Document pzJRpwyYovopXRQRxm84RM7k
DO A 133748
OONF TDFNTTAL
V
GT-100 200 OWITOMTNG LUG Li OIL COOLERS
'/
X/
GT--300/400 SWITCHING LUGL OIL COOLERS
SWITCHING l WEE OIL COOLERS - UNITS 300/400
jil
ALTHOUGH 'IHE FOLLOWING PROCEDURE IS SIMPLE AND STRAIGHT FORWARD^ IT IS
TO BE DONE IN THE PRESENCE OF SUPERVISION. CLOSING A VALVE OUT pF SEQUENCE COULD RESULT IN LOSS OF OIL AND SEVERE DAMAGE TO THE TURBINE.
WHILE OPERATING VALVES IN THIS PROCEDURE, LISTEN FOR UNUSUAL NOISES (SUCH A5 HIGH FRESSURE DROP ACROSS VALVES), AND RETURN THE VALVES TO THEIR FULI OPEN POSITION SHOULD THEY OCCUR.
DUPING THESE OPERATIONS, AN OBSERVER SHOULD WATCH FOR LUGE OIL TEMPERATURE OR FPESSUhf CHANGES WHILE THE BOARD OPERATOR OBSERVES LUBE OIL HEADER
^ 1 ;v III!' CDiv i fHH_ ROOtf.
FFl
SwC.VLY OPEN 7Ml 3/4" EQUAL i /1NC VALVES AND ALI OW TIME NOR THlj: S L'i'\ COC'LFi: TO FILL i THESE VALVES SHOULD NORMALLY BE OPEN).
AF L . -E T^-~ both INLET AND OUTLET WATER VALVES TO THE COOLER ARE
OPEN THE LUEC Oil. I i li_ET VALVE TO THE COOLER TO BE c;
-V U'-EN THE LUCE OIL OUTLET VALVE ON THE COOLER TO BE PUT IN I( !
5 . i. E 01N-E-VJN3 THE LUBE OIL TEMPERATURE TO THE FILTERS, VERY SLOWLY CLCCE THE uULl OIL INLET VA! VE ON THE COOLER BEING TAKEN OUT OF
6 IF i.L'LL OIL TEMPERATURE REMAINS CONSTANT, SLOWLY CLOSE THE OUTLET
VAlvE
THE COOLER TO BE TAKEN OUT OF SERVICE.
7. IF COU-. PR CHANGE IS FOR MAINTENANCE, CLOSE EQUALIZING VALVE AND RED tag EGJALIZING VALVE, INLET AND CUTLET LUBE OIL VALVES, AND INLET AiX OUTLET WATER VALVES.
REVISED M < 1/FL "3 A BLCO fc`-3
l'
DO A ,133749
OONFTDFNTTAl
V
/*-a -
TEXT #43
/
L.
PROCEDURE TO STARTUP A CHLORINE RECTIFIER
THIS PROCEDURE IS TO BE REVIEWED PRIOR TO THE STARTUP OF A CHLORINE RECTIFIER BY THE POWER 2 SHIFT SUPERVISOR AND BOARD SOS.
1. MAINTAIN COMMUNICATIONS WITH THE CHLORINE PLANT AND/OR POWER I AS TO WHAT CIRCUIT IS TO BE BROUGHT ON LINE AND WHEN. EMPHASIZE TO YOUR CONTACTS THAT POWER 2 NEEDS TO BE COMMUNICATED WITH JUST PRIOR (WITHIN 1 MINUTE) TO PLUG IN. MAKE SURE THAT THE CIRCUIT IS COMING UP ON THE LOWEST TAP.
2. COMMUNICATE CHLORINE'S INTENTIONS TO POWER 1 IN CASE THE CHLORINE PLANT HAS NOT MADE THAT COMMUNICATION. KEEP POWER I INFORMED OF THE CHLORINE PLANT'S STATUS.
3. REVIEW THE ELECTRICAL ONE-LINE DRAWING IN THE CONTROL ROOM TO SEE WHAT ELSE IS FED FROM THE BUS THAT THE UPCOMING CIRCUIT IS ON. CONSIDERATION SHOULD BE GIVEN TO THE GENERATORS THAT MAY BE DOWN. COMMUNICATE ANY CONCERNS TO POWER I.
4. COMMUTATION SHOULD BE MADE WITH ANY PLANTS WITH FEEDERS ON THE SAME BUS THAT MAY BE AFFECTED. WHENEVER STARTING RECTIFIER #1 OR #4 COMMUNICATION SHOULD ALWAYS BE MADE WITH POLY C.
c
EDITED: NLC 1/22/92 BLOCK #43
r
f>() A 7 33 730 ^ONrTDFNTTAJ
V
TEXT BLOCK #
44
OT--100/200 SHELL BLASTING THE COMPRESSOR
SHELL BLASTING COMPRESSOR - UNIT 100/200 0 1- OPEN THE THREE BLEED VALVES ON THE NORTH SIDE OF THE UNIT (NEAR
SEAL AIR PIPING).
2. INSURE VALVES 1, 6, 7, B, AND 9 ARE OPEN.
3. OPEN VALVES 2 AND 4.
4. SLOWLY POUR 5 POUNDS OF PECAN SHELLS INTO HOPPER.
5. ALLOW THIS HOPPER TO EMPTY; THEN CLOSE VALVE 4.
6. ALLOW AIR TO BLOW THRU FOR A MINUTE OR SO TO CLEAR OUT LINES; THEN CLOSE VALVE 2.
7. OPEN VALVE 3 AND VALVE 5.
8. SLOWLY POUR 5 POUNDS OF PECAN SHELLS INTO HOPPER.
9. ALLOW THIS HOPPER TO EMPTY; THEN CLOSE VALVE 5.
10. ALLOW AIR TO BLOW THRU FOR A MINUTE OR SO TO CLEAR OUT LINES; THEN CLOSE VALVE 3.
11. Q 12.
COVER HOPPERS. CLOSE BLEED VALVES ON THE NORTH SIDE OF UNIT.
RE-INSTALLED:JML 10/03/90 BLOCK #44
no A .ur'T rNC: KlT T Ai
4
GT-100/200 STARTUP CHECKLIST DATE: _________________________
UNIT
1. ALL RED TAG MASTERS RELEASED AND PULLED
2. ALL AUXILIARY EQUIPMENT IS UNTAGGED AND RACKED IN
3. STARTING MOTOR RACKED IN
4. SfcC SWITCHGEAR RACKED IN MECHANICALLY AND ELECTRICALLY
5. FUEL GAS AVAILABLE-PIPELINE. POWER 1 c CHLORINE NOTIFIED
6. FUEL GAS UNBLOCKED TO UNIT
7. DO WE HAVE ENOUGH CONDENSATE PUMPS RUNNING TO START UNIT
8. UNIT ON TURNING GEAR FOR ONE <1> HOUR PRIOR TO START
9. STEAM INJECTION LINE WARMING UP (CONTROLLER OPEN)
10. HYDROGEN PRESSURE IN GENERATOR AT 25 PSIG
11. HYDROGEN PURITY IN GENERATOR >95%
YES
NO
DO A IT-sVAS,' fONFTDFNTT Ai
12. SEAL OIL EVACTOR RUNNING >2" AND SEAL OIL SYSTEM ON LINE
13. LUBE OIL SYSTEM: A. OIL TEMP > 95 DEGREES B. LUBE OIL EVACTOR RUNNING >2" VACUUM ON C. OIL PUMPS RUNNING (AC L. a PUMP Sc JACKING OIL PUMP) D. POWER OIL FILTER IN SERVICE E. LUBE OIL FILTER IN SERVICE F. LUBE OIL COOLER IN SERVICE AND WATER OPEN G. OIL LEVELS NORMAL (STARTING MOTOR Sc RESERVOIR) H. CHECK FOR OIL LEAKS AFTER OIL SYSTEM IS RUNNING I. D. C. COOLING OIL BLOCK VALVE OPEN TO JACKING. HOT END AND TC J. LUBE OIL HEADER Sc RESERVOIR VALVES OPEN TO SEAL OIL SUCTION
14. HRU SECTION: A. DA AT 70% LEVEL AND VENT OPEN (DA DUMP UNBLOCKED) B. "STEAM TO DA UNBLOCKED AT TOP OF UNIT
(
DO A 133750
CONP TDFNT TAl
C. STEAM TQ DA PRESSURE CONTROLLER UNBLOCKED UPSTREAM AND DOWNSTREAM AND DRAINS OPEN
D. BFP'S UNBLOCKED AND READY TO RUN E. 2" CONDENSATE TO HIGH PRESSURE BFP SEAL
COOLERS UNBLOCKED TO ALLOW FLOW TO DA AND GLAND COOLERS
DO A 1347.44 r.ONF TDFNT1 A:
F.. RECIRCULATION LINE ON LOW PRESSURE BFP'S "UNBLOCKED
0. BOILERS AT FIRING LINE
H. ALL BLR. LEAD LINE AND NON-RETURN BLOCK VALUES OPEN
1. HIGH AND MEDIUM PRESSURE SUPERHEATER VENTS OPEN
J. LOW PRESSURE DRUM VENT OPEN
K. HIGH. MEDIUM AND LOW PRESSURE BLR. LEAD LINE WARM UP VENTS OPEN
L. HP & MP SUPERHEATER DRAINS OPEN AND UNPLUGGED <T0 DETERMINE IF UNPLUGGED. CHECK TO INSURE STEAM FLOW OUT OF DRAINS AFTER MACHINE HAS FIRED)
M. GT-200 ONLY - INSURE H. P. SUPERHEATER DRAIN LOCATED NORTH SIDE OF SOUTH TRAIN IE OPEN
N. GT-200 ONLY - AUTOMATIC BLOWDOWN VALVES MANUALLY UNBLOCKED
O. AWC'S AT 70% LEVEL
P. TURBINE ENCLOSURE VENT FANS IN AUTO
Q. DRAIN FROM INTERNAL STEAM LOOP IN DA OPEN
R. FEEDWATER REGULATORS UNBLOCKED. BY-PASSES AND H. P. TRICKLE FEED CLOSED
S. GAUGE GLASSES IN SERVICE
T. ALL CASING. EXHAUST. AIR INLET AND AWC DOORS CLOSED
U. U-DUCT DRAIN IS CLOSED. CONFINED SPACE ENTRY PERMIT REQUIRED TO ENTER SUMP
1. INSURE INSTRUMENT AIR PURGE TO BLEED VALVE CONDUIT IS OPEN
2. COMPRESSOR DRAINS (3) ARE CLOSED
3. PUT IN ALARM SERVICE PROGRAM ON COMPUTER
1)0 A 1 *3755 CONF TDFNTTAI
V. INSTRUMENT AIR AND BACK-UP AIR TO BLEED VALVES OPEN. ALSO CHECK AIR PURGE TO BLEED VALVE CONDUIT.
W. GT-200 ONLY - PYROMETER BLOCKED AND COOLING AIR ON (AFTER TRUBINE IS SYNCHRONIZED. CRACK VALVE TO HARM UP 1/2 HOUR BEFORE OPENING B/V).
X. SNUFFING STEAM TO HOT END MANUALLY UNBLOCKED
Y. CONDENSATE TO BLR. FLASH TANK CLOSED
--""~Z. COOLING WATER SUPPLY AND RETURN OPEN TO "HER. SAMPLE COOLERS
AA. OPEN DRAIN ON MP LEAD LINE ON WEST END OF UNIT, (GROUND LEVEL) TO ASSURE NO WATER HAS ACCUMULATED.
BB. CHECK STEAM INJECTION WARM-UP VALVE TO ASSURE THAT THE STEAM HAS NOT BEEN LOCKED DOWN WITH THE HAND WHEEL.
CC. OPEN 1" DRAINS ON HIGH PRESSURE BOILER FEED PUMP DISCHARGE LINES AND MAINTAIN FLOW
DD. SULFITE PUMP RUNNING
EE. HOLD GT LOAD AT 40 MW UNTIL BOILERS COME ON LINE
FF. CHECK LOW POINT BLEED ON FEED GAS LINE (WEST SIDE OF FUEL GAS CABINET)
GG. CHECK FUEL GAS LINE FOR ANY OPENED VENTS OR DRAINS
(AFTER START-UP)
HH. TAKE A COMPLETE SET OF READINGS ON UNIT INSIDE/OUTSIDE AND COMPARE TO READINGS PRIOR TO SHUTDOWN
II. FILE THIS CHECKLIST IN THE START-UP CHECKLIST FOLDER. THIS FILE IS KEPT IN THE SAME FILE CABINET AS THE SAFEWORK PERMITS. RECORDS RETENTION IS FOR ONE WEEK.
REVISED:JML 11/03/92 BLOCK 45
UPDATED:JMC 04/14/94
DO A 133756 OONF TDFNT T At
V I* *
* AUTOMATIC SPRINKLER SYSTEM 0. T. 100/200
THE PURPOSE OF THIS PROCEDURE IS TO INFORM YOU OF PROPER OPERATION OF THE AUTOMATIC SPRINKLER SYSTEM AND ITS KEY CHECK POINTS.
1. LOCATE THE AUTO SPRINKLER BLOCK VALVE AND INSURE INDICATION IS IN THE "OPEN" POSITION FOR FIRE WATER SUPPLY.
NOTE: INDICATOR IS LOCATED AT BOTTOM WEST SIDE OF SPRINKLER SUPPLY LINE.
2. LOCATE AUTO SPRINKLER SUPERVISORY AIR SUPPLY PRESSURE GAUGE. GAUGE SHOULD READ 25-28 OZ. OF PRESSURE <10 OZ. MIN. ) THIS PRESSURE IS TO GIVE INDICATION THAT SYSTEM IS SEALED AND FREE OF LEAKS.
3. LOCATE THE MERCURY CHECK-VALVE# IT IS MADE OF GLASS AND SHOULD BE VISUALLY INSPECTED FOR CRACKS OR OTHER DAMAGE.
NOTE:
THIS SYSTEM IS ACTIVATED BY "RATE OF CHANGE" IN SYSTEM PRESSURE FROM AUTO SPRINKLER VALVE TO HEAT DETECTOR HEADS. THEREFORE MAINTAINING AIR PRESSURE IS VERY IMPORTANT.
EDITED:JML 08/11/93 BLOCK *48
- `UPDATED: JML' .......... 10/11/93
-
C
~
*
* -. r^.
. v.. T/
(
00 a i.rr/s; CONFTOFN] I A!
&I 1
I Hi E7 duc;
ENT R V SUPPLEMENT
COMPLETION OF THIS SUPPLFWENT COVERS ITEMS PECULIAR TO THIS EOUIFH':.i:' A." :- '.`01 NECEESAR) LV INCLUDED fN THE MULT) -PERMIT. IN ADD 3 T11 !=! TO Ai'v) AO ATTACHKf.'.NT T'O THIS CHECKLIST/ THE CONFINE! CVJA in ENTRY FORi! NUOT DC ISSUED WITH AREAS NOTED THAT DC ' N f- - F i_Y.
CONDITIO'.:!: UNIT IS SHUT DOWN
NOTE: COMPILED SPACE ENTRY TORN AND MULTI-PERMIT MUST BE COMPLETED AS APPLICA'.;! E.
YES NO
1. EQA'-r OPERATOR HAS BE!' N NOTIFIED OF ENTRY AN!) APPROPRIATE RED TAPS OH-'MlD.
______ ______
2. STARTIN': MOTOR RACKED OUT AND RED TAGGED
. E 1IV I P-CT O'`"OR ro: I. .* ::O.: PI WATER-WASH).
______ ,, __
3 K . 0. (.; . r i !. P !_ I ' L! I'. DLOCTOD IN.. IN. ED DOWN.
_______ _ __
! PF 01 EC TED LIGHTING fl . i . 1 :T aj~ i \ nn:.o
iT MTiriFI CL COMPLETION
T1..' ' r.
i'V' 'V : ~ < ...
O' i
L-.TrEf'T FOR
- : j : . G. J\ i
1 A OPED
e :'
.
9. S-`E",'
::L. F.!.r (0) r.Ih'J'iE ESCAPE
F -1 , , : '
!'- ; 7 E 1 ho T.0 SEl. A'.D (j: ;P
~ ~ ..'t i ; / . v r ,;
1C, THE E./.! I I i OBSERVER !.- A CEP f I PIED HOC. E WATCH
11. THE r'V !
OP LEFT'EF; HAL A HOLE WATCH CARD.
EXCEPT I CNN TO STANDARD. 1. USE CD FIVE ( D > P: I (.?.'!!. ESCAPE PACKS RATHER THAN AIR LIME EQUIP
2. A \f -O' VI1 U..-T . O-.I I'jT UFED - DEFFNDANCt ON NATURAL r.rV!l.
3 t_ if. -* ;1 r pilot c. cv.:L w^casille
till)
of;:-,-' V . . : p-
_______________________________
00 A 1,33758 CONFTDFNTTAI
REVIS'D J:i! 07/02 BLQCr 4t-"
upta
t 10/1
c
(
DO A 1 3^700 CONF TDFNT TAl
r r> K'i'LEhENT
comple" : c. o'
s cur''us-l.nt co'iTE tte>s peculiar to this equipment a
not keiesdar:. i irA^jrc: in ia-- kulti-pechii
in addition to, and as
ATTA> 'I;. F I : tuts CHOCY.L I R1 , 'I HE STAL'DAr D SAFE NORK NULTI-FERMIT ISUFl
.. BE 1ST..:-.:
C CON :: i: \
A..SO CONFINED SPACE EN1 FT FORM is cnuidal,.
Vl.'.J MO
1. 2. 3.
4. 5. 6. 7, 8 9. 10.
C 11
12, 13. 14 15
C L"'il-,U; ip.1- i C.i'i"' EPf'.TUi < i LENS I HAr-I ...lO DEC!- .
F^EL CAS ISRED TAGGED WITH DOUBLE BLOCK AND BLEED.
STEP ;INJECTION IE RED TAGGED KITHDOUBLE BLOCK AND
r_EE!>
PLANT Alp is RED TAO( L'B 14110 DOUBLE Blvi CCK AND ELEED.
STP-rT j i N-1 HD I OR IB RA( NED OUT AND RED TAGGED, c- 3 i.A i-'ST TO 'N/'iTC OUT AND p ED TAO^I D
T 1. P C A"> (*!' mN*' RFi.1 T r. -O'ED
,,, r -: ;-v-
en'n-t pke to c^-coocijtic dust.
/. - i .p ' r1 1 - R L S r, TCP IE F:E.'--, j HI. 1:
.
'V1 . .:
S TO PE; e;; T:; N P RIP.I 17
I ' r i ' " / i ;. . j , '. S " !~ j I. C >. E N Ti- i /V iP EIT
L " I . t--- TE UJ1'BEK OF
It. i r L- 7" U! ' 'T ' ! . ,1 f. i I, 17. S'" r ' r~ . 1 , T 1 , \ T-
EXCEFT : O' 'T T C 51 ANSA'-- D .
1. PU-'-C-lNT OF- VESSEL- - Ri i v ON A)N r.OVE-TrNT,
2. USE or r j -E (D ;
JIT. ESO-.FE packs father than air line equipment.
3. H'f A ' ! 1 : USEI: DErTN'DCNCE O' NATURAL DRAFT.
c OP ET MAT
RE1. : 03/ BlO
[Hi A 13T71-.0 fONF TDFNT T Ai
UPDA71. I. 10/11 /`= I
DO A 130701 CONF TDFNTTAI
V iSITION LC'-! LNTF-Y SUPPLEMENT
l'J;1 t
Y <\ ij* - L FY.Ti-JT COVERS ITEMS PECULIAR TO THIS EQWIPMtNT
tL 4- t- i t. t r.1 " } UJCD IN THE MUI.TI-PERMIT. IN ADDITION TO AND
7 "E~ THT~ ECNuIET. the: CONFINED SPACE ENTRY FORM MUST
'V. fSfw r'iE
0 THAT VO NOT AFPLY.
consit::/ 'v o: it is shut noun.
NOTE- VESSEL ENTRY SECTION OF SAFE WORK MULTI-PERMIT MUST BE COMPLETED AS APIJ i_11' A' ! E
YIS NO
r.o- pi. CF'EPATOi' HAS DEEM MOTIF IED AT ENTRY AND APPRD-
r k : i.ri
i^.cs sic Nil N'
TEN" t! ;A'I VP F 3NSIDE DUC "t DELOW J 00 DEOF.
0 ?T-.- * ii.'. ' T T'r'(!C: t7': UUT Li'iD PCD T ACC ED.
- ; 1 . 1 l 1 1 , Ei C 1! f T iYN TPUTi'.L
-- ----
_______
_
1
;7 .i 7
i. l_T'' ; FU> IN. DLE'D DO-.)Ni .i I ,_.0 -U. '0 L - 7 ED /
*. '
i
7^r . 77 1 jN P.ND PDF T/.COLD
(
t c
EXCE" " 1.
; ' ,^71777 - !;. ! v r'M ( 1N r NT'- 'E. MK NT, (FA) i. i; t"' - i-SAT UR 7 L DLAKT POP VENTILATION. CM)
, i,E (Z) rANTitj ESCi\P'C PACi.5 RAThER THAN AIR LINE FGUIP.
OPER--.T j 7 , liErt' MAINTEf.-i.. I PE-h
re :
UFL10/ 1
DO A 1 337 NT* CONFIDENT TAI
TEXT BLOCK #
93
GT--100/200 BLEED VALVE ENCLOSURE ENTRY SUPPLEMENT
COMPLETION OF THIS SUPPLEMENT COVERS ITEMS PECULIAR TO THIS EQUIPMENT AND NOT NECESSARILY INCLUDED IN THE MULTI-PERMIT. IN ADDITION TO AND AS ATTACHMENT TO THIS CHECKLIST, THE STANDARD VESSEL ENTRY PERMIT MUST BE ISSUED WITH AREAS NOTED THAT DO NOT APPLY.
1. PRIOR TO ENTRY, MONITOR FOR OXYGEN CONTENT.
YES ____
2. BOARD OPERATOR NOTIFIED BEFORE ENTERING ENCLOSURE.
____
3. APPROPRIATE RED TAGS SIGNED.
____
4. STARTING MOTOR RACKED OUT AND RED TAGGED.
____
9. FUEL GAS LINE BLOCKED IN, BLEED DOWN AND RED TAGGED. DB & B ON GT-200 BLIND IN PLACE UNLESS BURNER HAS BEEN PULLED.
____
6. GEN BREAKER OUT, DC TURNED OFF AND RED TAGGED.
____
7. GROUND FAULT PROTECTED OR LOW VOLTAGE LIGHTING IS REQUIRED IN5IDE THE ENCLOSURE.
____
8. BOARD OPERATOR MUST BE NOTIFIED ON COMPLETION OF WORK AND EXIT FROM ENCLOSURE.
____
9. PLANT AIR - RED TAGGED AND DOUBLE BLOCK AND BLEED
____
10. IF WORK IS GOING ON IN THIS AREA OTHER THAN CHECKING VALVE OPERATION, THE BLEED VALVE OPENINGS MUST BE CLOSED TO PREVENT FOREIGN OBJECTS FROM ENTERING THE COMPRESSOR. THIS CAN BE ACCOMPLISHED BY OPERATING THE BYPASS VALVES TO THE BLEED VALVES. THIS WILL CLOSE THE BLEED VALVES. IT WILL THEN BE NECESSARY TO JAM A PIECE OF 2 X 4 IN THE OPENING TO INSURE THEY STAY CLOSED. JUMPER THE TURNING GEAR TIME OUT TRIP PRIOR TO INSTALLING THE 2 X 4'S. IF THE TURNING GEAR TIMES OUT, WE WILL LOSE SAFETY OIL AND THE BLEED VALVES WILL OPEN. THE THREE VALVES FOR THE 3RD AND 6TH STAGE VALVES WILL NEED THREE 11 INCH 2 X 4'S AND THE 9TH STAGE VALVE WILL NEED A 8 3/4 INCH 2X4. THESE 2 X 4'S WILL BE KEPT IN BUILDING 3706 ON THE EAST WALL.
11. SAFETY OBSERVER WILL HAVE FIVE <9> MINUTE ESCAPE PACKS FOR EACH PERSON INSIDE THE VESEL AND ONE FOR HIM/HER SELF.
12. THE SAFETY OBSERVER IS A CERTIFIED HOLE WATCH.
13. THE SAFETY OBSERVER HAS A HOLE WATCH CARD.
c
EXCEPTIONS TO STANDARD:
no a it-; ? 'i rONF T DrNT T At
1. USE OF FIVE (5) MINUTE ESCAPE PACKS RATHER THAN AIR LINE EQUIP. <4A>
2. INSTRUMENT AIR TO THIS AREA IS NOT ISOLATED.
OPERATIONS REPR: MAINTENANCE REPR: REVISED:NLC 11/13/91 BLOCK #93
r)0 A 1 33764 f'ONF TDFNT T Al
TRANSFERRING LUBE OIL FROM BOWSER TO GT-100/200 LUBE OIL RESERVOIRS
Vl.
INFORM BOARD OPERATOR THAT YOU ARE TRANSFERRING OIL FROM THE THE BOWSER TO THE UNIT AND WHICH UNIT YOU ARE TRANSFERRING TO.
2. >n - ' J' '
3.
INSURE THAT LINES FROM LUBE OIL STORAGE TO OTHER LUBE OIL RESERVOIRS ARE BLOCKED OFF.
OPEN RECIRCULATION VALVES BACK TO STORAGE TANK.
4. OPEN LUBE OIL PUMP SUCTION VALVES.
5. OPEN LUBE OIL PUMP DISCHARGE VALVE.
6. OPEN VALVES TO UNIT 100 OR 200 LUBE OIL RESERVOIR INLET. (DEPENDING ON UNIT YOU ARE TRANSFERRING OIL INTO).
7. START LUBE OIL TRANSFER PUMP FROM LOCAL SWITCH AT THE PUMP DISCHARGE OF PUNA MUST BE THROTTLED.
8. AFTER STARTING LUBE OIL TRANSFER PUMP, BLOCK IN RECIRCULATION VALVES BACK TO STORAGE TANK. IF THESE VALVES ARE LEFT OPEN, THE OIL WILL GO BACK INTO THE TANK INSTEAD OF GOING TO THE RESERVOIR.
9. ^r10.
STOP PUMP WHEN REQUIRED AMOUNT OF OIL HAS BEFN PUMPED TO THE RESERVOIR.
CLOSl- ALL VALVES THAT WERE PREVIOUSLY OPENED.
11. INFORM CONTROL ROOM OPERATOR AS TO HOW MUCH OIL IN INCHES (MEASURFD ON RESERVOIR DIPSTICK) WAS ADDED TO WHICH TURBINES.
NOTE: DON'T LET THE LEVEL GO BEYOND 17. WHILE PUMPING.
REVISED:UML 02/24/92 BLOCK #54
UPDATED:JML "05/12/93
c 00 a 1 00765,
l ONf- T DFNT T Al
SAFE WORK PROCEDURE TRANSFERRING THE GT-lOO AND GT-200 INVERTERS 1. MAKE SURE SWITCHES TS-1 (GT-lOO) AND TS-2 (GT-200) ARE IN THE NORMAL
(EPT) POSITION. 2. MAKE SURE THE "INVERTER OPERATION". "INVERTER OUTPUT", AND "ALTERNATE
SOURCE AC INPUT CIRCUIT BREAKERS ARE ALL IN THE "UP" POSITION ("ON") AND NOT TRIPPED. 3. MAKE SURE THE "INVERTER SUPPLYING LOAD", AND "INSYNC", LIGHTS ARE ON BEFORE TRANSFERRING. 4. ON FRONT OF THE INVERTER PANEL, PUSH THE "ALT. SOURCE TO LOAD" BUTTON. THE "ALTERNATE SOURCE SUPPLYING LOAD" LIGHT WILL COME ON. THE "INVERTER OUTPUT" METER WILL SHOW "0" LOAD AMPS FROM INVERTER. AT THIS TIME, YOU WILL BE ON EPT POWER. 5. AFTER 10-15 SECONDS, PUSH THE "INVERTER TO LOAD" BUTTON. ONLY IF "IN SYNC" LIGHT IS ON THE "INVERTER SUPPLYING LOAD" LIGHT WILL COME ON. AT THIS TIME, THE INVERTER WILL BE BACK TO NORMAL POWER FROM THE MAIN D. C. PANEL. REVISED: NLC 1/23/92 BLOCK #55
no A 10 07^6 CONF T OF NT T Al
CHECKING MECHANICAL OVERSPEED TRIP - UNITS 100/200
TO CHECK OVERSPEED TRIP, FOLLOW THE PROCEDURE INDICATED BELOW:
1. ON EAST SIDE OF GOVERNOR BLOCK, FACING THE SPEED CHANGER, THERE WILL BE A HANDLE TO YOUR RIGHT. THIS IS THE "OVERSPEED TRIP TEST HANDLE". IT WILL BE IN THE "OPERATE" POSITION WITH THE! HANDLE AWAY FROM YOU.
2. THERE ARE THREE GAUGES IN FRONT OF YOU. THEY ARE EMERGENCY OIL
(WITH AN INDICATION OF 30 PSI APPROX), OVERSPEED TRIP OIL (WITH A
"0" PSIG INDICATION) AND COMPRESSOR DISCHARGE.
j
I 3. THE "OVERSPEED TRIP" TEST HANDLE IS SPRING LOADED. START PULLING
THE HANDLE SLOWLY TOWARDS YOU AND OBSERVE THE EMERGENCY OIL ,AND OVERSPEED TRIP OIL GAUGES AS THEY WILL CHANGE PRESSURES QUICKLY RIGHI BEFORE YOU HAVE PULLED THE HANDLE TO ITS STOP POSITION.
SHOULD NOW SHOW THE FOLLOWING:
EMERGENCY OIL - 5-10 PSIG OVERSPEED TRIP OIL - 30 PSI (APPROX.) COMPRESSOR DISCHARGE
RIGHT BEFORE YOU GET TO THE STOP POSITION, YOU WILL OBSERVE THE EMERGENCY OIL PRESSURE GAUGE TO TO 6-10 PSIG, AND THE OVERSPEED TRIP OIL GAUGE WILL SHOW A PRESSURE INCREASE TO 30 PSI (APPROX). THE COMPRESSOR DISCHARGE GAUGE SHOULD STILL SHOW A PRESSURE RI EADING.
BACK TO NORMAL OPERATING POSITION
1. SLOWLY RELEASE THE HANDLE TO ITS NORMAL POSITION AWAY. IF RELEASED TOO QUICKLY, THIS WILL TRIP THE TURBINE. OBSERVE THE OVERSPEED TRIP OIL PRESSURE GO TO "0" PSIG FIRST. THE EMERGENCY OIL IS STILL AT 6-10 PSIG. KEEP SLOWLY RELEASING THE HANDLE AND OESERVE THE EMERGENCY OIL, GAUGE GO BACK TO 70 PSIG AS YOU LET THE HANDLE GO BACK TO ITS ORIGINAL OPERATE POSITION.
2. THE SYSTEM SHOULD BE JUST AS YOU FOUND IT WITH THE EMERGENCY OIL AT 30 PSI (APPROX. ) AND THE OVERSPEED TRIP OIL AT 0 PSIG. TEST IS COMPLETE.
REVISED:NLC 1/23/92 BLOCK #56
DO A 1337h7 OONFTDFNTTAl
CHECKING NfcCHANICAL OVERSPEED TRIP - UNITS 100/200
TO CHECK OVERSPEED TRIP. -FOLLOW THE PROCEDURE INDICATED BELOW:
1. ON EAST SIDE Or GOVERNOR BLOCK. FACING THE SPEED CHANGER. THERE WILL BE A HANDi_t TO YOUR RIGHT. THIS IS THE "OVERSPEED TRIP
, TEST HANDLE". IT WILL BE IN THE "OPERATE" POSITION WITH THE ( HANDLE AWAY FROM YOU.
2. THERE ARE THREE GAUGES IN FRONT OF YOU. THEY ARE EMERGENCY OIL (WITH AN INDICATION OF 30 PSI APPROX), OVERSPEED TRIP OIL (WITH A "0" PSIG INDICATION) AND COMPRESSOR DISCHARGE.
3. THE "OVERSPEED TRIP" TEST HANDLE IS SPRING LOADED. START PULLING THE HANDLE SLOWLY TOWARDS YOU AND OBSERVE THE EMERGENCY OIL AND OVERSPEED TRIP OIL GAUGES AS THEY WILL CHANGE PRESSURES QUICKLY RIGHT BEFORE YOU HAVE PULLED THE HANDLE TO ITS STOP POSITION. SHOULD NOW SHOW THE FOLLOWING:
EMERGENCY OIL - 5-10 PSIG OVERSPEED TRIP OIL - 30 PSI (APPROX.) COMPRESSOR DISCHARGE
RIGHT BEFORE YOU GET TO THE STOP POSITION. YOU WILL OBSERVE THE EMERGENCY OIL PRESSURE GAUGE GO TO 6-10 PSIG, AND THE OVERSPEED TRIP OIL GAUGE WILL SHOW A PRESSURE INCREASE TO 30 PSI (APPROX). THE COMPRESSOR DISCHARGE GAUGE SHOULD STILL SHOW A PRESSURE READING.
BACK TO NORMAL OPERATING POSITION
1. SLOWLY RELEASE THE HANDLE TO ITS NORMAL POSITION AWAY. IF RELEASED TOO QUICKLY, THIS WILL TRIP THE TURBINE. OBSERVE THE OVERSPEED TRIP OIL PRESSURE GO TO "0" PSIG FIRST. THE EMERGENCY OIL IS STILL AT 6-10 PSIG. KEEP SLOWLY RELEASING THE HANDLE AND OBSERVE THE EMERGENCY OIL. GAUCE SHOULD GO BACK TO 70 PSIG AS YOU LET THE HANDLE GO BACK TO ITS ORIGINAL OPERATING POSITION.
2. THE SYSTEM SHOULD BE JUST AS YOU FOUND IT WITH THE EMERGENCY OIL AT 00 PSI (APPROX. ) AND THE OVERSPEED TRIP OIL AT 0 PSIG. TEST IS COMPLETE.
REVISED:NLC 1/23/92 BLOCK #56
UPDATED: JML 02/02/94
r 00 0 130768 CONF 1 OF NT 1 Al
V
CLEANING COMPRESSOR - UNITS 100/200
(A). HAND CLEANING COMPRESSOR NORMALLY. ANYTIME THE COMPRESSOR INLET SCROLL. AND BLADES ARE CLEANED. IT IS DONE BY LABORERS. THIS IS A RELATIVELY SAFE JOB / 'JT LIKE ANY OTHER JOB. SAFETY PRECAUTIONS MUST BE TAKEN. THE ITEMS '-tfELOW MUST BE RED TAGGED AND CLEARANCE ACCEPTED BY ALL THE LABORERS DOING THE CLEANING BEFORE ENTERING THE COMPRESSOR INLET. CONFINED SPACE ENTRY SECTION OF THE MULTI-WORK PERMIT MUST BE FILLED OUT ALSO. AIR INLET ENTRY SUPPLEMENT MUST BE COMPLETED AND SIGNED. ALL LABORERS SHOULD HAVE RECEIVED POWER II BLOCK INDOCTRINATION WITHIN THE LAST YEAR.
(1) - GENERATOR BREAKER (2) - STARTING MOTOR (3) - TURNING GEAR (4) - FUEL GAS - DOUBLE BLOCK fc BLEED (5) - STEAM INJECTION - DOUBLE BLOCK & BLEED (6) - DOUBLE BLOCK & BLEED ON LINE CONDENSATE WATER WASH SYSTEM (7) - PLANT AIR DOUBLE BLOCK * BLEED
SAFETY EQUIPMENT REQUIRED TO DO THIS JOB IS AS FOLLOWS:
(1) - MONOGOGGLES (2) - LOW VOLTAGE LIGHTS OR GROUND FAULT RECEPTACLE (3) - RUBBER GLOVES CLEANING THE COMPRESSOR INLET SCROLL AND THE FIRST AND SECOND ROW OF VANES AND BLADES IS ACCOMPLISHED BY SCRUBBING THE METAL SURFACE WITH SCOTCH-BRITE AND HUNTER SOAP. THE DEPOSIT WHICH MUST BE REMOVED IS BLACK IN COLOR. s ENSURE THE TRAILING EDGE OF THE BLADES ARE SCRUBBED ESPECIALLY WELL BECAUSE l HEY ARE HARD TO SEE AND REACH.
REVISED:NLC 1/22/92 BLOCK #59
UPDATED:JML 11/16/93
C In') A 1 2?,Vt.c)
CONFTDFNT 7 AI
V
TEXT BLOCK #
60
HOT END BEARING ENCLOSURE ENTRY SUPPLEMENT
COMPLETION OF THIS SUPPLEMENT COVERS ITEMS PECULIAR TO THIS EQUIPMENT AND { NOT NECESSARILY INCLUDED IN THE MULTI-PERMIT. IN ADDITION TO AND AS L ATTACHMENT TO THIS CHECKLIST THE STANDARD VESSEL ENTRY PERMIT MUST BE
ISSUED WITH AREAS NOTED THAT DO NOT APPLY.
CONDITIONS: UNIT IS SHUT DOWN.
NOTE: VESSEL ENTRY SECTION OF SAFE WORK MULTI-PERMIT MUST BE COMPLETED AS APPLICABLE.
YES
NO
1. BOARD OPERATOR HAS BEEN NOTIFIED OF ENTRY AND APPROPRIATE RED TAGS SIGNED.
_______ ____
2. TEMPERATURE INSIDE DUCT BELOW 120 DEGF.
_______ ____
3. STARTING MOTOR RACKED OUT AND RED TAGGED.
_______ ____
4. AIR MOVER INSTALLED AND PROPERLY GROUNDED.
_______ ____
5. SNUFFING STEAM AND C02 BLOCKED IN AND RED TAGGED. C02 LINE DISCONNECTED.
6. LOW VOLTAGE OR GROUND FAULT PROTECTED LIGHTING AVAILABLE.
7. BOARD OPERATOR WILL BE NOTIFIED ON COMPLETION OF WORK AND EXIT.
8. SAFETY OBSERVER WILL HAVE FIVE (5) MINUTE ESCAPE PACKS FOR EACH PERSON INSIDE THE VESSEL AND ONE FOR HIM/HER SELF.
_______ ____ _______ ____ _______ ____ _______ ____
9. THE SAFETY OBSERVER IS A CERTIFIED HOLE WATCH.
_______ ____
10. THE SAFETY OBSERVER HAS A HOLE WATCH CARD.
_______ ____
EXCEPTIONS TO STANDARD: 1. USE OF FIVE (5) MINUTE ESCAPE PACKS RATHER THAN AIR LINE EQUIP. (4A) 2. LIFE LINE* HARNESS. ETC. NOT USED. (4B)
C OPERATIONS REPR:
MAINTENANCE REPR:
REVISED:UML 07/03/91 BLOCK #60
do a i:-n770 f.ONF TDF NT '( A;
SAFE WORK PROCEDURE
REPLACING G. T. LUBE OIL FILTER ELEMENTS - UNITS 100/200
THE G. T. LUBE OIL SYSTEM INCLUDES A PAIR OF FILTERS. ONE OF WHICH IS IN SERVICE AT ALL TIMES. THE OTHER CLEAN AND ON STAND-BY. WHEN. DUE TO HIGH DIFFERENTIAL PRESSURE ACROSS THE IN-SERVICE FILTER. IT BECOMES NECESSARY TO SWITCH TO THE STAND-BY ONE. THE FILTER ELEMENTS IN THE DIRTY UNIT THEN MUST BE REPLACED.
THE PROCEDURE FOR ACCOMPLISHING THIS TASK IS AS FOLLOWS:
1. INSURE THAT THE DIRTY FILTER IS ISOLATED - INLET AND OUTLET VALVES CLOSED TIGHT. AND VALVE IN THE 3/4" VENT PIPING CLOSED. AND VALVES ON 3/4" EQUALIZING LINE CLOSED.
2. CHECK ALL DRAINS TIED TO FILTER DRAIN HEADER TO INSURE FOR LUBE OIL SAMPLING, THEY ARE CLOSED. THESE ARE LUBE OIL FILTERS IN SERVICE, BOTH POWER OIL FILTER DRAINS AND BLOCK VALVES AT LUBE OIL HEADER (JUST SOUTH OF WEST L. 0. FILTER).
3. INSURE CENTRIFUGE SUCTION FROM LUBE OIL TANK IS CLOSED. OPEN THE 1 1/2" DRAIN VALVE ON THE DIRTY FILTER AND THE 3/4" VALVE CONNECTING THE DRAIN LINE TO CENTRIFUGE SUCTION. AT THIS TIME, THE CENTRIFUGE CAN BE STARTED ACCORDING TO PROCEDURE TO DRAIN LUBE OIL FILTER.
4. PROCEED TO DRAIN THE FILTER HOUSING, USING THE CENTRIFUGE PUMP. AFTER PUMPING LONG ENOUGH TO BE ASSURED THAT THE OIL LEVEL IN THE FILTER IS BELOW THE COVER, THE FILTER MAY THEN BE OPENED.
5. OPEN THE 3/4" VENT TO ATMOSPHERE (PLACE A BUCKET UNDER THIS VENT TO CATCH ANY DRIP).
6. DISCONNECT THE ORIFICE FLANGE IN THE VENT PIPING.
7. LOOSEN THE COVER NUTS AND DROP THE HOLD-DOWN BOLTS TO THE SIDE.
8. TIGHTEN THE DAVIT NUT SUFFICIENTLY TO LIFT THE COVER CLEAR OF THE FILTER HOUSING AND SWING THE COVER AWAY.
9. IF THE OIL LEVEL IS NOT LOW ENOUGH TO ALLOW WORK, AGAIN OPERATE THE CENTRIFUGE UNTIL PROPER LEVEL IS ACHIEVED.
10. THERE ARE ELEMENTS IN EACH, HELD TIGHTLY IN PLACE BY A SPRING MECHANISM ON TOP OF EACH THAT IS COMPRESSED BY A LONG BOLT WHICH SCREWS INTO A POST WHICH SUPPORTS THE FILTER ELEMENTS. REMOVE THESE EIGHT BOLTS AND THE SPRING MECHANISMS.
11. REMOVE THE EIGHT DIRTY FILTER ELEMENTS - HAVE A CONTAINER (FIBER PACK AND PADS) AVAILABLE IN WHICH TO PLACE THEM.
12. INSURE THERE IS NOTHING LAYING IN THE BOTTOM OF THE HOUSING.
13. INSTALL NEW FILTER ELEMENTS.
DO A 103771 CONFTDFNTTAI.
14. REPLACE SPRING MECHANISMS, COMPRESSING AS BEFORE BY TURNING BOLT INTO TOP OF EACH POST.
15. INSURE THE RUBBER GASKET IS IN PLACE AND CLEAN, AND THAT GASKET SURFACE ON THE COVER IS CLEAN.
16. SWING THE COVER BACK INTO PLACE. LOOSEN DAVIT NUT, AND ALLOW THE COVER TO SEAT ON GASKET.
17. LIFT HOLD-DOWN BOLTS BACK*INTO PLACE AND TIGHTEN COVER NUTS# USING CRISS-CROSS PROCEDURE TO ASSURE PROPER GASKET SEALING.
18. RE-CONNECT THE VENT ORIFICE FLANGE AND THEN OPEN THE VALVE IN THIS 3/4" LINE.
19. WITH THE 3/4" VENT TO ATMOSPHERE OPEN (AND A BUCKET UNDER IT) THE FILTER HOUSING CAN NOW BE REFILLED.
20. WHILE OBSERVING LUBE OIL PRESSURE SLOWLY OPEN THE VALVES IN THE 3/4" EQUALIZING LINE. THIS WILL ALLOW OIL FROM THE IN-SERVICE FILTER TO SERVICE FILTER TO FLOW INTO THE EMPTY ONE THROUGH THIS COMMON DRAIN PIPING.
21. WHEN OIL IS DISCHARGED FROM THE 3/4" VENT TO ATMOSPHERE, AND WHEN THE ORIFICE VENT LINE TO THE DRAIN HEADER FEELS WARM FROM OIL FLOWING IT THE 3/4" DRAIN VALVES ON THE EQUALIZING LINE CAN BE CLOSED, ALONG WITH THE VENT.
22. THE FILTER IS NOW FULL AND READY TO BE PUT BACK ON STANDBY. 23. WHILE SOMEONE OBSERVES THE LUBE OIL PRESSURE, SLOWLY OPEN THE INLET
VALVE UNTIL IT IS FULLY OPEN. IF A DROP IN LUBE OIL SUPPLY PRESSURE IS OBSERVED, CLOSE THE INLET AND GO BACK TO STEP 20. IF NO CHANGE IN PRESSURE IS OBSERVED, THE FILTER SHOULD HAVE THE INLET OPEN AND THE 3/4" VENT WITH ORIFICE TO THE DRAIN HEADER OPEN AND ALL OTHER VALVES CLOSED. THE FILTER IS NOW BACK ON STANDBY. 24. CLEAN UP THE AREA AND DISPOSE OF THE DIRTY FILTER ELEMENTS.
REVISED:NLC 1/22/92 BLOCK #61
no A 1337 77 f.ONF TDFNT1 Al
SAFE WORK PROCEDURE
ISOLATING STEAM LINE TO COMBUSTOR - UNITS 100/200
1. INSURE THAT BOARD OPERATOR HAS PUT CONTROL VALVE ON MANUAL AND CONTROLLER CLOSED.
2. BLOCK IN UPSTREAM STEAM VALVE (TOP OF AIR INLET DUCT).
I
3. BLOCK IN DOWNSTREAM STEAM VALVE (TOP OF THE AIR INLET DUCT). I
4. OPEN BLEED VALVE BETWEEN BLOCK VALVES.
5. HANG ALL PERTINENT RED TAGS.
NOTE: ALSO ON GT-200 TAG STEAM TO REGEN.
REVISED:NLC 1/23/92 BLOCK #62
UPDATED:JML ' 02718/94
c
c I'H') A 113773 C ONI TDI NT 1 A!
TEXT BLOCK #
69
SAFE WORK PROCEDURE
HYDROGEN/SEAL OIL SYSTEM OPERATION - UNITS 100/200
HYDROGEN CONTROL SYSTEM
THE 70 MW E-M GENERATOR IS HYDROGEN COOLED. 30 PSI PRESSURE BEING MAINTAINED IN THE CASING AT ALL TIMES.
HYDROGEN GAS IS SUPPLIED FROM A COMPRESSED GAS CYLINDER TRAILER, REGULATED TC 45 PSIG, AND SENT TO THE CONTROL CABINET. A REGULATOR VALVE IN THE CABINET MAINTAINS CASING PRESSURE AT 30 PSI. THERE IS A BY-PASS VALVE AROUND THIS REGULATOR FOR EMERGENCY USE. THERE IS A 5 PSI REGULATOR IN THE SYSTEM, NORMALLY OUT OF SERVICE AND ISOLATED FROM THE 30 PSI SYSTEM BY A CHECK VALVE, WHICH COMES IN TO MAINTAIN 5 PSI IN THE GENERATOR CASING ON LOSS OF SEAL OIL PUMPS. UNDER THESE CONDITIONS, SEAL OIL WOULD BE SUPPLIED FROM THE BEARING OIL HEADER, NECESSITATING REDUCED HYDROGEN PRESSURE IN THE GENERATOR. EXCESSIVE GAS PRESSURE WOULD BE VENTED AUTOMATICALLY.
HYDROGEN PURITY IN THE GENERATOR CASING MUST BE MAINTAINED IN THE 90-957. RANGE. THIS IS ACCOMPLISHED BY VENTING A SMALL AMOUNT OF GAS FROM THE SEAL OIL DETRAINING CHAMBERS AT EACH END OF THE GENERATOR. THIS SCAVENGE GAS FLOW IS CONTROLLED THROUGH THE TWO FLOWMETERS MOUNTED ON THE FRONT OF THE HYDROGEN CONTROL CABINET. INCREASING PURITY (ABOVE 957.) SIGNALS THE NEED TO REDUCE THE SCAVENGE RATES THROUGH THESE FLOWMETERS, AND OF COURSE, VICE VERSA.
ALSO MOUNTED ON THE FRONT OF THE CONTROL CABINET IS A PUSH BUTTON WHICH ALLOWS MANUAL OPERATION OF THE SOLENOID-OPERATED VENT VALVES IN THE SCAVENGE GAS LINES FROM THE DETRAINING CHAMBERS. OPERATION OF THIS PUSH BUTTON WOULD ALLOW RAPID VENTING OF GAS FROM THE DETRAINING CHAMBERS, RESULTING IN AN INCREASE OF PURE HYDROGEN FLOW TO THE MACHINE AS A MEANS OF CORRECTING SITUATIONS OF DANGEROUSLY LOW PURITY.
SEAL OIL SYSTEM
IN ORDER TO CONTAIN HYDROGEN GAS IN THE GENERATOR CASING, SEAL OIL IS APPLIED TO THE SEAL RINGS AT EACH END OF THE MACHINE AT 5 PSI GREATER THAN THAT OF THE GAS IN THE CASING.
UNDER NORMAL OPERATING CONDITIONS, THIS OIL IS SUPPLIED BY AN AC MOTORDRIVEN PUMP, TAKING SUCTION FROM THE BEARING OIL HEADER AND DISCHARGING AT 65 PSI TO THE DIFFERENTIAL PRESSURE REGULATOR WHICH MAINTAINS PRESSURE AT THE GENERATOR SEALS 5 PSI HIGHER THAN THE CASING GAS PRESSURE. ON LOSS OF THE AC SEAL OIL PUMP, DUE TO POWER FAILURE OR WHATEVER, A DC MOTOR DRIVEN PUMP IS PROVIDED AS A BACKUP.
AS STATED PREVIOUSLY, NORMAL SUCTION SUPPLY TO THE SEAL OIL PUMPS IS FROM
THE BEARING OIL HEADER. HOWEVER, ON LOSS OF PRESSURE ON THIS SYSTEM,
THE SEAL OIL PUMP WILL TAKE SUCTION FROM THE MAIN LUBE OIL TANK AND/OR
FROM THE SEAL DRAIN TANK. IT SHOULD BE REMEMBERED, HOWEVER, THAT ON
LOSS OF BEARING OIL PRESSURE IT IS NECESSARY TO CLOSE THE BLOCK VALVE
FROM THE SYSTEM TO THE SEAL OIL PUMP SUCTION HEADER. EXPERIENCE HAS
^
SHOWN THAT IF THIS VALVE IS LEFT OPEN UNDER THESE CONDITIONS, THE SEAL 2 o
OIL PUMP SOON BEGINS TO CAVITATE, APPARENTLY DRAWING IN AIR FROM THE
^
'DEAD' LINE.
z
THERE ARE TWO OTHER BACKUP SYSTEMS THAT WILL SUPPLY SEAL OIL ON LOSS
=! $
OF BOTH AC AND DC PUMPS. FIRST, THERE IS A SOLENOID OPERATED VALVE
^
WHICH SHOULD OPEN, SUPPLYING OIL FROM THE 220 PSI POWER OIL SYSTEM
TO THE SEAL OIL DIFFERENTIAL PRESSURE REGULATOR. SECOND, THIS FAILING,
OIL AT 30 PSI FROM THE BEARING HEADER WOULD BE SUPPLIED TO THE REGULATOR.
unLJFvFR. THTfi uni Ji n NFrFRRITATE OPERATING AT A REDUCED HYDROGEN PRESSURE
rnUM'I I nCi dtnL. vi\nj.i^ i nivi. LOSS OF BEARING OIL PRESSURE IT IS NECESSARY TO CLOSE THE BLOCK VALVE FROM THE SYSTEM TO THE SEAL OIL PUMP SUCTION HEADER. EXPERIENCE HAS SHOWN THAT IF THIS VALVE IS LEFT OPEN UNDER THESE CONDITIONS, THE SEAL OIL PUMP SOON BEGINS TO CAVITATE. APPARENTLY DRAWING IN AIR FROM THE 'DEAD' LINE. THERE ARE TWO OTHER BACKUP SYSTEMS THAT WILL SUPPLY SEAL OIL ON LOSS OF BOTH AC AND DC PUMPS. FIRST, THERE IS A SOLENOID OPERATED VALVE WHICH SHOULD OPEN, SUPPLYING OIL FROM THE 220 PSI POWER OIL SYSTEM TO THE SEAL OIL DIFFERENTIAL PRESSURE REGULATOR. SECOND, THIS FAILING, OIL AT 30 PSI FROM THE BEARING HEADER WOULD BE SUPPLIED TO THE REGULATOR. HOWEVER, THIS WOULD NECESSITATE OPERATING AT A REDUCED HYDROGEN PRESSURE IN THE GENERATOR (AS DESCRIBED PREVIOUSLY IN THE HYDROGEN CONTROL SYSTEM WRITE-UP). SEAL OIL FROM THE GENERATOR SEALS DRAINS TO THE DETRAINING CHAMBERS AT EACH END OF THE MACHINE, THENCE THROUGH THE FLOAT TRAP WHICH PREVENTS LOSS OF HYDROGEN TO THE DRAIN, AND INTO THE SEAL OIL DRAIN TANK. AN EVACTOR IS OPERATED ON THE DRAIN TANK TO MAINTAIN APPROXIMATELY 3"/H20 VACUUM IN THE TANK TO REMOVE GAS VAPORS AND TO FACILITATE DRAINAGE. ANY LEAKAGE INTO THE GENERATOR CASING, EITHER OIL OR WATER (FROM HYDROGEN COOLERS) WILL BE DETECTED AND ANNUNCIATED BY THE LIQUID-DETECTOR DEVICE PIPED FROM THE BOTTOM OF THE CASING. THE AUX. OPERATOR CHECKS ALL THIS HYDROGEN AND SEAL OIL EQUIPMENT EACH SHIFT, AND IT IS HIS RESPONSIBILITY TO SEE THAT EVERYTHING OPERATES NORMALLY OR TO REPORT ANY MALFUNCTIONS OR ABNORMALITIES TO THE SHIFT SUPERVISOR.
REVISED:UML 09/04/91 BLOCK #69
DO A 133775 CONFTDFNTTAl
TEXT BLOCK #
70
SAFE WORK PROCEDURE
TESTING OF GENERATOR LIQUID DETECTOR ALARM
EACH GENERATOR HAD IT'S OWN GENERATOR LIQUID DETECTOR DEVICE. THIS IS INSTALLED ON EACH MACHINE TO WARN OF LIQUIDS GETTING INTO THE GENERATOR CASING, WHICH COULD COME FROM A WATER LEAK IN THE HYDROGEN COOLERS OR OIL LEAKS FROM THE GENERATOR SHAFT SEALS.
TO ENSURE THAT THESE DETECTORS ARE OPERATING PROPERLY THEY MUST BE TESTED. THIS DUTY IS ASSIGNED TO A PARTICULAR SHIFT TO BE PERFORMED WEEKLY.
PROCEDURE FOR TESTING LIQUID DETECTOR:
1. INFORM BOARD OPERATOR YOU WILL BE TESTING THIS ALARM.
2. CLOSE DRAIN VALVE FROM GENERATOR (TOP AND BOTTOM DRAINS)
3. SLOWLY OPEN VENT VALVE ON TOP OF LEVEL POT (TO VENT TRAPPED H2) WITHIN THE DETECTOR AND THIS SHORT SECTION OF LINE, THERE WILL BE VERY LITTLE GAS TO BE VENTED. )
4. POUR CLEAN TURBINE OIL INTO VENT VALVE UNTIL THE BOARD OPERATOR NOTIFIES YOU OF THE ALARM OR UNTIL THE LINE IS FULL. IF THE LINE IS FULL AND YOU DID NOT GET AN ALARM, NOTIFY YOUR SUPERVISOR AND WRITE AND MMR FOR THIS TO BE CORRECTED.
5. PLACE CONTAINER UNDER LIQUID DETECTOR DRAIN VALVE AND OPEN, DRAINING ALL OF THE OIL FROM THE LIQUID DETECTOR AND LINE.
6. CLOSE VENT VALVE AND DRAIN VALVE.
7. OPEN DRAIN VALVE FROM GENERATOR SLOWLY.
8. CHECK FOR LEAKS IN THE LIQUID DETECTOR SYSTEM.
REVISED:UML 09/04/91
BLOCK #70
f'O A 133 77 f, CONir T 0 NT T AI
TEXT BLOCK #
71
SAFE WORK PROCEDURE
PURGING GENERATORS WITH N2
I. SAFETY A. HAZARDS: H2 IS FLAMMABLE FROM 57. TO 757. HYDROGEN IN AIR
B. REQUIRED SAFETY EQUIPMENT: BLOCK SAFETY EQUIPMENT
II. PROCEDURE
1. OPEN VENT FROM TOP OF GENERATOR.
2. ALLOW PRESSURE TO DROP TO APPROXIMATELY 5#.
3. PRESSURE UP TO 25# OF N2 THRU BOTTOM FEED ON GENERATOR.
4. OPEN VENT FROM TOP OF GENERATOR AND DEPRESSURE TO 5#.
5. PRESSURE UP TO 25# OF N2 THRU BOTTOM LINE OF GENERATOR.
6. OPEN VENT FROM TOP OF GENERATOR AND DEPRESSURE TO 5#.
7. PRESSURE UP TO 25# OF N2 THRU BOTTOM LINE OF GENERATOR.
8. CATCH A SAMPLE BOMB/ LABEL/ TAKE TO CA-IIFOR ANALYSIS SEE NOTE.
9. IF SAMPLE IS BAD, RETURN TO STEP 6.
10. IF SAMPLE IS GOOD, VENT PRESSURE FROM TOP OF GENERATOR TO 5#.*
*1. PURGE OUT SAMPLE LINE FROM TOP OF GENERATOR FOR APPROXIMATELY 10 SECONDS.
2 OPEN BOTH ENDS OF SAMPLE BOMB.
3. CONNECT TUBING TO SAMPLE BOMB AND SAMPLE LINE FROM TOP OF GENERATOR.
4. PURGE THRU SAMPLE BOMB FOR APPROXIMATELY 30 SECONDS.
5. CLOSE SAMPLE BOMB OUTLET BLOCK VALVE.
6. CLOSE SAMPLE BOMB INLET BLOCK VALVE.
7. CLOSE SAMPLE BLOCK VALVE.
8. DISCONNECT SAMPLE TUBING.
9. INSTALL CAP ON SAMPLE OUTLET.
REVISED:JML 11/28/90 BLOCK #71
Of! A 13'<777 f ONF 1 OF NT T A!
TEXT BLOCK #
73
SAFE WORK PROCEDURE
LOSS OF HIGH PRESSURE BOILER FEED PUMPS - UNITS 100/200
ON LOSS OF A HIGH PRESSURE BOILER FEED PUMP* OUR MAIN CONCERN WILL BE TRYING TO MAINTAIN A PROPER LEVEL IN THE HIGH PRESSURE DRUM. THESE BLR'S ARE DESIGNED TO RUN AT A LOW LEVEL FOR A LONG PERIOD OF TIME. BUT WE NEED TO GET A PROPER FIRING LEVEL AS SOON AS POSSIBLE TO KEEP FROM OVERHEATING AND ANY POSSIBLE TUBE DAMAGE.
1. UPON LOSS OF A HIGH PRESSURE BLR FEED PUMP. NOTIFY SHIFT SUPERVISOR AND AUXILIARY OPERATOR IMMEDIATELY.
2. ONCE THE HIGH PRESSURE BOILER FEED PUMP THAT WAS RUNNING TRIPPED. THE BOARD OPERATOR WILL IMMEDIATELY START THE BACK-UP PUMP. THE OUTSIDE OPERATOR(S) WILL CHECK THE TRIPPED PUMP TO INSURE IT IS NOT BACK SPINNING OR SPINNING.
3. IF STAND-BY PUMP WILL NOT BRING DRUM LEVEL BACK TO PROPER LEVEL FAST ENOUGH. HAVE AUXILIARY OPERATOR CRACK BY-PASS AROUND FEED WATER REGULATOR TO BRING LEVEL UP.
4. WHEN DRUM IS AT A NORMAL LEVEL, HAVE AUXILIARY OPERATOR CLOSE BY-PA5S AND 0.S. WILL MONITOR LEVEL FROM CONTROL ROOM.
5. NOTIFY MAINTENANCE SUPERVISOR OF PROBLEM WITH HIGH PRESSURE BLR FEED PUMP SO HE CAN HAVE PUMP OR MOTOR REPAIRED.
REVISED:JML 05/15/91 BLOCK #73
00 A 100778 rONFTDFNTTAl
TEXT BLOCK #
74
SAFE WORK PROCEDURE
LOSS OF LOW PRESSURE BLR FEED PUMPS - UNITS 100/200
ON LOSS OF A LOW PRESSURE BLR FEED PUMP, OUR MAIN CONCERN WILL BE TRYING TO MAINTAIN A PROPER LEVEL IN THE LOW AND MEDIUM PRESSURE DRUMS ^ND SUCTION TO HP BOILERS. THESE BOILERS ARE DESIGNED TO RUN AT A LOW LEVEL FOR A PERIOD OF TIME BUT WE NEED TO GET A PROPER FIRING LEVEL AS SOON AS POSSIBLE, TO KEEP FROM OVERHEATING AND POSSIBLE TUBE DAMAGE. OUR MAIN CONCERN IS A REDUCTION IN LOW PRESSURE FEEDWATER FLOW FROM THE SHUT DOWN PUMP BACK SPINNING. THIS CAN CAUSE FEED WATER FLASHING TO STEAM IN THE MEDIUM PRESSURE BOILER ECONOMIZER SECTION. THIS WI^L CAUSE A LOSS OF FEEDWATER FLOW TO THE HIGH PRESSURE BOILER FEED | PUMP. THIS PROBLEM CAN BE SERIOUS.
I 1. UPON LOSS OF A LOW PRESSURE BLR FEED PUMP, ALARM WILL GO OFF AN
ANNUNCIATOR PANEL, NOTIFY SHIFT SUPERVISOR AND AUXILIARY OPERATOR IMMEDIATELY.
2. HAVE SHIFT SUPERVISOR OR AUXILIARY OPERATOR BLOCK IN THE DISCHARGE OF THE PUMP THAT HAS TRIPPED. TRY TO ESTABLISH A CONSTANT FLOW TO THE MEDIUM AND THE HIGH PRESSURE DRUMS.
3. IF STAND-BY PUMP WILL NOT BRING DRUM LEVEL BACK TO A PROPER FIRING
LEVEL FAST ENOUGH, HAVE THE AUXILIARY OPERATOR CRACK OPEN THE BY-PASS
AROUND THE FEED WATER REGULATOR TO BRING BLR LEVEL BACK UP TO NORMAL
LEVEL.
i
4. WHEN DRUM LEVEL IS AT A NORMAL LEVEL, HAVE AUXILIARY OPERATOR CLOSE THE BY-PASS AND THE 0. S. WILL MONITOR LEVEL FROM CONTROL ROOM.
5. NOTIFY APPROPRIATE MAINTENANCE SUPERVISOR ABOUT PUMP/MOTOR PROBLEMS SO HE CAN HAVE IT REPAIRED AS SOON AS POSSIBLE.
REVISED:JML 05/15/91 BLOCK #74
DO A 103779 f.ONF TDFNTTAt
ISOLATING I*nw PRESSURE BOILER FLED PUMPS/MOTOR " UNITS MP-JOO A&B/MP-200 A$/.B
PUMP'
TE!'--! NC-K IS EE INC DONE ON LON PRESSURE BOILER FEED PUMP THAT REQUIRES aT TC) BE ISOLATED. THE FOLLOWING MUST BE DONE: (7 RED TACS REQUIRED)
1. RED TAG START/STOP SWITCH IN CONTROL ROOM IN THE STOP POSITION.
2. RED TAG LOCAL START/STOP SWITCH IN THE STOP POSITION.
3. (INSURE THAT PUMP IS NOT RUNNING) OPEN AND RFD TAG BREAKER IN HOC.
4. BLOCK IN AND RED TAG PUMP SUCTION VALUE.
5. BLOCK In AND RED TAG PUMP DISCHARGE VALVE.
6. BLOCK IN THE RECIRCULATION LINE OF THU DISCHARGE JUST BEFORE THE NOR1-". 11 .'P N CHECK VALVE. REP TAG THIS VALVE.
7. ..`"L'.
DRAIN QM POfiKN SC' THAT IT MAY DRAIN. RED TAX-: OPEN.
REV ID;..; 2/30/"I
BLGr> w"
up:- . 2/23-' r'N
no a i zr/ho CONf I DC Nil At
OPERATING OMIT 100/200 GENERATOR NEUTRAL SWITCH MANUALLY FROM THE BREAKER USING THE MANUAL HANDLE
DTE: Th a * procedure should be used when the electrical controls of qtnorator nee l'i a 1 swi t l h -Teal
1. Infor.'ii board operator of operation to be performed. 2. Proceed to generator neutral switch* remove locking pin and manual handle. 3. Open fiont panel of control box. This is done by sliding the front
panel down. Isolate the neutral switch motor electrically. Do this by removing the fuses or opening the power switches and red tagging. 4. With power off from motor, place cover back over control panel. 5. open ' 3p located in the top left corner of the front panel on the control boa Place manual crank handle in the slot provided and operate the neut".:' sw: tt. h by turning the crank 6. When d c riied operating is complete, remove manual crank handle and place it i r. The proper place on the f t n n t panel.
REV I ELD IV < R/1l/VO ,LOCi< r T..:,
UPDATED J 2/ e. 3 ' V V
VO A 133781
C ONF T DENT T A|
TEXT BLOCK #
119
SAFE WORK PROCEDURE
SWITCHING LUBE OIL FILTERS - UNITS 100/200
ALTHOUGH THE FOLLOWING PROCEDURE IS SIMPLE AND STRAIGHT FORWARD# IT IS TO BE DONE IN THE PRESENCE OF SUPERVISION. CLOSING A VALVE OUT OF SEQUENCE COULD RESULT IN LOSS OF OIL AND SEVERE DAMAGE TO THE TURBINE.
WHILE OPERATING VALVES IN THIS PROCEDURE. LISTEN FOR UNUSUAL NOISES (SUCH AS HIGH PRESSURE DROP ACROSS VALVES) AND RETURN THE VALVES TO THEIR FULL OPEN POSITION SHOULD THEY OCCUR.
DURING THESE OPERATIONS# AN OBSERVER SHOULD WATCH FOR FILTER DIFFERENTIAL OR LUBE OIL PRESSURE CHANGES.
1. CLOSE THE DRAIN VALVE AND OPEN THE VENT LINE TO THE LUBE OIL DRAIN HEADER (THESE VALVES SHOULD NORMALLY BE IN THESE POSITIONS).
2. CRACK THE INLET VALVE AND VERY SLOWLY ALLOW THE FILTER TO BE PUT IN SERVICE TO FILL WITH OIL (THE VENT LINE WILL BECOME WARM WHEN THE FILTER IS FULL).
3. WHEN FILTER IS FULL# SLOWLY OPEN THE INLET AND OUTLET VALVES ON THE FILTER TO BE PUT IN SERVICE, WHILE WATCHING FOR PRESSURE CHANGES.
4. VERY SLOWLY CLOSE THE OUTLET VALVE ON THE FILTER TO BE TAKEN OUT OF SERVICE# WHILE WATCHING OIL PRESSURES.
5. SLOWLY CLOSE THE INLET VALVE ON THE FILTER BEING TAKEN OUT OF SERVICE.
6. IF CHANGE IS FOR MAINTENANCE, RED TAG INLET, OUTLET, AND VENT VALVES. OPEN THE DRAIN AND PUMP THE FILTER DOWN WITH THE HAND DRAIN PUMP.
REVISED:NLC 9/11/90 BLOCK #119
DO A 1307HD OONF TDFNTT Al
PROCEDURE F-0R WELDING IN 100/200 REGENERATOR HEADER
CASE NO. 1 -
PLEASE NOTE: REGENERATOR ENTRY PERMIT REQUIRED IN ADDITION TO THIS SAFE ' 'ORK PROCEDURE.
1. THERE WILL BE TWO (2) SAFETY OBSERVERS 1 STATIONED OUTSIDE MANWAY 1 STATIONED INSJDE NEAR WELD AREA
2. BOTH WELDER AND INSIDE SAFETY OBSERVER WILL WEAR SUPPLIED AIR MASK. WELDER WILL USE SPECIAL TYPE WITH WELDING LENS. (INSURE THAT YOU HAVE ENOUGH AIR BOTTLES FOR DURATION OF JOB)
3. BOTH SAFETY OBSERVERS WILL USE HAND HELD RADIOS FOR COMMUNICATION. THEY WILL TEST RADIOS BETWEEN THE INSIDE MAN AND THE OUTSIDE MAN BEFORF STARTING JOB. THE OUTSIDE MAN WILL MAKE COMMUNICATION TEST WITH CONTROL ROOM. DURING WELDING, INSIDE AND OUTSIDE OBSERVERS WILL HAVE COMMUNICATION AT LEAST EVERY 5 MINUTES.
4. AN AJ R MOVER WILL BE PLACED AT MANWAY ENTRANCE (IN REVERSE, SO AS TO PUSH AIR THROUGH INSTEAD OF PULLING). COMMUNICATE TO OUTSIDE MAN THAT IN THE EVENT OF A SPILL, SHUTDOWN AIR MOVER AND EVACUATE MEN fKOM INSIDE.
5. WELDERS WILL WELD NO LONGER THAN 15-20 MINUTES AT A TIME. ALSO WHEN WELDC-HS SWAP, HAVE THE TWO SAFETY OBSERVERS SWAP. HEAT STRESS HAZARD DUE TO PREHEATING OF METAL TO 450 DEGF.
6 NOTIFY SECURITY FOR RESCUE TECHNIQUE.
7. COMMUNICATE PROCEDURE WITH ALL INVOLVED.
CASE II
PLEASE NOTE: REGENERATOR ENTRY PERMIT REQUIRED IN ADDITION TO THIS safe work procedure.
1. THERE WILL be (2) SAFETY OBSERVERS
1 STATIONED OUTSIDE MANWAY - CERTIFIED HOLEWATCH 1 STATIONED INSIDE NEAR WELD AREA
2. BOTH WEi.DER AND INSIDE SAFETY OBSERVER WILL HAVE A 5 MINUTE ESCAPE AIR PAr-K.
3. BOTH "SAFETY OBSERVERS WILL HAVE HAND HELD RADIOS FOR COMMUNICATIONS. THEY WILL TEST RADIOS BETWEEN THE INSIDE MAN AND THE OUTSIDE MAN BEFORF STARTING JOB. THE OUTSIDE MAN WILL MAKE COMMUNICATION TEST WITH CONTROL ROOM. DURING WELDING, INSIDE AND OUTSIDE OBSERVERS WILL HAVE COMMUNICATION AT LEAST EVERY 5 MINUTES WITH CONTROL ROOM OPERATOR MONITORING COMMUNICATIONS.
4. AN AIR MOVER (SMALL ELECTRIC) WILL BE PLACED AT MANWAY ENTRANCE
(IN Rl-VFRSE, SO AS TO PUSH AIR THROUGH INSTEAD OF PULLING).
COMMUNICATE TO OUTSIDE MAN THAT IN THE EVENT OF A SPILL, SHUTDOWN
AIR MOVER AND EVACUATE MEN FROM INSIDE.
DO A 137783
5. NOTIFY SECURI TY FOR RESCUE TECHNIQUE.
CONF TOFNT T A!
6. COMMUNICATE PROCEDURE WITH ALL INVOLVED.
REVISFrD: JMi. 07/02/91 BLOCK #127 UPDATED: JMl. - 12/16/93
00 A 1 337 84. C.ONF T OF NT T A1
DA-100/200 ENTRY SUPPLEMENT
COMPLETION OF THIS SUPPLEMENT COVERS ITEMS PECULIAR TO THIS EGUIPMENT AND NOT NECESSARILY INCLUDED IN THE MULTI-PERMIT. IN ADDITION TO
ND AS ATlACHMENT TO THIS CHECKLIST, THE STANDARD CONFINED SPACE
ENTRY PEP MI `I MUST 3E ISSUED WITH AREAS NOTED THAT DO NOT APPLY. i
1. UPSTREAM BLOCK VALVE ON DA STEAM PRESSURE CON TROL! | !< AND BY-PASS VALVE ARE CLOSED AND RED TAGGED
2. STEAM BLOCK VALVE AT DA IS CLOSED AND RED TAGGED.
3. DRAIN VALVE IS OPEN DOWNSTREAM OF DA PRESSURE CONTROL LER. RED TAG THIS VALVE.
4. DA DON:- VENT IS OPEN.
5. UPSTREAM BLOCK VALVE ON DA LEVEL CONTROLLER AND BY-PAUS VALVE ARE CLOSED AND RED TAGGED. DO MOT BLOCK DOWN STREAM BV. THIS WILL STOP THE LINE FROM I 1 EEDING PROPERLY
6. SURFi Y AND RETURN BLOCK VALVES ON CONDENSATE TO CRD HASH TANK ARE CLOSED AND RED-TAGGED.
7. GLAND WATER TO/FROM HP BFP'S BLOCKED IN AND RED TAGGED
B DRAIN VALVE IS OPEN DOWNSTREAM OF DA, LEVEL CON TROL! i ;;.
9. MAIN CONDENSATE BLOCK VALVE IS CLOSED AND RED I 'JT \7 [ " D
10. RED TAC CORTROL PUMP DISCHARGE AND SUCTION C LOS'-1) AND BLEED VAI VE OPEN.
11. DA IS DRAINED DA PUMP BLOCK VALVE AND BY-PAH5 VALVE ARE CLOSED AND RED-TAGGED.
12. BOTH L R BOILER FEED PUMPS ARE BLOCKED IN WITH SUCTION AND DISCHARGE VALVES RED-TAGGED.
13. DRAIN VALVE IS OPEN ON BFP SUCTION HEADER.
14. MANWAYS ON STORAGE TANK AND ON DOME ARE OPEN.
TEMPERATURE INSIDE THE TANK MUST NOT EXCEED 120 DEGRE'-h F.
15. SAFElY OBSERVER WILL HAVE TIVE (5) MINUTE ESCAPE
16 THE SAFETY OBSERVER IS A CERTIFIED HOLE WATCH.
17. THE SAFETY OBSERVER HB A HOLE WATCH CARD. EXCEPTIONS `|0 STANDARD
DO A 13S7BS OONFTDFNTTAl
1 VAL.V
INSTRUMENTS, INSTRUMENT LIMES NOT DISCONNECTED. (1D>
o use a:- five <c> minute escape packs rather than air line eqiup. (A A)
3. LIFE LINE, HARNESS, ETC., NOT USED <4B> OPERATION:; KEF'R: MAINTENANCE KEPR: REVISED. JMi 07/03/91 BLOCK #137 UPDATED: UN-.: 2/23/^A
DO A 133786 f.ONT TDFNT TA1
UNIT 10Q/P00 DA F3LL AFTER MAINTENANCE.
1. CHECK !:ED TAG MASTER, MAKE SURE ALL ACCEPTED ENTRIES HAVE BEEN RELEAK. D.
2. IF THE DA STORAGE TANK HAS BEEN OPENED, VISUALLY CHECK STORAGE TANK f i =R DEBRIS.
3. REMOVE AIR MOVER FROM DA DOME AND PUT DOME COVER BACK ON USING NEW CASKET. LEAVE VENT VALVE ON DOME CRACKED OPEN. PLACE STORAGE TANK MANHOLE COVER BACK OVER MANHOLE USING NEW GASKET.
4. CLOSE BOTTOM DRAIN VALVE UNDER DA STORAGE TANK. ALSO RECONNECT TUBING: TO SULFITE ENTRY BLOCK VALVE. OPEN SULFITE ENTRY BLOCK VALVE AND PUI L RED TAG.
5. CLOSE LP BOJLER FEED PUMPS HEADER DRAIN VALVE AND PULL THE RED TAG. 6. OPEN LPBFW PUMPS SUCTION VALVES. CLOSE LOW PRESSURE BF PUMPS DRAIN
VALVEN 7. REMOVE RED TAGS FROM CBD FLASH TANK HEAT EXCHANGER CONDENSATE BLOCK
VAL'L INLET AND OUTLET. OPEN CONDENSATE INLET TO MEAT EXCHANGER AND CONDENSATE OUTLET BLOCK VALVE. 8. REMOVE RED TAG FROM CONDENSATE HEADER DRAIN VALVE. CLOSE THIS valv: 9. REMOVE RED TAGS FROM CONDENSATE HEADER TO DA. f I EVEL. CONTROL!.'" GLUCK VALVE (1 TAG) lb: l EVEL CONTROL ' -.-'-PASS BLOCK VALVE U TAG) 11. CHECK LITH CONTROL r'. ` OPERATOR TO ENSURE THAT DA LEVEL CONTROL PEGU I AT OR IS CLOSED BEFORE UNBLOCKING CONDENSATE. 12. TING FDim, SEE DA START-UP PROCEDURE.
REVISED. UN: 07/00/91 BLOCK #23') UPDATED. JM:: 3/11/94
on a ion?ft7 CONE rDFNT T AS
SWITCHING LUBE OIL FILTERS - UNITS 100/200
WHEN AND IF THE PRESSURE DROP ACROSS THE IN-SERVICE LUBE OIL FILTER BECOMES EXCESSIVE, IT BECOMES NECESSARY TO TRANSFER TO THE STAND-BY ONE. IF THIS MUST BE DONE DURING THE TIME THE GT IS RUNNING, CARE MUST BE EXERCISED DURING THE SWITCHING OPERATION TO PREVENT LOWERING BEARING OIL PRESSURE TO AN EXTENT THAT TRIPPING THE GT IS A RESULT.
PROCEED AS FOLLOWS:
1.' CRAC!X OPEN THE 3/A" VENT ON THE STAND-BY FILTER TO INSURE IT IS FULL AND ALL AIR IS EXPELLED.
2. IF OIL IS MOT DISCHARGED THROUGH THE VENT, FILL THE STAND-BY FILTER BY CONNECTING IT TO THE IN-SERVICE ONE. THIS CAN BE ACCOMPLISHED EY OPENING THE 1 1/2" DRAIN VALVE ON THE INSERVICE FILTER AND CRACKING THIS DRAIN VALVE ON THE STAND-BY ONE. THIS WILL FLOW OIL FROM THE IN-SERVICE FILTER TO THE STAND-BY USING THE COMMON 1 1/2" DRAIN PIPING.
3. WHEN OIL DISCHARGES FROM THE STAND-BY FILTER VENT, CLOSE THIS 3/4" VALVE AND THE I 1/2" DRAIN VALVES.
4. WITH AN ASSISTANT WATCHING SYSTEM PRESSURE, SLOWLY CRACK THE INLET VALVE ON THE STAND-BY FILTER BE AWARE OF ANY UNUSUAL NOISE (SUCH AS RUSH OF OIL THROUGH VALVE).
S SLOWLY OPEN INLET VALVE WIDE.
i. Sl.CVL'-' OPEN' CUTLET VALVE ON THE STAND-BY FILTER NON IN' BERN'ICE.
THIS FILTER IS
7. SCLOSE THE INLET, THEN THE OUTLET VALVES ON THE FILTER TO BE ISOLATED AGAIN, ASSISTANT SHOULD WATCH SYSTEM PRESSURE CLOSELY.
r- I l-0 P s ARE NSW SWITCHED. ISOLATED FILTER MAY NOW BE OPENED FOR CHANGE-OUT OF DIRTY ELEMENTS. REFER TO APPLICABLE SAFE WORK PROCEDURE.
REVISED NLC 1/23/S2 BLOCK #235
DO A lir-T/RR PONf TDFNTT Al
TRANSFERRING1 OIL FROM 100/200 LUBE OIL RESERVOIR TO BOWSER 3TE; INFORM BOARD OPERATOR OF THE UNIT YOU ARE TRANSFERRING THE OIL FROM. 1. RED TAt' LUBE OIL SYSTEM, PUMPS AND HEATER. 2. INSURE ALL FILL LINES TO OTHER STATIONS AND BOILER FEED PUMPS ARE BLOCKED IN. 3. C0NNLC.1 CENTRIFUGE RETURN LINE AT UNION NEAR EAST END OF RESERVOIR. AND INSURE BV BACK TO RESERVOIR IS CLOSED. 4. CHECK THE LEVEL IN THE OLD SIDE OF THE BOWSER ON THE LEVEL TRANSMITTER AND INSURE IT WILL HOLD THE OIL BEING PUMPED FROM 100 OR 200. 5. UNBLOCK 100/200 TRANSFER LINE AT BOWSER (300/400 SHOULD BE BLOCKED). 6. OFEN INLET BV TO OLD SIDE OF BOWSER AND CLOSE VENT BV ON RECIRCULATION LINE 7. INSURE ALL BV'S TO THE NEW OIL SIDE ARE CLOSED. 8. STAR'i 1 HE CENTRIFUGE & PUMP UNTIL THE RESERVOIR IS EMPTY OR UNTII THE CENTRIFUGE LOSES ITS SUCTION. 9. SHUT DOWN THE CENTRIFUGE AND PLACE ALL VALVES BACK TO NORMAL. 0. THE ClNTRIFUGE RETURN LINE AT THE UNION MUST BE MISALIGNED AND CAPP:-i> AFTER THE RESERVOIR HAS BEEN EMPTIED.
REVISED. JN; 06/10/92 BLOCK #236 UPDATED: J'M 02/22/94
J)0 A 1337R9
0ONF7 0FNTTAI
PROCEDURE FOR STARTIN' AND RUNNING CENTRIFUGE - 100/200 1. INSURE SUPPLY AND RETURN TO CENTRIFUGE AT RESERVOIR ARE OPEN. 2. INSURE FILL VALVE FROM BOWSER TO RESERVOIR IS CLOSED. 3. OPEN CEN1RIFUGE DISCHARGE VALVE AT CENTRIFUGE. 4. CHrCK OIL LEVEL IN CENTRIFUGE - ADD IF NECESSARY (30 WT. MOTOR OIL>. 5. WB-N READY TO START, CALL BOARD OPERATOR TO INFORM HIM YOU WILL BE STARTING CENTRIFUGE. 6. START CENTRIFUGE BY PUSHING START BUTTON AT LOCAL STATION. 7. ALLOW CEN1RIFUGE TO COME UP TO SPEED. THIS SHOULD TAKE APPROXI MATELY 2 TO 3 MINUTES. OPEN WATER SUPPLY TO SEAL WATER GLASS HOUSING. CONTINUE ADDING WATER UNTIL WATER RUNS OUT OF OVER FLOW HOSE TO OVERFLOW TANK. 8. SHU! OFF SEAL WATER SUPPLY TO HOUSING. 9. SLOWLY OPEN SUCTION VALVE AT CENTRIFUGE.
10. INSURE THAT OVERFLOW TANK DRAIN VALVE IS CLOSED AS IT IS POSSIBLE TO DRAIN ENTIRE RESERVOIR AND TRIP TURBINE IF THIS VALVE IS LEFT OPEN AND CENTRIFUGE LOSES PRIME.
11. TEST HIGH LEVEL SHUT OFF BY FILLING TEST CUP AND COVERING HIGH LEVEL SHU! DOWN PROBE IN CENTER OF OVERFLOW TANK. THIS SHOULD TRIP CEN1RIFUGE AND ALARM IN CONTROL ROOM. IF EITHER DOES NOT WORK, AN MT;R SHOULD BE WRITTEN AND CENTRIFUGE SHUT DOWN. IF IT IS NECESSARY THAT CENTRIFUGE BE RUN IN THIS CONDITION, IT MUST NOT BE LFFT UNATTENDED WHILE RUNNING.
REVISED.JML 06/10/92 BLOCK #237
00 a 1 C ONF T OF NT I A1
00 A 13;-;7V C'ONF TDFN7 TA
GEN-100/200 TEST STAND-BY VOLTAGE REGULATOR NOTE: THIS TEST NEEDS TO BE COORDINATED WITH A MACHINE OUTAGE. 1. TURBINE/GENERATOR MUST BE RUNNING WITH EXCITATION FIELD ON GENERATOR. ,2. WITH VDi TAGE REGULATOR SELECTOR ON MAIN, NOTICE THE AMOUNT OF MEGAVAR
BEING PRODUCED. 3. CHECK 'I HE VOLTAGE ON THE STANDBY REGULATOR. IT SHOULD BE BETWEEN
120-140 VOLTS. IF THE VOLTAGE IS NOT IN THIS RANGE DO NOT MAKE THE SWAP. NOTIFY ELECTRICAL ENGINEER OR PROBLEM 4. SWAP l-k'C-M MAIN TO BACK-UP VOLTAGE REGULATOR USING THE SELECTOR ON THE TURBINE CONSOLE. NOTICE MEGAVAR CLOSELY TO ENSURE NO CHANGE OCCURS. 5. IF THI r<[- IS A CHANGE IN MEGAVARS, ADJUST TO DESIRED LEVEL USING VDI TAGE RAISE/LOWER CONTROLLER ON TURBINE CONSOLE. 6. IF VOLTAGE AND VARS ARE OK, SWITCH VOLTAGE REGULATOR SELECTOR BACK TO THE MAIN. NOTICE MEGAVARS FOR CHANGE, IF ONE OCCURS MAKE NECESSARY ADJUST Nr-NTS. TEST COMPLETE.
REVISED: N: : 9/12/vo BLOCK #24A UPDATED J>;: 02/02/94
DO A 1 A7 y ;1 OONf- TDFN T T A!
TEXT BLOCK #
247
GEN-100/200 TESTING AUTO OPERATION OF OCB AIR COMPRESSOR
1. INSURE THAT BLEED VALVE ON LINE CONNECTING 100 AND 200 OCB TANKS IS OPEN AND DRAIN AT 100 TANK IS CLOSED.
2. OPEN OCB TANK DRAIN VALVE LOCATED AT BOTTOM OF TANK AND BLEED PRESSURE FROM TANK.
3. AT APPROXIMATELY 160# PRESSURE, AIR COMPRESSOR WILL START TO RESTORE TANK PRESSURE TO APPROXIMATELY 175#.
4. CLOSE TANK DRAIN AND STAND BY UNTIL AIR COMPRESSOR PUMPS PRESSURE BACK UP AND SHUTS OFF AUTOMATICALLY.
5. INSURE THAT COMPARTMENT DOOR IS CLOSED AND LATCHED BEFORE LEAVING AREA.
REVISED: NLC 9/12/90 BLOCK #247
DO A fONF TDF NTTAi
GEN-10C/200 CHECK OPERATION OF NEUTRAL SWITCH 1. OUTSIDE OPERATOR SHOULD GO TO THE UNIT THAT IS TO BE CHECKED AND LOCATE
THE Nr U|RAL SWITCH TO BE TESTED. AFTER SWITCH IS LOCATED, CALL BOARD OPERATOR AND INFORM HIM YOU ARE IN POSH ION TO CHECK SWITCH. 3. BOARD OPERATOR WILL TURN GENERATOR NEUTRAL SWITCH TO CLOSED POSITION. INDICAIDR LIGHTS WILL CHANGE FROM GREEN TO RED WHEN SWITCH IS CLOSED. 2. WHEN LIGHT INDICATES RED, HAVE AUXILIARY OPERATOR VISUALLY VERIFY THAI THE NCUIRAL SWITCH IS CLOSED. 3. THEN TURN SWITCH BACK TO OPEN AND HAVE AUXILIARY OPERATOR VISUALLY VERIFY 'i HAT THE NEUTRAL SWITCH IS OPEN. 4. IF FOR SOME REASON SWITCH AND LIGHTS DO NOT OPERATE PROPERLY, CHANGE INDICATOR LAMP AND GET OUTSIDE OPERATOR TO VISUALLY CHECK SWITCH AND ASSOCIATED EQUIPMENT. TEST COMPLETE.
REVISED, J>;i 09/04/Fi BLOCK #240 UPDATED, jr: 02/02/94
00 A 133794 OONF TOFNT TAl
SWITCHING POWER OIL FILTERS SANE AS TURBINE PROCEDURE: #1, TURBINE DURING THESE OPERATIONS, AN OBSERVER SHOULD WATCH FOR FILTER DIFFERENTIAL OR POWER OIL PRESSURE CHANGES. 1. CLOSE THE DRAIN VALVE AND OPEN THE VENT LINE TO THE POWER OIL DRAIN
HEADER (THESE VALVES SHOULD NCRHALLY BE IN THESE POSITIONS). 2. CRACK THE INLET VALVE AND VERY SLOWLY ALLOW THE FILTER TO BE PUT IN
SERVICE TO FILL WITH OIL (THE VENT WILL BECOME WARM WHEN THE FILTER IS FULL) 3. WHEN FILTER IS FULL, SLOWLY OPEN THE INLET AND OUTLET VALVES ON THE FILTER TO BE PUT IN SERVICE, WHILE WATCHING FOR PRESSURE CHANGES. 4. VERY SLOWLY CLOSE THE OUTLET VALVE ON THE FILTER TO BE TAKEN OUT OF SERVICE, WHILE WATCHING OIL PRESSURES. 5. SLOWLY CLOSE THE INLET VALVE ON THE FILTER BEING TAKEN OUT OF SERVICE. 6 IF CHANGE IS FOR MAINTENANCE, RED TAG INLET, OUTLET, AND VENT VALVES OPEN THE DRAIN AND PUMP THE FILTER DOWN WITH THE CENTRIFUGE ASTER CLOSING CENTRIFUGE SUCTION VALVE AT RESERVOIR AND OPENING 3''*5" VALVE TO CENTRIFUGE SUCTION LINE.
REVISED NLC
DO A 133795 CONFTDFNTTAl
CLEANING UNIT ICO AND 200 LUEE OIL CENTRIFUGES
1. SMUT DOWN CENTRIFUGE IF RUNNING.
2. CLOSE SUCTION AND DISCHARGE VALVES AND RED TAG, ALSO RED TAG BREAKER.
3. ELOCK IN PRIMING WATER AT SOURCE AND REMOVE TUBING FROM TOP OF CENTRIFUGE.
4. LOOSEN CLAMP BOLTS AND OPEN BOWL COVER.
5. LOCK THE BOWL USING THE TWO LOCKING SCREWS.
6. REMOVE THE LARGE LOCKRING AND REMOVE BOWL HOOD. NOTE: LOCKRING HAS LEFT-HAND THREADS, USING TOOLS PROVIDED WITH CENTRIFUGE.
7. REMOVE THE SMALL LOCKRING AND REMOVE GRAVITY DISC. NOTE: LOCKRING HAS LEFT-HAND THREADS, USING TOOLS PROVIDED WITH CENTRIFUGE.
S. REMOVE THE DISC SET AND DISTRIBUTOR IN ONE PIECE. BE SURE NOT TO CHANGE THE DISC SET ARRANGEMENT. (ORDER OF DISCS)
9. REMOVE SPINDLE NUT, LOOSEN LOCKING SCREWS AND REMOVE BOWL.
10. CLEAN PARTS WITH A SUITABLE SOLVENT AND DRY THOROUGHLY.
11. REINSTALL BOWL, RELOCK WITH LOCKING SCREWS, AND TIGHTEN SPINDLE NUT.
12. REINSTALL THE DISTRIBUTOR AND DISC SET MAKING SURE DISTRIBUTOR FOLLOWS THE GUIDE POINTS
13. REINSTALL GRAVITY DISC AND SMALL LOCKRING.
14. REINSTALL THE BOWL HOOD USING GUIDE MARKINGS.
15. REINSTALL LARGE LOCKRINGS
16. UNLOCK THE BOWL AMOUNT.
BE SURE LOCKING SCREWS ARE LOOSENED A SUFFICIENT
17. CLOSE BOWL COVER AND TIGHTEN CLAMP BOLTS.
IS. REINSTALL TUBING FOR PRIMING WATER AND UNBLOCK AT SOURCE.
19. REMOVE RED TAGS AND START CENTRIFUGE AS PER START UP PROCEDURE.
REVISED:NLC 1/23/92 BLOCK #233
00 A 133796 f.ONF TDFNT T Al
TEXT BLOCK #
294
U-DUCT SUMP ENTRY SUPPLEMENT
COMPLETION OF THIS SUPPLEMENT COVERS ITEMS PECULIAR TO THIS EQUIPMENT AND NOT NECESSARILY INCLUDED IN THE MULTI-PERMIT. IN ADDITION TO AND AS ATTACHMENT TO THIS CHECKLIST, THE STANDARD VESSEL ENTRY PERMIT MUST BE ISSUED WITH AREAS NOTED THAT DO NOT APPLY. ALSO VESSEL ENTRY EQUIPMENT, I.E. , ROPE, HARNESSES, ETC.
CONDITIONS: UNIT IS SHUT DOWN.
NOTE: VtSSEL ENTRY SECTION OF SAFE WORK MULTI-PERMIT MUST BE COMPLETED AS APPLICABLE.
YES
1. GT SHUT DOWN. AREA HAS COOLED.
2. WATER HAS BEEN PUMPED OUT.
3. EXPLOSIMETER/02 LEVEL CHECKS MADE.
4. SAFETY 03SERVER WILL HAVE FIVE (5) MINUTE ESCAPE PACKS FOR EACH PERSON INSIDE THE VESSEL AND ONE FOR HIM/HER SELF,
5. THE SAFETY OBSERVER IS A CERTIFIED HOLE WATCH.
b. THE SAFETY OBSERVER HAS A HOLE WATCH CARD.
NO
EXCEPTIONS TO STANDARD: 1. BASICALLY OPEN SUMP - NO VENTILATION USED. (3A) 2. USE OF FIVE (5) MINUTE ESCAPE PACKS RATHER THAN AIR LINE EQUIP. <4A)
OPERATIONS REPR: MAINTENANCE REPR:
REVISED:JML 07/03/91 BLOCK #294
DO A 130797 fONFTDFNTTAl
DA 100/SOD START--UP
PURPOSE THE PURPOSE OF THIS PROCEDURE IS TO INSURE THAT CONDENSATE FLOWING T:!\U THE HRU HAS DEEM DEAERATED (OXYGEN FREE). IT WILL ALSO
TING HIGH PRESSURE BOILER FEED PUMP TEMPERATURE UP SLOWLY TO PREVENT HERMAL SHOCK TO THE PUMP.
1. OPEN DA STEAM INTERNAL LOOP DRAIN VALVE LOCATED AT GROUND LEVEL ON SOUTH SIDE OF SOUTH TRAIN.
________
2. CLOSE DA BOTTOM DRAIN VALVE LOCATED BELOW DA AT DA
.________
3 CLOSE DA DUMP CONTROl BY-PASS VALVE.
4. OPEN DA DUMP CONTROL BLOCK VALVES.
. __
5. OPEN i'A DOME VENT.
_______
6. BRING i EVEL TO DO'/. FULL.
7. SLOWl V ERINC STEAM PRESSURE UP TO 25 PSIG. ADMITTING STEAM "100 FAST WILL CAUSE EXCESSIVE WATER HAMMERING.
_____ ___ ___ .
S O-EN U" CONDENSATE LINE TO BOILER TEED U K1P GLAND COOLERS AND FLOW TO DA.
9. LET DA FILL TO OVERT-LOWING WHILE MAINTAINING 25 PSIG STEAM PRESSURE.
10 CONTINUE OVERFLOWING DA UNTIL BOILER FEED PUMPS ARE LOT IN SERVICE
________ _________ _______
EDITED CNN 04/22/92 BLOCK #347
UPDATED JM; 3/11/04
00 A 133700 OONFTDFNTTAl
PREPARATION FOE jjr,/100/300 COMF3.NED Sr'ACE ENTRY
WHEN EECEOEAF'i TO ENTER THE DEAERATORS FOR INSPECTION AND/OR MAINTENANCE WORK, 3 T 3U IMPERATIVE THAT ALL SET P REQUIREMENTS DE CGMPLLTEi). CONFINED SPACE ENTRY FERMITS AND SUPPLEMENTS SPECIFY EVERY PRECAUTION TO BE TAKEN.
TO PREPARE THE VESSEL FOR ENTRY, PROCEED AS FOLLOWS:
1. DRAIN THE STORAGE TANK BY PUMPING WATER TO THE BOILER SECTIONS, AU MUCH AT' POSSIBLE.
2. DRAIN THE REMAINING WATER TO THE SEWER BY OPENING THE 2'1 DRAIN VAI VF EENEA'I!! THE TANK WHICH CONNECTS TO THE DUMP LINE. THE DUMP CONTROL BY-PA: if? WILL ALSO HAVE TO BE OPENED. AFTER DRAINING, TAG BYBASS AND DRAIN OPEN.
3. DOUFl.l BLOCK AND BLEED OR DISCONNECT SULFITE TUB I IMG LINE PROM BULK TANK AND TAG. CLOSE AND TAG CARRIER FLUID UPSTREAM B/V AND SULFITE EW AT DEAERATOR OPEN CARRIER FLUID BLEED B/V AND RED TAG (DO NUT OpEFA /;- NEE),L.E THROTTLE VAI VP I
4. DOTE: ! block an:- ellh- condensate to da and tag
5, rr '" T- IF r".'AlL-r,JC slLjP the UNIT TO COOL BEFORE PROCEEDING TO OP; M IT THIS IS MO "i POSSSIBLE, BE AWARE OF HIGH TEMPERATURE METAL
r A- " f, T:W- POSE I OIL I Tv' OF' HOT VAPORS AND TAKE ADDED PRECAUTIONS.
6 : o .T DvjCF r NP L ^!. i: I'
I-.j L'r' AND TAiG.
7. r i. r1 \ 6 ' . i ; C
AND CvM.D l.P i'Oi! OR TEED PUMPS AND TAG. TAG C 0: iDCMS.' .T C T iJ AND FROM FLAE.il TANK,
P ELNOV!
.0 TV Vi '! Hi. SOUTH Fwr- OF STORAGE TANK
io r
! v TVS 0-.I D-.NE EE', 7 I Oi i N f IP.i.vE
THIS HIKE REQUIRE THE RENOVAI
11. i:Tiv; l & ~ .P ;-;U\'KP O'! DOME MANWAY FOP VENTILATION
C r DUN 1
!<LY
TIE Ot:F AND
12. HATE iTESSEL INTERIOR CHECKED FOR EXPLOSIVES AND OXYGEN CONTENT.
13. COKE; ! -lE NECESSARY PPEMITS.
14. FROvU; SAFETY OBSERVER
REVISED' J.U 07/0.0/9 E LOCI''. v;.V,
VFDA'LD i/ 1 1 t- -r
on a i 33799 CONF TDFNTTAI
PLACING. GAUGE GLASSES IN OERVICE UN1T5 100/200
WARNING: WHEN PLACING A GAUGE GLASS IN SERVICE. DO NOT STAND IN FRONT OF AND IN DIRECT LINE OF SIGHT WITH THE GAUGE.
NOTE: WHIN PLACING A GAUGE GLASS IN SERVICE ON AN OPERATING BOILER. PRECAUTIONS MUST BE TAKEN TO AVOID EXCESSIVE THERMAL SHOCK.
(1).
BEGINNING WITH ALL VALVES CLOSED. DPEN THE DRAIN VAI VE AND CRACK OPEN THE STEAM VALVE SLIGHTLY TO ALLOW THE STEAM TO r-lOW THROUGH THE GAUGE FOR 15 MINUTES.
<2).
CLuor- the drain valve to allow the gauge to fill up with CON; r-NSATE.
(3) .
CRACK OPEN THE WATER VALVE AND GRADUALLY AND ALTERNATELY CQi'I'l 3 NUE TO OPEN THE STEAM AND WATER VALVES UNTIL FUi LY DP: W THE GAUGE IS NOW IN SERVICE.
(4) .
3F i: !E GAUGE IS NEW OR HAS BEEN REPAIRED PRIOR TO PLACING IT IN SERVICE, IT WILL BE NECESSARY TO RETIGHTEN THE COVER PL AIL- CAP SCREWS AFTER THE GAUGE HAS BEEN IN SERVICE FOR
3 in 4 HOURS.
CAUTION
lil1 NOT USE WRENCHES CF< OTHER LEVERAGE DEVICES TO OPEN OR Cl OSS VALVES. IF VALVES DO NOT SHUT STEAM TIGHT WITH STANDARD HAND WHEELS OR CHAIN WHEELS. IT IS AN INDICATION THAT THE SEATS ARE STEAM CUT OR DAMAGED AND THAT THEY
:::o'.jl.d de relapped or replaced
REVISED J"i. 07/02/-. BLOCK #3"'>
UPDATED , ." C 02/22/FA
t DO A 13 3 80 O
CONP TDFNTTAl
RESETTING SNUFFING STEAM UNITS 100/200 THE 30 LE. SNUFFING STEAM IS AUTOMATICALLY ACTUATED BY EITHER OF THE FOLLOWIN<
A). LOSS OF VACUUM ON THE LUBE OIL RESERVOIR (EVACTOR MALFUNCTION) E). FIRE IN THE HOT END EEARING TUNEL. BOTH OF THESE EVENTS ARE ALARMED ON THE 100/200 TURBINE ALARM PANELS IN THE CONTROL ROOM. USE THE FOLLOWING PROCEDURE TO RESET THE SNUFFING STEAM ONCE THE PROBLEM AND ALARM HAS BEEN CLEARED. 1. GO TO THE NORTH SIDE OF TURBINE AND RESET THE RESET HANDLE. 2. GO TO THE AUTOMATIC VALVE AND CHECK TO BE SURE IT IS CLOSED ALL THE WAY. NOTE: IF THE VALVE DOES NOT FULLY CLOSE AFTER SEVERAL ATTEMPTS- YOU MAY HAVE TO NOTIFY THE INSTRUMENT DEPARTMENT TO CHECK THE RESET THE VALVE FOR PROBLEMS.
REVISED:NLC 1 / 2.3/92 BLOCK #337
00 A 137801 OONF TDFNI 1 A1
UN'ITS 100/200 COOL DOWN PROCEDURE
NOTE:
AFTER THE UNIT HAS BEEN UNLOADED AT 2 MW/MIN AND THE GENERATOR BREAKER OPENED, LET THE TURBINE WILL IDLE FOR 5 MINUTES AT NORMAL SPEED. (3,600 RPM'S). AFTER THE ABOVE TURBINE SPIN, THE TRISEN WILL AUTOMATICALLY TRIP THE TURBINE.
1. THE TURBINE WILL COAST DOWN AND GO ON TURNING GEAR AUTOMATICALLY.
2. IF THE TURBINE HAS TO BE COOLED DOWN FOR ANY REASON, THE UNIT CAN BE PUT ON STARTING MOTOR, USING THE NORMAL START STEPS. THE UNIT MAY BE KEPT ON STARTING MOTOR FOR AS LONG AS NECESSARY TO COOL THE UNIT. THE STARTING MOTOR SHOULD BE RUN AT 500-800 RPM'S FOR THE COOL DOWN CYCLE.
REVISED:NLC 1/23/92 BLOCK it33S
on n indoor
r ONF TOO NT I A1
UNITS 100/200 COOL DOWN PROCEDURE
NOTE:
AFTER THE UNIT HAS BEEN UNLOADED AT 2 MW/MIN AND THE GENERATOR BREAKER OPENED. LET THE TURBINE IDLE FOR 5 MINUTES AT NORMAL SPEED. (3.600 RPM'S). AFTER THE ABOVE TURBINE SPIN. THE TRISEN WILL AUTOMATICALLY TRIP THE TURBINE.
THIS WILL ONLY OCCUR IF THE UNIT WAS BROUGHT DOWN ON TRI-SEN, WITH NORMAL STOP OR MIN. LOAD SELECTED NOT MANUALLY. IF THE LOAD WAS LOWERED MANUALLY. YOU WILL HAVE TO TRIP THE TURBINE MANUALLY).
1. THE TURBINE WILL COAST DOWN AND GO ON TURNING GEAR AUTOMATICALLY. 2. IF THE TURBINE HAS TO BE COOLED DOWN FOR ANY REASON, THE UNITj! CAN BE
PUT ON STARTING MOTOR, USING THE NORMAL START STEPS. THE UNIT MAY BE KEPT ON STARTING MOTOR FOR AS LONG AS NECESSARY TO COOL THE UNIT. THE STARTING MOTOR SHOULD BE RUN AT 500-800 RPM'S FOR THE COOL DOWN CYCLE.
REVISED:NLC 1/23/92 BLOCK #388
UPDATED: UHL 11/12/93
i
DO A 1 33ftO ?, CONF TDFNTT Al
TEXT BLOCK #
390
UNITS 100/200 CAS TURBINE START-UP PROCEDURE WITHOUT THE USE OF THE COMPUTER
(A) START STEP NUMBER 1
1. SELECT STOP OFF
2. RESET ANNUNCIATOR ALARMS
3. SYSTEM RESET (CARDLOC SYSTEM)
4. RESET 86 DEVICES
5. CLOSE GENERATOR NEUTRAL SWITCH
6. SELECT FUEL
7. TURN OFF LUBE OIL HEATER
8. COMMAND A. C. LUBE OIL PUMP ON
9. TORGUE CONVERTER BRAKE OFF
10. EMERGENCY COOLIN OIL PUMP OFF
11. RESET OIL PUMPS
(B ) START STEP NUMBER 2
1. AUXILIARY POWER OIL PUMP ON
2. OUTPUT CLUTCH MODULATING VALUE ON
3. JACKING OIL PUMP ON
4. VISUAL CHECK OF TURNING GEAR PAWL (PAWL MUST BE UP AND OUT OF THE AND MOTOR MUST BE OFF)
(C) START STEP NUMBER 3
1. D. C. COOLING OIL PUMP ON
2. MODULATING CLUTCH SELECTOR SWITCH IN THE MANUAL POSITION
3. STARTING MOTOR ON
4. TORQUE CONVERTER CHARGING OIL PUMP ON
5. BLEED FUEL GAS HEADER (USE THE BUTTON BEHIND THE START BOARD TO DO THIS)
NOTE: THE MODULATING CLUTCH SWITCH IS USED TO REGULATE TURBINE SPl
AT 850 RPM'S FOR FIRING THE TURBINE OFF.
DO A i
r-nWPTDFN'1 I Al
<D) START STEP NUMBER 4
c0Nt
1. PUSH IGNITION BUTTON (ON GT 100 ONLY, WAIT APPROXIMATELY 20 SECOND THEN TURN IGNITION BYPASS SWITCH TO THE ON POSITION, THEN PUSH TRIi SOLENOID VALVE BUTTON. THIS STEP IS NOT NECESSARY ON GT 200).
FIRED.
3. AFTER THE UNIT IS FIRED* THE MODULATING CLUTCH SWITCH SHOULD BE TURNED TO THE AUTOMATIC POSITION.
(E) . START STEP NUMBER 5
1. SPEED GREATER THAN 950 RPM'S
(F) . START NUMBER 6
1. SPEED GREATER THAN 2,200 RPM'S (STARTING MOTOR SHOULD DISENGAGE AT THIS TIME)
(G) . START STEP NUMBER 7
1. SPEED GREATER THAN 3,450 RPM'S
<H>. START STEP NUMBER 8
1. SPEED GREATER THAN 3,600 RPM'S (THE FIELD FLASHES AND THE STEAM INJECTION RELAY AUTOMATICALLY RESETS)
SYNCHRONIZING GENERATOR
1. TURBINE RPM'S MUST BE AT 3,600.
2. ADJUST GENERATOR VOLTAGE SLIGHTLY HIGHER THAN SYSTEM VOLTAGE.
3. ASSURE STEAM INJECTION CONTROLLER IS ON MANUAL, VALVE IS CLOSED, AND THEN GO BEHIND THE START-UP BOARD AND PUSH STEAM INJECTION RESET BUTTON.
4. NOTIFY POWER I AND CHLORINE THAT YOU ARE ABOUT TO SYNCHRONIZE THE GENER/ TOR.
5. CLOSE THE OCB BREAKER WHEN THE SYNCROSCOPE INDICATES THAT YOU ARE IN 8YT WITH THE SYSTEM.
6. RAISE THE LOAD TO APPROXIMATELY 5 MW'S AND 5 MV'S.
7. OPEN GENERATOR NEUTRAL SWITCH.
8. RAISE LOAD TO APPROXIMATELY 15 MW'S.
(A). SWAP THE 2.4 KV FROM THE TIE TO THE MAIN.
(B). TRANSFER THE 2.4 KV AUTO/MANUAL SWITCH TO THEAUTOMATIC POSITION.
9. RAISE LOAD TO APPROXIMATELY 20 MW'S AND BEGIN TO PUT STEAM INJECTION ON THE UNIT.
10. RAISE LOAD TO APPROXIMATELY 30 M2'S AND WAIT FOR THE BOILERS TO COME ON LINE.
11. RAISE MACHINE UP TO FULL LOAD AT 3 MW'S PER MINUTE.
12 AFTER UNIT IS AT FULL LOAD, PUT IN ONE OF THE FOLLOWING MODES
(A). PYROMETER CONTROL (B). TIT CONTROL
00 A 1 3380 F
f ONF TDFNTT Al
(C). TAT CONTROL
NOTE:
AS EACH START STEP SEQUENCE IS COMPLETED, THE RED LIGHT ON THE START-1 PANEL WILL COME ON TELLING YOU THAT ALL THE PERMISSIVES HAVE BEEN MET THAT STEP.
REVISED: NLC 9/12/90 BLOCK #390
no A ]3080a OONF T OFNT TAI
CHECKING A COMBUSTIBLE GAS ALARM ON UNIT 100/200 M2 CABINET
1. ONCE AN ALARM IS RECEIVED IN THE CONTROL ROOM, THE BOARD OPERATOR WJll. CHECK "l I !E PERCENTAGE LEL READING ON THE "GAS TECH" METER. ANY PERCENT ABOVE DO'/. LEL IS CONSIDERED HAZARDOUS. THIS INFORMATION IS THEN GIVEN
TO th:- OUTSIDE OPERATOR.
2. THE OPERATOR THAT WILL CHECK THE ALARM SHOULD WEAR A FIRE PROTECTION NOMEX AND CARRY A PORTABLE COMBUSTIBLE GAS ANALYZER. (PORTABLE GAS ANALY/L-hS SHOULD ALWAYS BE CHECKED BEFORE USING).
3. COMMUNICATION IS VERY IMPORTANT AT THIS STAGE. IF THE LEL IS HIGHER THAN
507., SAMPLE THE GAS INSIDE OF THE CABINET.
IF LEL IS LESS THAN 007,
CHECK f L=R LEAKS INSIDE CABINET.
4. ALL Rr-yULTS SHOULD BE REPORTED TO THE CONTROL ROOM.
5. IF TH! !<[- IS A LEAK THAT CAN BE ISOLATED BY VALVING OFF A LINE, TH)0 SHOULD HE DONE. IF THE LEAK IS BETWEEN THE H2 CABINET AND THE GENERATOR, THEN TH;* MACHINE POSSIBLY WILL HAVE TO BE SHUTDOWN TO FIX THE PROJH EM.
REVISED; N: A 1/23/92BLOCK #599
UPDATED'JN-.: 2/23/94
DO A 133307 C ONF- TDFNT T A1
CLEANING COMPRESSOR - UNITS 300/400
(A). HAND CLEANING COMPRESSOR
NORMALLY, ANYTIME THE COMPRESSOR INLET SCROLL AND BLADES ARE CLEANED, IT IS DONE BY LABORERS. THIS IS A RELATIVELY SAFE JOB BUT LIKE ANY OTHER JOB, SAFETY PRECAUTIONS MUST BE TAKEN. THE ITEMS BELOW MUST BE RED TAGGED AND CLEARANCE ACCEPTED BY ALL THE LABORERS DOING THE CLEANING BEFORE ENTERING THE COMPRESSOR INLET.
(1) - GENERATOR BREAKER (2) - STARTING MOTOR (3) - TURNING GEAR (4) - FUEL GAS (5) - STEAM INJECTION (6) - DOUBLE BLOCK AND BLEED ON-LINE CONDENSATE WATER WASH SYSTEM (7) - BLOCK AND TAG OFF LINE WATER WASH VALVE
VESSEL ENTRY SECTION OF THE MULTI-WORK PERMIT MUST BE FILLED OUT, ALSO AIR INLET ENTRY SUPPLEMENT MUST BE COMPLETED AND SIGNED. ALL LABORERS SHOULD HAVE RECEIVED POWER II BLOCK INDOCTRINATION WITHIN THE LAST YEAR.
SAFETY EQUIPMENT REQUIRED TO DO THIS JOB IS AS FOLLOWS:
( 1 ) - MONOGOGGLES (2) - RESPIRATOR (3) - HARD HAT (4) - RUBBER GLOVES (5) - LOW VOLTAGE LIGHTING OR GFCI RECEPTACLE (6) - SAFETY HARNESS WITH 4-FOOT LANYARD
CLEANING THE COMPRESSOR INLET SCROLL AND THE FIRST AND SECOND ROW OF VANES AND BLADES IS ACCOMPLISHED BY SCRUBBING THE METAL SURFACE WITH SCOTCHBRITE AND HUNTER SOAP.
NOTE: CAUTION SHOULD BE TAKEN WHEN CLEANING THE TOP SECTION OF THE COMPRESSOR. THE SCROLL IS WET AND COULD BE VERY SLIPPERY. A SAFETY HARNESS IS REQUIRED THAT HAS A 4-FOOT LANYARD.
THE DEPOSIT WHICH MUST BE REMOVED IS BLACK IN COLOR. INSURE THE TRAILING EDGE OF THE BLADES ARE SCRUBBED ESPECIALLY WELL BECAUSE THEY ARE HARD TO SEE AND REACH. (THE SECOND ROW BLADES AND VANES WILL NEED TO BE CLEANED USING A SCRUB BRUSH. THIS BRUSH CAN BE OBTAINED FROM OUR IN-BLOCK LABORER. MAKE SURE BLADES AND VANES ARE RINSED VERY WELL WITH LARGE QUANTITIES OF WATER).
CAUTION SHOULD BE TAKEN WHEN USING THE SOAP TO AVOID EYE IRRITATION. THE LABORERS ARE INFORMED OF THIS POTENTIAL HAZARD AND THE NEED TO THOROUGHLY WASH THEIR HANDS IMMEDIATELY AFTER JOB COMPLETION OR GLOVE REMOVAL.
INSURE
AFTER JOB COMPLETION, NOTIFY THE MAINTENANCE SUPERVISOR FOR INSPECTION. INLET SHOULD NOW BE SWEPT TO REMOVE ANY FALLEN MATERIAL AND SOAP WATER. SIGN OFF THE RED TAG MASTER.
REVISED: JMI 01/08/93 BLOCK #416
DO A 133808 CONF TDFNT TAI
CHECKING A COMBUSTIBLE GAS ALARM ON UNIT 100/200 FUEL GAS BLOCK
NOTE:
COMBUSTIBLE CAS ALRM COMES FROM EITHER THE GAS BLOCK OR THE GOVERNOR BLOCK ON THESE TWO UNITS. THESE GAS OPERATING STATIONS ARE EXPOSED TO THE OUTSIDE ATMOSPHERE,
1. WHEN A COMBUSTIBLE GAS ALARM OCCURS ON UNIT 100 OR 200/ THE bOARD OPERATO WILL COMMUNICATE THE LOCATION AND LEL PERCENTAGE. THE GAS DETECTOR READ OUT IS JUST ABOVE THE TURBINE BEARING DATA WATCH.
NOTE: 50'/. LEL AND ABOVE IS CONSIDERED DANGEROUS.
, |
2. DIRECTLY AFTER THE LOCATION OF THE ALARM IS NOTED, THE BOARD; OPERATOR
WILL COMMUNICATE THE PERCENTAGE LEL OF GAS TO THE OUTSIDE OPERATOR.
3. THE OUTSIDE OPERATOR WEARING FIRE PROTECTION CLOTHING AND CARRYING A TESTED PORTABLE CQM3USTIBLE GAS ANALYZER WILL INVESTIGATE THE PROBLEM. CLOSE COMMUNICATION BETWEEN THE OUTSIDE OPERATOR AND THE CONTROL ROOM IS REQUIRED, BY PAGE PHONE ONLY AS RADIOS ARE NOT ALLOWED BY THE GAS CABINET.
4. ALARMED AREA SHOULD EE CHECKED COMFLETElY FOR LEAKS. ANY PROBLEM OP FINDI.NCS SHOULD BE REPORTED.
5. IF THE FROELEM IS SEVERE, THE UNIT POSSIBLY WILL HAVE TO SHUTDOWN BUT
IF THE LEAKS ARE THE PRODUCT OF ACCUMULATION THEN OPENING THE DOORS WILL
REDUCE THE CONCENTRATION TO A SAFE LEVEL.
!
REVISED NLC 1Z23/92 BLOCK #422
00 A 133809 OONFTDFNTTAl
PROCEDURE FOR STOPPING 100/200 CENTRIFUGE MP-106 AND MP-206
1. INFORM BOARD OPERATOR WHAT YOU ARE GOING TO DO. 2. CLOSE SUCTION VALVE TO RELEASE ALL OIL FROM CENTRIFUGE. 3. STOP CENTRIFUGE BY PUSHING STOP BUTTON ON LOCAL SWITCH. 4. WHEN CENTRIFUGE COMES TO COMPLETE STOP* CLOSE DISCHARGE VALVE.
NOTE:
FAILURE TO WAIT UNTIL CENTRIFUGE COMES TO A COMPLETE STOP BEFORE CLOSING DISCHARGE VALVE RESULTS IN OIL LEAKS AT "0" RINGS AT VARIOUS LOCATIONS ON THE CENTRIFUGE.
REVISED: JML 10/23/92 BLOCK #436
DO A 1-V-** 1 0 f.ONF T DFN'l 1 At
OPERATING DISCIPLlNt FOR THERMOCOUPLE ZONE FAILURES
PURPOSE: TO EXPLAIN THE REQUIRED ACTIONS THAT NEED TO 3E TAKEN WHEN TIL BBC TURBINES EXPERIENCE THERMOCOUPLE ZONE FAILURES.
EFINITIQN OF FAILURE TYPES
LOW FAILURE:
A FAILURE OF A THERMOCOUPLE THAT IS READING TOO LOW TO BE CONSIDERED CORRECT BY THE PROGRAM. THE PROGRAM HAS A FIXED VAL' - OF 300 DEGREES F THAT IT COMPARES WITH EACH THERMOCOUPLE REA G. IF THE THERMOCOUPLE IS READING LESS THAN THE 300 DEG S F, THE PROGRAM WILL REJECT THAT THERMOCOUPLE FROM THE PRO-. -- ::M. THIS PROGRAM LOGIC IS NOT ACTIVE BEFORE START STFP 5.
HIGH FAILURE:
A FAILURE OF A THERMOCOUPLE THAT IS READING TOO HIGH TO BE CONSIDERED CORRECT BY THE PROGRAM. THE PROGRAM HAS FIXFD HIGH VALLC. OF 1400 DEGREES F THAT IT COMPARES WITH EACH THERMOCOUPLE READii-.G. IF THE THERMOCOUPLE IS READING HIGHER THAN 1400 DECIDES F, THE PROGRAM WILL REJECT THAT THERMOCOUPLE FROM THE PROGRAM. THIS PROGRAM LOGIC IS ALWAYS ACTIVE.
DIFFERENT FAILURE.
A FAILURE THAT OCCURS WHEN TWO THERMOCOUPLES IN THE SAMF
ZONE DIFFER BY MORE THAN 30 DEGREES F IN THEIR READINGS.
WHEN
THIS DOES OCCUR, THE PROGRAM REJECTS BOTH THERMOCOUPLES
BECAUSE IT DOES NOT KNOW WHICH ONE IS CORRECT. THIS RESULTS
IN A ZONE FAILURE.
ZONE FAILURF:
A FAILURE WHICH OCCURS WHENEVER TWO THERMOCOUPLES IN THF SAME ZONE FAIL AND ARE REJECTED FROM THE PROGRAM. THIS FAILURE CAN BE THE RESULT OF A DIFFERENCE FAILURE OR A COMBINATION OF THE LOW AND/OR HIGH FAILURES. THERE ARE SIX ZONES ON THE EXHAUST OF THE BBC UNITS.
NOTE *########****##*#****#**## * r-
* EACH OF THESE CONDITIONS WILL ACTIVATE THE TURBINE
*
* EXHAUST THERMOCOUPLE FAILURE ALARM ON THE METRA ALARM *
* SCREEN. ANYTIME A THERMOCOUPLE FAILURE OCCURS, THE *
* TRI-SEN AUTOMATICALLY TRANSFERS TO SPEED CONTROL TO *
* PREVENT THE TURBINE FROM MAKING ANY SUDDEN CHANGES. *
**
********#**-#**#*>#***.******-* )Hfr#****# ***-*****#*
RESPONSE TO ZONE FAILURES __
00 A 133811 C0NFTDFNTTA1
WHEN A SINGLE ZONE FAILURE OCCURS, THE TURBINE WILL TRANSFER TO SPEED CONTROL AND GIVE AN EXHAUST THERMOCOUPLE FAILURE ALARM. OPERATIONS SHOULD PROCEED AS FOLLOWS:
1. LOOK AT THE EXHAUST THERMOCOUPLE SCREEN ON THE METRA AND LOCATE THIFAILED ZONE. FAILED THERMOCOUPLES WILL BE IN RED.
2. LOOK AT THE INDIVIDUAL THERMOCOUPLE READINGS AND DETERMINE IF THE THERMOCOUPLES FAILED HIGH < ABOVE 1400 DEGREES F) OR LOW ( BELOW 300 DEGREES F) OR A COMBINATION OF HIGH AND LOW. IF THEY HAVE, CALL THF ENGI NECK RESPONSIBLE AND HAVE THE FOLLOWING INFORMATION READY:
T< II- rvuAitr--r aicdaac TCMBCD ATI IOC IStTCTlDr AKin ACTPR THF THFRMnmiPI F
CHiLUKt.
B. THE TEMPERATURE OF THE THERMOCOUPLES THAT FAILED PRIOR TO THP FAILURE.
C. THE PRESENT TIT TEMP FROM THE RUN SCREEN ON THE METRA AND TIT TEMP PRIOR TO THE FAILURE.
E. COMPRESSOR DISCHARGE PRESSURE BEFORE AND AFTER FAILURE.
F. EGGCRATE TEMPERATURE BEFORE AND AFTER ZONE FAILURE.
G. MW LOAD BEFORE AND AFTER THE ZONE FAILURE.
H. DESCRIPTION OF ANY UNUSUAL EVENTS THAT WERE TAKING PLACE PRIOR TO THE THERMOCOUPLE FAILURE.
THE ENGINEER RESPONSIBLE WILL USE THIS INFORMATION TO DETERMINE THE APPROPRIATE ACTION TO BE TAKEN. NOTE:: RESPONSIBLE PERSON MAY NEED THE Til CALCULATION EQUATION GIVEN HERE;
HT= 1.39*TAT + 2. 9&*ICDP + 53
3. IF NEITHER HAVE FAILED HIGH OR LOW, THEN THE FAILURE IS A DIFFERENCE FAILURE OPERATIONS RESPONSE TO A DIFFERENCE FAILURE IS AS FOLLOWS:
A. OBSERVE THE FAILED THERMOCOUPLE VALUES AND DETERMINE IF EITHER OR BOTH ARE ERRATIC. IF BOTH THERMOCOUPLES ARE ERRATIC, THEN RESPOND AS PER 2 ABOVE.
B. LOOK AT THE EXHAUST SCREEN OF THE METRA, IF ONLY ONE THERMOCOUPLE IS ERRATIC AND ONE IS STEADY, CHART THE STEADY THERMOCOUPLE'S HISTORY ON THE CRT AND VERIFY THAT IT'S READING IS REASONABLE. IF THE VALUE IS REASONABLE, THEN RESET THE GOOD THERMOCOUPLE. RECORD THE PRESENT MW'S, GAS VALVE */., AND TIT TEMP FROM TH1- RUN SCREEN. RETURN THE MACHINE TO TIT CONTROL. IF THE MW LOAD CHANGES, ADJUST THE TARGET SETPOINT TO MAINTAIN THE PROPER LOAD. NOTIFY RESPONSIBLE ENGINEER OF THE SITUATION.
4. IF AT ANY TIME TWO ZONE FAILURES OCCUR, THE MACHINE WILL AUTOMATICAL! Y BEGIN A RUNBACK. IT WILL CONTINUE TO RUNBACK UNTIL MINIMUM LOAD 13 REACHED. OPERATIONS CAN HALT THE RUNBACK BY RESETTING A GOOD THERMOCOUPLE IN EITHER OF THE TWO FAILED ZONES THEREFORE, A QUICK RESPONSE IS REQUIRED. UPON RECEIVING THE RUNBACK ALARM, LOOK AT IHh EXHAUST SCREEN ON THE METRA AND OBSERVE THE FAILED ZONES IN RED. JF THERE IS A THERMOCOUPLE THAT IS STABLE AND IN NORMAL RANGE, IMMEDIATE! Y RESET THAT THERMOCOUPLE TO HALT THE RUNBACK. LEAVE THE MACHINE ON SPEED CONTROL AND PROCEED WITH STEPS 2 AND 3 ABOVE. NOTIFY APPROPRIATE STAFF PERSONNEL OF THE SITUATION.
5. IF AT ANY TIME THREE OR MORE THERMOCOUPLE ZONES FAIL, THE MACHINE WI! I TRIP IMMEDIATELY. IF THIS OCCURS. CALL OUT THE ENGINEER RESPONSIBLE TO INVESlI GATE AND REPAIR THE THERMOCOUPLES. LEAVE THE MACHINE ON TURNING GEAR. COOLING THE MACHINE SHOULD NOT BE REQUIRED UNLESS APPROPRIATE PLANT PERSONNEL DECIDE TO LEAVE THE MACHINE DOWN TO DO OTHER JOBS THAT WOULD REQUIRE THE MACHINE TO BE COOL. CHANGING THE THERMOCOUPLES THEMSELVES DOES NOT REQUIRE THE MACHINE TO BE COOLED.
f>J o
I TED: JM! /01/93 BLOCK #440
DO A 133818 OONFTDFNTTAl
PERFORMING' ! -YDROCEN LEAK TESTS ON UNITS 100/200
1. INFORM BOARD OPERATOR OF THE TASK YOU ARE ABOUT TO PERFORM.
THE GENERATOR H2 PRESSURE SHOULD BE 25 P5IG, IF IT IS NOT PRESSURED UP TO p"j PSIG, YOU WILL HAVE TO PRESSURE IT UP TO 25 PSIG.
3. BLOCK YOUR SUPPLY AND SCAVENGE RATES IN AND CHECK VENT TO MAKE SURI.IT IS CLOSED. DOUBLE BLOCK IF POSSIBLE.
4. INFORM BOARD OPERATOR THAT THE GENERATOR IS PRESSURED UP AND THAT YOU HAVE "I Hr SUPPLY AND SCAVENGER BLOCKED IN. GIVE HIM THF. PRESSURE READING ON THE GENERATOR.
5. EVERY HOUR FDR 6 HOURS, THE BOARD OPERATOR SHOULD WRITE DOWN THE HYDROGEN, BAROMETER PRESSURE AND THE STATOR WINDING "B" TEMPERATURE.
6. AFTER ALL IS COMPLETE, GO BACK TO THE GENERATOR YOU ARE TESTING AND UNBLOCK THE SUPPLY LIME AND SCAVENGER BACK TO NORMAL.
NOTE:
ANY DIFFERENCE GREATER THAN . 5# REQUIRES CHECKING AND REPAIRING ANY LEAKS ALSO COMMENT IF ANY CONDITIONS CHANGED SIGNIFICANTLY DURING TEC31. EX. COOLING TOWER H20 TEMPERATURE CHANGED, AMBIENT, ETC.
EDITED: JM! 03/2B/91 BLOCK #450
DO A 133810 CONFTDFNT TAI
CHANGING PLANT AIR FILTERS ON 100/200 UNITS
NOTE:
THESE FILTERS CAN BE CHANGED WITH THE UNIT ON THE LINE OR OFF THE LINEi HOWEVER. KEEP IN MIND THAT ISOLATING THIS FILTER WILL RESULT IN NO PLANT AIR BEING SUPPLIED FROM THIS UNIT.
1. CLOSE THE AIR IN BLOCK VALVE.
2. CLOSE THE AIR OUT BLOCK VALVE.
3. SLOWLY OPEN THE BLEED VALVE BETWEEN THE ABOVE BLOCK VALVES.
4. AFTER THE FILTER HAS ALL THE PRESSURE BLED OFF. THE FILTER CAN BE REPLACED. USE FILTER #B4-228H-61. RECORD DATE FILTER WAS CHANGED.
REDITED: JMC 2/24/94 BLOCK #458
UPDATED:JMC 4/14/94
DO A 13AB1A
C0NFTDFN1 t Al
TEXT BLOCK #
462
UNITS 100/200 TURBINE START-UP CHECKLIST
THE PURPOSE OF THIS CHECKLIST IS TO HELP THE OPERATORS STARTING THE GAS TURBINES VERIFY THAT ALL NECESSARY ITEMS REQUIRED FOR START UP HAVE BEEN TAKEN CARE OF.
YES
NO
1. HAVE ALL THE RED TAGS BEEN CHECKED AND CLEARED?
2. IS THE LUBE OIL TEMPERATURE ABOVE 95 DEGF. ?
3. IS THE AUXILIARY LUBE OIL PUMP RUNNING?
4. IS THE SEAL OIL SYSTEM 0.K.? (SUCH AS GENERATOR HYDROGEN PRESSURE, A. C. OIL PUMP RUNNING, DIFFEREN TIAL PRESSURE IN RANGE)
5. HAS A VISUAL INSPECTION OF THE LUBE OIL SYSTEM, GAS BLOCK, TURBINE, ETC. , BEEN MADE?
6. HAS THE U-DUCT DRAINS AND BLEED VALVE DRAINS BEEN CLOSED?
7. HAS THE AIR INLET BEEN INSPECTED AND DOORS CLEANED?
8. IS THE TRANSITION DUCT DOOR CLOSED? 9. HAS THE STEAM INJECTION SYSTEM BEEN WARMED UP?
10. ARE ALL OIL HEADER VALVES IN THE CORRECT OPERATING POSITION?
ARE ALL OIL AND HYDROGEN AND STARTING MOTOR COOLING SYSTEM VALVES IN THE CORRECT OPERATING POSITION?
11. IS ONE POWER OIL FILTER IN SERVICE?
12. IS ONE LUBE OIL FILTER UNBLOCKED AND IN SERVICE
13. IS THE MAIN GAS VALVE UNBLOCKED AND LINE PRESSURED UP?
14. IS THE STARTING MOTOR RACKED IN?
15. IS THE S&.C SWITCHGEAR RACKED IN?
16. IS THE STATION SERVICE TRANSFORMER RACKED IN?
17. ARE THE OCB BLADES CLOSED AND LOCKED AT THE BLOCK LINE?
IB. IS THE OCB RACKED IN:
(A). IS THE AIR VALVE UNBLOCKED?
DO A 133010 C.nNH DFN1 1 Al
(B) AT THE OCB: IS THE CONTROL POWER KNIFE SWITCH
<C). IS THE DC. BREAKER CLOSED IN THE CONTROL ROOM?
19. VERIFY COMPUTER IS WORKING: UNBLOCK LINE LOCAL SWITCH ON PRINTER.
COMMENTS:
REVISED: NLC 9/13/90 BLOCK #462
DO A 103HI 6
<' ONF 1 OF NT T AI
ISOLATING LUEE OIL SYSTEMS ON UNITS 100 AND 200 TO CHANGE FILTERS
1. NOTIFY BOARD OPERATOR OF JOB TO BE DONE ON LUBE OIL SYSTEM. 2. REVIEW AND UPDATE PROCEDURE. 3. RED TAG ALL NECESSARY OIL PUMPS OUT ON LUBE OIL SYSTEM.
A. AUX. LUEE OIL B. VALVE TO SEAL OIL (CLOSED) FROM L. 0. HEADER C. VALVE TO SEAL OIL (OPEN) FROM L. 0. TANK 4. BLOCK IN FILL LINES TO LUBE OIL FILTERS. 5. BLOCK IN SUCTION FROM L. 0. TANK TO CENTRIFUGE. 6. OPEN DRAIN VALVE TO SUCTION OF CENTRIFUGE FROM L.0. FILTERS. 7. ONCE FILTER HAS BEEN PUMPING DOWN ABOUT 15 OR 20 MINUTES, BREAK BLEED AT ORIFICE (USING A 1 GALLON BUCKET TO CATCH ANY EXCESS LEFT IN LINE) BREAK BOLTS APART. OPEN LID SO YOU CAN WATCH LEVEL DECREASE AND ALSO TO KEEP AN EYE ON IT SO YOUR CENTRIFUGE WANT LOSE PRIME S. ONCE LEVEL IS DOWN HALF WAY LAST SET OF FILTERS IN DESIRED FILTER BLOCK OFF AND DRAIN SECOND FILTER (SAME WAY). 9. CHANGE OR CHECK FILTERS.
REVISED:NLC 1/23/92 BLOCK 4489
DO A 13 38 17 PONT TOP N 1 1 Ai
UR' seal ADUusiTicur
1. ISOLAiL' EFP AS PER PROCEDURE OM CRT
2. RED TAG KFP A Pi PER RED T A O' MASTER.
IvfJTE
GLAND SEAL H20 DDLS NOT HAVE TO BE BLOCKED AND TAGGED TO PERFORM THIS JOB. (PUMP MUST BE DE-PRESSURI ZED).
3. AFTEP PUMP HAS DEPRE5SURED, YOU CAN CONTINUE. TAKE AMEASUREMENT OF THE SPACE BETWEEN THE. SEAL RETAINER HOUSINGAND THE SEAL LOCKINGCOI LAR. (IT 5: i* -OLD BE APPROXIMATELY 1/12" CLEARANCE. )
NOTE MAKE SURE LOCKING COLLAR ALLEN SCREWS ARE TIGHT. IF THEY ARI
LOOSE, LOCKING COLLAR HAY HAVE SLID INWARDS CAUSING SEAL FACES TO lOOP
CONTACT WITH ONE ANOTHER AND ALLOW LEAKAGE. IF SO, SET CLEARANCE AT
1/B", PUSHING COLLAR AWAY FROM PUMP. USE SHIM MATERIAL ON THREE SIDES
OF COIIAP WHEN SETTING CLEARANCE TO ASSURE COLLAR FACE IS SQUARE TO
SEAL HOUSING. IF ALLEN SCREWS WERE FOUND TO BE TIGHT, LOOSEN LOCK
SCREW.': on COLLAR AMD MOVE COLLAR (.015"), IN ADDITION TO THE 1/D"
CLEARANCE THAT YOU ALREADY HAVE. AGAIN USE THE SKIM STOCK MATER IAl
ON ALI Three SIDES OF THE LOCKING COLLAR TO ASSURE a SQUARE ALIGNMENT.
I YOU EM, UMD AT THIS POINT HAVE (2) SHIMS .020 AND .010). LOCKING CUL! AR
MUED M EG.ARE (NOT COCKED OR SEALS WILL LEAK)
WHEN YOU HAVE TUP CM LAR
FCGI"IMPED PROPERLY, TIGHTEN At LEN SCREWS TO LOCK COLLAR IN PLACE.
4. CLOGS MEEDS BACK AND CRACK OPEN SUCTION VALVE ON PUMP UNTIL A FLOW 10
GDMaUPU COOING FROM BLEED valve
Close BLEED VALVE AND PRESSURE UP
PUMP (UiG-lW
KEEP an EVE DM SEALS WHILE PRESSURING UP AND CHECK FOR
0 F' Gr- i`:'F -! S PRESSURED UP, ROLL PUMP SHAFT (BY HAND) AND AGAIN CHECK
E-M5 i M- LEM'.ACF
IP TKCRF IS ND LEAKAGE, UNTAG PUMP AND PUT PUMP
3 SEALS ARE PM ) LL LEAKING, BUT HAS SLOWED, REPEAT THE ABOVE STEFS MOVING OUT AWAY FROM PUMP ANOTHER 0. 15 OF AN INCH. IP ,ttcr MOVING COLLAR . 030" TRCfT THE ORIGINAL 1/0" SETTING, T! IE IS L s ARE STILL LEAKING, SEALS ARE PROBABLY WORM TOO BADLY FOR ADJUSTMENT AND SHOULD BP REPLACED.
RED TAG PUMP AMD MMR PGR SEAL REPLACEMENT,
REVISED NT C 9/13/VO BLOCK 4F:i
UPDATED. u:tl 3/10/94
00 A 1 FORTH rONP T OF NT T Al
HOT END b: ING FT RES UNITS 100/200
SEVERAL 031 CONTAINING LINES EXIST IN THE HOT END DEAR IMG TUNNEL. LEAKS 4 ANY Or THESE DR BEARING SPLIT LINE LEAKS NAY CAUSE OIL ElRES. THESE
.-IRES ARE AUTOMATICALLY DETECTED BY A U-V SCANNER LOCATED IN THE TUNNEI . THE MAIN E"Jf<E PROTECTION DEVICE CONSISTS OF A STEAM SNUFFING NOZZLE FED BY 30 PSIG STEAM FROM THE MAIN HEADER, THIS STEAM IS AUTOMATICALLY OPERATED BY THE U-V SCANNER WITH A BYPASS FOR MANUAL OPERATION. THIS SYSTEM IS BACKED UP BY TWO LARGE COO BOTTLES LOCATED ALONG THE NORTH AIR INLET DUG I. THESE ARE MANUALLY OPERATED.
FIRES IN THIS BEARING TUNNEL WILL MOST LIKELY RESULT IN FAILURES OF THE INSTRUMENTATION IN THIS AREA AND POSSIBLY HIGH BEARING TEMPERATURE READINGS DUE TO FAILURE OF THE THERMOCOUPLE WIRING WHICH WOULD RESULT IN A TURBINE TR IP
ACTION TO IP TAKEN IN THIS INSTANCE IS AS FOLLOWS:
1. OPEN SNUFFING STEAM BYPASS AND USE COO AS NECESSARY TO STOP FLAMES.
CHE->- ! UE Oil. EVACTOR FOR PROPER OPERATION AND TANK VACUUM (ABOUT IK PEG) , IF THf. E'-'ACi OR IS NOT PULLING (2 INCHES) A GOOD VACUUMTAG OUT Tr-c EVACTOR AMD BREAK THE EVACTOR DISCHARGE LIME WHERE IT "WEE THE TO- OF THE COMPRESSOR INt_ET. CHECK FOR WATER BUILDUP.
P
L L L MOON DPf IN LINE FROM BEARING DRIP PAN.
4 th1 ' (;M
PROTECTION EQUIPMENT PERIODICALLY TO ASSSURE NO FURTHER
; ;aO._.E;'1 (CONTINUOUS CFlP AT 5 0:4 WITH STEAM CAN CAUSE WATER TO BE
r INTO LUBE OIL SYS TEN}
5 't ' IA T EFE QP THF mBOVl TO S'0 THE FIRE. RUN SNUFFING STEAM AS EM AND SCHEB-ULI. 1HE UNIT DOWN FOR INSPECTION.
6. O' ;py (SECURITY when YOU US" UP A COD BOTTLE. ANYTIME DAY OR NIGHT. THE' VI L BEING ANOTHER DOT 11. E AND INSTALL IT
REVISED N. 9/10/90 BLOCK r-Clo
UPDATED - UN-: 3/10/94
00 A 10 3819 GONF TDFNTT Al
A. 4
TEXT BLOCK #
522
EMERGENCY PROCEDURE
GT-lOO & GT-200 U-DUCT FAILURE
BACKGROUND INFORMATION
THE FAILURE OF A U-DUCT ON THE BBC GAS TURBINES IS AN OCCURENCE WE NEED TO BE PREPARED FOR AT ANY TIME. IT IS NOT KNOWN WHAT THE FAILURE MODE WILL BE NOR HOW IT WILL AFFECT THE TURBINE OPERATION. WE HAVE HAVE HAD A U-DUCT FAILURE HERE AT POWER 2 BUT UNFORTUNATELY WE DO NOT HAVE VERY MUCH DATA ON HOW THE VARIABLES WILL CHANGE DURING THE FAILURE. THE ONLY THING ABSOLUTE IS THAT THE REGENERATOR AIR FLOW WILL GO DOWN. FOR THIS REASON, AUTOMATIC TRIPS WILL BE SET UP TO SHUT DOWN THE TURBINE IF THE REGENERATOR AIR FLOW FALLS BELOW A SET AMOUNT. MANUAL OPERATOR TRIPS WILL BE REQUIRED IF A REGENERATOR AIR FLOW REDUCTION OCCURS ALONG WITH OTHER KEY PARAMETER CHANGES. IT IS NOT KNOWN IN
WHAT DIRECTION THESE OTHER PARAMETERS WILL MOVE, THEREFORE CHANGES IN ANY DIRECTION ARE SIGNIFICANT.
1. AUTOMATIC TRIPS ARE BEING INSTALLED ON GT-lOO AND GT-200 TO TRIP THE MACHINE ON LOW REGENERATOR AIR FLOW. THE TRIPS WILL BE SET AT 1300 MLB/HR. THE TRIPS WILL REQUIRE TWO TRANSMITTERS TO READ LOW TO ACTIVATE. GT-lOO ONLY HAS ONE TRANSMITTER AT PRESENT, BUT A SECOND TRANSMITTER WILL BE ADDED ON THE NEXT OUTAGE. THE TRIPS WILL BE ACTIVE ON AFTER THE TURBINE RPM'S ARE GREATER THAN 3600.
2. OPERATORS SHOULD MANUALLY TRIP THE UNIT IF THE FOLLOWING CONDITIONS EXIST:
- THE REGEN AIR FLOW LOW ALARM HAS ACTIVATED ON ANY OF THE AVAILABLE FLOW INDICATIONS. THE ALARMS ARE SET APPROXIMATELY 100 MLB/HR LESS THAN THE NORMAL OPERATING FLOWS.
AND
- ANY CHANGE IS OBSERVED ON ANY OF THE FOLLOWING ITEMS:
A. GENERATOR MEGAWATTS
B. PYROMETER TEMPERATURE
C. BLADE PATH SPREAD
D. HEAT RATE
DO A 133870
E. FUEL GAS FLOW
CONF TDFNT TAl
3. IF A LOW REGENERATOR AIR FLOW ALARM ACTIVATES ON THE PDP-11, THE FOLLOWING ACTIONS SHOULD BE TAKEN:
A. IMMEDIATELY HISTORY LOG THE PYROMETER TEMPERATURE.
B. SELECT "SETUP" ON THE HISTORY LOG OPTIONS.
T.________________ FFI J!/LlL_^TMF^_nNI_JHF_SFJ1 JP_PPT TnKlg
c. BLADE PATH SPREAD
t>. MEAT RATE E. FUEL. AS FLOW
V< <
3. IF A LOW REGENERATOR AIR FLOW ALARM ACTIVATES ON THE PDP-11, THE FOLLOWING ACTIONS SHOULD BE TAKEN:
A. IMMEDIATELY HISTtlRY LOG THE PYROMETER TEMPERATURE.
B. SELECT "SETUP" ON THE HISTORY LOG OPTIONS.
C. SELECT "TIME" ON THE SETUP OPTIONS.
D. SELECT THE 2 MINUTE INCREMENT FOR 12 HOURS
E. ADVANCE THROUGH THE PAGES USING THE "FWD'f SELECTION AND OBSERVE THE TRENDS ON THE JNPUTS.
F. IF ANY OF THE INPUTS ARE TRENDING UP OR DOWN OTHER THAN CHANGES THAT YOU KNOW WERE CAUSED BY DEFINEABLE OCCURENCES (DAY/NIGHT TEMPERATURE, WATER WASHING, WASH COLUMNS SHUT DOWN, ETC. ) THEN DECIDE TO SHUT THE TURBINE DOWN.
G. CALL POWER 1 AND CHLORINE AND INFORM THEM THAT YOU WILL BE SHUTTING DOWN THE SPECIFIED GAS TURBINE IN 3 MINUTES. INSTRUCT THEM TO EITHER PICK UP LOAD ON THE GSU TIE LINE OR CUT CHLORINE RECITIFER LOAD BY AN AMOUNT EQUAL TO THE MEGAWATT OUTPUT OF THE UNIT YOU ARE ABOUT TO SHUT DOWN.
H. AFTER 3 MINUTES HAVE ELAPSED, ANNOUNCE THAT YOU ARE NOW GOING TO TRIP THE GAS TURBINE - tHEN DO SO USING THE EMERGENCY STOP BUTTON.
I. CONTACT THE PRODUCTION ENGINEER. PLANT SUPERINTENDENT. OR PRODUCTION SUPERVISOR.
REVISED:NLC 9/13/90 BLOCK #522
00 A 130801 00NFTDFNTTA1
ISOLATING 100/200 Hp & MP BOILER VESSEL ENTRY CHECKLIST AS TURBINh SHUTDOwN AND TAGGED. 1. RACK OUT AND RED TAG STARTING MOTOR. 2. DOUBLE BLOCK AND BLEED GAS LINE AND RED TAG. 3. DOUBLE BLOCK AND BLEED STEAM INJECTION LINE AND RED TAG. 4. HP, MP AND LP NON-RETURNS, LEADLINES AND WARM-UP VALVES DOUBLE BLOCK AND BLEED AND RED TAGGED. 5. DOUBLE BLOCK AND BLEED FEED H20 TO HP, MP, AND LP BOILERS. 6. RACK OUT AND RED TAG MP-103A/B AND MP-203A/B HP B^P'S (ELECTRICALLY). RACK OUT AND RED TAG MP-100A/B AND MP-200A/B LP BFP'S (EIECTRICALLY). 7. WHEN BOILER QUITS STEAMING, DRAIN BOILER SECTION. 8. DRAIN ECONOMIZER SECTION IF NEEDED. 9. DOUBLE BLOCK AND BLEED OR DISCONNECT CHEM. FEED
" PUMPS. 10. 02 AND EXPLOSIMETER TEST RUN AND RESULTS ARE 0.K. 11. OBTAIN PROPER PERMITS TO ENTER VESSEL AND SUPPLEMENTS.
EDITED:NLC 11/13/91 BLOCK #524 UPDATED: JMC 2/21/94
( CONF- TDFNT TA
ISOLATING 100/200 HOT END FIRE PROTECTION 1. INFORM BOARD OPERATOR THAT YOU WILL'BE ISOLATING THE HOT END FIRE
PROTECTION. 2. RED TAG DOUBLE BLOCK AND BLEED DOWNSTREAM OF BOTTLES. 3. CLOSE AND RED TAG THE UPSTREAM AND DOWNSTREAM BLOCK VALVES AT THE
SNUFFING STEAM TRIP VALVE. 4. RED TAG SNUFFING STEAM BYPASS VALVE CLOSED. 5. RED TAG VENT TO ATMOSPHERE OPEN. 6. HOT END FIRE PROTECTION NOW ISOLATED. REVISED: NLC 1/23/92 BLOCK #525
00 A OONFTOFN7T4I
ANNUNCIATOR TRIP ALARMS
GT--100/200 TRI-SEN GENERATED ALARMS: THE FOLLOWING IS A LISTING OF ALL -ARMS GENERATED BY THE TRI-SEN AND APPROPRIATE ACTION TO FOLLOW FOR
UNFAMILIAR ALARMS. ADDITIONALLY, PROCEDURES FOR ACTIONS REQUIRED ON ALL ALARMS WILL BE POSTED SOON.
ANNUNCIATOR TRIP ALARMS: 1. BLADE PATH SPREAD HIGH TRIP --HIGH TO LOW SPREAD > 250 DEGF. 2. TURNING GEAR TIME-OUT TRIP -- ROTOR ON T.G. IF RESET PB DEPRESSED, ONE MINUTE TIMER WILL BE ACTIVATED. IF START PB NOT DEPRESSED DURING THIS TIME INTERVAL, ROTOR WILL AUTO MATICALLY RFTURN TO T. G.
3. LOSS OF SPEED SENSORS TRIP -- START STEP > 4 (GAS PRESS OK, VENT CLOSED, SPEED > 720, FLAME ON) AND SPEED < 200 RPM.
4. SAFELY OIL PRESSURE LOW TRIP -- PERM 2 SATISFIED AND SAFETY OIL r-RFSSURF. < 50 PSIG. (dP8031)
5. LOW DC VOLTS TRIP -- CONTROL POWER VOLTAGE < 94 VOLTS (dDCC27)
6. HIGH TURBINE INLET TEMP TRIP -- TIT > 1920
8. HIGH DEAR INC TEMP TRIP -- TEMP > 230 DEGF ON BOTH PROBES OF SINGLF BEARING(dTMBRGT)
9. TURBIN:- UNDERSPEED TRIP -- SPEED < 3400
0. HIGH VIBRATION TRIP (dVMT) --OCCURS WHEN EITHER RELATIVE AND EITHER SEIM)C (VELOMETER) GO ABOVE TRIP SETPOINT.
11. HIGH TURBINE EXHAUST TEMP TRIP -- TAT > 1086 OR EGGCRATE TEMP > 1051 (BOTH AVERAGES) OR PRIOR TO BREAKER CLOSURE SPEED < 2200 AND TAT > 900.
12. FLAMl MONITOR TRIP -- LOSS OF FLAME AND BREAKER OPEN OR LOSS OF FLAMI-, BREAKER CLOSED AND ISOLATED FROM SYN BUS. REQUIRES BOTH MONITLRS TO SEE NO FLAME.
13. LOW LUBE OIL PRESS TRIP -- LUBE OIL PRESS < 18# AND PERM ONE SATISFIED. (dP3034A)
14. OVERS!'LED TRIP -- ELECTRICAL (NO OS TEST) SPEED > 3890 MECHANICAL (OS TEST) SPEED > 4050
15. PROTECTIVE RELAY TRIP -- GENERATOR 86T (dG86)
16. EMERGENCY TRIP -- EMERGENCY TRIP PUSHBUTTON tdETRIF)
DO A 130804 OONFTDFNTTAl
V
IB. C.-'l9.
20.
STARTING MOTOR FAULT TRIP -- SPEED < 2200 AND STARTING NOT RUNNING. (dSMFALT)
TORO. CONV. OVERTEMP TRIP -- SPEED < 2200 AND TEMP > 300 DEGF
<dTS3046) CONTROL OIL PRESSURE HI TRIP --SPEED < 2200 AND PRESSURE GREATLR THAN 50#. <dPSB032)
21. TORG. CONV. MOD. CLUTCH COOLING OIL PRESS TRIP -- SPEED < 530* PERM 7 NOT SATISFIED AND TORQ. CONV. MOD. CLUTCH COOLING OIL PRESS < 15#. < dPS32Sl)
22. TURBINE ACCELERATION LOW TRIP -- PERM 5 SATISFIED AND PERM 7 NOT SATISFIED; PRESENT SPEED MINUS SPEED 20 SFCONDS PRIOR < 10 RPM AND CONDITION EXIST FOR 25 SECONDS.
23. TORQ. CONV. CLUTCH OIL PRESS. LOW TRIP -- PERM 3 SATISFIED* PERM A NOT SATISFIED AND TORQ. CONV.CLUTCH OIL PRESS < 180#. <dPS3043)
*** ALARM SUMMARY **#
33. BLADE PATH SPREAD HIGH RUNBACK -- HI-LO EXHAUST SPREAD IS GREATER THAN 230 DEGF. GOVERNOR WILL QUICKLY CUT LOAD UNTIL SPREAD CLEARS. ACTION: REDUCE FIRING TEMP TO LOWER SPREAD. CONTACT APPROPRIATE PERSONNEL.
34. (
EXHAUST TC MALFUNCTION -- SPREAD BETWEEN TWO TC'S > 30 AND TEMPS ARE > 300 AND TEMP < 1400. NOTE: GO TO EXHAST T/C SCREEN ON CRT AND
HIT F'K: POINT, WHICH WILL SHOW YOU THE ACTION TO TAKE FROM THERE. PROBI FM TC'S WILL BE IDENTIFIED ON METRA AS FOLLOWS:
ACTinN:
FAL34M1: PROBE 1 -- FAL34M2: PROBE 2 FAL34M3: PROBE 3. . . .FA34M12: PROBE 12 BOTH PROBLEM TC'S WILL BE LOOKING AT THE SAME POINT. UPON ALARM, GO TO THE EXHAUST SCREEN ON THE METRA. THE NUMBER OF GOOD TC'S WILL BE REDUCED FROM 12 TO 10. THIS IS DONE TO ELIMINATE THESE TWO FROM THE TAT CALCU LATIONS. IF ONE OF THE TC'S GOES BELOW 300 OR GREATER THAN 1400* TC RESET BUTTON WILL PUT THE REMAININGGOOD ONE IN THE CALCULATION AND # OF GOOD TC WILL GO TO 11. IF THE 50 DEGREE SPREAD CLEARS* BOTH CAN BE RETURNED BY THE TC RESET. THE PROBLEM TC'S WILL TURN RED FOR EASY ID.
THIS ALARM WILL ALSO BE ACTIVATED IF ANY OF THE TC'S GO BELOW 300 OR ABOVE 1070. IF THIS OCCURS, THE TC'S WILL TURN YELLOW FOR EASY ID. THE TEMP MUST FALL BELOW 1060 BEFORE THE ALARM WILL CLEAR. IF BOTH TC'S LOOKING AT THE POINT AGREE, WE KNOW THE CONDITION IS REAL- THE ONLY METHOD OF ELIMINATING THE CONDITION IS TO REDUCE THE FIRING TEMPERATURE.
c
DO A 1V-S8'\S CONF TDFNT T Al
35. ^,
LOW GAS MAIN PRESSURE -- GAB PRESS < 200# ACTION: TAKE APPROPRIATE ACTION TO INCREASE PRESSURE < dPS`1005)
36. EMERGENCY & SECURITY OIL LOW PRESS -- PERM 2 SATISFIED AND SAFETY OIL < 50#. <dP8031 & dPS8034>
38. POWER OIL FILTER DIFFERENTIAL PRESSURE HIGH -- POWER OIL DIFF. PRESS. > 12#. (dPD3033) ACTION. CHANGE FILTER
39. CONTROL SYSTEM TROUBLE -- THIS ALARM INDICATES ONE OF THE FOUR RACKS HOUSED IN THE TRI-SEN CABINET REQUIRES SOME TYPE OF MAINTENANCE. THIS COULD RANGE FROM A BLOWN FUSE TO A MODULE FAILURE. ACTION: CONTACT BRUCE COOPER, KEITH CROUSILLAC OR PHIL CAMPO IMMEDIATELY. NO OTHER OPERTOR ACTION IS REQUIRED OTHER THAN MONITORING.
40. LOSS OP SPEED SENSOR -- SPEED > 40 AND EITHER PROBE "A" MINUS PROBE "E" > 4 RPM OR PROBE "C" - "D" > 4 RPM. ACTION: ONE OF THE SPEED PROBES IS FAULTY AND MUST BE CHANGED. THREE SPEED PROBES ARE USED AND THE CONTROLLER IS MEDIAN SELECTING BETWEEN THE THREE. ONE BAD PROBE SHOULDN'T CAUSE A TRIP NEVERTHELESS BRUCE COOPER SHOULD BE CALLED OUT IMMEDIATELY.
43. (
STEAM INJECTION MALFUNCTION -- THREE CONDITIONS CAN CAUSE THIS ALARM TO BE ACTIVATED. PRESSURE < 210#, TEMP < 410, OR SPEED < 3564.
ACTION: GO TO DEBUG SCREEN, CALL UP DIGITAL INPUT SCREEN AND GO TO PAGE THREE. THE PRESSURE INPUT <DPSSI) AND TEMPERATURE (DTSSJ) SHOULD BE RED TO INDICATE CONDITION SATISFIED. IF EITHER IS GREEN TAKE APPROPRIATE ACTION TO CORRECT SITUATION. MONITOR SPEED TO INSURE IT DID NOT ACTIVATE THE ALARM IF PRESS AND IL-MP ARE RED.
44. LUBE OJL FILTER HIGH DIFF. PRESS. -- DIFFERENTIAL PRESSURE GREATCU THAN 12#. <dPD3032)
45. COMBUSTIBLE GAS ALARM -- ACTION: CHECK FOR GAS LEAKS (dCOMGASO
46. LUBE OIL HEATER OVERTEMP -- LUBE OIL HEATER TEMP > 150 DEGF. <dTS3024>
47. GENERATOR LOSS OF FIELD -- VOLTAGE REGULATOR WILL AUTOMATICALLY TRANSFER TO BACK UP. <dX40L)
ACTION: CALL BLOCK ELECTRICIAN TO LOCATE PROBLEM
48. LUBE OIL PRESS LOW -- PERM 1 SATISFIED AND LUBE OIL PRESS LESS THAN 22#. (dP3034 & dPS3042>
(
no a i 33b;'(s CONF T OF NT I Al
/ 49. 52.
SEAL OIL EVACTOR MALFUNCTION -- SEAL OIL VACUUM < 1# <dP53444>
COMPRESSOR DISCHARGE PRESS. XMITTER MALF -- THE DIFFERENCE BETWEEN
THE OUTPUTS OF THE CDP XMITTERS >5. THE OUTPUT FROM THESE TWO
XMITTERS IS HIGH SELECTED AND GOES INTO THE TIT CALCULATIONS.
ACTION: MONITOR THE TIT OUTPUT AND PLACE THF TURBINE ON SPEED/
LOAD CONTROL UNTIL PROBLEM IS CORRECTED. CONTACT BRUCE COOPER
OR SOMEONE IN THE INSTRUMENT DEPARTMENT IMMEDIATELY.
I
1
|
BLEED VALVE MALFUNCTION -- PERM 1 SATISFIED, PERM 6 NOT SATISFIED
AND BLEED VALVE CLOSES OR BLEED VALVES OPEN AFTER PERM 7. CONTACT
BLOCK ELECTRICIAN OR BRUCE COOPER. (dBVQPEN & dBVCLSD)
ACTION: CHECK OIL TO AIR RELAYS AND ELECTRIC SOLENOIDS.
54. TURBINE ENCLOSURE TEMP HIGH -- TURBINE ENCL. TEMP > 200.
55. SHUTDOWN SOLENOID VALVE MALF. -- PERM 6 SATISFIED AND ONE OF THE FOLLOWING VALVES IS NOT CLOSING: GAS VENT, MIN FLOW, EMERG. SHUTOEF
EMERG. , OR SAFETY OIL. <dZS4281) ACTION: MONITOR EACH INPUT ON THE DIGITAL INPUT PAGE IDENTIFY AND CORRECT THE PROBLEM.
56. ,
TURBINE EXHAUST TEMP HIGH -- EITHER THE EGGRATE TEMP IS ABOVE 1012
OR TAT > 10D0.
!
ACTION: MONITOR EGGRATE TEMP AVERAGES TO SEE IF EITHER IS ERRATIC.
IF ERRATIC. CALL BRUCE COOPER OR INSTRUMENT MAN TO CHECK TICS-
REDUCE- FIRING TEMP.
^ 57. 58.
TRIP RESET OIL TEST OR MALFUNCTION -- RESET OIL > 5#. ( dPSSO '1 )
FLAME MONITOR -- ACTIVATED IF NO FLAME CONFIRMED 12 SEC. AFTER IGNITION PB DEPRESSED. < dFMB Sc dFMA)
59. LUBE OIL LEVEL HIGH/LOW <dLS3044>
60. TURBINE OVERSPEED -- ACTIVATED IF TURBINE SPEED > 3610
61. LUBE OIL TEMP HIGH OR LOW -- LUBE OIL TEMP > 130 OR < B5 DEGF <dTS5049>
65. BEARING TEMP HIGH -- BEARING TEMP > 180 DEGF.
66. REVERSE POWER TRIP -- GENERATOR HAS BECOME MOTORIZED AND TAKING POWER. (dRP32X> CAN ONLY HAPPEN WHEN MACHINE IS TIED TO THE GRID.
67. TURBINE INLET TEMP HIGH -- TIT > 1850 DEGF.
68. GEN. VOLTAGE REGULATORE BACKUP IN SERVICE <dTRSS> ACTION: CONTACT BLOCK ELECTRICIAN
69. VIBRATION HIGH (dVMA)
,, /O.
GEN DUS DEAD OR PT FAILURE -- COMES FROM LINE PT <Ddx27) ACTION- CONTACT BLOCK ELECTRICIAN
00 A 133807 CONF TDFNTT Al,
V
p\. ROTOR GLAND DIFF. PRESS LOW -- PERM7 SATISFIED AND ROTOR GLAND DIFF. PRESS < 10# (Dp8095 & DpdB096)
72. GENETA1 OR FIELD GROUND ALM <Dfg> ACTION: CONTACT BLOCK ELECTRICIAN
73. TURBINS UNDERSPEED -- PERM7 SATISFIED & SPEED < 3450 ACTION: CONTACT BRUCE COOPER OR PHIL CAMPO
76. GENERATOR STATOR TEMP HIGH -- STATOR TEMP > lBOf HI HHI 170, ISO ACTION: HAVE INSTRUMENT MAN CHECK RTD'S TO SEE IF TEMP IS CORRECT. IF CORRECT CONTACT APPROPRIATE SUPERVISION TO DISCUSS SHUTDOWN. (dTMSTAT)
77. HOT END BEARING FIRE ALM. (dFIRE) ACTION- INSURE SNUFFING STEAM EXTINGUISHERS FIRE
78. HOT ENA BEARING SNUFFING STEAM VALVE OPEN (dSSTOPN)
79. TURNING GEAR MALFUNCTION -- SPEED <1 FOR 2 SFCONDS AND TRI-SEN HAS REQUESTED TGEAR ON OR TRI-SEN HAS REQUESTED TGEAR ON WITH NO DIGITAL INPUT REQUESTING IT TO DO SO. ACTION: CONTACT BLOCK ELECTRICIAN
80. DC EM.. RGENCY PUMP OVERLOAD -- ACTIVATED IF EITHER OF THE FOLLOWING PUMPS IS OVERLOADED: EMERGENCY COOLING OIL, UACKING OIL OR DC SEAL OIL. (dQCPOL,dQUOL. dSODCOL) ACTION: CHECK THE ABOVE DIGITAL INPUTS TO CONFIRM WHICH PUMP IS OVERLOADED AND CORRECT PROBLEM
81. GENERATOR H2 SEAL TEMP TURBINE END HIGH -- TEMP > 180 DEGF. ACTION: CHECK SEAL OIL FLOW INDICATOR, CHECK OIL COOLER 0UTLF1 TEMP. <dTS3162>
82. GENERATOR H2 SEAL TEMP EXCITER END HIGH -- TEMP > 180 ACTION: SAKE AS ABOVE. <dTS3161)
83. SEAL OIL DIFF. PRESS. LOW -- DIFF. PRESS < 3 <dPD3167)
84. SEAL OIL SUPPLY PRESS LOW -- SUPPLY DPRESSURE < 40#.
86. GENERATOR HIGH/LOW PRESS -- ACTIVATED PRESSURE >31 OR <10# ACTION: IF HI VERIFY PRESSURE IN THE FIELD ON H2 PRESS SUPPLY GAUGE. RE-ADJUST REGULATOR. IF LO, VERIFY PRESS ON PRbSS GAUGE, RE-ADJUST REGULATOR, CHECK FOR LEAKS OR LOW SUPPLY. <iPTB242)
87. GENERATOR GAS TEMP HIGH ~ GAS TEMP > 142 <dT8146A) ACTION. CHECK FOR INSUFFICIENT H2 COOLING, HIGH GEN LOAD, OR INSUFFICIENT H2 PURITY.
on A : 330,`'8 CONFTDFNT TAl
1
88. GENERATOR H2 PURITY LOW -- PURITY < 94*/. <iPURH2> 7 i ACTION; INCREASE SCAVENGER FLOW, ADD H2 TO SYSTEM
89. SEAL OIL FLOAT TRAP OIL LEVEL HIGH (dLS3168> ACTION; VERIFY VALVE (3252) BETWEEN FLOAT TRAP OUTLET AND LOOP SEAL TANK IS OPENED. CHECK FOR RESTRICTIONS.
90. GENERATOR LIQUID DETECTOR ALARM <dLS3169> ACTION: VERIFY OIL DRAIN FLOW FG3236, CHECK FOR RESTRICTION INTO FLOW TRAP.
92. SEAL OIL DC PUMP RUNNING (dSODCRN)
93. EMERGENCY COOLING OIL PUMP RUNNING (dQCPRUN)
94. AUX. PUMP EMERGENCY OPERATION -- SPEED > 3600 AND AUX POWER OIL OR AUX LUBE OIL RUNNING. (cQC, cAL)
95. LUBE 0)L EVACTOR MALFUNCTION -- VACUUM > 8" (dPS3041)
96. DISABLE LOAD SHEDDER TRIPS -- MEGAWATTS MUST GO > 25 TO SET. IF THEY FAIL < 15, ALARM COMES IN AND REMAINS UNTIL M2'S > 25 AGAIN.
METRA 1010B7 ALARMS
FGVLVDF - GAS VALVE DIFFERENCE ALARM -- ACTUAL VALVE POSITION MINUS ( 1KI-SEN COMMAND > 6
ACTION: CONTACT I&E ENGINEER OR PHIL CAMPO THERE IS NO DANGER OF TRIPPING THE MACHINE
FEXHLIM - EXHAUST TEMP CONTROLLER IN -- COMES IN IF TEMP GOES ABOVE 900 DURING STARTUP. ACTION; NO ACTION REQUIRED
FSPDGAP - SPEED EXCURSION ALARM -- SPEED MINUS 3600 > 20 ACTION: MONITOR SPEED, MAYBE NECESSARY TO GO ON SPEED CONTROL IF TRI-SEN DOESN'T MAKE SWAP AUTOMATIC
FSPDDIF - SPEED DIFFERENCE FLAG -- SPEED SP - SPEED > 100 ACTION: CONTACT I&E ENGINEER OR PHIL CAMPO
FSPEEDA,
FSPEEDB, FSPEEDC, FSPEEDD (ON) -- SPEED MINUS SPEED A OR SPFED B, C, D > 5 (SPEED PROBE TROUBLE FLAG) ACTION: POSSIBLY ONE OF THE SPEED PROBES IS BAD. CONTACT INSTRUMENT MAN AND I& E ENGINEER.
IINGLV - MAX/MIN GAS VALVE LIMIT ALARM ACTION: CONTACT I&E ENGINEER OR PHIL CAMPO NO DANGER OF TRIPPING MACHINE
( 'EVISED: NI C ' */22/92
' BLOCK #527
UPDATED: UM<: 03/10/94
DO A 13 38 C0NFTDFNTTA1
V
TEXT BLOCK #
532
ISOLATING DA FOR VESSEL ENTRY CHECKLIST
C SHUT GT DOWN;
HRU SECTION ALSO DOWN, ALL BFP 'S OFF.
1. DOUBLE BLOCK CARD TO DA AND BLEED.
2. DOUBLE BLOCK STEAM TO DA AND BLEED.
3. RACK OUT AND RED TAG CHEMICAL PUMPS TO DA CORTROL AND P04.
4. VENT AND DRAIN DA.
5. GET NECESSARY PERMITS AND SUPPLEMENTS.
6. RED TAG LP BFP'S.
REVISED:NLC 9/13/90 BLOCK #532
(
c
On A 1 C ONF TDFN T ] A!
TEXT BLOCK #
536
ISOLATING GT-100/200 LUBE OIL EVACTOR
USE THE FOLLOWING PROCEDURE TO ISOLATE THE LUBE OIL EVACTOR IF THE TURBINE IS DOWN AND THE OIL IS PUMPED OUT OF THE MAIN LUBE OIL TANK.
1. TURN OFF AND RED TAG THE LUBE OIL EVACTOR BREAKER IN BUILDING 3704.
NOTE: CLOSE THE SNUFFING STEAM BLOCK VALVES AS THE SNUFFING STEAM WILL ACTUATE ON LOSS OF LUBE OIL TANK VACUUM.
USE THE FOLLOWING STEPS IF THE LUBE OIL EVACTOR IS TO BE ISOLATED ON LINE.
1. INSTALL THE AIR EDUCTION UNIT ON THE LUBE OIL TANK.
2. OPEN AND RED TAG AIR VALVE TO AIR EDUCTOR.
3. TURN OFF AND RED TAG THE LUBE OIL EVACTOR BREAKER IN BUILDING 3704.
4. CLOSE AND RED TAG THE LUBE OIL EVACTOR DISCHARGE/DAMPER BLOCK VALVE.
5. ADJUST AIR FLOW TO THE AIR EDUCTOR TO MAINTAIN LUBE OIL TANK VACUUM IN THE PRESCRIBED RANGE.
REVISED:NLC 9/13/90 BLOCK #536
[H) A 1 33R31 CONriDFNl 1 Al
TEXT BLOCK #
537
ISOLATING GT-IOO/SOO SEAL OIL SYSTEM
THE FOLLOWING PROCEDURE MAY ONLY BE PERFORMED ONCE THE GENERATOR IS DOWN AND HAS BEEN PURGED WITH C02 AND THEN PURGED WITH INSTRUMENT AIR.
1. CLOSE AND RED TAG THE HYDROGEN SUPPLY BLOCK VALVE AT THE ROTOMETER AT THE SOUTH SIDE OF THE SOUTH AIR WASH INLET.
2. CLOSE AND RED TAG THE HYDROGEN SUPPLY BYPASS BLOCK VALVE.
3. CLOSE AND RED TAG THE UPSTREAM HYDROGEN SUPPLY BLOCK VALVE.
4. CLOSE AND RED TAG THE C02 SUPPLY BLOCK VALVE.
5. ADJUST AND MAINTAIN SMALL INSTRUMENT AIR PURGE THROUGH THE GENERATOR* USING THE INSTRUMENT AIR SUPPLY BLOCK VALVE AND GENERATOR VENT BLOCK VALVE. THIS IS TO PREVENT ANY MOISTURE FROM ENTERING THE GENERATOR.
6. TURN OFF AND RED TAG THE D. C. SEAL OIL PUMP BREAKER IN THE CONTROL ROOM D. C. PANEL LABELED D. C. P-1.
7. CLOSE AND RED TAG THE 2251B. POWER OIL BACKUP TO SEAL OIL BLOCK VALVE.
8. TURN OFF AND RED TAG THE A. C. SEAL OIL PUMP BREAKER IN BUILDING 3704.
9. CLOSE AND RED TAG THE SEAL OIL SUPPLY BLOCK VALVE FROM THE MAIN LUBE OIL HEADER.
10. CLOSE AND RED TAG THE SEAL OIL SUPPLY BLOCK VALVE FROM THE MAIN LUBE OIL TANK.
11. TURN OFF AND RED TAG THE SEAL OIL EVACTOR BREAKER IN BUILDING 3704.
REVISED:NLC 9/13/90 BLOCK #537
no A 1AOB30 CONFIOFNTI Al
ISOLATING GT-100/200 AIR WASH CHILLERS
1. SHUT DOWN AIR WASH CHILLER RECIRCULATION PUMPS AND TAG THE FOLLOWING
A). LOCAL SWITCHES B>. MAIN BREAKERS IN BUILDING 3704 C). SUCTION BLOCK VALVES
!
2. CLOSE AND RED TAG THE AIR WASH CHILLER UPSTREAM DUMP BLOCK VALVE.
3. CLOSE AND RED TAG THE AIR WASH CHILLER DUMP BYPASS BLOCK VAljvE.
I 4. CLOSE AND RED TAG THE CONDENSATE MAKE UP BLOCK VALVES (3) TO THE
AIR WASH CHILLER.
5. DRAIN BASINS IF NECESSARY.
1
REVISED:NLC 1/23/92
BLOCK #538
I
DO A 133833 CONF T DFNT 1 A:
ISOLATING GT-100/200 LUBE OIL EVACTOR USE THE FOLf. OWING PROCEDURE TO ISOLATE THE LUBE OIL EVACTOR IF THE TURBINE IS DOWN AND THE OIL IS PUMPED OUT OF THE MAIN LUBE OIL TANK. NOTE: CLOSE THE SNUFFING STEAM BLOCK VALVES AS THE SNUFFING STEAM WILL
ACTUATE ON LOSS OF LUBE OIL TANK VACUUM. 1. TURN OFF AND RED TAG THE LUBE OIL EVACTOR BREAKER IN BUILDING 3704.
USE THE FOLLOWING STEPS IF THE LUBE OIL EVACTOR IS TO BE ISOLATED ON LINE. 1. INSTALL THE AIR EDUCTION UNIT ON THE LUBE OIL TANK. 2. OPEN AND RED TAG AIR VALVE TO AIR EDUCTOR. 3. TURN OFF AND RED TAG THE LUBE OIL EVACTOR BREAKER IN BUILDING 3704. 4. CLOSE AND RED TAG THE LUBE OIL EVACTOR DISCHARGE/DAMPER BLOCK VALVE. 5. ADJUST AIR FLOW TO THE AIR EDUCTOR TO MAINTAIN LUBE OIL TANK VACUUM
IN THE PRESCRIBED RANGE.
REVISED:NLC 1/23/92 BLOCK #536
00 A 133034
rONF TDFNT TAi
ISOLATING GT-100/200 SEAL OIL SYSTEM
THE FOLLOWING PROCEDURE MAY ONLY BE PERFORMED ONCE THE GENERATOR IS ?WN AND HAS BEEN PURGED WITH N2 AND THEN PURGED WITH INSTRUMENT AIR. 1. CLOSE AND RED TAG THE HYDROGEN SUPPLY BLOCK VALVE AT THE SOUTH SIDE OF THE SOUTH AIR WASH INLET. 2. CLOSE AND RED TAG THE HYDROGEN SUPPLY BYPASS BLOCK VALVE. 3. CLOSE AND RED TAG THE UPSTREAM HYDROGEN SUPPLY BLOCK VALVE.
4. MISAL JON, CAP AND RED TAG LINE ON SOUTH AIR INLET. 5. ADJUS I AND MAINTAIN SMALL INSTRUMENT AIR PURGE THROUGH THE
GENERATOR, USING THE INSTRUMENT AIR SUPPLY BLOCK VALVE AND GENERATOR VENT BLOCK VALVE. THIS IS TO PREVENT ANY MOISTURE FROM ENTER INO THE GENERATOR. 6 TURN OI-F AND RED TAG THE D. C. SEAL OIL PUMP (100 MP-119A OR 200 NP-219A) BREAKER IN THE CONTROL ROOM D. C. PANEL LABELED D.C. P-1. 7. CLOSE AND RED TAG POWER OIL BACKUP TO SEAL OIL BLOCK VALVE S. TURN OEF AND RED TAG THE A. C. SEAL OIL PUMP (MSOP 1A OR MSO 2A) BREA:-; < IN BUILDING 3704. 9. CLOSE AND RED TAG THE SEAL OIL SUPPLY BLOCK VALVE FROM THE MAIN LUBE OIL :!'-ADER. 10. CLOSl- AND RED TAG THE SEAL OIL SUPPLY BLOCK VALVE FROM THE MAIN LUBE OIL TANK. 11. TURN OEF AND RED TAG THE SEAL OIL EVACTOR (100 MEV IB OR 200 MEV 2B) BREAK' >< IN BUILDING 3704.
REVISED. J<VU 06/29/92 BLOCK #537
UPDATED: JN;: 3/11/94
c
DO A ISSftSE CONF t OF NT I Al
ISOLATING GT-100/200 SEAL OIL SYSTEM
THE FOLLOWING PROCEDURE MAY ONLY BE PERFORMED ONCE THE GENERATOR IS DOWN AND HAS BEEN PURGED WITH C02 AND THEN PURGED WITH INSTRUMENT AIR.
1. CLOSE AND RED TAG THE HYDROGEN SUPPLY BLOCK VALVE AT THE ROTOMETER AT THE SOUTH SIDE OF THE SOUTH AIR WASH INLET.
2. CLOSE AND RED TAG THE HYDROGEN SUPPLY BYPASS BLOCK VALVE. 3. CLOSE AND RED TAG THE UPSTREAM HYDROGEN SUPPLY BLOCK VALVE. 4. CLOSE AND RED TAG THE C02 SUPPLY BLOCK VALVE. 5. ADJUST AND MAINTAIN SMALL INSTRUMENT AIR PURGE THROUGH THE
GENERATOR, USING THE INSTRUMENT AIR SUPPLY BLOCK VALVE AND GENERATOR VENT BLOCK VALVE. THIS IS TO PREVENT ANY MOISTURE FROM ENTERING THE GENERATOR. 6. TURN OFF AND RED TAG THE D. C. SEAL OIL PUMP BREAKER IN THE CONTROL ROOM D.C. PANEL LABELED D. C. P-1. 7. CLOSE AND RED TAG THE 2251B. POWER OIL BACKUP TO SEAL OIL BLOCK VALVE. 8. TURN OFF AND RED TAG THE A. C. SEAL OIL PUMP BREAKER IN BUILDING 3704. 9. CLOSE AND RED TAG THE SEAL OIL SUPPLY BLOCK VALVE FROM THE MAIN LUBE OIL HEADER. 10. CLOSE AND RED TAG THE SEAL OIL SUPPLY BLOCK VALVE FROM THE MAIN LUBE OIL TANK. 11. TURN OFF AND RED TAG THE SEAL OIL EVACTOR BREAKER IN BUILDING 3704.
REVISED:NLC 1/23/92 BLOCK #537
DO A 1S383A rONFTHFNT T Ai
V
I ISOLATING MEV-1B/2B SEAL OIL EVACTOR I USE THE FOLLOWING PROCEDURE TO ISOLATE THE SEAL OIL EVACTOR ON LINE ; OR IF THE UNIT IS DOWN AND THE SEAL OIL SYSTEM IS STILL IN SERVICE. I
j r 1. OPEN AND RED TAG THE SEAL OIL EVACTOR BYPASS BLOCK VALVE.
! 2. TURN OFF AND FED TAG THE SEAL OIL EVACTOR <100 MEV IB OR 200 MEV 2B) BREAKER IN BUILDING 3704.
i
3. CLOSE AND RED TAG THE SEAL OIL EVACTOR DISCHARGE/DAMPER BLOCK VALVE.
REVISED:JML 12/23/92 BLOCK #339
r
k
c
DO A ] .iADO7 f ONF TDFN1 1 a;
ISOLATING GT-I00/200 LUBE OIL SYSTEM FOR TURBINE OVERHAUL THIS PROCEDURE IS FOR ISOLATING THE LUBE OIL SYSTEM FOR TURBINE OVERHAUL AND LEAVING THE OIL IN THE MAIN LUBE OIL TANK. THE FOLLOWING STEPS SHOULD BE TAKEN ONCE THE TURBINE, STARTING MOTOR, AND TURNING GEAR ARE DOWN AND RED TAGGED. 1. RED TAG IN THE OPEN POSITION THE SEAL OIL SUPPLY BLOCK VALVE
FROM THE MAIN LUBE OIL TANK. 2. CLOSE AND RED TAG THE SEAL OIL SUPPLY BLOCK VALVE FROM THE MAIN
LUBE OIL HEADER. CHECK SEAL OIL SYSTEM ONCE THIS IS DONE TO INSURE SUCTION FROM THE MAIN LUBE OIL TANK IS 0. K. VERIFY BY CHECKING SEAL OIL PUMP DISCHARGE PRESSURE AND SEAL OIL DIFFERENTIAL PRESSURE. 3. TURN OFF AND RED TAG THE D. C. JACKING OIL BREAKER IN THE CONTROL ROOM D. C. PANEL LABELED D. C. P-1. 4. TURN OFF AND RED TAG THE D. C. COOLING OIL PUMP BREAKER IN THE CONTROL ROOM D. C. PANEL LABELED D. C. P-1. 5. IN BUILDING 3704, RACK OUT AND RED TAG THE FOLLOWING BREAKERS: A). TORQUE CONVERTER CHARGING OIL PUMP B). MODULATING CLUTCH COOLING OIL PUMP C). AUXILIARY POWER OIL PUMP D). AUXILIARY LUBE OIL PUMP E). LUBE OIL EVACTOR ONLY IF THE SEAL OIL SYSTEM IS DOWN AND/OR
THE GENERATOR IS PURGED.
REVISED:NLC 1/23/92 BLOCK #540
DO A 133838 rONF TOFNTT Al
ISOLATING MRTG-100/200 TURNING GEAR
TO ISOLATE THE TURNING GEAR ON 100/200 WHILE LEAVING THE JACKING OIL IN SERVICE, USE THE FOLLOWING PROCEDURE:
Q 1. TURN LOCAL SWITCH TO THE EMERGENCY STOP POSITION AND RED TAG.
2. TURN THE D. C. TURNING GEAR (MRTG-100 OR MRTG-200) BREAKER II^ BUILDING 3704 TO THE OFF POSITION AND RED TAG.
TO ISOLATE THE TURNING GEAR AND THE JACKING OIL TOGETHER, USE THE
FOLLOWING PROCEDURE:
I
1. TURN LOCAL SWITCH TO THE EMERGENCY STOP POSITION AND RED TAG. I
2. TURN THE D. C.TURNING GEAR (MRTG-100 OR MRTG-200) BREAKER IN
BUILDING 3704 TO THE OFF POSITION AND RED TAG.
3. IN THE D. C. PANEL FOR GT-100/200 LOCATED IN THE CONTROL ROOM, TURN OFF THE TURNING GEAR/JACKING OIL PUMP BREAKER AND RED TAG.
REVISED:JML 12/23/92 BLOCK #541
r
( DO A 133839 OONF 1 DFNTTAi
ISOLATING GT 100/200 WATER WASH SYSTEM FOR VESSEL ENTRY
1. CLOSE AND RED TAG UPSTREAM WATER WAShi BLOCK VALVE LOCATED IN THE EAST SIDE OF THE SOUTH AIR INLET DUCT. OPEN THE WATER WASH HEADER DRAIN BLOCK VALVE AND RED TAG.
3. CLOSE AND RED TAG DOWNSTREAM WATER WASH BLOCK VALVE. 4. CLOSE AND RED TAG OFF LINE WATER WASH VALVE, SOUTH OF TURBINE BY
U-DUCT.
REVISED:JML 11/03/92 BLOCK #542
UPDATED:JML
12/01/93
'
''
c
c
no A 130840 GONFTDFNT T A1
GT-100/200 CLEAN H2 COOLERS
V-LEANING 100/200 H2 COOLERS
NOTE: TURBINE AND GENERATOR MUST BE OFF LINE IN ORDER TO PERFORM COOLER CLEAN OUT.
1. BLOCK IN AND TAG COOLING WATER IN AND OUT ON NORTH AND SOUTH COOLERS ON EAST END OF GENERATOR.
2. SIGN RED TAG MASTER.
3. REMOVE COVERS ON NORTH AND SOUTH SIDE OF COOLERS ON EAST END OF GENERATOR.
CAUTION: THESE COOLERS WILL STILL BE UNDER PRESSURE AT THIS TIME. THERE IS NO WAY TO DEPRESSURIZE.
REMOVE ANY TRASH.
4. FAB UP TYGON TUBING TO PROCESS WATER HOSE CONNECTION AND INSERT INTO EACH INDIVIDUAL TUBE AND FLUSH UNTIL OUTLET WATER IS CLEAR AND HAS A GOOD FLOW THROUGH IT. IN THE EVENT SOME TUBES HAVE SOME RESTRICTION, IT MAY BE NECESSARY TO BACK FLUSH TO CLEAR THEM.
(.
NOTE: H2 VAPORS MAY BE PRESENT IF THERE IS A TUBE LEAK. AFTER ALL TUBES HAVE BEEN CLEANED AND FLUSHED AND NO INDICATION OF A TUBE LEAK, INSTALL COVERS WITH NEW GASKETS.
6. AFTER COVERS ARE INSTALLED, RELEASE MASTER AND PUT COOLERS BACK IN SERVICE AND CHECK FOR LEAKS.
REVISED:NLC 1/23/92 BLOCK #343
C
C
V
1
t
TEXT BLOCK #
544
CLEANING 100/200 LUBE OIL COOLERS
NOTE: IN ORDER TO FLUSH OIL COOLERS ON GT 100/200, THE TURBINE AND OIL SYSTEM MUST BE DOWN.
| 1. BLOCK IN AND TAG COOLING WATER TO AND FROM LUBE OIL COOLERS.
i I 2. SIGN RED TAG MASTER. }
3. REMOVE BLIND FLANGES ON EAST END OF TOP AND BOTTOM COOLERS.
CAUTION: COOLERS ARE STILL UNDER PRESSURE AT THIS TIME. THERE IS NO WAY TO DEPRESSURE OR DRAIN AT THIS TIME.
! 4. FAB UP TYGON TUBING TO PROCESS WATER HOSE CONNECTION AND INSERT INTO EACH INDIVIDUAL TUBE AND FLUSH UNTIL OUTLET WATER IS CLEAR AND HAS A GOOD FLOW THROUGH IT. IN THE EVENT SOME TUBES HAVE SOME RESTRICTION, IT MAY BE NECESSARY TO BACK FLUSH IT CLEAR THEM.
5. MONITOR OUTLET WATER FOR OIL OR OIL SHEEN IN WATER WHICH WOULD INDICATE A TUBE LEAK.
6. AFTER AIL TUBES HAVE BEEN CLEAN AND NO INDICATION OF A TUBE LEAK, INSTALL BLIND FLANGES WITH NEW GASKETS.
( 7. RELEASE RED TAG MASTER AND PUT BACK INTO SERVICE AND CHECK FOR V LEAKS.
REVISED:NLC 9/13/90 BLOCK #544
c
DO A 13384? CONF TDFNTT Al
,,RU 100/200 FREEZE PRECAUTION (DOWN)
LEVEL I
IF 100 AND 200 IS DOWN AND THE HRU'S NEED TO BE DRAINED FOR FREEZE PRECAUTIONS, THE FOLLOWING STEPS SHOULD BE TAKEN:
1. OPEN HP, MP AND LP BOILER DRAINS - BOTH SIDES WIDE OPEN
2. OPEN ALL ECONOMIZER DRAINS - BOTH TRAINS
3. OPEN DEAERATOR DRAIN AND DRAIN DEAERATOR
4. OPEN HP SUPERHEATER DRAINS AND VENTS - BOTH TRAINS
5. OPEN MP SUPERHEATER DRAIN AND VENT
6. OPEN DRUM VENTS - HP. MP AND LP
7. OPEN DRUM WATER COLUMN DRAINS - HP, MP AND LP
8. OPEN DEAERATOR WATER COLUMN DRAIN
9. ( -0.
OPEN PREHEATER DRAINS - BOTH TRAINS
PLACE ALL FEEDWATER REGULATORS ON MANUAL AND OPEN - OPEN ALL BY-PASSES AND OPEN ALL BOILER FEED PUMP DRAINS
11. RACK OUT AND RED TAG ALL BOILER FEED PUMPS ELECTRICALLY
12. OPEN ALL DOWNCOMER DRAINS - BOTH TRAINS
13. OPEN VENTS ON ALL LEAD LINES TO KEEP LEAD LINE HOT UP TO NON-RETURN
14. UNPLUG P04 AND CONTROL PUMPS - DISCONNECT DISCHARGE PIPING AT PUMP DRAIN LINE INTO BUCKET AND POUR BACK INTO BULK TANK
15. BLOCK IN P04 AND CONTROL BULK TANKS - DISCONNECT SUCTION LINE AT PUMPDRAIN LINE INTO BUCKET AND POUR BACK INTO BULK TANK
16. INSURE SAMPLE COOLERS ARE OPEN - THIS WILL DRAIN CBD LINES - (NOTE: ON 200, DRAINS IN CBD LINES MUST BE OPENED).
17. BLOCK IN STEAM TO DEAERATOR - GROUND LEVEL. BLOCK VALVE UPSTREAM OF CONTROL VALVE AND OPEN DRAINS ON BOTH SIDES OF CONTROL VALVE.
18. CONDENSATE TO UNIT -
A. BLOCK IN AT BLOCK VALVE UPSTREAM OF DEAERATOR LEVEL CONTROL VALVE.
r B. OPEN DRAINS ON EACH SIDE OF DEAERATOR LEVEL CONTROL VALVE.
C. OPEN DRAINS ON BOILER FEED PUMP GLAND COOLERS. D. BLOCK IN CONDENSATE TO FLASH TANK.
OONF t'dfnt TaT
E. AFTER EVERYTHING HAS DRAINED. PROCEED AS FOLLOWS.
F. BLOCK IN CONDENSATE TO AND FROM BOILER FEED PUMP GLAND COOLERS. G. CLOSE DOWNSTREAM VALVE ON CONDENSATE TO DEAERATOR - (THIS IS THE LAST
VALVE ON THIS LINE). H. CLOSE DRAINS DOWNSTREAM OF DEAERATOR LEVEL CONTROL VALVE. , I. RUN WATER HOSE FROM DRAIN UPSTREAM OF DEAERATOR LEVEL CONTROL VALVE TO
DITCH. J. CRACK OPEN CONDENSATE TO FLASH TANK AND ALLOW SMALL AMOUNT OF FLOW
THROUGH FLASH TANK AND BACK OUT OF HOSE TO DITCH. EDITED: JML 11/11/92 BLOCK #545 UPDATED:JML 12/16/93
c
(
\
no A 133844 CONF T DFNTI Al
GT-ICO.'200 'I El MUCH QVRSPD Ti< IF' DM GT--1
-ACTUAL TEIULM- O!" THE MECMAN \ CAL OVERSPEED TRIP
C ON GT- ICC
THE PUFF OFT- OF THIS test is to hake sure the turbine would trip in
CASE OR A SUDDEN LOAD DROP, AND THL ELECTRICAL OVLRSPEED TRIP DID
NOT TRIP `! I ! UNj I .
|
TO TEST IMF MECHANICAL OVER SPEED TRIP, TICE FOLLOWING MUST BE DUnL
1. THE GENERATOR MUST BE WARMED UP PRIOR TO THE TEST. THE GENERATOR ROTOR RIMS NEED TO BE HOT TO AVOID DAMAGE. LOAD UP GENERATOR A MINIMUM OF 00 MW'S FOR ONI. I SALE HOUR.
2. THE "UPXHE MUST BE RUNNING WITH NO LOAD ON THE GENERATOR TO
3 AN EM. j i IEEE L>; HIS DEE3CNEE MUST JUMP OUT THE ELECTRONIC OVERSPEED am. ~u a:cm rpAi io,. i ini rr r
(J) Tl-MF CCiLTLdl C~ 'to CL (TS-S19D) <") S N' i 1 41 I 00 'ID MOO ON r," 4)7 '!u CO O'.) r. /, TO Ct-J.1 (A!..! WIRES JUMPED FROM Y. TO X)
| i
- 0 : ,AL. 0- FOUR
JUMPERS SHOULD EE USED.
. ~i-7 ri
eco.^d be performed very carefully as anv movement jm
T:-e c-pi: :h.'o;:.p cr hie sated chancer etoc disk will result in
s:;-.;;
speed ch.vmes
cm engineer or his designee will rehovi-
T- D IN ; C CHA.L-O STOP DISC, LOCATED BY THE EMERGENCY TRIP DEVICE
Ct : AS' SICE OF TOO CAS ccntrol CABINET DO THIS I3Y removing
the com:.-, pmrf or tli: cover plpte (two (2) allen head screws) then
FE'-: T A' r
E'-F^T S( RE'-.1 ON Ti-!R SPEED CHANCER STOP DISK. REMOTE HIE
DIE- L-E CERTAIN TO REMEMBER OaCTLY HOW THE DISK WAS REMOVED.
5. IN
E CCN'ROL ROOM, 11 IE FOARD OPERATOR WILL RAISE THE SPEED OF THL
to=cd-h
the screen ccoroi. h.'.mdle, at a steady rate, up to tii:
MECHANl ( A._ OVER SPEED TRIP POINT, DO NOT MAINTAIN THE TURBINE AT
HIGH SNOODS MORE THAN A FEW MINUTES. THE TURBINE IS MOT DESIGNED
TO <MN AT HIGH SPEEDS FOR EXTENDED PERIODS OF TIME. RAISE THE SFELD
AT A RAPID RATE BUT NOT SO FAST THAT THE TRIP SPEED CANNOT BE IDENTI
FIED RECORD THE SPICED AT WHICH THE TURBINE TRIPPED.
. A--EF THE OVEPSPEED TRIP TEST HAS BEEN COMPLETED, THE SPEED CHANCER IN TV; CHS CONTROL CABINET CAN BE PUT BACK TO NORMAL OPERATION AND THE JUMPERS CAN BE REMOVED FROM THE TURBINE CONTROL BOARD.
7. THE Vrm CAN NOW EE PUT BACK INTO NORMAL OPERATION.
( FEVJS' .
i
9/10/ 1
EL.r:>. a--../
DO A 133845 CONFTDFNTTA!
ACTUAL TESTING OF THE MECHANICAL OVERSPEED TRIP ON GT-lOO
THE PURPOSE OF THIS TEST IS TO MAKE SURE THE TURBINE WOULD TRIP IN CASE OF A SUDDEN LOAD DROP AND THE ELECTRICAL OVERSPEED TRIP DID NOT TRIP THE UNIT. TO TEST THE MECHANICAL OVERSPEED TRIP, THE FOLLOWING MUST BE DONE. 1. THE GENERATOR MUST BE WARMED UP PRIOR TO THE TEST. THE GENERATOR
ROTOR RINGS NEED TO BE HOT TO AVOID DAMAGE. LOAD UP GENERATOR A MINIMUM OF 20 MW'S FOR ONE HALF HOUR. 2. THE TURBINE MUST BE RUNNING WITH NO LOAD ON THE GENERATOR TO PERFORM THE TEST. 3. THE BOARD OPERATOR WILL USE A "KEY" (A COIN) TO TURN THE "MEC 0/S TEST" SWITCH TO THE "DM" POSITION. THIS SWITCH IS LOCATED ON THE TRI-SEN CONTROL PANEL. THIS WILL AUTOMATICALLY TAKE THE ELECTRONIC OVERSPEED TRIP OUT OF SERVICE AND ALLOW THE MECHANICAL OVERSPEED TRIP TO WORK.
4. THE BOARD OPERATOR THEN CAN USE THE SPEED CONTROL HANDLE TO RAISE THE SPEED OF THE TURBINE. DO SO AT A STEADY RATE UP TO THE MECHANICAL OVERSPEED TRIP POINT. DO NOT MAINTAIN THE TURBINE AT HIGH SPEEDS MORE THAN A FEW MINUTES AS THE TURBINE IS NOT DESIGNED TO RUN AT HIGH SPEEDS FOR EXTENDED PERIODS OF TIME. RAISE THE SPEED AT A RAPID RATE BUT NOT SO FAST THAT THE TRIP SPEED CANNOT BE IDENTIFIED. THE TRI-SEN RECORDS AND REPORTS THE HIGHEST ATTAINED SPEED THAT THE COMPUTER SAW.
&. AFTER THE OVERSPEED TRIP TEST HAS BEEN COMPLETED, THE "MEC 0/S TEST" SWITCH CAN BE PUT BACK IN THE "OFF" POSITION. THIS WILL AUTOMATICALLY RESET THE ELECTRONIC OVERSPEED TRIP.
6. THE UNIT IS NOW READY FOR NORMAL OPERATION.
REVISED:NLC 1/23/92 BLOCK #549
HO A 13384 8 C.ONFTOFNI I A!
ADDING CONDENSATE TO 100/200 S03 TANK
NOTE:
BEFORE BEGINNING ADDING CONDENSATE TO S03 TANK. FIRST DETERMINE HOW MUCH CONDENSATE MILL BE ADDED AND WHAT THE FINSIH LEVEL SHOULD BE IN TANK. ALWAYS ADD THE SAME AMOUNT OF
CONDENSATE AS S03 TO TANK.
1. REMOVE COVER ON TOP OF TANK.
2. CHECK DRAIN VALVE ON FILL LINE TO ASSURE IT IS CLOSED.
3. OPEN FILL BLOCK VALVE TO TANK AND BEGIN FILLING TANK.
4. MONITOR LEVEL IN TANK BY OBSERVING GALLON IDICATIQN ON EAST END OF TANK. (DO NOT LEAVE TANK AREA DURING CONDENSATE ADDING PROCESS).
5. AFTER DESIRED LEVEL IS OBTAINED. CLOSE CONDENSATE FILL BLOCK VALVE.
6. REPLACE COVER ON TOP OF TANK.
7. OPEN BLEED ON FILL LINE AND DRAIN LINE.
REDITED:JMC 2/24/94 BLOCK #660
UPDATED: JMC 4/14/94
'' '* *'
'
D0 A T33B47 OONF T DFNT T Al
GT-200 ON-LINE PREFILTER CHANGE
REMOVAL AND INSTALLATION OF PREFILTER
1. OPEN WIRE CAGE DOOR. 2. ROLL PREFILTER MEDIA. 3. PLACE PREFILTER MEDIA IN TRASH BAG IMMEDIATELY
AFTER REMOVAL. 4. INSERT NEW REPLACEMENT MEDIA 5. CLOSE WIRE CAGE DOOR. 6. CONTINUE TO THE NEXT USED FILTER. CAUTION:
- MONOGOGGLES SHALL BE WORN THROUGH THE ENTIRE JOB. - HOLE WATCH (SAFETY WATCH) WILL BE REQUIRED THROUGHOUT THE ENTIRE
JOB. - SAFETY BELT WILL BE REQUIRED WHEN WORKING OFF THE UPPER LEDGES. - COMMUNICATION SHALL BE MAINTAINED WITH THE CONTROL ROOM THROUGH
THE ENTIRE JOB THORUGH USE OF A HAND HELD RADIO. - WATER WASH GT-200 PRIOR TO ENTRY TO CLEAN COMPRESSOR. - ANY CHANGES IN GT-200 UNIT OUTPUT OR PERFORMANCE MONITORED BY THE
BOARD OPERATOR WILL REQUIRE IMMEDIATE SHUTDOWN OF THE JOB AND EVACUATION FROM THE AWC.
SR. PRODUCTION ENGR.
PLANT SUPERINTENDENT
MAINT. SUPERVISOR
REVISED: NLC 1/23/92 BLOCK #714
SHIFT SUPERVISOR
DO A 133848 O.ONFTDFNTTAl
GT-100/200 PYROMETER STAR T-UP/SHUTDOWN
THE PURPOSE OF THIS PROCEDURE IS TO ISOLATE 100/200 PYROMETER TO PREVENT WATER FROM CONDENSING ON THE SIGHTGLASS. PYROMETER SHOULD BE ISOLATED PRIOR TO OR DURING TURBINE SHUTDOWN. IN THE EVENT OF A TURBINE TRIP, AND TURBINE WILL BE DOWN MORE THAN 4 HOURS, ISOLATE PYROMETER. SHUTDOWN PROCEDURE:
1. INSURE PYROMETER IS NOT CONTROLLING TURBINE LOAD. 2. CLOSE PYROMETER BLOCK VALVE <2" GATE VALVE) 3. REMOVE VENT PLUG TO DEPRESSURE SIGHTGLASS. PYROMETER SHOULD BE PLACED IN SERVICE 8 HOURS AFTER TURBINE START-UP. START-UP PROCEDURE: 1. INSURE THAT PYROMETER IS IN PLACE AND CONNECTED IN THE FIELD. 2. INSTALL VENT PLUG AT SIGHTGLASS. 3. OPEN PYROMETER BLOCK VALVE. REVISED:JML 1/22/92 BLOCK 717
133BA0
pO A C.ONF T OF NT f Al
MRTG-100/200 TURNING GEAR PAWL RELEASE
ON OCCASION, THE TURNING GEAR PAWL MAY GET JAMMED IN THE CATCH IF THE TURNING GEAR TRIES TO COME ON WHEN THE SHAFT IS STILL TURNING. IF THIS SHOULD OCCUR, THE PAWL SHOULD BE DISLODGED BY:
1. INSURE TURBINE HAS COMPLETELY STOPPED TURNING. 2. RED TAG TURNING GEAR LOCAL SWITCH AND BREAKER IN BLDG. 3704. 3. REMOVE THE PLEXIGLASS COVER AT TURNING GEAR ON INTERMEDIATE
BLOCK.
NOTE;
THIS COVER MAY BE HARD TO REMOVE DUE TO THE INTERMEDIATE BLOCK BEING UNDER A VACUUM. WHEN THIS COVER IS PULLED, THE VACUUM WILL DROP ON THE LUBE OIL RESERVOIR AND THE SNUFFING STEAM MAY COME ON TO THE HOT END. IF THE SNUFFING STEAM COMES ON. IT WILL HAVE TO BE RESET WHEN THE JOB IS COMPLETED.
4. USE A PAIR OF CHANNEL LOCKS OR A SCREW DRIVER TO DISLOGDE PAWL. 5. YOU MAY HAVE TO SPREAD THE TWO CATCH ARMS APART AND THEN PRY PAWL
DOWN 6. REINSTALL PLEXIGLASS COVER. 7. REMOVE RED TAGS FROM LOCAL SWITCH AND BREAKER.
REVISED: JML 12/23/92 BLOCK 718
UPDATED: JMt: 2/23/94
r.'O A ) 33BSQ c ONF T OF NT 1 A!
TEXT BLOCK #
793
GT-lOO LUBE OIL MIST ELIMINATOR
REFERENCE:
THIS PROCEDURE USES NOMENCLATURE ASSOCIATED WITH THE EQUIPMENT DRAWING FOUND IN THE EQUIPMENT FILES C100/200 AREA; LUBRICATION SYSTEM; KOCH MIST ELIMINATOR]
I. PREPARE VESSEL FOR SERVICE
1. CONNECT INLET AND OUTLET GAS PIPING TO NOZZLES N-l AND N-2. RESPECTIVELY.
2. CONNECT THE DIFFERENTIAL PRESSURE GAUGE ACROSS PRESSURE TAPS C-4 AND C-5.
3. PIPE OIL DRAINS C-2 AND C-3 BACK TO THE LUBE OIL RESERVOIR WITH VALVES IN EACH LINE LOCATED AT THE VESSEL. THE VALVE ON DRAIN C-2 SHOULD NORMALLY BE CLOSED AND ONLY OPENED TO DRAIN ANY OIL ACCUMULATION BACK TO THE RESERVOIR.
4. PIPE THE BOTTOM OF C-l BACK TO THE LUBE OIL TANK WITH A VALVE INSTALLED AT THE C-l CONNECTION. CLOSE THIS VALVE AND FILL THE UNIT THROUGH THE TOP OPENING WITH TURBINE OIL. CONTINUE TO FILL UNTIL OIL IS AT THE C-l LEVEL. THIS SUBMERGES THE DRAIN PIPE ATTACHED TO THE FILTER ELEMENT FLANGE AND PREVENTS GAS FROM BYPASSING THE ELEMENT. PLUG THE TOP OF C-l AND OPEN THE VALVE.
5. THF VESSEL IS NOW READY TO OPERATE.
II. OPERATING REQUIREMENTS
THIS UNIT SHOULD BE MAINTENANCE FREE. IF A PROBLEM OCCURS IN MAIN TAINING TANK VACUUM, FIRST CHECK THE DIFFERENTIAL PRESSURE GAUGE. IT SHOULD NOT BE EXCEEDING 4 IN. H20. SECOND, BEGIN OPENING THE BYPASS AROUND THE FILTER UNTIL THE DESIRED TANK VACUUM IS ACHIEVED. ONCE THE DESIRED VACUUM IS ACHIEVED, ALTERNATE THE BYPASS AND MIST ELIMINATOR VALVING UNTIL THE MIST ELIMINATOR IS TAKEN OUT OF SERVICE. IF THE DESIRED VACUUM CANNOT BE OBTAINED BY OPENING THE BYPASS, CHECK THE EVACTOR AND THE LINE UPSTREAM OF THE VENT FOR OBSTRUCTION.
EDITED: JML 07/18/91 BLOCK #
DO A 133RC>1 OONF' T OF NT T At
100/200 SPEED PROBE FAILURE RESPONSE
PURPOSE: J
TO PROVIDE OPERATIONS AND PLANT PERSONNEL A GENERAL DESCRIPTION OF THE SPEED LOGIC SYSTEM AND HOW TO RESPOND TO SPEED LOGIC PROBE FAILURES.
SPECIAL NOTE: THE TRI-SEN PROGRAM LOGIC WILL ALLOW THE MACHINE TO RUN AS LONG AS THERE IS ONE UNFAILED PROBE. THE LOGIC IS SET THIS WAY ONLY TO PROVIDE SOME TIME TO PLAN AND CONDUCT A CONTROLLED SHUTDOWN OF THE UNIT. CONTINUED OPERATION WITH ONLY A SINGLE PROBE IS NOT WITHIN THE GUIDELINES OR SUPPORT OF THE TECH CENTER. OTHER THAN TO PLAN AND CONDUCT A SHUTDOWN.
SYSTEM DESCRIPTION GT-100/200 SPEED LOGIC USES THREE SPEED PROBES FOR DETERMINING THE SPEED OF THE MACHINE. THE PROGRAM VERIFIES THAT EACH SPEED INPUT IS "GOOD" AND THEN MEDIUM SELECTS THE SPEED. MEDIUM SELECT IS THE MIDDLE VALUE. THE PROGRAM CONTINUES TO MEDIUM SELECT UNTIL ANY ONE PROBE FAILS. ONCE A PROBE FAILS, THE PROGRAM THEN USES "HIGH SELECT" FOR DETERMINING MACHINE SPEED AND CONTINUES TO USE HIGH SELECT UNTIL THERE ARE THREE GOOD INPUTS AND THEN IT WILL RETURN TO MEDIUM SELECT.
THE VERIFICATION OF THE SPEED INPUTS IS A CHECK TO ENSURE THAT THE PROBE'S INPUT IS GREATER THAN 200 RPM. THE VERIFICATION STEP DOES NOT OCCUR UNTIL THE IGNITION STEP IS COMPLETE. IF A PROBLE IS DETECTED TO BE BELOW 200 RPM, THE PROGRAM WILL FAIL THAT PROBE AND FORCE THAT INPUT TO ZERO. THE HIGH SELECT LOGIC WILL ALSO BE ACTIVATED. NOW THE PROGRAM WILL CONTROL OFF THE HIGHEST OF THE TWO REMAINING PROBES. AT THIS POINT, THERE ARE TWO SCENARIOS THAT CAN TAKE PLACE:
IF ONE OF THE PROBES DROPS BELOW 200 RPM, IT WILL BE FAILED AND CONTROL WILL CONTINUE ON THE ONE REMAINING PROBE. AS THIS PROBE'S INPUT CHANGES THE PROGRAM WILL RESPOND TO TRY AND MAINTAIN 3600 RPM. IF THE INPUT BEGINS TO DROP. THE MACHINE WILL TRY TO PICK UP SPEED. IF THE INPUT REACHES 3950 RPM, THE MACHINE WILL TRIP ON OVERSPEED. IF THE SPEED DROPS BELOW 3400 RPM THE MACHINE WILL TRIP ON UNDERSPEED. IF THE INPUT BEGINS TO INCREASE, THE MACHINE WILL TRY AND REDUCE SPEED.
2. IF ONE OF THE PROBES BEGINS TO READ ABOVE 3600 RPM, THE PROGRAM WILL TAKE THAT VALUE AS THE MACHINE SPEED AND REACT ACCORDINGLY. THE PROGRAM WILL "THINK" THAT THE MACHINE IS IN AN OVERSPEED CONDITION AND IT WILL TRY TO REDUCE THE SPEED. SHOULD THE SPEED INPUT REACH 3950 RPM, THE MACHINE WILL TRIP ON OVERSPEED.
FAILURE RESPONSE OPERATIONS RESPONSE TO THE FIRST PROBE FAILURE IS:
1. GO TO THE SPEED INPUT SCREEN AND LOOK AT THE THREE SPEED INPUT VALUES. NOTE WHICH PROBE HAS FAILED. VERIFY THAT THE REMAINING TWO PROBES ARE STABLE AND READING THE SAME VALUE OF 3600 RPM.
2. NOTIFY THE I&E ENGINEER OF THE FAILURE. OPERATIONS RESPONSE TO THE SECOND PROBE FAILURE IS:
no A 133*5? r.ONFTOFNT I Al
1. GO TO THE SPEED INPUT SCREEN AND LOOK AT THE THREE SPEED INPUT VALUES NOTING WHICH PROBES HAVE FAILED. VERIFY THAT THE ONE REMAINING PROBE IS READING 3600 RPM.
2. NOTIFY POWER 1 OF THE SITUATION AND THAT IF THE LAST SPEED PROBE FAILS, THE MACHINE WILL TRIP. DISCUSS THE EFFECTS OF SHUTTING THE MACHINE DOWN TO CORRECT THE PROBLEM.
3. NOTIFY PLANT SUPERINTENDENT OF THE SITUATION AND THE NEED TO REPAIR THE SPEED INPUTS. DISCUSS SHUTTING THE MACHINE DOWN. THE TECH CENTER RECOMMENDS SHUTTING THE UNIT DOWN FOR REPAIR AS SOON AS POSSIBLE.
NOTIFY I&E ENGINEER OF THE SITUATION AND THE PLANNED COURSE Of ACTION. CALL OUT BLOCK INSTRUMENT PERSONNEL FOR THE REPAIR IF THE MACHINE IS TO BE SHUT DOWN.
REDITED:JMC 04/14/94 BLOCK #761
lj
UPDATED:UML . 05/05/94
''"
'`
`
` -`
(
(
HO A 1
^
f.ONF T OF NT T A1
k
e
C
c
T-100/200 AWC HIGH DELTA-P
IF THE "GT-100 AWC HIGH DELTA-P" OR THE "GT-200 AWC HIGH DELTA-P" ALARM ACTIVATES. THE FOLLOWING ITEMS SHOULD BE DONE.
1. SHUT DOWN THE AWC PUMPS.
2. MONITOR THE AWC DELTA-P INDICATIONS ON THE STRIP CHART.
3. MONITOR THE AWC DELTA-P INPUTS ON THE PICS DISPLAY (CRT).
4. MONITOR THE STATIC PRESSURE INDICATION ON THE COMPRESSOR INFORMATION PAGE OF THE PDP-11.
5. INSPECT THE INLET ON THE SIDES. BOTTOM. AND TOP TO DETERMINE WHY THE FILTERS MAY BE PLUGGING UP AND IF THE AWC WOODEN WALLS ARE STILL INTACT. SOMETIMES RAIN CAN LEAK INTO THE AWC DOWNSTREAM OF THE DEMISTERS. POSSIBLY OVER THE FILTERS. CAUSING THEM TO PLUG UP.
6. VERIFY THAT THE AWC LEVEL IS ADEQUATE. IF THE LEVEL IS TOO HIGH (ABOVE SO*/.) WATER GETS BLOWN ONTO THE FILTERS AND UP INTO THE TURBINE INLET. A LOW LEVEL (BELOW 6OX) WILL ALLOW AIR TO BYPASS THE FILTERS THROUGH A HOLE WHICH EXISTS IN THE SEPARATING WALL. (THIS MIGHT SHOW UP AS A LOW FILTER DIFFERENTIAL PRESSURE THOUGH. )
SHUTTING DOWN THE AWC PUMPS WILL ALLOW DRY AIR TO PASS THROUGH THE FILTERS THEREBY DRYING THEM OUT, ASSUMING THEY HAVE GOTTEN WET.
MONITORING THE DELTA-P INDICATION ON THE STRIP CHART AND PICS DISPLAY WILL GIVE SOME INFORMATION ON WHETHER THE SITUATION IS WORSENING.
MONITORING THE STATIC PRESSURE INDICATION ON THE PDP-11 WILL GIVE MORE INFORMATION ABOUT THE FILTER CONDITION. THE STATIC PRESSURE
INDICATION IS ACTUALLY THE VACUUM RIGHT AT THE INLET OF THE COMPRESSOR
IF THE STATIC PRESSURE IS HIGH, THE VACUUM IS HIGH AND THE COMPRESSOR
IS SUCKING HARD. THE FILTERS MAY BE PLUGGING UP OR, IF THE TEMPERATUR
IN THE INLET IS BELOW 40 DEG. F, ICE MAY BE FORMING SOMEWHERE IN THE
INLET.
DO A 133854
FURTHER ACTION STEPS:
OONFTDFNTTAt
1.WHEN THE AWC DELTA-P INDICATION REACHES 4. 5 INCHES OF WATER DIFFERENTIAL, THE HINGED DOORS ON THE AWC WALLS NEXT TO THE FILTERS SHOULD BE WEDGED OPEN. THIS WILL ALLOW AIR TO BYPASS THE FILTERS AND PREVENT THEM OR THE WOOD INLET WALLS FROM FAILING. THIS MUST BE DONE CAREFULLY AS THE DOORS ARE DIFFICULT TO OPEN WHILE THE MACHINE IS RUNNING. ALSO BE CAREFUL NOT TO LET ANYTHING GET PULLED INTO THE INLET.
CONTACT THE AREA ENGINEER, PRODUCTION SUPERVISOR, OR PLANT SUPERINTENDENT.
3. IF THE DELTA-P INDICATION READS FULL SCALE THEN WE ARE OPERATING WITHOUT KNOWING THE TRUE DIFFERENTIAL PRESSURE. THE DELTA-P COULD WORSEN WITHOUT US KNOWING AND THE STATIC PRESSURE WOULD RISE DUE TO A HIGH VACUUM. UNDER THESE CONDITIONS, IT IS ADVISEABLE TO CONSIDER SHUTTING DOWN THE TURBINE DUE TO A POTENTIAL OF SUCKING IN THE AWC WALLS. THE FULL SCALE
V
READING ON THE DELTA-P TRANSMITTER IS 5 INCHES OF WATER. REVISED: NLC 1/23/92 BLOCK 762 ( JPDATED: JML 12/01/93
no A 13385 F f ONFTDFNTTAl
GT-100/200 OFF-LINE WATER WASH COMPRESSOR
1. GET SOAP TANK FROM WAREHOUSE AND BRING TO SITE.
2.
C
3.
CLOSE DISCHARGE B/V ON SOAP TANK. THEN POUR FIVE GALLONS OF SOAP IN TANK THROUGH TOP FILL VALVE. CLOSE FILL VALVE.
HOOK WATER HOSE TO WATER IN FROM SUPPLY.
4. HOOK WATER HOSE FROM WATER OUT TO NOZZLE HEADER.
5. MAKE SURE ALL FOUR <4> NOZZLE B/V'S ARE OPEN.
6. OPEN DRAIN AT BOTTOM OF U-DUCT. INSURE THAT DRAIN IS NOT PLUGGED.
NOTE: CONFINED SPACE ENTRY PORTION OF THE MULTI-WORK PERMIT AND ENTRY SUPPLEMENT FOR ENTERING THE U-DUCT SUMP IS REQUIRED.
7. INSURE ALL THREE COMPRESSOR DRAINS ON THE NORTH SIDE TURBINE ARE OPEN.
8. PRIOR TO START OF STARTING MOTOR. MAKE ANNOUNCEMENT OF INTENT.
9. HAVE BOARD OPERATOR BRING TURBINE UP ON STARTING MOTOR TO 500 RPM'S AND HOLD.
10. PLACE THE <3) THREE WAY VALVE HANDLES IN THE UP POSITION WHICH ALLOWS AIR TO THE BLEED VALVES. THIS WILL CLOSE THE BLEED VALVES.
11. BOARD OPERATOR SHOULD VERIFY THAT THE "BLEED VALVE MALFUNCTION" ALARM IS IN "ALARM".
^12. OPEN WATER SUPPLY TO TANK. THEN OPEN OUTLET B/V ON TANK. NEXT. OPEN WATER WASH HEADER B/V.
13. WITH INLET DOOR OPEN. CHECK ALL NOZZLES TO ASSURE FLOW.
14. LET WASH UNTIL COMPRESSOR DRAINS ARE CLEAR OF SOAP THEN BLOCK WATER IN AND PICK UP ALL EQUIPMENT.
15. CONTINUE RUNNING TURBINE ON STARTING MOTOR FOR A FEW MINUTES TO DRY OUT.
16. RETURN BLEED VALVE ISOLATION SWITCHES TO "AUTO" POSITION BY PLACING THE (3) THREE WAY VALVE HANDLES IN THE DOWN POSITION.
17. TAKE UNIT OFF OF STARTING MOTOR.
IB. CLOSE (3) NORTH SIDE COMPRESSOR DRAINS AND THE U-DUCT DRAIN.
NOTE:
RINSING CAN BE ASSISTED WITH WATER HOSE IF NEEDED. BEFORE ENTERING INLET. THE FOLLOWING NEEDS TO BE TAGGED FOR VESSEL ENTRY ALONG WITH A CONFINED SPACE ENTRY PERMIT. ALSO. REMOVE ALL LOOSE OBJECTS FROM PERSON ENTERING INLET.
RED TAG THE FOLLOWING:
C 1. FUEL CAS 2. STEAM INJECTION 3. PLANT AIR 4. AUTO WATER WASH
00 0 133800
OONF- 1 DFNT 1 Al
EDITED:JML 10/21/92 BLOCK #797 UPDATED:UML 12/01/93
C
(
DO A 13 3 R D 7 OONFTDFNTTAl
CLEANING 100/200 AWC DISTRIBUTION HOLES AND TOP
TO CLEAN THr. AWC DISTRIBUTION HOLES, YOU HAVE TO TAKE A PIECE OF 3/B" TUBING ON TOP OF THE AWC AND TAKE THE TUBING AND ROD OUT OF EACH
OLE THAT IS PLUGGED.
TO CLEAN THE TOP, PICK UP ANY TRASH THAT IS FLOATING ON TOP OF THE WATER AND PLACE IN A GARBAGE CAN.
NOTE: CAUTION MUST BE TAKEN WHEN YOU ARE WALKING AROUND ON TOP BECAUSE THE ALGAE IS VERY SLIPPERY AND THIS COULD CAUSE A SLIPPING HAZARD.
NOTE:
CAUTION SHOULD BE TAKEN ON THE SOUTH AWC'5 BECAUSE OF THE HIGH VOLTAGE LINES FROM THE GENERATOR. BECAUSE OF THE HAZARDS, IT IS BEST TO HAVE A SECOND PERSON THERE AS A SAFETY OBSERVER.
EDITED: UMi 09/06/91 BLOCK #805 UPDATED: JM-:: 2/23/94
c
( no a i vwc-' CONFTDFNTTAl
UNIT 100/200 FREEZE PRECAUTIONS
LEVEL, I
LEVEL I FREEZE (TEMPERATURE IS FORECASTED TO STAY ABOVE 20 D^G. F AT NIGHT WITH A WIND CHILL FACTOR ABOVE 0 DEG. F AND ABOVE 32 DEG. F THE NEXT DAY. )
IN/OUT
__ !___1. TURN ON STEAM TRACINGS. CHECK FORADEQUATE FLOW.
|
__ A. SOUTH SIDE OF HRU 100
'
__ B. SOUTH SIDE OF HRU 200
__ C. 301! STEAM LINE NE CORNER OF C/RBUILDING
__ !___2 ESTABLISH FLOW THRU FAUCETS IN BLDG. 3703
__ i___ 3. ;__ 4.
BLOCK IN PROCESS H20 SERVICE HEADER AT PROCESS H20 BACK-UP TO COOLING
TOWER. ESTABLISH FLOW THRU THE BLEED VALVE UPSTREAM OF 2" SERVICE BLOC
VALVE. OPEN DRAIN VALVE DOWNSTREAM OF COOLING TOWER FLUSH CONTROL VALV
AND DOWNSTREAM OF 2" PROCESS H20 VALVE. ALSO DRAIN EACH SERVICF WATER.
STATION. DRAIN CAR WASH SYSTEM. ALSO DRAIN DEAD-END (TUBING) OUTSIDE
CONTROL ROOM EAST DOOR.
, |
OPEN DRAIN ON TOP OF PROCESS WATER HEADER AT NE CORNER OF B-3703.
i 5. ESTABLISH FLOW ON CONDENSATE TO BATTERY ROOM IN BLDG. 3703.
:______6P. UT COOLING TOWER FILL CONTROL VALVE ON MANUAL. OPEN ABOUT 57., ALSO OPEN THE BLOWDOWN VALVE TO CONTROL LEVEL. BUT DO NOT CLOSE COMPLETELY.
:______7E. STABLISH GOOD FLOW THRU CHLORINATOR.
:______eI.NSURE CHLORINATOR HEATER IS PLUGGED IN.
:______9O. PEN CROSS CONNECTION VALVE BETWEEN 2" COOLING H20 SUPPLY AND RETURN LIMPS AT S. DEAD ENDS OF N/S PIPE-RACK.
10. ESTABLISH FLOW THRU DRAINS ON POTABLE H20 MAKE-UP LINE. ALSO FAUCET AT BLOCK LIMITS.
__ !___ 11. CRACK DRAINS ON 900 AIR RECEIVER. COOLER. PRE-FILTER,AND AFTER FILTER. ESTABLISH FLOW THRU STAND-BY COMPRESSOR OIL COOLER. TURN ON HEATER FO DRAIN ALI .
,12. BLOCK AND DRAIN THE PROCESS H20 TO OLD WAREHOUSE.
13. BLOCK AND DRAIN C/R EYE WASH.
!______1O4.PEN DRAIN ON POTABLE H20 TANK.INSURE FLOW THRU MAKE-UP LINE,OPEN BLFE ON TANK BY-PASS LINE.
!______1P5.UT SAFEFY/EYEWASH HEATING SYSTEM IN SERVICE.
! 16. INSURE FLOW THRU LUBE OIL AND HYDROGEN COOLERS AND TO STARTING MOTORS.
17. OPEN BLEED ON CONDENSATE LINE TO BLDG. 3709 BATTERIES.
18.MAINTAIN 100/200 AWC LEVELS AT BOX.
00 A 133R59 CONF TDFNTTAl
! 19. CRACK OPEN BLEED ON DISCHARGE OF THE STANDBY PUMPS ON T-1250 SYSTEM. ! 20. OPEN DRAINS UPSTREAM OF WEST RETURN* CA II, DEMIN. AND POWER I COND.
DU.V* VALVES. 21. OPEN 3/4" BY-PASS LINE AROUND COND. MOV 1250. 22.CHECK INSTRUMENT AIR HEADER DEADEND FOR MOISTURE. i______23. OPEN DRAINS ON DEMIN LINE AT NE CORNER. <2> __ i___24. INSURE FLOW IN AND OUT A/C IN MCC 100/200. __ I___25. INSURE CHEMICAL FLOW TO C. T. !______ 26. INSURE ADEQUATE FLOW THRU ALL BOILER SAMPLE COOLERS. !______27. INSURE ADEQUATE FLOW THRU HIGH PRESSURE BFP SEAL COOLERS. I_____ 28. OPEN BLEEDS ON CONDENSATE TO GT MANUAL WATERWASH LINES. !_____ 29. DOUBLE BLOCK AND BLEED MAIN WATER WASH LINE DOWNSTREAM OF STRAINERS
ON 100/200. ALSO MISALIGNED PIPING AND CAP. !______30. OPEN BLEEDS ON CENTRIFUGES PRIMING LINE. ,,i__ 31. INSPECT GAS TURBINE INLETS FOR ICE FORMATION AT THE INLET SCROLLS AND
T:i:- 100/200 SCREENS. :______32. MAINTAIN FLOW THROUGH C. T. STANDBY PUMP THROUGH DISCHARGE BLEED VALVE. !_____ 33. INCREASE BOILER SAMPLE FLOWS. !_____ 34. DRAIN GT 100 AIR INLET P-TRAP. !_____ 35. DRAIN GT 200 AIR INLET P-TRAP. J______36.ESIABLISH FLOW THROUGH BLEED ON EYEWASH STATION IN T-1250 AREA. i______ 37. INSURE ELECTRICAL HEAT TRACING ARE ON AT T-1250 CONDENSATE AREA.
BREAKER IS IN BLDG. 3704* LIGHTING PANEL - F. BREAKER #24 J_____ 3B. CRACK OPEN DRAINS ON NORTH SIDE OF HRU 100/200 HYDRO LINES. ---------- 39 INSURE CARRIER WATER FLOW TO DEAERATOR AND STEAM TRACING IS ON.
REVISED: JNi 03/1S/93 BLOCK #803
UPDATED:JMC 03/11/94
r V DO A 133860 CONF TDFN'T TA1
V
t
!
} HRU 100/200 FREEZE PRECAUTION (DOWN)
1
^i
LEVEL I
IF 100 AND TOO IS DOWN AND THE HRU'S MEED TO BE DRAINED FOR FREEZE PRECAUTIONS, THE FOLLOWING STEPS SHOULD BE TAKEN:
OPEN HP, MP AND LP BOILER DRAINS - BOTH SIDES WIDE OPEN
1
OPEN ALL ECONOMIZER DRAINS - BOTH TRAINS
OPEN DEAERATOR DRAIN AND DRAIN DEAERATOR
OPEN HP SUPERHEATER DRAINS AND VENTS - BOTH TRAINS
1
OPEN MP SUPERHEATER DRAIN AND VENT
1
OPEN LFjUM VENTS - HP, NP AND LP
1
OPEN Dr.UM WATER COLUMN DRAINS - HP, MP AND LP
OPEN DEAERATOR WATER COLUMN DRAIN
1
OPEN
HEATER DRAINS - BOTH TRAINS
I 10< PLACE ALL FEEDWATER REGULATORS ON MANUAL AND OPEN - OPEN ALL BY-PASSES AND O.-IN ALL BOILER FEED PUMP DRAINS
c RACK QUI AND RED TAG ALL BOILER FEED PUMPS ELECTRICALLY
11 1 12. OPEN Al 1 DOWNCOMER DRAINS - BOTH TRAINS
1 13. OPEN VENTS ON ALL LEAD LINES TO KEEP LEAD LINE HOT UP TO NON-RETURN
1 14 UNPLUG P04 AND CONTROL PUMPS - DISCONNECT DISCHARGE PIPING AT PUMP DRAIN l)NE INTO BUCKET AND POUR BACK INTO BULK TANK
1 15 BLOCK IN P04 AND CONTROL BULK TANKS - DISCONNECT SUCTION LINE AT PUMPDRAIN LINE INTO BUCKET AND POUR BACK INTO BULK TANK
1 16' INSURE SAMPLE COOLERS ARE OPEN - THIS WILL DRAIN CBD LINES - (NOTE: ON 200, DRAINS IN CBD LINES MUST BE OPENED).
1 17` BLOCK IN STEAM TO DEAERATOR - GROUND LEVEL. BLOCK VALVE UPSTREAM OF CONTROL VALVE AND OPEN DRAINS ON BOTH SIDES OF CONTROL VALVE.
1 18 CONDENSATE TO UNIT -
A. BLOCK IN AT BLOCK VALVE UPSTREAM OF DEAERATOR LEVEL CONTROL VAI VE.
B. OPEN DRAINS ON EACH SIDE OF DEAERATOR LEVEL CONTROL VALVE.
r C. OPEN DRAINS ON BOILER FEED PUMP GLAND COOLERS. D. Bl flCK IN CONDENSATE TO FLASH TANK.
00 A 1SSSA1
E. AP IL-R EVERYTHING HAS DRAINED, PROCEED AS FOLLOWS. CONFTOFNT TA1
F. Bl OCK IN CONDENSATE TO AND FROM BOILER FEED RUMP GLAND COOLERS.
G. CLnSE DOWNSTREAM VALVE ON CONDENSATE TO DEAERATOR - (THIS IS THE LAST wai vr riM ruio i tm>: i ...........
H. CLOSE DRAINS DOWNSTREAM OF DEAERATOR LEVEL CONTROL VALVE. I. RUN WATER HOSE FROM DRAIN UPSTREAM OF DEAERATOR LEVEL CONTROL VALVE TO
DITCH. U. CRACK OPEN CONDENSATE TO FLASH TANK AND ALLOW SMALL AMOUNT OF FLOW
THROUGH FLASH TANK AND BACK OUT OF HOSE TO DITCH. K. OPEN L. P. BOILER FEED PUMP RECIRCULATION DRAIN AND DRAIN CARRIER
WATER LINF, L. OPEN CONDENSATE FILL VALVE ON TOP OF SULFITE TANK AND DRAIN LINF. M. OPEN CARRIER WATER DRAIN AT DISCHARGE OF SULFITE PUMP AND DRAIN
LI Nil. EDITED; JML 11/11/92 BLOCK #54f> UPDATED:UN-': 3/11/94
(
r V DO A CONFIDENT! Al
OT-100/200 BEARING OIL FLUSH PROCEDURE
PREPARATION FOR OIL FLUSH:
1. GET FIVE (5) OIL FLUSH HOSES LOCATED IN THE SIDE COMPARTMENT OF THE METRIC TOOL TRAILER. FOUR HOSES WILL BE THE SAME SIZEj ONE WILL BE LARGER.
2. INSTALL THE LARGEST HOSE IN THE BEARING FEED HOLE OF THE THRUST BEARING. THE OTHER FOUR HOSES INSTALL IN THE COMPRESSOR AND HOT END BEARING - BOTH SIDES OF THE SPLIT LINE.
3. TAKE A BRASS PLUG AND TAP IT CENTLY INTO THE BEARING FEED LINE HOLE JUST UNTIL SNUG.
4. USING TWO SPLIT LINE BOLTS FOR EACH OF THE HOLES. TIE #9 WIRE AROUND THE FLUSH CONNECTIONS AND AROUND THE BOLTS UNTIL VERY TIGHT.
5. INSERT RUBBER HOSES AS FAR DOWN INTO THE DRAIN CAVITY AS POSSIBLE. WIRE THEM DOWN IN THE DRAIN WITH STAINLESS WIRE SECURELY SO THEY CAN'T WHIP OUT.
6. THERE ARE THREE OVERSPEED OIL TUBINGS IN THE HOT END TUNNEL. SLIP A 3/4" BLUE HOSE OVER EACH 8WAGEL0K AND ROUTE THEM INTO THE DRAIN CAVITY OF THE HOT END BEARING. THESE DON'T NEED TO BE SECURED AS THERE IS NO PRESSURE INVOLVED.
7. THE JACK SHAFT COVERS ARE OFF DURING THIS PROCEDURE. THE JACK SHAFT TO THE INTERMEDIATE BLOCK MUST BE DRAPED WITH VISQUEEN AND SECURED BECAUSE OIL WILL SPRAY DOWN THE JACK SHAFT AND OUT ALL OVER
THE PLACE.
8. WHERE HOSES ARE INSERTED IN THE SPLIT LINE OF EACH BEARING. A SMALL DAM OF DUCT SEALANT MUST BE MADE AND PUT ON THE HORIZONTAL SPLIT LINE TO PREVENT THE OIL FROM FLOWING OVER THE SPLIT LINE.
DURING THE FLUSH:
1. NEED ONE PERSON POSITIONED AT THE HOT END BEARINO.
2. NEED ONE PERSON POSITIONED AT THE COMPRESSOR BEARING AND JACK
SHAFT.
3. NEED OPERATOR ON INTERCOM TALKING TO MAN IN MCC STARTING AND
STOPPING PUMP.
4. NEED A MAN AT THE OIL FILTER WATCHINO OIL PRESSURE.
00 A 1 3
CONF IDFNTT Al
NOTE: THE ABOVE PEOPLE ARE NOT TO LEAVE AT ANY TIME DURING THE FLUSH.
3. OPERATOR ON THE INTERCOM WILL TELL THE MAN IN THE MCC TO START THE PUMP.
6. WHEN THE OIL PRESSURE REACHES 94. THE MAN AT THE OIL FILTERS WILL HAVE THE MAN IN THE MCC SHUT THE PUMPS DOWN. AND ALL PERSONNEL WILL CHECK FOR LEAKS OR OTHER PROBLEMS.
7. START THE PUMP AGAIN. BRING TO 13*. SHUT PUMP OFF. HAVE EVERYONE CHECK FOR LEAKS OR SPLASHBACK.
8. START Tt PUMP AGAIN. BRING TO 30. CHECK WITH EVERYONE FOR LEAKS, AND LET IT FLUSH FOR 30 MINUTES.
9. AT THIS TIME, YOU CAN START THE JACKINO OIL PUMP AND LET IT RUN FOR 30 MINUTES ALSO, CHECKING THE LINES ASSOCIATED WITH
IT FOR LEAKS. 10. AT THIS POINT, MAKE A COMPLETE ROUND, CHECKING ALL CONNECTIONS
AND PIPING FOR LEAKS. AFTER THE OIL FLUSH: 1. WHEN OIL FLUSH IS COMPLETE, ALL OIL FLUSH HOSES WILL BE REMOVED AND RETURNED TO THE METRIC TRAILER. 2. IMMEDIATELY AFTER REMOVING OIL HOSES. PUT RUBBER 8T0PPERS IN HOLES. 3. NO WORK WILL BE ALLOWED WITH RUBBER PLUGS OUT OF THE HOLES. THEY WILL BE REMOVED ONLY WHEN YOU'RE READY TO SET THE BEARING CAP BACK ON. IF THIS IS NOT DONE PROPERLY. ANOTHER OIL FLUSH WILL HAVE TO BE DONE. NOTE: BEARING AREA MUST BE COVERED WITH VISOUEEN OR TARP WHEN WORK IS NOT BEING PERFORMED. THIS INCLUDES BREAKS AND LUNCH BREAKS.
EDITED: JML 02/04/92 BLOCK 4814 UPDATED:JML . 09/14/93
HO A 1 f.ONF TDFNT TA1
OPEN CASE SPINNING GT-lOO AND 200
THE PURPOSE OF THIS PROCEDURE IS TO SAFELY SPIN QT-100 OR CT-200 WITH ,'tHe COVER OFF OF THE MACHINE. THIS WILL BE DONE FOR THE BALANCE ^ JRPOSES.
NOTE: EXTREME CAUTION MUST BE TAKEN TO PREVENT PERSONAL INJURY AND ANY DAMAGES TO THE MACHINE AS WELL.
1. TURBINE DECK MUST BE CLEARED COMPLETELY OF ALL LOOSE MATERIAL AND
TOOLS MUST BE REMOVED FROM DECK AND SURROUNDING AREA. ROPES} TARP.
VISQUEEN. ETC* MUST ALL BE REMOVED.
j
2. AIR INLETS NORTH AND SOUTH MUST BE CLEANED AND ALL LOOSE MATERIAL REMOVED. ALSO BURNER DECK MUST BE CLEARED.
3. AREA SHOULD BE ROPED OFF (ALL ENTRANCES TO TURBINE DECK AREA). RED DANGER TAPE SHOULD BE USED RATHER THAN YELLOW CAUTION TAPE.
4. THE TURNING GEAR MUST BE RACKED OUT AND RED TAGGED. ALSO THE TURNING GEAR TIME OUT MUST BE TAKEN OUT OF SERVICE ON TRISEN FOR THIS PRO CEDURE.
5. BLEED VALVE PERMISSIVE WILL HAVE TO BE JUMPERED IN THE CONTROL ROOM. THE JUMPER WILL NEED TO BE LAID DOWN ON TERMINAL STRIP AF-11 TO AF-12 BEHIND THE TURBINE CONTROL BOARD PANEL. IF A TRI-SEN ENGINEER IS PRESENT. THIS CAN ALSO BE ACCOMPLISHED THROUGH THE PRQGRAfjl.
6. {
BOARD OPERATOR WILL MAKE ANNOUNCEMENT OVER BLOCK PA FOR ALL PERSONNEL TO LEAVE THE AREA. NO ONE WILL BE ALLOWED IN THE ROPED AREA WHEN THE MACHINE IS BEING PUT ON STARTING MOTOR. A BLADE FAILURE COULD RESULT IN SERIOUS INJURY OR DEATH TO PERSONNEL.
7. THE SHIFT SUPERVISOR WILL NOW MAKE A FINAL INSPECTION OF THE AREA TO MAKE CERTAIN ALL PERSONNEL HAVE CLEARED THE AREA. HE WILL COMMUNICATE TO THE BOARD OPERATOR THAT THE AREA IS CLEAR.
8. THE STARTING MOTOR BREAKER CAN NOW BE RACKED IN. ONCE THE STARTING MOTOR IS RACKED IN. THIS WILL ALSO BE COMMUNICATED TO THE BOARD OPERATOR.
9. THE BOARD OPERATOR WILL NOW ANNOUNCE OVER THE BLOCK PA THE FINAL ANNOUNCEMENT THAT WE WILL BE SPINNING THE MACHINE AND PROCEED TO DO SO. THE SPEED CONTROL ADJUSTMENT WILL BE SET AT MINIMUM POSITION PRIOR TO STARTING THE STARTING MOTOR.
10. THE MACHINE WILL ONLY BE BROUGHT UP TO APPROXIMATELY SO RPM'S ON THE INITIAL SPIN AND WILL BE TRIPPED OFF LINE AT 50 RPM'S. DOW PERSONNEL WILL BE ALLOWED IN THE ROPED AREA ON COAST DOWN TO LISTEN FOR ANY UNUSUAL NOISES. RUBS. LOOSE BLADES. ETC. AGAIN EXTREME CAUTION MUST BE TAKEN AS TO PREVENT PERSOAL INJURY.
11. THE STARTING MOTOR MUST BE RACKED OUT AND RED TAGGED BEFORE ANY
WORK IS CONTINUED. THIS WILL INCLUDE ADDING BALANCE WEIGHTS TO
THE ROTOR.
`- ! .
12. THE ABOVE STEPS MUST BE FOLLOWED EACH TIME THE MACHINE IS TO BE SPINNED THEREAFTER. ON EACH ADDITIONAL SPIN. THE SPEED CAN BE INCREASED UNTIL MAXIMUM STARTING MOTOR SPEED IS OBTAINED.
EDITED:JML 02/04/92
DO A 1 338<S5 CONFTDFNTTA!
BLOCK *816 UPDATED: JML 12/01/93
c
*
V -t,v
c
f
\ no a 1 AoHAt-j
rONFTOFNl I Ai
GT-100/200 IGNITOR CHECKOUT PROCEDURE
WARNING: HOT WORK PERMIT IS REQUIRED
1. GET HOT WORK PERMIT.
2. PULL BOTH PILOT ASSEMBLIES. LOCATE IN A POSITION WHERE THE FLAME IS VISIBLE FROM THE GROUND.
3. COVER FLANGE HOLES WITH DUCT TAPE AFTER PULLING PILOT ASSEMBLY.
4. TRISEN PROGRAMMER TO "DISABLE" AND TURN "OFF" THE FOLLOWING THREE VARIABLES. "CQV4124". "CION". AND "CQV4123"
9. CHECK IGNITOR OPERATION - ENTIRE LOOP IS CHECKED BY FIRINO IGNITORS FROM TRISEN PROGRAMMER. DISABLE "CIGN" AND TURN ON. TURN LOCAL IGNITION SWITCH TO ON AND VERIFY THAT THE IGNITORS ARE IGNITING. TURN OFF "CION". IF IGNITORS DO NOT IGNITE* REPLACE IGNITORS AND REPEAT THIS STEP.
6. VERIFY LOCAL IGNITION SWITCH IS LEFT IN "ON" POSITION.
7. ONCE PROPER OPERATION OF IGNITORS IS CONFIRMED* EXIT COMBUSTOR AREA.
8. PLACE RED "DANGER" TAPE ON DOGHOUSE LADDER AND BURNER ACCESS LADDER.
9. GO TO LOCATION ON GROUND WHERE PILOT FLAME CAN BE DETECTED.
10. CONTACT CONTROL ROOM TO CONFIRM "READY TO TEST". SHIFT SUPERVISOR SHOULD MAKE FINAL ROUND TO CONFIRM AREA IS CLEAR. BOARD OPERATOR WILL MAKE ANNOUNCEMENT "IGNITOR TEST IN PROGRESS - STAY CLEAR".
11. TRISEN PROGRAMMER OPERATOR REMAIN IN CONSTANT CONTACT WITH PERSONS MONITORING FLAME VIA PAGE PHONE.
12. WHEN OUTSIDE OBSERVER GIVES "OREEN LIGHT". PROGRAMMER OPERATOR TO PROCEED AS FOLLOWS:
1). TURN ON "CQV4124" - CLOSES PILOT VENT 2). TURN ON "CIGN" - ENABLES IGNITION XFMR 3). TURN ON "CQV4129" FOR SIX (6) SECONDS - OPEN PILOT BLOCK
VALVES. PILOT FLAME SHOULD BE SEEN ON BOTH IGNITORS 4>. TURN "OFF" CQV4125" - CLOSES PILOT BLOCK VALVES 9). TURN "CION" - DISABLES IGNITION XFMR 6). TURN "OFF" CQV4124" - OPENS PILOT VENT
13. IF PILOT FLAME IS VERIFIED FROM BOTH ASSEMBLIES. REPEAT STEP "12" TWICE TO VERIFY REPEATABILITY.
14. IF PILOT FLAME IS NOT CONFIRMED. ADJUST PILOT GAS REGULATOR AND REPEAT STEP "12".
EDITED: JML
10/27/92 BLOCK *818
no a 1 OORf,? ONf- l DFNT t A!
V
UPDATED:JHL 09/14/93
5
* ' -*"*'#**
i- '
c
no a iawaa f'ONF T OF NT T Al
GT-100/200 START UP (CONTROL ROOM OPERATOR)
1).
1
INSURE TURBINE IS READY FOR STARTUP - OUTSIDE DUTIES ARE COMPLETE* AND START-UP CHECK SHEET COMPLETED. ALSO* REVIEW STEAM INJECTION STARTUP PROCEDURE AND BEGIN WARMING IT UP.
2). RESET 86 DEVICES.
3). RESET HSDA.
4). SEND 0. S. TQ TURNING GEAR TO INSURE PAWL IS UP WHEN YOU ARE READY.
5). GO TO STARTUP SCREEN AND DEPRESS "SYSTEM RESET".
6). MAKE BLOCK ANNOUNCEMENT OF OT. STARTUP. AT THIS POINT* TURNING GEAR SHOULD DISENGAGE AND PAWL SHOULD REMAIN UP. CONFIRM WITH 0. S.
7). DEPRESS "START" BUTTON. BRING SPEED UP TO ABOUT 800 RPM'S USING MANUAL START-UP SPEED CONTROL.
8). MONITOR PERMISSIVE TO STEP 3Aj (IGNITION FLASHINGS). 9). DEPRESS "IGNITION" BUTTON.
10). MONITOR FLAME* TURBINE SPEED* AND EXHAUST TEMPERATURE TO ASSURE IGNITION ON STARTUP SCREEN.
11). MONITOR ALARMS AS TURBINE RAMPS UP TO 3600 RPM'S.
12).
WHEN TURBINE REACHES 3600 RPM'S AND FIELD HAS FLASHED. INSURE THAT GENERATOR VOLTAGE IS SLIGHTLY HIGHER THAN SYSTEM VOLTAGE. NOTIFY POWER J & CHLORINE OF TURBINE SYNCHRONIZATION (MAKE SURE NEUTRAL IS CLOSED).
13).
DEPRESS "AUTO SYNC. AFTER SYNCHRQNIZIN BRING GENERATOR LOAD UP TO 20 MEGAWATTS BY SELECTING "TIT CONTROL". THEN MOLD BY DEPRESSING "SPEED CONTROL".
14).
ASSURING THAT STEAM INJECTION LINE IS ABOVE 425 DEGREES, CLOSE STEAM INJECTION CONTROL VALVE AND DEPRESS "STEAM INJECTION ON". SLOWLY BRING UP TO ABOUT 10.000 LB. /HR.
15). GENERATOR SHOULD HAVE ABOUT 20 MW'S. ADJUST VOLTAGE TO ABOUT 10 MVARS.
16). USING TIT CONTROL* RAISE GEN. LOAD TO 40 MW'S AND HOLD BY DEPRESSING "SPEED CONTROL" UNTIL BOILERS ARE ON LINE.
NOTE: INSURE SET POINT IS CORRECT THEN SELECT DESIRED TEMPERATURE CONTROL.
17). SELECT DESIRED TEMPERATURE CONTROL (SPEED CONTROL. PYRO OR TIT). AND RAISE TURBINE TO FULL LOAD. ADJUST VOLTAGE AS NEEDED.
IS). POSITION THE "EPT" SWITCH BACK TO THE NORMAL POSITION.
EDITED:JML 03/22/93 BLOCK *819
___ _ _ - - --........... UPDATED: JMC 04/14/94
`
..
DO A 188889 C.ONF T DFNT T At
PUTTING STEAM INJECTION ON T-100/200
NOTE:
O 1).
WARMING UP OF THE STEAM INJECTION HEADER SHOULD BEGIN PRIOR TO START-UP SO THAT THERE WILL BE NO DELAY IN START-UP.
235# STEAM HEADER WARMED UP TO FIRST MANUAL BLOCK VALVE. BY OPENING BLEED UPSTREAM OF THIS VALVE.
2). OPEN DRAINS ON STEAM INJECTION LINE BEFORE CONTROL VALVE AND SECTION OF LINE BETWEEN CONTROL VALVE AND ISOLATION VALVE.
3). UNIT 200 ONLY: MAKE SURE 3" LINE TO REGENERATOR LINE IS DOUBLE BLOCKED AND BLED.
4). CLOSE CONTROL VALVE.
5. CRACK OPEN HEADER BLOCK VALVE AND SLOWLY WARM UP LINE THROUGH DRAINS TO CONTROL VALVE.
NOTE: MANUAL BLOCK VALVE DOWNSTREAM OF ISOLATION SHOULD REMAIN CLOSED UNTIL LINE IS WARMED UP AND READY TO BE PUT ON.
6). UNBLOCK MANUAL BLOCK TO 2" WARM UP VENT. ALSO CHECK HANDWHEEL ON TOP OF VALVE AND MAKE SURE VALVE IS NOT MANUALLY CLOSED.
7). WHEN NO WATER IS DETECTED FROM DRAINS, CLOSE BACK ON DRAINS AND FULLY OPEN HEADER BLOCK VALVE.
8). BOARD OPERATOR CAN NOW SLOWLY CRACK OPEN CONTROL VALVE AND ALLOW STEAM TO START FLOWING THROUGH 2" VENT. OUTSIDE OPERATOR NEEDS
( TO CHECK AND VERIFY VENT VALVE IS OPEN AND A GOOD FLOW IS ESTABLISHED ^ THROUGH VENT VALVE (APPROX. 5,000 LBS. PER HOUR).
9). BOARD OPERATOR WILL MONITOR LINE TEMPERATURE ON TRI-SEN AND ASSURE LINE IS HEATING UP. TARGET TEMPERATURE SHOULD BE 425 DEGREES F.
10).
WHEN LINE TEMPERATURE REACHES 425 DEGREES F, AND THE PRESSURE
PERMISSIVE IS MET WHICH IS 225 PSIG, THE STEAM INJECTION LINE
UPSTREAM OF THE CONTROL VALVE ON THE TRI-SEN STARTUP SCREEN
WILL TURN FROM A GREEN TO A RED COLOR. THE FOLLOWING SHOULD BE
DONE:
00 A 133870
A). BOARD OPERATOR CAN CLOSE CONTROL VALVE
- CONFTOFNT TAl
B). OUTSIDE OPERATOR CAN UNBLOCK MANUAL BLOCK TO UNIT. C). BOARD OPERATOR CAN NOW DEPRESS THE (STEAM INJECTION ON)
BUTTON ON THE TRISEN CONTROL PANEL.
NOTE: GENERATOR LOAD SHOULD BE AT APPROXIMATELY 15 MEGAWATTS.
11).
STEAM INJECTION CAN NOW BE SLOWLY PUT INTO MACHINE. CRACK OPEN
CONTROL VALVE AND MONITOR FLOW ON CHART AND ON CRT. THE EXHAUST
TEMPERATURE SPREAD SHOULD ALSO BE MONITORED WHILE PERFORMING THIS
STEP. ESTABLISH A FLOW OF APPROX. 10,000#'S/HR AND/LET MACHINE
STABILIZE BEFORE INCREASING.
/
12). ~
OAS LOAD CAN NOW BE INCREASED ALONG WITH STEAM INJECTION. STEAM INJECTION FLOW SHOULD BE KEPT AT A MINIMUM AT LOW TURBINE LOADS. BECAUSE THERE IS A POSSIBILITY F BLOWING THE FLAME OUT ESPECIALLY DURING LOW TURBINE LOADS. MONITOR NOX EMISSIONS AND EXHAUST TEMPERATURE SPREAD WHILE MACHINE IS LOADING UP. INCREASE STEAM INJECTION FLOW AS NEEDED TO KEEP BOTH WITHIN CONTROL PARAMETERS. NOX < 100 PPM AND SPREAD < 250 DEGF.
. 1*31___ LiUCM Tl IDO TklC _ IC CIM I V J J1Ancn^_ STCAM JJM.JPCTTOM AN PC PUT ON BATTO
I tni-'tWA I UKt tjrKtftU bnuULU ALbU t nuwi luncu wniLC rcnrumuiw iriid
STEP. ESTABLISH A FLOW OF APPROX. 10. 000#'S/HR AND/LET MACHINE
STABILIZE BEFORE INCREASING.
/
GAS LOAD CAN NOW BE INCREASED ALONG WITH STEAM INJECTION. .STEAM INJECTION FLOW SHOULD BE KEPT AT A MINIMUM AT LOW TURBINE LOADS. BECAUSE THERE IS A POSSIBILITY OF BLOWING THE FLAME OUT ESPECIALLY DURING LOW TURBINE LOADS. MONITOR NOX EMISSIONS AND EXHAUST TEMPERATURE SPREAD WHILE MACHINE IS LOADING UP. INCREASE STEAM INJECTION FLOW AS NEEDED TO KEEP BOTH WITHIN CONTROL PARAMETERS. NOX <100 PPM AND SPREAD < 250 DEGF.
13). WHEN TURBINE IS FULLY LOADED. STEAM INJECTION CAN BE PUT ON RATIO CONTROL TO RAMP AS NEEDED WITH THE FUEL GAS FLOW.
EDITED:JML
C 02/02/94 BLOCK #820
UPDATED:JML ` T547T2/94
i
S". H.*,
DO A 133871 CONFTDFNT 1 Al
GT--100/200 SHUTDOWN PROCEDURE
1. C:2.
COMMUNICATE WITH POWER I AND CL2 TO INSURE THE NECESSARY LOAD INCREASES AND CUTS WILL BE MADE TO BALANCE THE SYSTEM.
NOTIFY PIPELINE AND INFORM THEM OF THE SHUTDOWN.
3. PROCEED WITH SHUTDOWN BY PRESSING THE "NORMAL STOP" BUTTON LOCATED ON TUP TRISEN BOARD.
4. MONITOR TURBINE DURING SHUTDOWN. MAKE SURE STEAM INJECTION IS CUTTING BACK AS TURBINE LOAD DECREASES. KEEP MEGAVARS APPROXIMATELY HALF OF MEGAWATT LOAD.
5. PUT "LPT" SWITCH TO THE BACK-UP POSITION.
6. AT APPROXIMATELY 15 MW, THE TRISEN WILL STOP CUTTING LOAD AND INSTRUCT OPERATOR TO CALL POWER I TO INSURE LOAD SHEDDER IS NOT PICKING ANY TRIPS. ALSO, LET CL? KNOW THAT WE'RE SHUTTING DOWN TURBINE AND WHAT RECTIFIER IT MIGHT AFFECT.
7. AGAIN, DEPRESS "NORMAL STOP" BUTTON ON TRISEN BOARD TO RESUME NORMAL STOP.
8. BREAKER WILL OPEN, NEUTRAL WILL CLOSE AUTOMATICALLY.
9. FUEL GAS WILL REMAIN OPEN FOR APPROXIMATELY 5 MINUTES FOR TURBINE COOL I'EWN.
10. AFTER 5 MINUTES OF COOL DOWN, TURBINE WILL TRIP. FUEL GAS VALVE WILL CLOS:-. FIELD BREAKER WILL OPEN, STEAM INJECTION WILL SHUT OFF. MACH] Nit WILL COAST DOWN AND GO ON TURNING GEAR.
11. SHUTDOWN EFP'S IMMEDIATELY AFTER TURBINE TRIP. HAVE AUXILIARY OPERATOR CHECK PUMPS TO ASSURE THEY AREN'T BACKSPINNING.
12. OPEN NECESSARY VENTS AND DRAINS ON BOILER.
13. BLOCK IN FUEL GAS TO TURBINE. DO THIS BY BLOCK IN MAIN FUEL GAS VALVE. DEPRESSURE SCRUBBER BY OPENING FUEL GAS VALVES TO BLOWDOWN TANK. WHEN PRESSURE IS DEPLETED, BLOCK IN FUEL GAS TO BLOWDOWN AND OPEN VENT. ALSO BLOCK FUEL GAS VALVE AT SCRUBBER, OPEN VENT BETWFPN SCRUBBER AND MAIN BLOCK VALVES. DEPRESSURE FUEL GAS SYSTEM THROUGH FUEL GAS BLOWDOWN TANK ONLY. IF N2 PURGE IS REQUIRED ON FUEL GAS SYSTEM, FOLLOW N2 PURGE OF 100/200 FUEL GAS PROCEDURE.
14. RED I AG PERTINENT EQUIPMENT NECESSARY FOR THE SHUTDOWN.
15. IF THE TURBINE HAS TO BE COOLED DOWN FOR ANY REASON, THE UNIT CAN BE PUT ON STARTING MOTOR, USING THE NORMAL START STEPS. THE UNIT MAY BE KEPT ON STARTING MOTOR FOR AS LONG AS NECESSARY TO COOL THE UNIT. THE STARTING MOTOR SHOULD BE RUN AT MAXIMUM RPM'S FOR THE COOL DOWN CYCLE. AS THE TURBINE COOLS, THE STARTING MOTOR SPEED SHOUL.D BE LOWERED TO HAVE THE COMPRESSOR DISCHARGE TEMPERATURE LOWER THAN THE EXHAUST TEMPERATURE.
REVISED: JM: 02/18/93 BLOCK #827
UPDATED: JM-.:
DO A f.ONr TDFNT1 Al
SWAPPING G7-10Q LUBE OIL EVACTORS
CNOTE:
THIS PROCEDURE IS FOR GT-lOO ONLY.'
C NOTIFY BOARD OPERATOR THAT YOU ARE ABOUT TO SWAP LUBE OIL EVACTORS.
2. CHECK EVACTORS IN THE FIELD AND MONITOR VACUUM BEFORE AND AFTER THE SWAP.
3. GO IN 3704 AND SWITCH THE EVACTOR TO BE STARTED FROM "AUTO" TO THE HAND ''03 IT ION.
4. CHECK EVACTOR IN THE FIELD TO SEE IF IT STARTED AND SUCTION VALVE OPENED (VACUUM SHOULD RISE WITH BOTH EVACTORS RUNNING). RETURN TO 3704.
5. THE EVACTOR TO BE SHUT DOWN SHOULD BE STOPPED AND PUT IN THE ,,AUTO,' POSITION. AFTER THIS, CHECK VACUUM AND RESET SNUFFING STEAM LATCH.
NOTE: SNUFFING STEAM WILL TRIP AND CANNOT BE RESET, IF BOTH EVACTORS ARP FUNNING.
EDITED. JM! 02/22/93 BLOCK #830
UPDATED: JMi -02/18/94
(
00 A 13 387 3
r ONF TOP NTT Al
ISOLATING G1-100/200 DC SEAL OIL PUMP
NOTIFY BOARD OPERATOR THAT YOU ARE TAKING THE DC SEAL OIL PUMP OUT OF SERVICE.
RACK OUT
r
NOTE: START OUT.
AND RED TAG THE DC SEAL BUTTON SHOULD BE TESTED
OIL PUMP BREAKER TO INSURE PROPER
IN CONTROL ROOM. PUMP IS RACKED
2. BLOCK AND RED TAG SUCTION AND DISCHARGE BLOCK VALVES.
3. BLOCK AND TAG DC SEAL OIL PUMP WARM UP TUBING.
4. DC SEAL OIL PUMP IS NOW READY TO BE DISCONNECTED ELECTRICALLY AND ALL P 5 P 3 NG MAY BE OPENED.
NOTE: TO DEPRESSURE THIS PUMP. THE PRESSURE GAUGE ON THE DISCHARGE MUSI BE REMOVED.
EDITED: JM; 03/18/93 BLOCK #837
UPDATED: JML 02/18/94
c
HO A 133874 CONF TDFNT 1 At
V
CHANGE OUT L2 SAFETY ON UNIT 100/200 NOTE: TH:- UNIT DOES NOT HAVE TO DE DOWN TO CHANGE OUT H2 SAFETY ^ BLOCK IN MAIN SUPPLY VALVE UPSTREAM OF H2 REGULATOR AND TAG. (j BLOCK AND TAG BYPASS VALVE. 3. UNLOCK GEN. SUPPLY VALVE AND CLOSE AND TAG. 4. OPEN VENT TO BLEED THAT SECTION OF LINE AND TAG BLEED. 5. REMOVE PIPING FROM SAFETY (VENTY SIDE, SUPPLY SIDE). 6. INSTALL 3/4" 150# BLIND FLANGE ON SUPPLY SIDE, AND 3/4" PLUG ON VENT
SIDE. 7. ONCE BLIND AND PLUG HAS BEEN INSTALLED, CLOSE VENT AND REMOVE TAGS. 8. DURING THE TIME THE SAFETY IS OUT AND YOU HAVE TO ADD H2, USE
BYPASS VALVE AND GEN. SUPPLY VALVE TO FILL UNIT. REINSTALLING H2 SAFETY 1. INSTALL TAGS ON MAIN H2 SUPPLY VALVE, GEN. SUPPLY VALVE AND BYPASS-
VALVE. 2. OPEN VLNT TO BLEED AN)) TAG. XT. INSTALL SAFETY AND PIPING. L_ . CLOSE VLNT. 5. OPEN MAIN H2 SUPPLY TO REGULATOR. 6, CHECK LOR LEAKS (ONCE IT IS ESTABLISHED THERE ARE NO LEAKS, PRESSURE
UP ALL THE WAY). SYSTEM IS NOW BACK IN SERVICE.
EDITED. JM! 03/22/93 BLOCK #841 UPDATED:UMl 02/18/94
r
DO A 13387S OONF TDFNT T At
V
ISOLATION OF AC SEAL OIL PUMP 100/200
NOTE: IN ISOLATING THE AC SEAL OIL PUMPS ON 100/200 YOU NEED TWO OPERATORS
START DC SEAL OIL PUMP AND INSURE PUMP IS PUMPING.
2. SHUTDOWN AC SEAL OIL PUMP (WATCH DC PUMP DISCHARGE PRESSURE* AND PRESSURE WITH DC RUNNING; IT SHOULD READ ABDUT 5# DIFF. OF H2 PRESSURE).
3. RACK DU) BREAKER IN 3704.
4. BLOCK IN SUCTION VALVE AND TAG.
5. BLOCK ]N DISCHARGE VALVE AND TAG.
AC SEAL OH PUMP START UP 1. UNBLOCK SUCTION VALVE.
2. UNBLOCK DISCHARGE VALVE.
3. RACK IN BREAKER AND START UP PUMP. 4. CHECK OUT FLOW AND DISCHARGE PRSSURE OF AC PUMP.
out, r,:;uT down dc seal oil pump.
ONCE PUMP HAS LINED
C EDITED. JMI. 03/22/93 BLOCK #842
UPDATED: JMl 02/18/94
r
00 A 13387A TONE T OFNT T Al,