dow Industrial Hygiene Guidelines of 2.0 flbers/cc.
GO
CD O
hl>s cn o
Jir
Distribution
H. G. Ahlich. OCD Unit IV
* J. T. Barton, B-101
File,/
L. A. R-impy 1803 Midland A. W. Schaffer 2030 Midland M. G. Swank 1803 Midland * F. D. Axe - Pittsburg * J. E. LeBeau - 1803 Midland
* C. E. Halphen - Plaquemine * G. L. Meier - Strongsville * A. F. Pollock - Sarnia * S. M. Gorgacz 474 Midland
AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY
STOO15 0 15
Al-2772
page 1
INTRODUCTION
SPN Dismantling, Inc. was contracted by Texas Operations to remove asbestos insulation from two gas turbine generators located at the A-100 Chlor-Alkali plant which is currently under demolition.
The asbestos removal job took two, eight- hour days to complete In which personnel were monitored for one, eight-hour period. Asbestos monitoring of contractor personnel was done to verify that the job procedures were adequate to assure compliance with OSHA Standard 1910.1001 and Texas Operations Safety
Standard No. 45.
MONITORING METHODOLOGY
Asbestos samples were taken with battery operated MSA sampling pumps, calibrated for 2 liters/mfn. flow rates before and after sampling. Asbestos was collected on a 37 mm filter holder containing a 0.8 micron Mllllpore Type AA filter. Fibers were counted by the Analytical Services Department.
EVALUATION CRITERIA
The evaluation of exposure levels were based on the following criteria using the more stringent of established or recommended guidelines:
Oow IHG (Flbers/CC)
TLV (Flbers/CC)
Asbestos
2.0*
2.0*
* If greater than 5.0 micrometers In length
The Dow Industrial Hygiene Guide and Threshold Limit Value(TLV) are measures of acceptable 8-hour time-weighted average exposures.
RESULTS AND CONCLUSIONS
Two SPN Contractor personnel were monitored on February 7, 1985 while removing asbestos from two gas turbine generators at the A-100 block. The results are as follows:
Contractor
Badge No. 8-Hour (Flbers/CC)
Weather Conditions
SPN
SC 585-1751
0.05
SPN
SC 585-5720
0.11
North wind @ 12 MPH
M Ml H
The above results show both time-weighted averages to be below the current guidelines of 2 fibers/cc. SPN personnel for this particular job task are not being overexposed to airborne asbestos fibers.
RECOMMENDATIONS
SPN supervision should Inform all employees with a potential for exposure to
asbestos of the hazards of overexposure to asbestos fiber: the informing should be documented.
bbs