Document pqmj4vavjGaqY8BX3wVdDqVE

DO A 1 3 4 0 1 6 CONFTDENTTAI HRU 300/400 HYDRO TEST OF L. P. BOILER AT 40# NOTE: GAS TURBINE IS DOWN* BFP'S ARE TAOGED ELECTRICALLY AND CONDENSATE HEADER IS PRESSURED UP. A. c THE FOLLOWING VENTS MUST BE OPEN: 1. UP. DRUM VENTS 2. L. P. SUPERHEATER VENTS 3. U P. VENT BETWEEN NON RETURN AND LEAD LINE OPEN (IN CASE NON RETURN LEAKS THROUGH). B. THE FOLLOWING VALVES MUST BE CLOSED PRIOR TO FILLING L. P. BOILER: 1. UPSTREAM WARM UP BLOCK VALVE AROUND LEAD LINE BLOCK VALVE; 2. ALL L. P. BOILER DRAINS. 3. L. P. SUPERHEATER DRAINS. 4. CONTINUOUS BLOWDOWN FROM M. P. BOILER. 5. CONTINUOUS BLOWDOWN FROM L. P. BOILER TO FLASH TANK. 6. M. P. DISCHARGE ON BFP'S. 7. L. P. NON-RETURN 8. L. P. LEAD LINE c. IN ORDER TO FILL FOR HYDRO* THE FOLLOWING MUST BE DONE: 1. CLOSE BLEEDS ON CONDENSATE FILL HEADER TO M. P. FEEDWATER STATION. 2. HAVE BOARD OPERATOR INSURE THAT THE M. P. FEEDWATER MOV. M.P. MOV BPYASS AND M. P. FEEDWATER REGULATOR ARE CLOSED. ' 3. OPEN BV'S UPSTREAM AN DOWNSTREAM OF SPOOL PIECE AND L. P. FEEDWATER REGULATOR. THEN HAVE BOARD OPERATOR OPEN LP FEED H20 REG TO ESTABLISH FLOW TO BOILER. NOTE: BOILER SHOULD BE FILLING AT THIS TIME. 4. WHEN DRUM LEVEL STARTS TO RISE. SEND AN OPERATOR TO THE TOP OF THE BOILER. 5. WHEN WATER BEGINS COMING OUT OF THE DRUM VENTS. CLOSE DRUM VENTS. 6. CONTINUE TO FILL UNTIL YOU GET WATER OUT OF THE SUPERHEATER VENT. ONCE YOU GET OUT OF SUPERHEATER VENTS. HAVE BOARD OPERATOR CLOSE FEED WATER REGULATOR. THEN CLOSE SUPERHEATER VENT. AFTER YOU HAVE FINISHED CLOSING SUPERHEATER VENT. GO TO LP FEED WATER REGULATOR AND CRACK BYPASS PAYING CLOSE ATTENTION TO GAUGE ON LOW PRESSURE ON LOW PRESSURE DRUM. BRING PRESSURE UP TO 40# USING USING BYPASS THEN BLOCK BYPASS IN FOR INSPECTION. 7. AFTER INSPECTION OF L. P. BOILER AND IF NO LEAKS ARE FOUND. DEPRESSURE AND DRAIN THE BOILER AND PREPARE THE BOILER FOR START UP. DOUBLE BLOCK AND BLEED HYDRO HEADER. NOTE: OPEN THE SUPERHEATER VENTS AND DRAIN TO INSURE THE SUPERHEATER IS COMPLETELY DRAINED BEFORE START UP. NOTE: CAUTION IS TO BE TAKEN NOT TO LIFT THE SAFETY WHILE HYDDROING THIS BOILER. EDITED: JML 07/03/91 BLOCK #13 UPDATED:JML DO A 134017 CONFTDFNT TA( V HRU-300/400 STARTUP HRU START (COLD) - UNIT 300/400 THIS PROCEDURE IS WRITTEN WITH THE FOLLOWING ASSUMPTIONS: 1. BFP IS READY TO START. 2. 1250# STEAM LINE TO POWER I IS PRESSURED UP AND WARMED. 3. POWER I HAS BEEN NOTIFIED THAT HRU IS BEINO STARTED. PROCEDURE: 1. HIGH, MEDIUM AND LOW PRESSURE BOILER A. OPEN LEAD LINE AND NON-RETURN BLOCK VALVES ON HIGH PRESSURE AND RED TAG ELECTROMATIC SAFETY VALVE LEAD LINE. B. OPEN DRUM VENTS (2) C. OPEN VENT ON SUPERHEATER OUTLET LINE BEFORE NON-RETURN. D. OPEN VENT ON SUPERHEATER OUTLINE LINE BETWEEN NON-RETURN AND 1250# BLOCK VALVE. 2. PUT DA LEVEL CONTROLLER IN MANUAL AND ESTABLISH MINIMUM FLOW TO DA (LET DA OVERFLOW DURING START-UP) WITH CORTROL PUMP RUNNING. 3. START BOILER FEED PUMP AND ESTABLISH MINIMUM WATER LEVEL IN EACH BOILER (HP, MP, LP) 4. PUT FEEDWATER DRUM LEVEL CONTROL ON MANUAL AND ESTABLISH TRICKLE FEED TO BOILERS CONTROLLING LEVEL WITH BLOWDOWN VALVES. 5. PHOSPHATE AND CORTROL TANKS SHOULD BE CHECKED FOR ADEQUATE LEVEL INSURING THAT SUCTION AND DISCHARGE VALVES ARE OPEN, START P04 PUMPS. 6. AS UNITS BEGIN TO HEAT UP, OPEN MANUAL BLOWDOWNS TO MAINTAIN DRUM LEVELS BELOW HALF FULL. PUT FEEDWATER REGULATORS ON AUTOMATIC WHEN BOILERS BEGIN TO GENERATE STEAM. 7. CLOSE ALL VENTS AND DRAINS WHEN STEAM FLOW IS ESTABLISHED. 8. SET UP CONTINUOUS BLOWDOWN SYSTEM ON ALL BOILERS. HRU START-UP (HOT) DO A 13401B CONI' T OF NT 7 Al 1. PRIOR TO START-UP, BLOWDOWN DRUM LEVELS TO JUST BELOW GAUGE GLASSES (FIRING LEVEL). 2. ESTABLISH TRICKLE FEED FLOW TO BOILERS AND CONTROL LEVELS WITH BLOWDOWNS. 3. FEEDWATER REGULATIONS SHOULD CONTROL DRUM LEVELS ON "AUTO". AFTER BOILERS START STEAMING, ADJUST BLOWDOWNS AS NECESSARY TO PREVENT HIOH DRUM LEVEL. 4. CLOSE ALL VENTS AND DRAINS WHEN STEAM FLOW IS ESTABLISHED. _____ V REVISED: JML 11/03/92 ^ BLOCK #26 c ( 00 A 134019 OONFTDFNTTAl V TEXT BLOCK # 27 SAFE WORK PROCEDURE START-UP CHECK LIST - HRU 300/400 HEAT RECOVERY UNIT START-UP 1. GAS TURBINE READY FOR START-UP. 2. ALL RED TAG MASTERS RELEASED AND EQUIPMENT READY TO GO. 3. ALL BOILER ENTRANCES CLOSED AND TIGHTENED. 4. COOLING WATER TO ALL EQUIPMENT READY TO GO. 5. BOILER FEED PUMPS READY FOR SERVICE. 6. CHEMICAL DRUM CHARGED. P04 LINE UNBLOCKED. 7. FEEDWATER REGULATORS UNBLOCKED AND READY TO GO. 8. FEEDWATER FLOW TO DA AND OVERFLOWING. 9. FUEL GAS UNBLOCKED AND PURGED. 10. STEAM LINES WARMING, LEAD LINE DRAINS CRACKED OPEN. 11. SUPERHEATER DRAINS (MP St HP) CRACKED OPEN. 12. ALL PRESSURE AND LEVEL INDICATORS AND TRANSMITTERS UNBLOCKED. 13. CORTROL SYSTEM IN SERVICE. 14. BOILER DRUM LEVEL ESTABLISHED. 15. ELECTROMATIC RELIEF VALVE MANUALLY BLOCKED AND RED TAGGED. REVISED:UML 10/29/91 BLOCK *27 YEs NO ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ no a i :-i40?o CONF'IDFNTTA! SAFE WORK PROCEDURE SHUTDOWN OF HEAT RECOVERY UNIT - HRU 300/400 CONDITIONS: 1. QAS TURBINE AND BOILER FEED PUMPS HAVE BEEN SHUT DOWN. PROCEDURE: 1. OPEN HICH PRESSURE AND MEDIUM PRESSURE SUPERHEATER DRAINS (BEFORE OAS TURBINE IS SHUT DOWN IF POSSIBLE). 2. CRACK OPEN SUPERHEATER VENTS AND STEAM LINE VENTS. 3. SHUT DOWN P04 AND CORTROL PUMPS AND BLOCK DISCHARGE. 4. BLOCK STEAM TO DEAERATOR (IF DOWN FOR OVERHAUL). 5. FOLLOW GAS TURBINE COOL DOWN PROCEDURE. NOTE: DO NOT LET BOILER LEVELS (ESPECIALLY HIGH PRESS. AND MED. PRESS. ) GET ABOVE SOX. LET BOILERS GO EMPTY RATHER THAN ALLOW TO OVERFLOW (NO DAMAGE WILL OCCUR FROM LETTING A BOILER GO EMPTY AFTER TURBINE HAS BEEN SHUTDOWN). REVISED:JML 11/03/92 BLOCK #28 00 A 134071 C'ONFTDFNTTAI V safe: work procedure HYDROSTATIC TESTING FEEDWATER PREHEATER - HRU 300/400 CONDI!IONS' \l. GAS TUrUINE IS DOWN. PROCEDURE: 1. ELOCK IN DEAERATOR LEVEL CONTROL VALVE AND BY-PASS. 2. BLOCH IN ROTOR AND CONDENSATE TEMPERATURE CONTROL VALVE AND BY-PASS 3. CLOSE ALL PREHEATER DRAIN VALVES (8 TO EACH SECTION). 4. OPEN O'1 BLOCK VALVE ON CONDENSATE HEADER FROM POWER 1. 5. OPEN AU VENTS ON EACH SECTION (6). FILL PREHEATER WITH CONDENSATE UNTIL CONDENSATE OVERFLOWS VENTS. 6 CLOSE A.I L VENT S. 7 PRESSURE UP PREHEATER USING CONDENSATE HEADER PRESSURE. REVISED, N! < 9/i 1 / '/ 0 BLOCK 2? UFDATED Ji'li 08/30/93 DO (".ONE T DENT T A' TEXT BLOCK # 30 HRU 300/400 HYDRO TEST HP BOILER NOTE: CONDITION OF UNIT IS DOWN. BOILER FEED PUMPS TAGGED ELECTRICALLY. CONDENSATE HEADER PRESSURED UP. C A. THE FOLLOWING VENTS MUST BE OPEN. 1. HP DRUM VENT. 2. HP SUPERHEATER VENT. 3. LEAD LINE VENT BETWEEN NON RETURN AND LEAD LINE MOV. THE FOLLOWING VALVES MUST BE CLOSED BEFORE STARTING TO FILLjTHE B. BOILER. ! 1. UPSTREAM WARM-UP AROUND LEAD LINE MOV 2. ECONOMIZER DRAINS 3. SUPERHEATER DRAINS 4. ALL BOILER DRAINS 5. CBD AT HIGH PRESSURE DRUM 6. HIGH PRESSURE DISCHARGE BV ON BOTH BF PUMPS 7. NON RETURN 8. LEAD LINE MOV C. FILL FOR HYDRO 1. AT GROUND LEVEL BY FEED H20 REGULATOR. HAVE BOARD OPERATOR OPEN FEED H20 MOV BY-PASS. i l 2. CONNECT SPOOL PIECES ON CONDENSATE) FILL LINE TO HIGH PRESSURE c FEED H20 LINE. CLOSE ALL BLEEDS ON FILL LINE. 3. OPEN CONDENSATE FILL BV FROM CONDENSATE HEADER. 4. OPEN HP BF (YELLOW HANDLE) THAT TIES THE CONDENSATE SYSTEM TO THE FEEDWATER SYSTEM. 5. WHEN DRUM LEVEL STARTS TO RISE, POSITION AN OPERATOR AT TOP OF BOILER. WHEN WATER COMES OUT OF DRUM, CLOSE DRUM VENT. 6. WAIT UNIT YOU GET WATER OUT OF SH THEN CLOSE SH VENT. 7. LET BOILER PRESSURE UP TO CONDENSATE HEADER PRESSURE. 8. CLOSE HP CONDENSATE FILL BV (YELLOW HANDLE). 9. LEAVE LOW PRESSURE CONDENSATE FILL BV'S OPEN TO CONDENSATE SYSTEM IN CASE HP FILL BV LEAKS THRU. PUTTING THE SQUEEZE ON THE BOILER 1. NORMAL HYDRO PRESS ON HP BOILER IS 1000 PSI. no A 1A40GG GONFTDFNT TAI. 2. SOURCE OF HYDRO PRESS IS OFF THE HP BFP FROM THE GT THAT IS RUNNING. CLOSE ALL BLEEDS ON HYDRO LINES. c 3. PRESSURE UP HYDRO LINE FROM UPSTREAM OF FW REGULATOR OF UNIT THAT IS RUNNING TO DOWNSTREAM OF FW REGULATOR OF UNIT WHICH IS TO BE HYDRO'D. 4. POSITION AN OPERATOR ON TOP OF BOILER MONITORING HP DRUM PRESSURE. 5. OPERATOR ON GROUND SLOWLY CRACKS HYDRD VALVE APPLYING PRESSURE ptMVl i iiif i | ii I ^1 t i 4 *^1*^ 9*1^ --, rnan condensate header. ^7 hTT^TyELLOH HANDLE> THAT TIES THE CONDENSATE SYSTEM TO 4. THE FEEDWATER SYSTEM. 5. WHEN DRUM LEVEL STARTS TO RISE* POSITION AN OPERATOR AT TOP OF BOILER. WHEN WATER COMES OUT OF DRUM. CLOSE DRUM VENT. 6. WAIT UNIT YOU GET WATER OUT OF SH THEN CLOSE SH VENT. 7. LET BOILER PRESSURE UP TO CONDENSATE HEADER PRESSURE. 8. CLOSE HP CONDENSATE FILL BV (YELLOW HANDLE). 9. LEAVE LOW PRESSURE CONDENSATE FILL BV'S OPEN TO CONDENSATE SYSTEM IN CASE HP FILL BV LEAKS THRU. D. PUTTING THE SQUEEZE ON THE BOILER 1. NORMAL HYDRO PRESS ON HP BOILER IS 1000 PSI. 2. SOURCE OF HYDRO PRESS IS OFF THE HP BFP FROM THE GT THAT IS RUNNING. CLOSE ALL BLEEDS ON HYDRO LINES. 3. PRESSURE UP HYDRO LINE FROM UPSTREAM OF FW REGULATOR OF UNIT THAT IS RUNNING TO DOWNSTREAM OF FW REGULATOR OF UNIT WHICH IS TO BE HYDRO'D. 4. POSITION AN OPERATOR ON TOP OF BOILER MONITORING HP DRUM PRESSURE. 5. OPERATOR ON GROUND SLOWLY CRACKS HYDRO VALVE APPLYING PRESSURE TO BOILER. WHILE WATCHING GAUGE ON FEED WATER LINE. 6. ALSO. ASK BOARD OPERATOR TO WATCH DRUM PRESSURE GAUGE IN CONTROL ROOM. 7. IF BOARD OPERATOR GETS LOW DISCHARGE PRESSURE ALARM ON BFP THAT IS RUNNING. THIS MEANS YOU ARE USING TOO MUCH WATER AND NEED TO CUT BACK ON HYDRO. 8. ONCE YOU HAVE REACHED 1.000 PSI ON BOILER, MAINTAIN WHILE IN SPECTION IS BEING DONE. (MAINTAIN PRESSURE FOR 30 MINUTES PRIOR TO INSPECTION). 9. ONCE HYDRO IS COMPLETE. A. OPEN DRUM AND SUPERHEATER VENTS B. DRAIN BOILER TO FIRING LEVEL C. DRAIN SUPERHEATER SECTION D. DOUBLE BLOCK AND BLEED HYDRO LINES TO UNIT NOTE: NEVER LEAVE HYDRO STATION UNATTENDED BECAUSE BOILER PRESSURE CAN GET AWAY FROM YOU CAUSING SAFETIES TO BLOW IF PRESSURE GETS TOO HIGH. A PERSON MUST REMAIN AT THE TOP OF THE BOILER TO WATCH THE DRUM PRESSURE GAUGE. ANOTHER PERSON MUST REMAIN AT THE HYDRO VALVE BY THE HP REGULATOR. REVISED:JML 07/03/91 BLOCK #30 no A 134004 c ONf- TDFNTTA1 HRU 300 St 400 HYDRO TEST OF M. P. BOILER AT 125# NOTE: GAS TURBINE IS DOWNi BFP'S ARE TAGGED ELECTRICALLY AND CONDENSATE HEADER IS PRESSURED UP. THE FOLLOWING VENTS MUST BE OPEN: 1. M P. DRUM VENTS 2. M. P. SUPERHEATER VENTS. 3. M. P. VENT BETWEEN NON-RETURN AND LEAD LINE OPEN (IN CASE NON RETURN LEAKS THROUGH) B. THE FOLLOWING VALVES MUST BE CLOSED PRIOR TO FILLING M.P. BOILER: 1. UPSTREAM WARM-UP BLOCK VALVE AROUND LEAD LINE BLOCK VALVE. 2. ALL M. P. BOILER DRAINS. 3. M. P. SUPERHEATER DRAINS. 4. CONTINUOUS BLOWDOWN FROM H. P. BOILER. 5. CONTINUOUS BLOWDOWN TD L. P. BOILER. 6. M. P. DISCHARGE ON BFP'S 7. M. P. NON-RETURN 8. M. P. LEAD LINE. 9. n. P. ECONOMIZER DRAINS. 10. L. P. FEEDWATER REGULATOR SHOULD BE MANUALLY BLOCKED IN CASE REGULATOR LEAKS THROUGH. C. IN ORDER TO FILL FOR HYDRO, THE FOLLOWING MUST BE DONE. 1. HAVE BOARD OPERATOR OPEN M.P. FEEDWATER MOV BY-PASS. ^ 2, OPEN BV'S UPSTREAM AND DOWNSTREAM OF SPOOL PIECE. ( NOTE. BOILER SHOULD BE FILLING AT THIS TIME. 4. WHEN DRUM LEVEL STARTS TO RISE, SEND AN OPERATOR TO THE TOP DF THE BOILER. 5. WHEN WATER BEGINS COMING OUT OF THE DRUM VENTS, CLOSE DRUM VENTS AND TELL OPERATOR DOWNSTAIRS THAT YOU ARE GETTING WATER OUT OF THE DRUM VENT. 6. CONTINUE TO FILL UNTIL YOU GET WATER OUT DF THE SUPERHEATER VENT. THEN CLOSE VENT AND INFORM OPERATOR DOWNSTAIRS. 7. M.P. DRUM SHOULD PRESSURE UP TO CONDENSATE HEADER PRESSURE, 125#. 8. AFTER MAINTAINING M. P. BOILER AT 125# FOR ONE (1) HOUR, IT IS THEN OKAY TO INSPECT FOR LEAKS. 9. AFTER INSPECTION OF M. P. BOILER AND IF NO LEAKS ARE FOUND, DE- PRESSURE AND DRAIN THE BOILER AND PREPARE THE BOILER FOR START UP. DOUBLE BLEED AND BLEED HYDRO HEADERS. NOTE: OPEN THE SUPERHEATER VENTS AND DRAINS TO INSURE THE SUPERHEATER IS COMPLETELY DRAINED BEFORE START UP. THIS PROCEDURE REPLACED ORIGINAL PROCEDURE - HYDO TEST OF M. P. AND L. P. BOILER. REVISED:JML ( 7/03/91 ^ (LOCK #31 UPDATED: JML 12/16/93 on A 1 .-Iq 0,'.\s C ONF T DFNT 7 A1 HRU-300/400 DRUM ENTRY AND CHECKLIST DRUM ENTRY PROCEDURE AND CHECKLIST - HRU 300/400 CONDITIONS: GAS TURBINE SHUT DOWN AND TAGGED: DRUM VENTED AND DRAINED; BOILER FEED PUMPS ISOLATED AND TAGGED. CHECKLIST: 1. PULL STARTING MOTOR AND DISCONNECTS AND TAG. YES NO 2. BLOCK IN FUEL GAS AND VENT FUEL LINE. 3. STEAM NON-RETURN CLOSED AND TAGGED. STEAM OUTLET LINE VENTS OPEN, DRUM VENTS OPEN. 4. P04 PUMPS TAGGED. 5. BOILER FEED PUMPS ISOLATED AND TAGGED. FEEDWATER REGULATORS BLOCKED AND BY-PASSES CLOSED AND TAGGED. (HP AND MP) 6. FEEDWATER REGULATOR AND BY-PASS VALVE BLOCKED AND TAGGED (LP BOILER). 7. SUPERHEATER BY-PASS CONTROL VALVE AND BY-PASS VALVE BLOCKED AND TAGGED (HP BOILER). 8. CONTINUOUS BLOWDOWN LINES IN OR OUT OF DRUM BLOCKED AND TAGGED. 9. CORTROL AND SULFITE LINE DOIBLE BLOCKED, BLED AND TAGGED 10. MEDIUM PRESSURE ECONOMIZER TO DA LINE DOUBLE BLOCKED BLED, AND TAGGED 11. BOTH ENDS OF DRUM OPEN. 12. OXYGEN AND COMBUSTIBLES TEST 0.K. 13. AFTER 02 AND COMBUSTIBLE CHECK, INSTALL AIR MOVER PROPER VENTILATION. 14. APPROPRIATE PERMITS OBTAINED. REVISED:JML 12/23/92 BLOCK *33 DO A ->4 0D(r.ONrTnf-'N'i i a; V HRU-300/400 BOILER ENTRY CHECKLIST BOILER ENTRY CHECKLIST - HRU-300/400 CONDITIONS: ^ GAS TURBINE IS DOWN AND ON TURNING GEAR. PROCEDURE: 1. PULL DISCONNECT ON STARTING MOTOR AND RED TAG. 2. DOUBLE BLOCK & BLEED it RED TAG FUEL GAS. SYN GAS. STEAM INJECTION AND NITROGEN TO UNIT. 3. HP, MP, AND LP STEAM LEAD LINES, NON-RETURN VALVES AND WARM UP LINES DOUBLE BLOCK, BLEED, AND RED TAG VENTS BETWEEN LEAD LINE AND NON RETURN TAGGED OPEN. 4. CHEMICAL FEED PUMPS BLOCKED AND TAGGED, DOUBLE BLOCK AND BLEED OR DISCONNECT. 5. DISCONNECTS PULLED AND RED-TAGGED ON BOILER FEED PUMPS. 6. ALL FEEDWATER ON HP, MP, AND LP DRUMS DOUBLE BLOCK AND BLEED AND RED TAGGED. 7. BOILER COMPLETELY VENTED AN DRAINED. ( 8. 02 AND EXPLOSIMETER TESTS RUN AND RESULTS O. K. 9. PROPER PERMITS OBTAINED FROM CONTROL ROOM. YES _______ NO ____ _______ _______ _______ _______ _______ _______ _______ ____ _______ REVISED:NLC 11/15/91 BLOCK #34 f 00 A 134 0.'/ CONI- "1 Nf NT I AS TEXT BLOCK tt 35 HRU-300/400 DRAINING THE BOILER DRAINING THE BOILER * HRU 300/400 0 CONDITIONS: BOILER WILL BE DOWN FOR AN INDEFINITE PERIOD OR NEEDS TO BE COMPLETELY DRAINED FOR MAINTENANCE REASONS. (NOTE: EACH BOILER SECTION CAN BE DRAINED INDIVIDUALLY AFTER DRUM IS DRAINED. BOILER MUST BE STOPPED STEAMING BEFORE DRAINING). PROCEDURE: 1. SHUT DOWN BOILER FEED PUMPS AND RED TAG. 2. BLOCK IN AND TAG FEEDWATER CONTROL VALVES AND BY-PASSES. 3. BLOCK IN STEAM NON-RETURN VALVES. 4. BLOCK IN P04 LINE TO HP DRUM AND TAG. 5. BLOCK IN CONTINUOUS BLOWDOWN LINES. TO COMPLETELY DRAIN THE BOILERS, THE FOLLOWING VENTS MUST BE OPENED AND RED TAGGED. 1. HP SUPERHEATER OUTLET VENT BEFORE NON-RETURN 2. HP BOILER DRUM VENT 3. MP SUPERHEATER VENT 4. MP BOILER DRUM VENT 5. LP SUPERHEATER VENT (LOCATED ON OUTLET LINE AFTER MP STEAM LINE) 6. LP BOILER DRUM VENT 7. FEEDWATER PREHEATER VENTS (6 ON EACH SECTION). NOTE: IF ECONOMIZER SECTIONS ARE TO BE DRAINED, APPROPRIATE VENTS ON EACH SECTION MUST BE OPENED. THE FOLLOWING DRAIN VALVES MUST BE OPENED TO COMPLETELY DRAIN THE BOILER: 1. HP SUPERHEATER DRAINS (6) 2. HP BOILER DRAINS (6) 3. MP SUPERHEATER DRAINS (6) 4. MP BOILER DRAINS (6) 5. LP BOILER DRAINS (6) NOTE: EACH BOILER DRUM HAS TWO FEEDERS WHICH CAN BE DRAINED. EACH LP BOILER HAS A 4" FEEDER. EACH MP BOILER HAS A 6" FEEDER, AND EACH HP BOILER HAS TWO 10" FEEDERS. EACH FEEDER CAN BE DRAINED THRU A 2" DRAIN VALVE. 00 A 1 34078 6. HP ECONOMIZER 2 DRAIN VALVES OONF TDFNT T A1 V 7. HP ECONOMIZER #1 DRAIN VALVES 8. MP ECONOMIZER DRAIN VALVES 9. FEEDWATER PREHEATER DRAINS RE-INSTALLED: VML 10/03/90 BLOCK #35 C i ( do a i :-iAorc) OONF TDFNT T A! V TEXT BLOCK # 36 SAFE WORK PROCEDURE DEPRESSURING AND DRAINING DEAERATOR AND.LP BOILER AFTER HYDROSTATIC TEST - HRU 300/400 C CONDITIONS: DEAERATOR AND LP BOILER READY FOR DRAINING AFTER HYDRO TEST AT CONDENSATE HEADER PRESSURE. PROCEDURE: 1. CLOSE DEAERATOR LEVEL CONTROL BY-PASS. 2. SLOWLY OPEN DRAIN VALVE ON A LP BOILER SECTION AND ALLOW BOILER AND DEAERATOR TO DE-PRESSURE. 3. OPEN VENT ON STEAM SUPPLY LINE TO DEAERATOR. AS LEVEL DROPS OPEN VENTS ON DEAERATOR AND LP DRUM. NOTE: IF DESIRED TO DRAIN BOILER AND NOT DEAERATOR. CLOSE BY-PASS VALVE AROUND LP BOILER FEEDWATER REGULATOR. REVISED:JML 07/02/91 BLOCK #36 C r,t) A 1 340.V-' r.ONKlUrNTT A'. V HRU-300 TAKING DA OUT OF SERVICE TAKING DEAERATOR OUT OF SERVICE FOR MAINTENANCE WORK CONDITIONS: ^TURBINE IS DOWN. ALL BFP'S OFF. PROCEDURE: 1. BLOCK IN UPSTREAM AND DOWNSTREAM BV'S AROUND LEVEL CONTROL VALVE. INSURE BY-PASS BLOCK VALVE IS CLOSED. 2. BLOCK IN CQRTROL FEED TO STORAGE TANK. RED TAG BOILER FEED PUMPS ELECTRICALLY. 3. BLOCK IN SUCTION LINES TO THE BOILER FEED PUMPS. 4. BLOCK IN BFP RECIRCULATION LIhE. 5. BLOCK THE 30# STEAM SUPPLY TO THE DA AT THE VALVE OFF THE MAIN STEAM HEADER. ALSO BLOCK WARM-UP BY-PASS VALVE IN. 6. OPEN 2" VENT ON DA FULLY. 7. DRAIN STORAGE TANK ONLY IF NOT STEAMING AND IF MAINTENANCE IS TO BE PERFORMED ON DA. f REVISED:CNS V 04/22/92 BLOCK #37 ,.Vv Tv <*?*%*' C. DO A 134031 DONF 1 DFNT TAi HRU-300/400 FILLING THE BOILERS ^~ILLING THE BOILERS - HRU 300/400 CONDITIONS: GAS TURBINE IS DOWN; BOILER HAS BEEN DRAINED AND OPENED. ALL MASTERS HAVE BEEN CLEARED. PROCEDURE: 1. MAKE SURE BOILER FEED PUMS ARE LINED UP FOR SERVICE. DEAERATOR SHOULD BE IN SERVICE; LEVEL SHOULD BE NORMAL AND LEVEL CONTROL VALVE UNBLOCKED. 2. ALL ECONOMIZER, DOWNCOMERS, AND LOWER HEADER DRUM VALVES SHOULD BE CLOSED. 3. ALL DRUM AND SUPERHEATER VENTS SHOULD BE OPEN. SUPERHEATER DRAINS SHOULD EE CLOSED. 4. MAKE SURE VALVES TO ALL LEVEL INDICATORS ARE OPEN. 5. ALL DRUM LEVEL FEEDWATER REGULATORS BLOCKED IN AND BY-PASSES CLOSED. LOW PRESSURE BOILER s- 1. ( SLOWLY CRACK LOW PRESSURE BOILER FEEDWATER REGULATOR AND FILL LOW PRESSURE DRUM. WATCH DEAERATOR LEVEL CLOSELY. WHEN DESIRED LEVEL IS REACHED, CLOSE BY-PASS AND UNBLOCK FEEDWATER REGULATOR. MEDIUM AND HIGH PRESSURE BOILERS 1.START EITHER OF THE BOILER FEED PUMPS. (REFER TO PROCEDURES FOR BOILER FEED PUMP START UP). FILL BOTH DRUMS WITH BY-PASS VALVES AROUND FEEDWATER CONTROL VALVES. FILL SLOWLY AND WATCH DEAERATOR LEVEL. WHEN DESIRED LEVEL IS REACHED, CLOSE BY-PASSES AND STOP PUMP. UNBLOCK FEEDWATER REGULATORS. REVISED:UML 07/02/91 BLOCK #38 UPDATED:JMC 2/23/94 ( on A 1 V4 03? CONFIDENT I Al V ............... --.--I.....I 1.1 * TEXT BLOCK # 39 SAFE WORK PROCEDURE UNIT 300/400 DEAERATOR OPERATING PRESSURE: (OPERATING TEMPERATURE: CAPACITY (HOLDING): CAPACITY (FLOW): 30 PSIG 275 DGF 16.000 GALLONS ESTABLISHING DEAERATOR LEVEL: CONDITIONS: HRU IS DOWN; ALL BFP'S OFF. PROCEDURE: r f 1. OPEN 2" VENT VALVE ON TOP OF DEAERATOR. il J$ 2. BE SURE ALL VALVES TO LEVEL INDICATING AND PRESSURE TRANSMITTERS T\< ARE OPEN. 3. PLACE DEAERATOR LEVEL CONTROL VALVE ON MANUAL AND CLOSE; BE SURE BY-PASS IS CLOSED. 4. OPEN UPSTREAM AND DOWNSTREAM BLOCK VALVES TO LEVEL CONTROL VALVE. CRACK OPEN 1" DRAIN JUST BEFORE CB SLIGHTLY IF LINE IS COLD. 5. ^6. OPEN 1" VENT PARTIALLY ON EACH FEEDWATER PREHEATER SECTION. AS PREHEATERS FILL. CLOSE VENTS. PUT CONDENSATE FLOW CONTROLLER TO CONDENSATE HEADER ON MANUAL AND CLOSE. OPEN UPSTREAM AND DOWNSTREAM BV'S. BE SURE BY-PASS IS CLOSED. 7. CHECK DEAERATOR DUMP CONTROL VALVE AND UNBLOCK. BE SURE MANUAL DUMP IS CLOSED. 8. PUT LP BOILER DUMP LEVEL CONTROLLER ON MANUAL AND CLOSE. OPEN BLOCK VALVES BEFORE AND AFTER REGULATOR. BE SURE MANUAL BY-PASS IS CLOSED. 9. PUT FW PREHEATER BY-PASS CV ON MANUAL AND CLOSE. OPEN BV'S BEFORE AND AFTER CONTROL VALVE. BE SURE MANUAL BV IS CLOSED. i 10. PUT FW DRUM LEVEL CONTROLLERS FOR MP AND HP BOILERS ON MANUAL AND CLOSE. I OPEN BV'S BEFORE AND AFTER REGULATOR. BE SURE MANUAL BY-PASSES ARE j CLOSED. 11. ESTABLISH LEVEL IN DA BY USING THE LEVEL CONTROL VALVE ON MANUAL. I 12. IF START-UP OF UNIT IS IMMINENT. LINE UP CORTROL FEED AND START INJECTINC [ CORTROL INTO THE DEAERATOR. ! DO A 134033 k 13. AFTER UNIT HAS COME UP TO 30#. CLOSE BACK ON 2" VENT. CONF TOFNT T Al I NOTE: 1. THE DEAERATOR PRESSURE AND LP BOILER DRUM PRESSURE MUST BE BE EQUAL. IT MAY BE NECESSARY TO PINCH BACK ON THE 2" DA _ VENT BEFORE PRESSURE REACHES 30 PSIG. \ 2. PUT DA LEVEL CONTROL VALVE ON AUTO AS SOON AS SOME FLOW IS ESTABLISHED THROUGH DEAERATOR. MM A ITH AC crinM CLOSED. 9. PUT FW PREHEATER BY-PASS CV ON MANUAL AND CLOSE. OPEN BV'S BEFORE AND AFTER CONTROL VALVE. BE SURE MANUAL BV IS CLOSED. 10. PUT FW DRUM LEVEL CONTROLLERS FOR MP AND HP BOILERS ON MANUAL AND CLOSE. OPEN BV'S BEFORE AND AFTER REGULATOR. BE SURE MANUAL BY-PASSES ARE CLOSED. 11. ESTABLISH LEVEL IN DA BY USING THE LEVEL CONTROL VALVE ON MANUAL. 12. IF START-UP OF UNIT IS IMMINENT* LINE UP CORTROL FEED AND START INJECTING CORTROL INTO THE DEAERATOR. 13. AFTER UNIT HAS COME UP TO 30#, CLOSE BACK ON 2" VENT. NOTE: 1. THE DEAERATOR PRESSURE AND LP BOILER DRUM PRESSURE MUST BE BE EQUAL. IT MAY BE NECESSARY TO PINCH BACK ON THE 2" DA VENT BEFORE PRESSURE REACHES 30 PSIG. 2. PUT DA LEVEL CONTROL VALVE ON AUTO AS SOON AS SOME FLOW IS ESTABLISHED THROUGH DEAERATOR. 3. PUT ALL ROTOR TEMPERATURE CONTROLLERS <3> ON AUTO AS SOON AS UNIT IS FIRED. SAFETY CONSIDERATIONS: HOT WATER IS THE CAUSE OF MANY ACCIDENTS. DOUBLE CHECK ALL VENTS AND DRAINS. REVISED: JML 07/02/91 BLOCK #39 DO A 1 3 4034 CONF TDFNT TAl HRU - 300/400 BOILER ENTRY NOTE: THE CONFINED SPACE CHECKLIST SUPPLEMENT AND SAFE WORK MULTI-PERMIT MUST BE COMPLETED. ~i. DRAIN THE BOILER. 2. CLOSE AND RED TAG HIGH, MEDIUM AND LOW PRESSURE BOILER NON-RETURN VALUES. 3. CLOSE AND RED TAG ALL BOILER LEAD LINE VALVES. ! 4. CLOSE AND RED TAG ALL BOILER LEAD LINE WARM-UP VALVES. I 5. OPEN ALL LEAD LINE DRAINS OR VENTS. 6. CLOSE AND RED TAG ALL FEEDWATER BLOCK AND BY-PASS VALVES. 7. CLOSE AND RED TAG ALL ECONOMIZER INLETS OR RACK OUT AND RED TAG ALL THE BOILER FEED PUMPS. B. BLOCK IN AND BLEED DOWN GAS LINE ACCORDING TO TURBINE-GENERATOR PROCEDURE #19. 9. CLOSE AND RED TAG CHEMICAL FEED LINE BLOCK VALVES. DOUBLE BLEED AND BLEED OR DISCONNECTED. | I 10. CLOSE AND RED TAG THE STEAM INJECTION BLOCK VALVES, SYN GAS BV'S, AND NITROGEN BV'S. .1. RUN A OXYGEN TEST AND AN EXPLOSIMETER TEST IMMEDIATELY PRIOR TO ENTERING THE BOILER. IF THE BOILER IS LEFT UNATTENDED DURING THE WORK PERIOD, THE VESSEL MUST BE RETESTED FOR EXPLOSIVE LIMITS AND OXYGEN. 12. BECAUSE OF THE SIZE, COMPLEXITY AND NATURAL DRAFT OF OUR BOILERS AN AIR MOVER IS USELESS AND NORMALLY NOT NEEDED. 13. ONLY LOW VOLTAGE OR GROUND FAULT PROTECTED LIGHTING EQUIPMENT SHALL BE USED INSIDE THE BOILER. TRANSFORMER MUST ALWAYS BE PLACED OUTSIDE THE BOILER. 14. A SAFETY OBSERVER, SUPPLIED BY THE CRAFT DOING THE WORK. WILL BE STATIONED AT THE MANWAY AT ALL TIMES WHILE ANY WORKER IS IN THE BOILER. THE OBSERVER SHALL HAVE A FIVE (5) MINUTE ESCAPE PACK WITH HIM AT ALL TIMES AND A FIVE MINUTE ESCAPE PACK FOR EACH PERSON IN THE BOILER. 15. A SAFE WORK PERMIT MUST BE ISSUED FOLLOWING ALL THE GUIDELINES SET OUT IN SL&P STANDARD S-302 (SECTION 5). 16. THE INDIVIDUAL CRAFTS WORKING IN THE BOILER MUST SIGN THE APPROPRIATE RED TAG MASTERS. 17. A PROCEDURE AND EQUIPMENT FOR RESCUE MUST BE ON THE JOB SITE BEFORE ENTERING THE BOILER. 18. A CRAFT SAFETY MEETING WILL BE HELD BEFORE THE JOB BEGINS TO FAMILIARIZE THE MEN WITH OUT BLOCK AND ANY SPECIAL PROCEDURES OR EQUIPMENT. ^ i 3403F f ONF T DFNTTA1 k tv i ttu: UnC 07/03/91 BLOCK #40 UPDATED: JML 12/29/93 C I t c ( v 00 A 134030 CONFTDFNT 1 Al V TEXT BLOCK # 41 SAFE WORK PROCEDURE BLEEDING THE CHEMICAL FEED PUMPS OF AIR c 1. BLEEDING THE P04 PUMPS. A. TURN PUMPS OFF - A OR B. B. CLOSE DISCHARGE VALVE. C. OPEN BLEED VALVE. D. TURN PUMP ON. E. ALLOW ALL AIR TO BLEED UNTIL A STEADY RHYTHM OF PG4/WATER IS FOUND. F. TURN PUMP OFF. G. CLOSE BLEED VALVE. H. OPEN DISCHARGE. I. RESTART PUMP. 2. BLEEDING THE S03 PUMPS. A. TURN PUMP OFF. B. CLOSE DISCHARGE VALVE. c C. REMOVE VALVE CAP. D. RESTART PUMP. E. ALLOW ALL AIR TO BLEED OUT UNTIL A STEADY PUMPING RHYTHM OF CHEMICAL IS FOUND. F. STOP PUMP. G. REPLACE VALVE CAP. H. OPEN DISCHARGE VALVE. I. RESTART PUMP. REVISED: UML 07/02/91 BLOCK #41 r 00 A 134037 CONFTDFNTTAl TEXT BLOCK # 121 BOILERS - 300/400 1. WHAT PRESSURE AND TEMPERATURE STEAM DOES EACH BOILER MAKE? 2. WHAT IS THE FLOW RATING OF EACH BOILER? 3. WHAT IS THE PURPOSE OF THE SUPERHEATER? 4. WHERE DOES THE HIGH PRESSURE STEAM GO? 5. WHERE DOES THE MEDIUM PRESSURE STEAM GO? 6. WHERE DOES THE LOW PRESSURE STEAM GO? 7. WHAT IS THE ECONOMIZER FOR? 8. HOW IS THE HP, MP, St LP STEAM SUPERHEATED? 9. HOW DO WE CONTROL THE HIGH PRESSURE SUPERHEATER OUTLET TEMP (HI >< LOW)? 10. WHAT IS THE PURPOSE OF THE FEEDWATER PREHEATER? 11. EXPLAIN THE CONTINUOUS BLOWDOWN. 12. HOW IS OUR MANUAL BLOWDOWN SYSTEM NORMALLY SET UP AND WHEN DO WE USE IT? 13. IN PREPARATION FOR STARTUP, HOW MUCH WATER LEVEL SHOULD BE ESTABLISHED IN THE BOILERS. 14. HOW MANY INDICATORS OF DRUM LEVEL DO WE HAVE ON EACH BOILER? 15. HOW ARE THESE LEVELS CONTROLLED DURING STARTUP? 16. HOW SHOULD THE VARIOUS VENTS AND DRAINS BE SET UP PRIOR TO STARTUP? 17. WHEN SHOULD THEY BE CLOSED? 18. HOW DO YOU WARM UP THE STEAM LINES FROM THE HEADER TO THE NON-RETURN? WHY DO WE WARM THEM UP? 19. OF THE SAFETY VALVES ASSOCIATED WITH EACH BOILER, WHEN ONE OPENS FIRST AND WHY? 20. HOW IS THE D. A. DUMP VALVE IMPORTANT DURING STARTUP? 21. HOW IS THE CONDENSATE RETURN HEADER RELATED TO THE GT ROTOR AIR COOLER? 22. IS IT POSSIBLE TO CLOSE THE D. A. LEVEL CONTROL VALVE TIGHT? WHAT IS THE REASON FOR THIS? 23. WHY IS M. P. FEEDWATER SUPPLY NEEDED TO THE L. P. BOILER DURING STARTUP? 24. EXPLAIN THE CONDENSATE AND FEEDWATER SYSTEMS FOR HP, MPi *t LP BOILERS. 25. TRACE OUT THE LP, MP, t HP STEAM SYSTEMS. 26. EXPLAIN WHERE ALL OF THE DRAIN LINES BELOW THE BOILERS COME FROM. ______________ rern euerro _ / Ann DO A 134038 OONFTDFNTTAL 25. TRACE OUT THE LP, HP, tt HP STEAM SYSTEMS. 26. EXPLAIN WHERE ALL OF THE DRAIN LINES BELOW THE BOILERS COME FROM. CHEMICAL FEED SYSTEM - 300/400 --------- ----------------- - -------1. DESCRIBE THE SULFITE FEED SYSTEM. 2. DESCRIBE THE PHOSPHATE FEED SYSTEM. 3. WHY SHOULD THE SULFITE TEST BE RUN FIRST? 4. WHAT EFFECTS IS ANY DOES HIGH SILICA HAVE ON THE BOILERS? 5. WHY DO WE KEEP THE REDUCING AGENTS FOR SILICA IN A DARK BOTTLE? 6. DURING WHAT TEST DO WE NEED TO WEAR MONOGOGGLES? 7. EXPLAIN WHAT TO DO WHEN THE P04 AND S04 PUMP STOPS PUMPING. 8. EXPLAIN HOW TO MEASURE THE FEED RATE FOR P04 AND S04 IN MILLILITERS PER MINUTE. 9. WHAT SHOULD THE MIXTURE OF THE CHEMICALS BE IN THE P04 AND S03 TANKS. (IN PERCENT). BOILER FEED PUMPS - 300/400 1. WHAT ARE THE NORMAL DISCHARGE PRESSURE OF THE BOILER FEED PUMPS? 2. WHAT SIZE IS THE BOILER FEED PUMP MOTORS? 3. WHERE DOES THE BOILER FEED PUMP TAKE SUCTION? 4. WHAT HAPPENS IS THE BOILER FEEDPUMP SUCTION PRESSURE FALLSBELOW A PRESET LEVEL? _ 5. WHAT IS THE NORMAL SOURCE OF LUBE OIL FOR THE BOILER FEED PUMPS? FOR THE MOTOR? 6. HOW IS THE LUBE OIL TEMPERATURE CONTROLLED ON THE BOILER FEED PUMP? 7. WHAT IS THE SOURCE OF WATER FOR THE SEALS? 8. EXPLAIN THE PROCEDURE FOR ISOLATING AND RED TAGGING A BOILER FEED PUMP AND MOTOR. WHAT IF THE MOTOR IS TO BE WORKED ON? 9. WHAT DO YOU CHECK PRIOR TO STARTING UP A BOILER FEED PUMP? 10. HOW IS THE BOILER FEED PUMP MOTORS COOLED? 11. WHAT IS THE PURPOSE OF THE RECIRCULATION LINE? 12. AT APPROXIMATELY WHAT PRESSURE WILL THE BOILER FEED PUMP TRIP ON THE LOW OIL PRESSURE? 13. WHAT IS THE PURPOSE OF THE WARM UP LINE? EXPLAIN HOW IT WORKS. nn a i 34039 CONF' T DF NT T A! TEXT BLOCK # 123 C 1- TURBINE - 300/400 DESCRIBE THE 300/400 TRAIN <WEST TO EAST). A. WHAT ARE THE MAIN DIFFERENCES BETWEEN 100/200 AND 300/400. 2. EXPLAIN THE LUBE OIL SYSTEM. (POINT OUT EACH COMPONENT IN THE LUBE OIL SYSTEM AND TELL WHAT IT DOES AND WHY ITS THERE. ) A. WHAT IS NORMAL HIGH PRESSURE OIL PRESSURE? B. WHAT IS HIGH PRESSURE OIL AND WHERE DOES IT COME FROM? C. WHAT IS NORMAL BEARING OIL PRESSURE? D. WHAT IS THE DIFFERENCE IN HIGH PRESSURE OIL ANDBEARING OIL? E. WHAT IS NORMAL LUBE OIL RES. VACUUM? F. WHAT IS CONSIDERED A HIGH DIFFERENTIAL PRESSURE ACROSS THE LUBE OIL OIL FILTERS? G. WHAT ARE THE THREE USES OF LUBE OIL BESIDE BEARING LUBRICATION? H. HOW MANY OIL COOLERS ARE THERE? HOW MANY ARE NORMALLY IN SERVICE? HOW CAN YOU TELL WHICH IS IN SERVICE? ( I. CAN THE LUBE OIL COOLERS BE SWITCHED WITH MACHINE IN SERVICE? IF ^ SO, HOW? J. CAN THE LUBE OIL FILTERS BE SWITCHED WITH MACHINE IN SERVICE? IF SO, HOW? K. WHAT IS THE CORRECT PROCEDURE FOR SWITCHING LUBE OIL PUMPS? L. HOW DOES THE OIL RESERVOIR WATER DETECTOR WORK? WHAT IS THE INDICATION FOR WATER IN THE RESERVOIR? M. WHAT IS THE SOURCE OF TORQUE CONVERTER OIL? WHAT IS THE PRESSURE OF THIS OIL? N. HOW MANY VAPOR EXTRACTORS ARE THERE? WHERE ARE THEY CONNECTED? O. IF THE MAIN VAPOR EXTRACTOR FAILS AND THE STANDBY CANNOT MAINTAIN RESERVOIR VACUUM, WHAT COULD BE THE PROBLEM? P. WHAT STARTS THE D. C. EMERGENCY LUBE OIL PUMP? HOW LONG WILL THE MACHINE RUN WITH THE D, C. PUMP AS THE ONLY SOURCE OF OIL SUPPLY? 3. EXPLAIN THE SEAL OIL SYSTEM. (POINT OUT EACH COMPONENT IN THE SEAL OIL SYSTEM AND TELL WHAT IT DOES AND WHY IT'S THERE. ) q A. WHAT IS NORMAL SEAL OIL SUPPLY PRESSURE? B. WHAT IS NORMAL SEAL OIL DIFFERENTIAL PRESSURE? C. WHAT IS NORMAL SEAL RESERVOIR VACUUM? D. WHAT ARE THE THREE SEAL OIL SUPPLY SOURCES? f umat tp thf unoMAi <snuprr nr gcat nn > 00 A 1^4040 CONFTDFNTTAl F. WHAT COULD YOU DO TO CORRECT LOW SEAL OIL DIFFERENTIAL PRESSURE? G. HOW COULD YOU MANUALLY START THE STANDBY SEAL OIL PUMP? IS IT A.C. OR D. C. ? WHERE DOES THE STANDBY PUMP GET ITS SUCTION? H. AT WHAT PRESSURE DOES THE MACHINE TRIP ON LOW SEAL OIL DIFFERENTIAL PRESSURE? I. WHAT IS THE NORMAL RANGE OF SEAL OIL TEMPERATURE? J. UNDER WHAT CONDITIONS WOULD THE SEAL OIL SUPPLY NOT BE COOLED OIL? K. WHERE ARE THE DEFOAM TANKS AND HOW MANY ARE THERE? L. HOW IS OIL LEVEL MAINTAINED IN THE DEFOAMING TANKS? ^ M. WHERE CAN YOU CHECK DEFOAM TANK LEVEL? N. WHAT COULD BE THE RESULT OF AN EXTRA HIGH LEVEL IN THE DEFOAM TANK? 0. WHAT CONTROLS THE LEVEL IN THE SEAL OIL DRAIN TANK (LOOP SEAL TANK)' P. WHAT COULD BE THE RESULT IF THE SEAL OIL DRAIN REGULATOR MALFUNCTIOh AND ALLOWED MORE OIL TO FLOW OUT OF THE LOOP SEAL TANK THAN IS FLOWING IN? G. HOW CAN THE LEVEL IN THE LOOP SEAL TANK BE CONTROLLED MANUALLY? 4. EXPLAIN THE H2 CODLING SYSTEM ON THE GENERATOR A. SHOW HOW TO PUT H2 IN THE GENERATOR. B. SHOW HOW TO PURGE THE GENERATOR WITH C02 AND THEN AIR AND BACK THE OTHER WAY. C. WHY IS THE C02 MANIFOLD AT THE BOTTOM OF THE GENERATOR AND THE H2 MANIFOLD AT THE TOP? D. HOW DOES THE PURITY METER BLOWER WORK AND HOW SHOULD IT BE VALVE UP FOR H2 OR CDS. E. WHFRE COULD LIQUID COME FROM IN THE GENERATOR? F. HOW DO YOU TEST THE LIQUID DETECTOR? G. HOW DO YOU DRAIN LIQUID OUT OF THE LIQUID DETECTOR AND/OR GENERATOR' H. WHY SHOULD THE GAS CHANGE SELECTOR SWITCH BE IN THE GAS CHANGE POSITION WHEN ADDING HYDROGEN TO THE GENERATOR? 5. EXPLAIN THE FUEL GAS SYSTEM TO THE GT-300/400. A. WHAT IS NORMAL FUEL GAS PRESSURE? B. IF THE TURBINE TRIPS IS THERE STILL FUEL GAS INSIDE THE TURBINE ENCLOSURE. 6. EXPLAIN THE STEAM INJECTION SYSTEM. A. WHERE DOES THE STEAM COME FROM? B. WHAT IS THE NORMAL PRESSURE AND TEMPERATURE? HO a T34041 CONF TOFNT T Af C. WHAT CAN THE PRESSURE GO TO AND HOW DOES THIS HAPPEN? D. HOW DO YOU WARM UP THE STEAM INJECTION LINE BEFORE PUTTING IN SERVICE? E. WHY DOES STEAM BLOW OUT OF THE DITCH BEFORE THE STEAM INJECTION GOES ON? 7. WHAT DOES IGV STAND FOR? A. WHERE ARE THE IGV'S LOCATED? B. SHOW HOW TO TELL WHAT POSITION THE IGV'S ARE IN BY LOOKING AT THE POSITION INDICATOR. C. WHAT DO THE IGV'S DO? D. HOW DO THEY WORK? 8. WHERE IS THE ELECTRICAL PACKAGE? A. POINT OUT THE STARTERS FOR THE FOLLOWING PUMPS. 1. LUBE OIL PUMP #1. 2. LUBE OIL PUMP #2. 3. EMERGENCY LUBE OIL PUMP. 4. EMERGENCY SEAL OIL PUMP. 5. LUBE OIL EVACTORS. 6. SEAL OIL EVACTORS. 7. BOTH BFP AUX. LUBE OIL PUMPS. B. SHOW HOW TO SWAP LUBE OIL PUMPS. C. SHOW HOW TO TEST THE FIELD GROUND DETECTOR. D. WHAT VOLTAGE STARTERS ARE LOCATED IN THE ELECTRICAL PACKAGE (A. C. OR D. C. )? E. SHOW HOW TO DE-ENERGIZE ALL THE POWER TO THE ELECTRICAL PACKAGE (480 VOLT A. C. , 125 VOLT D. C. ). 9. WHAT IS SNUFFING STEAM USED FOR? A. WHERE DOES SNUFFING STEAM COME FROM? B. WHERE IS THE SNUFFING STEAM CONTROL VALVE? C. WHAT OPENS THE SNUFFING STEAM CONTROL VALVE? D. HOW DO YOU RESET THE VALVE? E. WHY IS IT IMPORTANT THAT THE STEAM TRAP, BELOW THE SNUFFING STEAM CONTROL VALVE, IS IN GOOD WORKING CONDITION? 10. WHAT THREE AREAS ARE HALOGEN FIRE EXT. SYSTEM LOCATED? A. WHAT IS THE PRIMARY FIRE PROTECTION SYSTEM ON GT 300/400? B. HOW DO HALOGEN SYSTEMS WORK? C C. WHERE IS THE MAIN CONTROL PANEL FOR THE TURBINE FIRE SYSTEM LOCATED? D. HOW DO YOU MANUALLY DISCHARGE THE HALON SYSTEM? DO A 10404? E. SHOW HOW TO RESET THE HORN AND FLASHING LIGHTS. C.ONF 1 0FN1 T Al E. WHAT SHPUI D YOU DO IF THE HALOGEN SYSTEM GOES OFF WHILE YOU ARE: 1. INSIDE THE BUILDING. 2. OUTSIDE THE BUILDING. 11. WHAT AREA DOES THE FOAM FIRE FIGHTING SYSTEM AFFECT? A. WHERE DOES THE FOAM GO? B. WHERE DOES THE FOAM COME FROM? C. HOW DO YOU TURN THE FOAM SYSTEM ON? D. IF THE SWITCH DID NOT WORK, HOW COULD YOU MANUALLY GET THE FOAM SYSTEM ON? E. WHEN SHOULD YOU TURN THE FOAM SYSTEM ON? F. HOW DO YOU TURN THE SPRINKLER SYSTEM ON TO THE MECHANICAL PACKAGE? G. WHEN SHOULD YOU TURN THE SPRINKLER SYSTEM ON? 12. WHERE IS THE ROTOR AIR COOLER LOCATED? A. WHAT IS THE ROTOR AIR COOLER USED FOR? B. HOW DOES IT WORK? C. WHY IS THERE A VENT VALVE ON THE BOTTOM OF THE ROTOR AIR COOLER? D. WHEN DOES IT OPEN AND CLOSE? E. WHY ARE THERE BLOCK VALVES AND A BYPASS VALVE IN THE WATER LINES TO THE ROTOR AIR COOLER? 13. DESCRIBE THE AIR INLET SYSTEM. A. HOW DOES THE WATER HELP THE TURBINE? B. HOW IS THE BASIN LEVEL CONTROL? C. WHY DO WE BLOW DOWN WATER FROM THE COOLERS AND WHERE DOES IT GO? REVISED:NLC 9/11/90 BLOCK #123 ( A 134043 N/'TDFNT TEXT BLOCK # 232 REBUILDING GAUGE GLASSES - UNITS 300 AND 400 GENERAL THE GAUGE GLASSES REQUIRE MINIMUM CARE FOR LONG PERIODS OF SERVICE. MAINTENANCE IS USUALLY CONFINED TO THE REPLACEMENT OF GASKETS AND MICA. THE GAUGE HAS BEEN DESIGNED TO PERMIT REBUILDING OF INDIVIDUAL PORTS. IT IS NOT NECESSARY TO REMOVE THE GAUGE FROM ITS MOUNTING FOR NORMAL PORT MAINTENANCE. (WARNING: THE DRAIN VALVE MUST ALWAYS REMAIN OPEN WHILE REPAIRING THE GAUGE OR WHILE IT IS OUT OF SERVICE FOR ANY REASON). PORT REBUILDING 1. WITH THE GAUGE OUT OF SERVICE AND DEPRESSURIZED, REMOVE THE COVER PLATE, CUSHION GASKET, STRIP PACKING, GLASS, MICA, PROTECTIVE GASKET, SEALING GASKET. 2. CLEAN THE GASKET SEATING SURFACE THOROUGHLY WITH A BRASS WIRE BRUSH. (CAUTION: DO NOT USE ANY HARD EDGE SCRAPERS AS THEY MAY DAMAGE SEATING SURFACE). 3. HANDLE MICA AND GLASS WITH CLEAN HANDS TO LENGTHEN THE LIFE OF THESE PARTS AND PROMOTE GOOD VISIBILITY. ALSO KEEP THE MICA AND GLASS FREE FROM MOISTURE OR FINGERPRINTS. (CAUTION: USE ONLY COMMERCIAL GLASS CLEANERS OR HOUSEHOLD DETERGENTS ON GLASS SURFACE; DO NOT USE ABRASIVE CLEANERS). 4. REPLACE ALL PARTS IN THE FOLLOWING SEQUENCE: SEALING GASKET, PROTEC TIVE GASKET, MICA, GLA5S AND STRIP PACKING, CUSHION GASKET AND COVER PLATE. (NOTE: IT IS VERY IMPORTANT THAT THE THREADS AND WASHER FACES OF THE HEADS OF ALL CAP SCREWS BE LIBERALLY LUBRICATED WITH MOLYKOTE TYPE "G" ). COVER PLATE CAP SCREW TIGHTENING PROCEDURE (WARNING: GAUGE MUST FIRST BE TAKEN OUT OF SERVICE AND DEPRESSURIZED). 1. THREAD THE CAP SCREWS INTO PLACE "FINGER TIGHT". APPLY 20 INCH-POUNDS OF TORQUE AT A TIME FOLLOWING A CRISS-CROSS SEQUENCE UNTIL EACH CAP SCREW HAS BEEN TIGHTENED TO A FINAL TORQUE OF ISO INCH-POUNDS FOR LOW MEDIUM PRESSURE GAUGES AND 360 INCH-POUNDS FOR HIGH PRESSURE GAUGES. CHECK THE FINAL TORQUE TO ENSURE AN EVEN TIGHTENING OF EACH PORT. 2. PUT GAUGE GLASS IN SERVICE USING SAFE WORK PROCEDURE - PLACING GAUGE GLASS IN SERVICE - UNITS 300 AND 400. REVISED:NLC 9/12/90 BLOCK #232 DO A 134044 f'ONF' T Df:' NT T A1 V TEXT BLOCK # 233 PLACING GAUGE GLASS IN SERVICE C (WARNING: WHEN PLACING A GAUGE INTO SERVICE, DO NOT STAND IN FRONT OF AND IN A DIRECT LINE OF SIGHT WITH THE GAUGE). NOTE: WHEN PLACING A GAUGE INTO SERVICE ON AN OPERATING BOILER, PRE CAUTIONS MUST BE TAKEN TO AVOID EXCESSIVE THERMAL SHOCK). 1. BEGINNING WITH ALL VALVES CLOSED, OPEN THE DRAIN VALVE AND CRACK CRACK OPEN THE STEAM VALVE SLIGHTLY TO ALLOW THE CONDENSATE TO FLOW THROUGH THE GAUGE FOR 15 MINUTES. 2. CLOSE THE DRAIN VALVE TO ALLOW THE GAUGE TO FILL UP WITH CONDENSATE. 3. CRACK OPEN THE WATER VALVE AND GRADUALLY AND ALTERNATELY CONTINUE TO OPEN THE STEAM AND WATER VALVES UNTIL FULLY OPEN. THE GAUGE IS NOW IN SERVICE. 4. IF THE GAUGE IS NEW OR HAS BEEN REPAIRED PRIOR TO PLACING IT IN SERVICE, IT WILL BE NECESSARY TO RE-TIGHTEN THE COVER PLATE CAP SCREWS AFTER THE GAUGE HAS BEEN IN SERVICE FOR 3 AND 24 HOURS. ON A REPAIRED GAUGE, ONLY THE REPAIRED PORTS NEED TO BE RE TIGHTENED. IT IS NECESSARY TO TAKE THE GAUGE OUT OF SERVICE AND DEPRESSURIZE IT FIRST. REFER TO THE SAFE WORK PROCEDURE ENTITLED "REBUILDING GAUGE GLASSES - UNITS 300 AND 400" FOR COVER PLATE TIGHTENING. ( (CAU1I0N: DO NOT USE VALVE WRENCHES OR OTHER LEVERAGE DEVICES TO V OPEN AND CLOSE VALVES. IF VALVES DO NOT SHUT STEAM TIGHT WITH STANDARD HAND WHEELS OR CHAIN WHEELS, IT IS AN INDICATION THAT THE SEATS ARE STEAM CUT OR DAMAGED AND THEY SHOULD BE RE-LAPPED OR REPLACED). REVISED: NLC 9/12/90 BLOCK #233 ( I Of) A 1A404S r ONF' T OF NT TA1 TEST IM- C;: ;: !.y * TO'.; OF ALL. NOV ' ON wru oco/'400 FEEDWATER SYSTEM TEST lEC FN PRESSURE DF UN: 1 SLCi-.L Y ecEN PY-PASS i'lOV UNTIL FEEDWATER REG. IS SHUT. 2 ClI'CE :F! EDWATf.F SKITOIF NOV. OBSERVE FECDWP TER FLOW. N,'.t r A L, i_EA!<,-Tr:KO,;C ii VALVE 3 IF Rlo . DROP'S, mD-jUS i BY -Pi.EL, i-H'TY 4. place: i pednatlp regulator on manual and ofen REGULATOR 100*/. than EAO Id o'/.. HAVE AUXILIARY OPERATOR OBSERVE OPERATION OP VALVE. 4. RAISE Oi< LOWER FEEDWATER FLOW TO CHECK HIGH AND LOW LEVEL ALARMS. 5. Ty -E'lUEM TO NORMAL Or'flRATION, INSURE CONTROL VALVE IS CLOSED AND OPEN SMJT-o: ; NOV. WATCH PREPEATFR FLOW. ts. cw:s EHVv-OrT if. ofen, start CLOSING EY-PASS NOV AND CONTROL valve should FTATT OPEN INC. ,-,.y rrrr;:. " - 0::'.r."'"-'E i'll QnERA!ION VALVES LOCALLY. TO TEST HED3UM {_.E`Y'E:_ = USA, ToE AUOvE PROSEDVF E WITH THE NEDIUH FRESOORE 00 A 1 A 4 0 4 N. OONF TOFNTTAI V WARMING UP STEAM LEAD LINES - UNITS 100/200 DURING SHUTDOWNS. WHEN WATER/STEAM SIDE WORK IS SCHEDULED ON THE HRU. IT IS NECESSARY THAT THE STEAM LINES BE ISOLATED, BLED DOWN, AND RED-TAGGED. BEFORE RE-STARTING A UNIT. IT IS THEN NECESSARY TO WARM-UP AND PRESSURE UP THESE LINES UP TO THE BOILER NON-RETURNS. i PROCEED AS FOLLOWS: ' 1. INSURE THAT THE NON-RETURN VALVES (H. P. , M. P. # AND L. P. ) ARE STILL CLOSED. 2. OPEN LEAD LINE VENTS TO ATMOSPHERE FROM EACH OF THE THREE L^INES. 3. OPEN DRAIN ON 235# LINE AT NON-RETURN. 4. INSURE BOTTOM DRAIN ON THE M. P. LINE HAS BEEN CRACKED AND LINE IS FREE OF CONDENSATE. 5. OPEN BOTTOM DRAINS ON L. P. LINE AND BEFORE DA PRESSURE CONTROLLER. 6. CRACK OPEN WARM-UP VALVE AROUND 235# HEADER BLOCK VALVE, ADMITTING STEAM INTO THE LEAD LINE. 7. CRACK OPEN WARM-UP VALVE AROUND M. P. BLOCK VALVE, ADMITTING 30# STEAM INTO LEAD LINE. 8. CRACK OPEN WARM UP VALVE AROUND LP LEAD LINE. i ! 9. OBSERVE ALL VENTS AND DRAINS AND GRADUALLY BEGIN CLOSING VALVES AS LINES HEAT UP AND STEAM DISCHARGE BECOMES DRIER. AT THE SAME TIME, GRADUALLY OPEN UP MORE ON WARM-UP VALVES, ADMITTING MORE STEAM. 10. AS PRESSURE INCREASES, THROTTLE VENTS TO MINIMIZE NOISE. 11. ALLOW PRESSURE TO BUILD UP IN EACH LINE, THROTTLING VENTS AND DRAINS AS NECESSARY. ALLOW PRESSURES TO EQUALIZE WITH THAT ON THE HEADERS. 12. OPEN BLOCK VALVES AND CLOSE WARM-UP VALVES ONLY AFTER VENT/DRAINS ARE BLOWING DRY STEAM. NOTE THAT THE BY-PASS AROUND THE 15/30# CHECK VALVE MUST BE LEFT OPEN TO MAINTAIN FLOW THROUGH THE L. P. LEAD LINE. 13. PLACE AVAILABLE STEAM TRAPS IN SERVICE. 14. OPEN NON-RETURN VALVES BEFORE STARTING UP QT. SAFETY CONSIDERATIONS: 1. INSURE THAT RED TAGS HAVE BEEN PROPERLY RELEASED AND CLEARED. 2. WEAR HEARING PROTECTION. 3. WEAR GLOVES TO PREVENT BURNS. 4. PROCEED SLOWLY WITH COLD LINES. AVOID CREATING WATER HAMMER. REVISED: JML 03/10/92 BLOCK #254 DO A 1 'i 4 04 7 f.ONF T r>FNl T Ai V TEXT BLOCK # 281 DEAERATOR ENTRY SUPPLEMENT-UNITS 300/400 COMPLETION OF THIS SUPPLEMENT OCVERS ITEMS PECULIAR TO THIS EQUIPMENT AND NOT NECESSARILY INCLUDED IN THE MULTI-PERMIT. IN ADDITION TO AND AS ATTACHMENT TO THIS CHECKLIST, THE STANDARD VESSEL ENTRY PERMIT MUT BE ISSUED WITH AREAS NOTED THAT DO NOT APPLY. 1. CLOSE MAIN CONDENSATE BLOCK VALVE TO THE UNIT. RED TAG THIS VALVE. 2. CLOSE UPSTREAM BV AT DA AT LEVEL CONTROL VALVE. INSURE BY-PASS BV IS CLOSED. RED TAQ ALL THREE VALVES. 3. CLOSE CONDENSATE RETURN TO POWER I BV AND OPEN BV TO DITCH. RED TAQ VALVES. 4. CLOSE AND RED TAG BFP'S RECIRCULATION VALVES. 5. CLOSE BFP A & B SUCTION VALVES AND DIS CHARGE VALVES AND RED TAG. 6. OPEN AND TAG BFP A & B DRAINS. 7. OPEN DRAINS ON CONDENSATE HEADER AND DA FILL LINE. 8. RED TAG CORTROL PUMP BREAKER AND LOCAL SWITCHES. DISCONNECT TUBING TO DRAIN. 9. CLOSE DA STEAM PRESSURE REGULATOR BLOCK VALVE AND BY-PASS BLOCK VALVE AROUND THE REGULATOR. 10. CLOSE DA STEAM BV AND UP STREAM WARM UP BV. OPEN DOWN STREAM WARMUP AND BLEED. RED TAG THOSE VALVES. 11. OPEN DA BOTTOM DRAIN AND BY-PASS AROUND DA DUMP CONTROL VALVE. 12. REMOVE MANWAY COVER FROM NORTHSIDE OF DA STORAGE TANK. ALSO REMOVE DOME COVER. 13. PLACE AN AIR MOVER ON THE DOME OPENING TO MOVE AIR THROUGH THE STORAGE TANK. DA TANK TEMPERATURE MUST NOT EXCEED 120 DEGREES WHEN BEING ENTERED. 14. BEFORE ENTRY: A) SIGN RED TAG MASTERS, B) OBTAIN VESSEL ENTRY PERMIT, C) REFER TO S & LP STANDARD S-302 15. SAFETY OBSERVER WILL HAVE FIVE (5) MINUTE ESCAPE PACKS FOR EACH PERSON INSIDE THE VESSEL AND ONE FOR HIM/HER SELF. 16. THE SAFETY OBSERVER IS A CERTIFIED HOLE WATCH 17. THE SAFETY OBSERVER HAS A HOLE WATCH CARD. YES NO C EXCEPTIONS TO STANDARD: r ONF ?nr 1. VALVES. INSTRUMENTS. AND INSTRUMENT LINES NOT DISCONNECTED. (ID) 2. USE OF FIVE <5) MINUTE ESCAPE PACKS RATHER THAN AIR LINE EQUIP. <4A) 3. LIFE LINE, HARNESS, ETC. NOT USED. <4B) OPERATIONS REP: MAINTENANCE REP: REVISED: JML 07/03/91 BLOCK #281 c-ONf-- TOFNT TA1 HRU-300 DEAERATOR & STORAGE VESSEL ENTRY PROCEDURE 1. (j 2. CLOSE AND RED TAG STEAM BLOCK VALVE UPSTREAM OF DEAERATOR STEAM PRESSURE CONTROL REGULATOR. RED TAG CONTROLLER IN CONTROL ROOM. CLOSE AND RED TAG D. A. STEAM DV AND UPSTREAM WARM UP BV. OPEN DOWN STREAM WARM UP AND BLEED. TAG BLFED OPEN. 3. CLOSE CONDENSATE BLOCK VALVE UPSTREAM OF D. A. LEVEL CONTROLLER. ALSO CLOSE BY-PASS BLOCK VALVE. RED TAG BOTH OF THESE VALVES. OPEN DRAIN DOWNSTREAM OF THESE VALVES TO BLEED DOWN CONDENSATE HEADER. 4. CLOSE MAIN CONDENSATE BV TO THE UNIT AND RED TAG. 5. RED TAG CORTROL CHEMICAL RUHR ELECTRICAL CORD, BULK TANK BLOCK VALVE. AND BLOCK VALVE AT D. A. DISCONNECT TUBING AT BULK TANK TO SERVE AS A BLEED. 6 COP IRC if AND SULFITE LINE DOUBLE BLOCKED, BLED AND TAGGED. MEDIUM PRESSURE ECONOMIZER TO DA LINE DOUBLE BLOCKED, BLED AND TAGGED. S. 0~EN AND RED TAG D. A. STGRAGE TANK BOTTOM DRAIN AND THE BY-PASS AROUKP D A. DUMP CONTROLLER. THIS WILL COMPLETELY DRAIN THE D.A. STOP AC-.": TANK. RED TAG BOILER FEED PUMPS ELECTRICALLY. 9 CLOSI SUCTION BLK VALVES AND RECIRCULATION VALVES ON BOILER FEED PUMPS (A l- )i) AND RED TAG OPEN DRAIN VALVES ON PUMPS. 1C FEMOVi MANHOLE COVER PROM NORTH SIDE OP STORAGE TANK. 11 REMOVE- MANHOLE COVER PROM NORTH SIDE OF DEAERATOR VESSEL. 12. Fi_ACF AN AIR MOVER ON THE DA MANHOLE COVER TO MOVE AIR THROUGH THE STORAGE TANK AND VENTILATE. 13. EE^CRf ENTRY, CHECK THE FOLLOWING: A. SIGN !<[ D TAG MASTERS R. DETAIN VESSEL ENTRY PERMIT G. REFER TO S fc LP STANDARD S-30P REVISED: JMi 02/1S/93 BLOCK #357 UPDATED JMi f 08/30/93 V no A I 340 00 ( ONF TOP NT T At TEXT BLOCK # 363 WASTE OIL PROCEDURE 1. OIL PADS/ BOOMS/ OIL SORB/ OR LIQUID OIL MUST BE PACKAGED IN 30 GALLON BLACK PLASTIC CONTAINER. WEIGHT LIMIT SHOULD NOT EXCEED 200 POUNDS. UNLESS OTHERWISE SPECIFIED. 2. EACH PACK SHOULD BE LABELED ON SIDE ONLY AS FOLLOWS: CONTENTS (OR PADS. TYPE 1082 POWER II DATE BOOMS. OIL SORB. OR LIQUID OIL) 3. ALL CONTAINERS ARE TO BE PLACED ON GOOD. USABLE PALLETS WITH NO MORE THAN FOUR (4) CONTAINERS. AND SEVERAL ROUNDS OF DUCT TAPE OR FIBERGLASS TAPE TO HOLD THEM IN PLACE. DO NOT DOUBLE STACK. 4. ALL CONTAINERS ARE TO BE IN GOOD CONDITION. AND HAVE LIDS AND RINGS ON THEM. THE LIDS ARE TO BE IN PLACE AND THE RINGS FASTENED IN SUCH A MANNER AS TO PREVENT THEM FROM POPPING UP WHILE BEING TRANSPORTED. 5. FOR PICKUP. CALL THE WASTE DISPATCHER AT EXT. I860. RADIO 209. c REVISED:NLC 9/12/90 BLOCK #363 r DO A 1340S1 CONS TDFNT T A1 TEXT BLOCK # 364 OIL TESTING PROCEDURE 1. PLACE CLEAN OIL CATCH PAN OR BUCKET BENEATH THE BEARING HOUSING DRAIN POINT. CAUTION SHOULD BE TAKEN TO PREVENT OVERFLOWING THE PAN OR BUCKET. 2. WHILE THE OIL IS DRAINING AND AFTERWARDS, CEHCK THE BOTTOM OF THE DRAIN PAN FOR ANY SOLID PARTICLES AND IDENTIFY THEM IF POSSIBLE. IF METAL FRAGMENTS ARE FOUND, SOME DAMAGE TO THE BEARINGS HAS ALREADY OCCURRED, THEREFORE, AN MMR SHOULD BE SUBMITTED TO REBUILD THIS EQUIPMENT. IF OPERATIONS PERMITS, THIS EQUIPMENT SHOULD REMAIN RED TAGGED. 3. CHECK THE OIL FOR DISCOLORATION. THIS CAN BE DONE EASILY BY COMPARISON WITH SOME FRESH OIL OF THE SAME TYPE. 4. CHECK THE OIL FOR WATER CONTENT. WATER IS HEAVIER, SO IT SHOULD SEPARATE AND SETTLE TO THE BOTTOM. 5. MAINTENANCE SUPERVISOR SHOULD BE NOTIFIED IF PROBLEMS ARE FOUND. REVISED:NLC 9/12/90 BLOCK #364 DU A ! A4OF.A C.ONF TDFNTT Al TEXT BLOCK # 365 BEARING HOUSING FLUSHING PROCEDURE 1. ALWAYS USE OIL OF THE SAME TYPE THAT WILL REMAIN IN THE BEARING HOUSING FOR LUBRICATION. I 2. USING A CLEAN FUNNEL, POUR THE FRESH OIL INTO THE BEARING HOUSING THROUGH THE OIL FILLING HOLE AND COLLECT THE FLUSHED OIL AT THE LOW POINT DRAIN WITH THE OIL CATCH PAN OR BUCKET. FLUSH UNT|L CLEAN. | 3. A VARSOL OR KEROSENE FLUSH IS REQUIRED BEFORE THE FRESH OIL , FLUSH IF THE FOLLOWING CONDITIONS EXISTED WHEN THE OIL WAS TESTED. A. WATER IN THE OIL B. ANY SOLID PARTICLES IN THE OIL C. ANY DISCOLORATION OF THE OIL 4. IT MAY BE NECESSARY TO INSERT THE SPRAY NOZZLE FROM THE SPRAYER INTO THE OIL FILL HOLE AND SPRAY AT SEVERAL DIFFERENT ANGLES INSIDE THE BEARING HOUSING IN ORDER TO CLEAN IT SUFFICIENTLY. REVISED:NLC 9/12/90 BLOCK #365 00 A ^ 3 4 0 0 CO Nl'- 1 OF Ml1 ^ V TEXT BLOCK 366 DIVERTING PLANT AIR TO ONE SET OF DRYERS IN THE EVENT OF MALFUNCTION OF EITHER THE 900 OR THE 1000 AIR DRYERS, IT IS POSSIBLE FOR THAT SET TO BE ISOLATED AND PLANT AIR DIVERTED FROM THE PROBLEM AREA TO THE OTHER SET OF DRYERS. THE ISOLATION OF ONE SET OF DRYERS WILL HAVE NO AFFECT ON THE SERVICE AIR SYSTEMS. BOTH THE 900 AND THE 1000 AREAS WILL CONTINUE TO BE SUPPLIED, AS USUAL, FROM A COMMON, INTERCONNECTED SYSTEM. TO SUPPLY PLANT AIR TO ONE SET OF DRYERS WHILE ISOLATING THE OTHER, PROCEED AS FOLLOWS: 1. OPEN BY-PASS VALVE AROUND THE INSTRUMENT AIR CONTROL STATION CONNECTING THE 900 SYSTEM TO THE 1000 SYSTEM (IF IT IS NOT ALREADY OPEN). 2. INSURE VALVE, IN THE PLANT AIR SYSTEM WHICH CONNECTS THE 900 TO THE 1000 AREA, IS OPENED (VALVE LOCATED OVERHEAD IN THE PIPERACK EAST OF THE 1000 STAND-BY AIR COMPRESSOR). 3. OPEN THE 900/1000 PLANT AIR TIE BLOCK VALVE AT 900 SYSTEM, LOCATED EAST OF COOLER (LABELED "PLANT AIR TO/FROM 1000 SYSTEM"). 4. IT SHOULD NOT BE NECESSARY TO BLOCK IN ANY OF THE PLANT AIR SUPPLY LINES FROM THE INDIVIDUAL GT'S. CHECK-VALVES INSTALLED IN EACH OF THESE LINES SHOULD OFFER SUFFICIENT PROTECTION, UNLESS A UNIT IS SHUTDOWN FOR MAINTENANCE AND ANY AIR LEAKAGE BACK INTO IT WOULD CAUSE A PROBLEM. 5. ISOLATE THE MALFUNCTIONING SET OF DRYERS. REVISED:NLC 9/12/90 BLOCK #3661 c 1 -440c-4 no a C.ONF T OFNT T Al TEXT BLOCK # 367 CHANGING QR REMOVING AIR DRYERS 900 SAFETY VALVES NOTE: WHEN REMOVING SAFETY VALVES FROM THESE AIR DRYERS, IT IS IMPORTANT THAT THE UNIT BEING WORKED ON BE KEPT OUT OF SERVICE A MINIMUM OF TIME. SO IT IS NECESSARY THAT ALL TOOLS AND REPLACEMENT PARTS BE ON HAND NEAR THE JOB BEFORE STARTING. SAFETY NOTE: EACH DRYER IS EQUIPPED WITH TWO SAFETY VALVES. REMOVE ONLY ONE VALVE FROM EACH LEAVING ONE TO PROTECT THE EQUIPMENT WHILE MAINTENANCE IS BEING CARRIED OUT ON THE OTHER. 1. OPEN FRONT PANEL DIRECTLY AFTER DRYER SWITCH. TURN OFF POWER TO THE TIMER. THIS WILL PREVENT ANY FURTHER SWITCHING OF THE DRYERS. RED TAG THIS SWITCH. 3. CLOSE PURGE AIR BLOCK VALVE. ALLOW PRESSURE TO COMPLETELY BLEED OFF DRYER THAT IS IN THE REGENERATION CYCLE. RED TAG THIS VALVE. 3. USING THE PROPER TOOLS, REMOVE STACK FROM THE SAFETY VALVE <THE ONE ON THE REGENERATING DRYER). 4. CAREFULLY REMOVE THE SCREWS FROM THE SAFETY VALVE. BE ALERT, THERE MAY BE A LITTLE PRESSURE REMAINING IN THE DRYER. 5. REMOVE THE SAFETY VALVE FROM THE TOP OF THE DRYER. 6. USING A NEW GASKET AND THE PROPER BLIND, CLOSE OFF THE HOLE PREVIOUSLY COVERED BY THE SAFETY VALVE. TIGHTEN SCREWS SUFFICIENT TO PREVENT AIR LEAKAGE. 7. TURN POWER BACK ON TO THE TIMER AND RE-ADJUST PURGE AIR TO 52#. REMOVE RED TAGS. S. REPEAT PROCEDURE STEPS 1 TO 7 ON THE OPPOSITE DRYER. 9. WHEN DRYERS ARE AT FULL LOAD, CHECK THE BLINDS OR SAFETY VALVES FOR LEAKS. 10. PICK UP TOOLS AND EQUIPMENT. DISPOSE OF ANY TRASH. NOTE: USE THIS PROCEDURE ALSO WHEN REMOVING BLINDS AND PUTTING SAFETY VALVES ON. RED TAG LOCATIONS: <1). DRYER TIMER SWITCH (2). PURGE AIR BLOCK VALVE REVISED:NLC 9/12/90 BLOCK #367 00 A 134OSS CONF TDFNTTAl TEXT BLOCK # 368 CHANGING OR REMOVING AIR DRYER 1000 SAFETY VALVES NOTE: WHEN REMOVING SAFETY VALVES FROM THESE AIR DRYERS, IT IS IMPORTANT THAT THE UNIT BEING WORKED ON BE KEPT OUT OF SERVICE A MINIMUM OF TIME. SO IT IS NECESSARY THT ALL TOOLS AND REPLACEMENT PARTS BE ON HAND NEAR THE JOB BEFORE STARTING. 1. AS SOON AS DRYERS SWITCH, TURN OFF POWER TO THE TIMER. THIS WILL PREVENT ANY FURTHER SWITCHING OF DRYERS. RED TAG THIS SWITCH. 2. TURN THE PURGE AIR OFF TO THE DRYER IN THE REGENERATION CYCLE. THIS REQUIRES A SMALL SCREWDRIVER WHICH IS USED TO TURN THE AD JUSTMENT SCREW CLOCKWISE UNTIL IT STOPS. CHECK PURGE AIR PRESSURE GAUGE TO INSURE PRESSURE IS COMPLETELY OFF THE DRYER. 3. WITH THE PROPER TOOL THE SAFETY RELIEF VALVE CAN NOW BE REMOVED. BE AWARE THAT THERE WILL BE PRESSURE REMAINING INSIDE SO SAFETY SHOULD BE POPPED BEFORE REMOVING. 4. AFTER REMOVAL OF THE SAFETY VALVE, REPLACE WITH THE SPARE SAFETY. USE TEFLON THREAD TAPE AND TIGHTEN SUFFICIENTLY TO PREVENT AIR LEAKAGE. 5. PUT THE PURGE AIR ON AND ADJUST THE PRESSURE TO READ 100#. TURN THE TIMER ON THE FRONT PANEL ON TO START THE DRYER CYCLE. REMOVE RED TAG. 6. CHECK FOR AIR LEAKS AROUND THE SPARE SAFETY THAT HAS BEEN INSTALLED. 7. REPEAT PROCEDURE STEPS 1 THRU 6 ON THE OPPOSITE DRYER IF THE SITUATION IS APPROPRIATE. 8. CLEAN UP ALL TRASH AND PLACE ALL TOOLS IN THEIR PROPER PLACE. 9. INSURE SAFETY VALVE GETS TO THE PERSON OR PERSONS WHO HANDLES THEIR MAINTENANCE. RED TAG LOCATIONS: <1). TIMER SWITCH AND DRYER CONTROL PANEL. REVISED: NLC 9/12/90 BLOCK #368 f) A 1 34 056 CONF TDFNTTAl Ai->- HRU-300/400 BOILER ENTRY SUPPLEMENT COMPLETION OF THIS SUPPLEMENT COVERS ITEMS PECULIAR TO THIS EQUIPMENT CANO NOT NECESSARILY INCLUDED IN THE MULTI-PERMIT. IN ADDITION TO AND AS ATTACHMENTS TO THIS CHECKLIST, THE STANDARD VESSEL ENTRY PERMIT MUST BE ISSUED WITH AREAS NOTED THAT DO NOT APPLY. YES NO 1. THIS IS A AS SIDE ENTRY. 2. THIS IS A WATER SIDE ENTRY. 3. FUEL AS RED TAGGED WITH DOUBLE BLOCK AND BLEED. 4. 8YN AS RED TAGGED WITH DOUBLE BLOCK AND BLEED. 5. STEAM INJECTION RED TAGGED WITH DOUBLE BLOCK AND BLEED. 6. NITROGEN SUPPLY RED TAGGED WITH DOUBLE BLOCK AND BLEED. 7. H. P. , M. P. , AND L. P. STEAM LEAD LINES RED TAGGED WITH DOUBLE BLOCK AND BLEED. 8. ( 9. CONDENSATE TO HRU IS RED TAGGED WITH DOUBLE BLOCK AND BLEED. CHECMICAL FEED SYSTEM IS RED TAGGED WITH DOUBLE AND BLEED. 10. BOILER FEED PUMPS RED TAGGED ELECTRICALLY. 11. STARTING MOTOR RED TAGGED. 12. APPROPRIATE RED TAG MASTERS SIGNED. 13. BOARD OPERATOR WIL BE NOTIFIED OF ENTRY AND EXIT. 14. LOW VOLTAGE OR GROUND FAULT PROTECTED LIGHTING IS AVAILABLE. 19. SAFETY OBSERVER IS A CERTIFIED HOLE WATCH. 16. SAFETY OBSERVER WILL HAVE THE APPROPRIATE NUMBER OF 5 MINUTE ESCAPE PACKS. 17. AIR MOVER USED FOR VENTILATION EXCEPTIONS TO STANDARD: NOTE: ALL NEED NOT BE COMPLETED FOR EITHER A BOILER ENTRY OR AN HRU ENTRY. 1. VALVES, INSTRUMENTS, INSTRUMENT LINES NOT DISCONNECTED (ID) 2. USE OF S-MIN. ESCAPE PACKS RATHER THAN AIR LINE EQUIPMENT. (4A) 3. LIFE LINE, HARNESS, ETC. NOT USED <4B> 4. AIR MOVER FOR VENTILATION NOT ALWAYS USED ON GAS SIDE - DEPENDENCE ON NATURAL DRAFT. < 3A) ; ,0 A 13AOS7 CONF T DFNT t A1 EXCEPTIONS TO STANDARD: NOTE: ALL NEED NOT BE COMPLETED FOR EITHER A BOILER ENTRY OR AN HRU ENTRY. C/l. VALVES. INSTRUMENTS. INSTRUMENT LINES NOT DISCONNECTED <1D) 2. USE OF 3-MIN. ESCAPE PACKS RATHER THAN AIR LINE EQUIPMENT. (4A) 3. LIFE LINE. HARNESS. ETC. NOT USED <4B) 4. AIR MOVER FOR VENTILATION NOT ALWAYS USED ON QAS 8IDE - DEPENDENCE ON NATURAL DRAFT. (3A) OPERATIONS REP: MAINTENANCE REP: . REVISED:JML 02/18/92 I BLOCK #369 DO A I.SAOAh: rONFTDFNTTAl TEXT BLOCK # 369 HRU-300/400 BOILER ENTRY SUPPLEMENT COMPLETION OF THIS SUPPLEMENT COVERS ITEMS PECULIAR TO THIS EQUIPMENT AND NOT NECESSARILY INCLUDED IN THE MULTI-PERMIT. IN ADDITION TO AND AS ATTACHMENTS TO THIS CHECKLIST* THE STANDARD VESSEL ENTRY PERMIT MUST BE ISSUED WITH AREAS NOTED THAT DO NOT APPLY. YES ! NO 1. BOILER IS DRAINED AND DRAIN VALVES TAGGED OPEN. 2. HP* MP. AND LP NON-RETURN VALVES ARE CLOSED AND TAGGED. 3. HP* KP* AND LP STEAM LEAD LINE VALVES ARE CLOSED AND RED TAGGED. 4. HP. MP. AND LP LEAD LINE WARM-UP VALVES ARE CLOSED AND RED TAGGED. 5. HP, MP, AND LP LEAD LINE VENTS AND DRAINS ARE OPEN. 6. ALL FEEDWATER BLOCK AND BYPASS VALVES ARE CLOSED AND RED TAGGED. ALL CONDENSATE TO UNIT DOUBLE BLOCK AND BLEED AND RED TAGGED. 7. ALL ECONOMIZER INLET BLOCK VALVES ARE CLOSED AND RED TAGGED OR RACK OUT AND RED TAG ALL BOILER FEED PUMPS. 8. FUEL GAS SUPPLY LINE DOUBLE BLOCK* BLEED AND RED TAGGED. 9. CHEMICAL FEED LINES DOUBLE BLOCK AND BLEED OR DISCONNECTED AND RED TAGGED. 10. STEAM INJECTION LINE DOUBLE BLOCK AND BLEED AND RED TAGGED. 11. ANY OBSTRUCTION TO NATURAL DRAFT FOR VENTILATION. 12. LOW VOLTAGE OR GROUND FAULT PROTECTED LIGHTING AVAILABLE. 13. SAFETY OBSERVER WILL HAVE FIVE (5) MINUTE ESCAPE PACKS FOR EACH PERSON INSIDE THE VESSEL AND ONE FOR HIM/HER SELF. 14. INDIVIDUAL CRAFTS HAVE SIGNED THE APPROPRIATE RED TAG MASTERS. 15. CRAFT SAFETY MEETING HAS BEEN CONDUCTED. 16. STEAM/WATER SIDE ENTRY. 17. GAS SIDE ENTRY. DO A 1 34 0c>9 (" ()Nf' T DFN T TA1 _______ p _______ l. ____ ________ ________ ________ I _______ i_ ____ ________ ________ ____ ________ ________ ________ ________ ________ ____ ____ ________ ________ ________ _ V -W ''~'T W --i r--i-*- v i--'w. 19. THE SAFETY OBSERVER IS A CERTIFIED HOLE WATCH. 20. THE SAFETY OBSERVER HAS A HOLE WATCH CARD. ^EXCEPTIONS TO STANDARD: NOTE: ALL NEED NOT BE COMPLETED FOR EITHER A BOILER ENTRY OR AN HRU ENTRY. 1. VALVES. INSTRUMENTS. INSTRUMENT LINES NOT DISCONNECTED (ID) 2. USE 0F5-MIN. ESCAPE PACKS RATHER THAN AIR LINE EQUIPMENT. (4A) 3. LIFE LINE, HARNESS, ETC. NOT USED (4B) 4. AIR MOVER FOR VENTILATION NOT ALWAYS USED ON GAS SIDE - DEPENDENCE ON NATURAL DRAFT. <3A) OPERATIONS REP: MAINTENANCE REP: REVISED: NLC 11/13/91 BLOCK #369 ( i i [ ) 0 A 1 3 *4 (. / t"; A CONF 7 OF NT T Ai V TEXT BLOCK # 407 ISOLATING AND REMOVING SUCTION STRAINER'FROM 300/400 BOILER FEED PUMPS NOTE: THE BOILER FEED PUMP THAT THE STRAINER IS TO BE REMOVED MUST BE SHUT DOWN. 1. ON A SHUTDOWN BFP, RED TAG THE MAIN BREAKER* LOCAL START SWITCH* AND THE CONTROL ROOM SWITCH. 2. CLOSE THE TWO SUCTION BLOCK VALVES, RED TAG BOTH OF THESE VALVES. 3. OPEN VALVE ON SUCTION STRAINER TO DEPRESSURIZE THE STRAINER HOUSING. 4. ONCE STRAINER HOUSING HAS BEEN DEPRESSURIZED, THE NUTS ON THE HOUSING CAN BE LOOSENED. 5. BE CAREFUL THE STRAINER AND OUTER BLIND ON THE HOUSING IS USUALLY HOT AND HEAVY. 6. WHEN THE STRAINER HAS BEEN REMOVED, IT CAN BE CLOSELY INSPECTED AND CLEANED. ALSO INSPECT THE STRAINER HOUSING FOR FOREIGN MATERIAL. 7. ONCE INSPECTION AND CLEANING IS COMPLETE, THE STRAIN CAN BE PUT BACK IN PLACE. USE A NEW GASKET AND USE THE PROPER NUT TIGHTENING TECHNIQUE. ( REVISED:NLC ^ 9/13/90 BLOCK #407 li c no A 1 ?4 0M CCiNFTOFNTTAl TEXT BLOCK # 439 PRE-STARTUP CHECKLIST FOR UNITS 300/400 1. UNIT HAS BEEN ON TURNING GEAR (MINIMUM ONE HOUR). 2. H. P. , M. P. , L. P. BOILER LEADLINE VENTS ARE OPEN IN THE CROW'S NEST AND LEAD LINES NEAR OPERATING TEMPS. 3. D. A. IN SERVICE 4. BLOCK ELECTROMATIC VALVE. 5. ARE ALL THREE STEAM NON-RETURN AND LEAD LINE VALVES OPEN, ALSO SUPERHEATER VENTS. 6. ENSURE GAUGE GLASSES ARE UNBLOCKED. 7. H. P. , M. P. . L. P. BOILER LEAD LINE DRAINS ARE CRACKED OPEN ON THE SOUTHSIDE OF THE H. R.U. 8. ESTABLISH FLOW ON CASING VENTS (3) OF B.F. P. 'S AND A AND B AND BRING TO NEAR OPERATING TEMP. 9. CHEMICAL FEED PUMPS WORKING PROPERLY. 10. ESTABLISH FLOW THROUGH H. P. AND M. P. SUPERHEATER DRAINS. 11. UNBLOCK DA OVERFLOW (AUTOMATIC) VALVE. 12. H. P. SAMPLE LINE TO COOLER BLOCKED. 13. HAVE LUBE OIL PUMPS AND PIPING BEEN CHECKED FOR LEAKS? ARE PUMPS IN AUTO? 14. IS THE D. A. LEVEL CONTROLLER BLOCKED? 19. IS HOT END SNUFFING STEAM UNBLOCKED AND RESET? 16. H2 COOLING WATER AND EXCITER COOLING WATER UNBLOCKED. 17. H2 PRESSURE ON THE GENERATOR IS 21 TO 26 LBS. 18. STEAM INJECTION IS HOT UP TO THE CONTROL VALVE. 19. FUEL GAS IS PRESSURED UP TO THE SHUTOFF VALVE. 20. CONDENSATE RETURN LINE IS UNBLOCKED AND NORMAL. 21. LUBE OIL RESERVOIR LEVEL IS ABOUT 1'6" (LEVEL WILL RISE WHEN MACHINE STARTS). 22. ALL TURBINE VENT FANS ARE IN AUTO POSITION. 23 CHECK ALL HRU SECTION DOORS AND TURBINE INLET AND EXHAUST DOORS. THEY SHOULD ALL BE CLOSED. DO. ..IS STFAM TN.JFnTJnw STARTUP PRnOFINJBF RFING _ 22. ALL TURBINE VENT FANS ARE IN AUTO POSITION. 23 CHECK ALL HRU SECTION DOORS AND TURBINE INLET AND EXHAUST DOORS. THEY SHOULD ALL BE CLOSED. 24. IS STEAM INJECTION STARTUP PROCEDURE BEING -FOLLOWED? -- 25. LUBE OIL TEMPERATURE IS 90 DEGF. OR ABOVE. 26. LUBE OIL COOLER IS UNBLOCKED. ,27. ALL SWITCHES IN THE PS & 0 CABINET IN THE MECHANICAL 1 PACKAGE ARE IN AUTO POSITION. 28. CHECK TO SEE IF LUBE OIL AND SEAL OIL EVACTORS ARE ON AUTO. 29. IS BACKUP SEAL AIR UNBLOCKED. SEAL? 30. HAVE ALL RED TAGS PERTAINING TO THE MACHINE BEEN CLEARED AND PULLED? 31. ENSURE ALL CHARTS ARE INKING AND WORKING PROPERLY. 32. ANNUNCIATOR LAMPS CHECKED? 33. ARE ALL BOILER DRUMS AT PROPER FIRING LEVEL? 34. CHECK CONDENSATE PUMPS FOR GOOD SUPPLY OF WATER. IS THERE ENOUGH PUMPS RUNNING? 35. HAVE POWER 1. CHLORINE AND PIPELINE BEEN NOTIFIED OF THIS STARTUP? 36. CHECK ALL ANNUNCIATOR CARDS TO INSURE THEY ARE ALL IN. 37. IGV'S CLOSED AND CONTROLLER ON MANUAL. ALSO SELECTOR ON WOODY. 38. ESTABLISH CONDENSATE FLOW THRU FEEDWATER PREHEATER. REVISED:JML 07/02/91 BLOCK #435 HO A 134063 CONF T OFNT TAt V TEXT BLOCK # 437 TAKING UNIT 300 OR UNIT 400 ELECTROMATIC RELIEF VALVE OUT OF SERVICE 1. PUT ELECTROMATIC RELIEF VALVE SWITCH IN THE OFF POSITION. THIS SWITCH IS LOCATED ON BOILER BOARD (300/400) IN THE CONTROL ROOM. RED TAG THIS SWITCH. 2. OPEN THE SWITCH THAT SUPPLIES POWER TO THE RELIEF VALVE. THIS SWITCH IS LOCATED IN IPP IPP-DC 300. BREAKERS #4 AND #6 IN THE INVERTER ROOM. RED TAG THIS SWITCH OPEN. 3. CLOSE THE MAIN BLOCK VALVE TO THE ELECTROMATIC RELIEF VALVE. RED TAG THIS VALVE CLOSED. 4. CLOSE ELECTROMATIC RELIEF VALVE SENSING LINE BLOCK VALVE. THIS VALVE IS LOCATED AWAY FROM THE WALKWAY AND HANDRAILS. BE CAREFUL WHEN OPERATING THIS VALVE. RED TAG THIS VALVE. REVISED:JML 07/02/91 BLOCK #437 c r DO A 134004 rONF TDFNTT Al REMOVING, REBUILDING, AND REINSTALLING HRU 100/200 GAUGE GLASSES REMOVING THE GAUGE GLASS FROM SERVICE ' 1. BLOCK IN THE UPPER (STEAM SIDE) GAUGE GLASS BLOCK VALVE AND THEN BLOCK IN THE LOWER (WATER SIDE) GAUGE BLOCK VALVE. RED TAG BOTH VALVES. 2. OPEN THE'DRAIN TO.ATMOSPHERE TO DRAIN AND DEPRESSURIZE. RED TAG OPEN 3. TIME FOR IT TO COOL OFF BEFORE ATTEMPTING TO REMOVE IT. , I 4. REMOVE THE GAUGE GLASS BY REMOVING THE UPPER AND LOWER PACKING NUTS AND LIFT THE GAUGE GLASS UP AND OUT. GAUGE GLASS MAY NOW BE TAKEN TO SHOP TO REPLACE THE PRISMATIC GLASS. DISASSEMBLING GAUGE GLASS NOTE: BEFORE ATEMPTING TO LOOSEN RETAINING NUTS. IT WOULD BE A GOOD IDEA TO SOAK THEM WITH PENETRATING OIL AND LET STAND FOR 10-13 MINUTES. 1. REMOVE NUTS, WASHERS. AND IRON CLAMPS. NOTE HOW THE CLAMPS ARE POSITIONE ON THE GAUGE GLASS, SHORT SIDE OF THE CLAMP ON THE COVER PLATE. 2. REMOVE GAUGE GLASS COVER PLATE AND OUTER GASKET. 3. REMOVE PRISMATIC GLASS TAKING CARE TO NOTICE ANY BREAKS OR CRACKS IN THE GLAS8. ! 4. REMOVE INNER GASKET FROM GAUGE GLASS BODY. 5. THOROUGHLY CLEAN THE GASKET SEATS ON THE GAUGE GLASS BODY AND THE COVER PLATE. THE SURFACES SHOULD BE SMOOTH AND FREE OF ANY SCRATCHES. ANY IRREGULARITIES IN THE SURFACES CAN CAUSE THE GLASS TO SHATTER AS IT IS BEING TIGHTENED. 6. CLEAN THE MACHINE BOLT THREADS. IF USING A BENCH GRINDER WITH A WIRE WHEEL, USE VISE GRIPS TO HOLD THE BOLTS TO PREVENT KICKBACK OR WHEEL DRAW. LUBRICATE THE BOLT THREADS WITH FEL-PRO WHEN FINISHED. REASSEMBLING THE GAUGE GLASS 1. CENTER THE NEW INNER GASKET IN THE GAUGE OLASS BODY. 2. CENTER THE NEW PRISMATIC OLASS ON THE INNER OASKET. 3. PLACE THE NEW OUTER GASKET AND COVER PLATE OVER THE OLASS. 4. REPLACE THE CLAMPS, WASHERS, AND NUTS. 3. TIGHTEN ALL NUTS FINGER TIGHT. THEN FOLLOWING THE TIGHTENING SEQUENCE, (STARTING AT CENTER PAIR OF NUTS, TIGHTEN IN ALTERNATE PAIRS TO EITHER END), TIGHTEN EACH NUT ONE FLAT AT A TIME UNTIL SNUG. USING A TORQUE WCH, TORQUE THE NUTS TO 40 FOOT POUNDS FOLLOWING THE TIGHTENING SEQUENCE. 6. GAUGE OLASS MAY NOW BE REINSTALLED ON THE HRU. PUTTING THE OAUGE GLASS BACK IN SERVICE1 ,,^ A t DO A 1 340O.S CONFTDFNTTAt 1. REPLACE BOTH UPPER AND LOWER RUBBER PACKINO AND METAL WASHER. V 2. REINSTALL GAUGE GLASS ON THE HRU IN THE REVERSE SEQUENCE OF REMOVING THE GAUGE GLASS FROM SERVICE. 3. PREHEAT GAUGE GLASS BY OPENING DRAIN VALVE AND CRACKING OPEN THE UPPER (STEAM SIDE) BLOCK VALVE. THIS ALLOWS A SMALL FLOW OF STEAM THROUGH GAUGE GLASS BODY BRINGING IT UP TO OPERATING TEMPERATURE. ------------ " . . : -" 4. WHEN GAUGE GLASS IS THOROUGHLY HEATED. RETORQUE OAUGE TO FULL TORQUE AFTER GAUGE IS WARMED UP TO OPERATING TEMPERATURE (APPROX. 10 MINS. ) WITH ISOLATION VALVES CLOSED AND DRAIN VALVE OPEN. 3. WHEN THE OAUGE GLASS IS THOROUGHLY HEATED. CLOSE THE DRAIN VALVE AND SLOWLY OPEN THE UPPER (STEAM SIDE) AND LOWER (WATER SIDE) BLOCK VALVES. DO NOT STAND IN FRONT OF GAUGE GLASS WHEN OPENING THE BLOCK VALVES AS THERE IS A POSSIBILITY OF THE OAUGE GLASS BLOWING OUT DUE TO DEFECT OR INADEQUATE WARM UP. 6. OAUGE GLASS IS BACK IN SERVICE 7. CLEAN UP AREA AND PLACE TOOLS BACK IN LOCKER. TOOLS REQUIRED TO REBUILD GAUGE OLASS 1. 5/8" WRENCH 2. 11/16/ WRENCH 3. TORQUE WRENCH AND 11/16" SOCKET 4. GRINDER WITH WIRE WHEEL 3. SCREWDRIVER 6. HAMMER x REVISED: NLC 01/27/92 BLOCK *439 UPDATED:JML 07/30/93 " \ \ *' - . -f * ` 1 5> 4 . , * . * *\ iii c DO A 1 VtOr f c 0N[- 1 or NT T Ai TEXT BLOCK # 461 FILLING BOILERS HRU-300 AND 400 THE PURPOSE OF THIS PROCEDURE IS FOR FILLING BOILERS AFTER THEY HAVE BEEN DRAINED FOR REPAIR OR INSPECTION OF TUBES. ALL WORK MUST BE COMPLETED AND RED TAG MASTERS CLEARED BEFORE ANY WORK CAN BE PERFORMED TO FILL BOILERS. ALL DRUM AND BOILER DOORS SHOULD BE CHECKED TO MAKE SURE NO PERSONNEL ARE STILL INSIDE VESSEL BEFORE CLOSING. YELL INSIDE VESSEL PRIOR TO CLOSING. CHECK AND CLOSE ALL DRAIN VALVES ON HRU INCLUDING HP AND MP SUPER HEATER DRAINS IF NYDRO-TESTING IS TO BE PERFORMED. OPEN ALL VENTS ON TOP HRU, INCLUDING SUPERHEATER VENTS. OPEN HP AND MP ECONOMIZER BLOCK VALVES. OPEN PREHEATER FILL AND CLOSE VENTS ON FILL LINE. CHECK PREHEATER DRAINS AND CLOSE. INSTALL SPOOLS ON HP AND MP FEEDWATER REGULATOR LINES AND OPEN CONTROL LOOPS AND SPOOL BLOCK VALVES. BLOCK IN HYDROSTATING BLOCK VALVES FROM UNIT ON LINE AT BOTH CONTROL LOOPS. DO NOT ATTEMPT TO FILL WITH THIS LINE, VALVES WILL BE DAMAGED. MAKE SURE YOU HAVE ENOUGH MAKE-UP PUMPS FOR FILLING WITHOUT UPSETTING UNITS ON LINE. IF YOU NEED ANOTHER MUP CALL POWER I BEFORE STARTING. OPEN CONDENSATE TO UNIT TO BE FILLED AND CALL BOARD OPERATOR. AFTER CONDENSATE FLOW HAS BEEN ESTABLISHED, OPERATOR SHOULD LOOK FOR LEAK OR DRAINS LEFT OPEN. BOARD OPERATOR CAN OPEN FEEDWATER REGULATORS TO HP, MP, AND LP BOILERS. FLOW WILL BE INDICATED BY FEEDWATER PREHEATER FLOW AND TOTAL CONDENSATE FLOW TO POWER II. THIS SHOULD BE WATCHED CLOSELY AS NOT TO TAKE TOO MUCH CONDENSATE FROM UNITS ON LINE.* *IF HYDRO-TESTING IS TO BE PERFORMED, AN OPERATOR SHOULD BE STATIONED ON TOP HRU AFTER LEVEL IS SHOWN ON CONTROL BOARD TO CLOSE AND COM MUNICATE TO CONTROL ROOM WHEN CONDENSATE COMES OUT VENTS. NOTE: FOR HYDRO-TESTING ONLY. REVISED:NLC 9/13/90 BLOCK #461 DO A 1 -.4 06; CONF TDFNTTAi TEXT BLOCK # 492 UNIT 300/400 HIGH PRESSURE FEEDWATER REGULATOR FAILURE IN THE EVENT THE LEVEL IN 300/400 HIGHPRESSURE DRUM STARTS RISING UN CONTROLLABLY, PUT THE FEEDWATER REGULATOR IN "MANUAL" AND TRY CLOSING IT. IF INDEED THE REGULATOR HAS FAILED, TURN THE HIGH PRESSURE FEEDWATER MOV TO "CLOSE". WHILE THE VALVE IS CLOSING, WATCH THE FEEDWATER FLOW ON THE CHART AND WHEN IT STARTS COMING DOWN, START OPENING THE HIGH PRESSURE FEEDWATER BYPASS MOV TO THROTTLE THE FLOW. WHEN THE LEVEL SETTLES OUT, GET AN INSTRUMENT MAN TO CHECK THE FEEDWATER REGULATOR. NOTE: IF THE HIGH PRESSURE FEEDWATER MOV FAILS TO STOP THE RISING DRUM LEVEL, THE MANUAL BLOCK VALVE AT THE REGULATOR CAN BE CLOSED. REVISED:NLC 9/13/90 BLOCK #492 DO i !F40;,F CONF 7 OF NTT Al V TEXT BLOCK # 498 300/400 FEEDWATER PREHEATER FERROUS SULFATE/ COPPER SULFATE REMOVAL AND DISPOSAL C REMOVAL OF MATERIAL FROM FEED WATER HEATER 1. INDOCTRINATE ALL PERSONNEL INVOLVED AS TO THE HAZARDS OF THE BLOCK AND THE HAZARDS OF THE JOB. THE HAZARDS OF THE JOB INCLUDE COPPER SULFATE AND FERROUS SULFATE. THE INDOCTRINATIN WILL INCLUDE HYGIENE PORTION OF THE MSDS SHEETS. (WASH THEIR HANDS, NOT PUT IT IN THEIR MOUTHS, WASH ANY EXPOSED AREAS AND WHAT TO DO IF EXPOSED TO THE MATERIAL). ALL PERSONNEL WHO WORK ON THE JOB MUST HAVE BEEN PRE-MEDICAL APPROVED TO WEAR RESPIRATORY PROTECTION. FIT TESTING IS REQUIRED ON ALL MASKS (COMFO II, DUST MASK, ETC). THE TLV OF COPPER SULFATE IS 1 MG/M3 THE TLV OF FES04 IS 1 MG/M3/ 2. THE SCAFFOLD CREW WILL THEN BUILD A SCAFFOLD SO THAT THE SANDBLASTER CAN BLAST THE MATERIAL OFF THE TUBES. THE SCAFFOLD CREW WILL WEAR THE FOLLOWING EQUIPMENT WHEN INSIDE THE VESSEL. (1). (2). (3). (4). (5). PAPER SUIT NITRITE GLOVES RUBBER BOOTS MONOGOGGLES DUST MASK (NOTE: MAKE SURE THEY HAVE BEEN FIT TESTED) 3. THE SAND BLASTER DOING THE WORK WILL WEAR THE FOLLOWING EQUIPMENT: (1). (2). (3). (4). (5). PAPER SUIT NITRITE GLOVES RUBBER BOOTS MONOGOGGLES A HOOD WITH BREATHING AIR AND A DUST MASK THE SAND3LASTER WILL LIGHTLY SWEEP THE TUBES TO REMOVE THE MATERIAL. NOTE: DURING THE TIME THE SANDBLASTER AND THE CLEAN UP PEOPLE ARE WORKING, OXYGEN LEVELS WILL BE TAKEN EVERY 30 MINUTES. THESE OXYGEN LEVELS WILL BE RECORDED ON A FORM AND REVIEWED AT THE END OF THE JOB. IF AT ANY TIME THE OXYGEN LEVELS DROP BELOW 19X, HAVE THE PEOPLE QUIT BLASTING AND GET OUT OF THE VESSEL. 4. THE CLEAN UP PEOPLE WILL WEAR THE FOLLOWING EQUIPMENT: (1) . (2) . (3) . (4) . (5) . PAPER SUIT NITRITE GLOVES RUBBER BOOTS MONOGOGGLES COMFO II OVAG WITH PREFILTER THE CLEAN UP WILL BE BY VACUUM TRUCK PULLING THE MATERIAL OUT OF THE l FEED WATER HEATER SECTIONS. THIS WILL ALSO INVOLVE VACUUMING THE TUBES. THE MATERIAL WILL THEN BE AUGERED INTO BARRELS THAT WILL WEIGH NO MORE THAN 250 LBS. DO A 13406W C'.ONF TOFNT T At i nrrr nTconcAi AKm UAPIIIIM TDI IPU PDnrCniltJF WASTE DISPOSAL AND VACUUM TRUCK PROCEDURE --- 1. PLACE WATER IN 15 GALLON PACKS FILLED TO THE TOP AND PUT TOP ON TIGHTLY. 2. PLACE 4 tDRUMS ON EACH PALLET. LABEL THE DRUMS COPPER SULFATE/IRON SULFATE AND SAND NON HAZARDOUS WASTE TYPE - 2689 POWER 2 1/9/90 OR WHATEVER DATE NOTE: THE FOLLOWING MUST BE DONE! 1. PACKS MUST BE FILLED TO THE TOP. THIS IS ALL PACKS NO MATTER HOW MUCH OTHER MATERIAL IS IN THE PACKS. EXAMPLE: IF THE PACK IS 1/4 FULL OR 3/4 FULL FILL UP THE REMAINING EMPTY PORTION WITH CATLITTER. 2. PUT THE TOPS ON THE PACKS. HOWEVER/ ONCE THE PACKS ARE FILLED. IT WILL REQUIRE PACKS TO BE 100*/. INSPECTED. THIS MEANS THAT THE TOPS HAVE TO COME BACK OFF AND THE PACKS WILL BE INSPECTED BEFORE THEY GO TO LANDFILL. BECAUSE OF THE LARGE CHANCE OF RAIN AND THE WAY THIS MATERIAL ABSORBS WATER, IT WOULD BE ADVISABLE TO DELAY THIS UNTIL A LATER TIME. WE WILL FILL IN THE WASTE TYPE NUMBER LATER. 3. ONCE ALL OF THE MATERIAL IS OUT OF THE TRUCK. HAVE IT OPENED AND SWEPT OUT IF THAT IS POSSIBLE. AFTER THAT RINSE THE TRUCK WITH AS LITTLE WATER AS POSSIBLE AND PUT THAT WATER INTO A FIBER PACK WITH J ABSORBENT MATERIAL. LABEL THAT PACK/PACKS WITH WEAK ACID, GRANULAR ABSORBENT MATERIAL AND COPPER SALTS WASTE TYPE # 1488 POWER II 1/9/90 OR WHATEVER DATE ONCE THE TRUCK IS CLEANED, IT MAY BE RELEASED. NOTE: MAKE SURE TRUCK IS CLEAN OR IT WILL COME BACK REVISED:UML 07/03/91 BLOCK #498 DO A "I 34070 CONFTDFNTTAI V HRU 300/400 FREEZE PRECAUTION (DOWN) LEVEL I Cl. BLOCK IN DOWNSTREAM BLOCK VALVE ON CONDENSATE SUPPLY. OPEN DRAIN SLIGHTLY TO KEEP LINE FLOWING. 2. OPEN HP, MP, AND LP BOILER DRUM VENTS. 3. OPEN HP, MP, AND LP BOILER DRAINS WIDE OPEN. 4. OPEN DA BOTTOM 3" DRAIN AND DA DUMP BYPASS. 5. CRACK OPEN STEAM TO DA USING PRESSURE CONTROL VALVE. 6. OPEN Al L BOILER SUPERHEATER VENTS. 7. OPEN ALL BOILER DRUM AND DA WATER COLUMN DRAINS. 8. OPEN ALL PREHEATER DRAINS - ALL TRAINS. 9. OPEN ALL ECONOMIZER DRAINS - ALL TRAINS. PLACE ALL FW REGULATORS ON MANUAL AND OPEN FULLY, INCLUDING BY-PASSES. OPEN A! I. DRAINS ON BOTTOM OF FW REGULATORS. 10. OPEN ALL BFP DRAINS. 11. RACK 0!J( AND RED TAG BFP'S ELECTRICALLY. r 12. OPEN ALL DOWN COMER DRAINS - ALL TRAINS. ^ 13. OPEN VENTS ON ALL LEAD LINES TO KEEP LINES HOT TO NON-RETURN. 14. UNPLUG P04 AND CORTROL PUMPS, DISCONNECT DISCHARGE LINES AT PUMP, DRAIN INTO BUCKET AND POUR BACK INTO BULK TANK. 15. BLOCK IN P04 AND CORTROL BULK TANKS, DISCONNECT SUCTION LINE AT PUMP, DRAIN LINE INTO BUCKET, AND POUR INTO BULK TANKS. 16. INSURE SAMPLE COOLERS ARE WIDE OPEN TO DRAIN CBD LINES. 17. CRACK OPEN DRAINS UPSTREAM AND DOWNSTREAM OF CONTROL VALVE ON CONDENSATE RETURN 10 POWER I SLIGHTLY TO KEEP LINE FLOWING ON THE POWER I SIDE AND TO DRAIN ON POWER II SIDE OF C/V. 18. CRACK OPEN MIXING TEE-DRAINS AND DEAERATOR LEVEL CONTROL DRAINS. EDITED: JMl. 11/10/92 BLOCK #799 UPDATED: JMC 2/23/94 no A 1 A 4071 C ONF T DF NT T Al ISOLATING SUCTION LINE TO REMOVE STRAINERS FOR BFP 300/400-A/B ISOLATING SUCTION LINE TO REMOVE STRAINER (P-300 A/B & P-400 A/B) J ACCOMPLISH THIS JOB SAFELY, THE FOLLOWING PROCEDURE SHALL BE COLLOWED: i i 1. SHUT THE PUMP DOWN (AS PER SAFE WORK PROCEDURE STARTING AND STOPPING BF PUMPS P-300 A&B AND P-400 A & B), IF IT IS RUNNING. 2. TAG THE CONTROL ROOM REMOTE SWITCH. 3. TAG THE LOCAL SWITCH. | ^ 4. RACK OUT AND RED TAG THE 4160 VOLT MOTOR BREAKER. 5. CLOSE AND RED TAG THE STRAINER UPSTREAM BLOCK VALVE. 6. CLOSE AND RED TAG THE STRAINERS DOWNSTREAM BLOCK VALVE. 7. OPEN THE DRAIN VALVE ON THE "Y" STRAINER AND RED TAG. RETURNING TO SERVICE 1. CLOSE THE DRAIN VALVE ON THE "YM STRAINER. 2. OPEN THE STRAINER'S UPSTREAM BLOCK VALVE. ^3. OPEN THE STRAINERS DOWNSTREAM BLOCK VALVE. 4. RACK IN THE 4160 VOLT MOTOR BREAKER. 5. REMOVE THE LOCAL SWITCH RED TAG. 6. REMOVE THE CONTROL ROOM REMOTE SWITCH RED TAG. [ REVISED:NLC 9/14/90 BLOCK #660 UPDATED:JML 12/09/93 '' : c no A 13407.' r ONP TDFNT TAl