Document ppwkoXBw5kzNxLo6gNj4Jwmra

PLAINTIFF'S EXHIBIT V- ' INTERNAL CORRESPONDENCE IH FILE COPY * UNION OAHBIOE CORPORATION `nical cent tM PO h'iClX F336 1 SOUTH CHARLESTON. WV 3`~3G3 ' II. E. Rucker ' 512 2009 1 " ' "8. H. Avashia, M.D. - 512/23 W. L. Browning - 512/2149 R. E. Coyner - 512/2009 C. M. Hutsenpi11ir, Jr. - 512/77 S. E. II1ikainen - 512/2 C. P. Maxwell - 511/701-2 B. R. McMakin - 512/2009 R. J. Romagnoli - 512/303 September 18, 1987 ... `EM&TS - HS&EA Industrial Hygiene Asbestos Exposure Monitoring Attached are the results of the seven days of asbestos monitoring, while completing the cleanup at Cellosize Building 77. This included the storeroom, maintenance shop, equipment and tools, maintenance lunchroom, the backroom off of the shop, the electrical switchrack room, the mezzanine and the outside area south of building 77. The rooms inside the building were sealed as much as possible and air was continuously exhausted through HEPA fiIters. All area and personal samples for the final seven days of monitoring were below the 0.2 fiber/cc permissible exposure level standard per OSHA asbestos standard 29CFR 1926.58 and were below the 0.1 fiber/cc action level per the same standard. Employees wore no street clothes, two pair of coveralls, headcovers, boots, gloves and A0 R57-A HEPA half-face cartridge respirators. They showered before meals and at the end of the workday before leaving plant. Please inform G. F. Sowards, J. C. Coyner, S. R. Erskine, D. W. Brogan and M. L. Wallace of their exposure monitoring results as soon as possible. Have them sign and date this report and return it to M. A. Patel at Building 701-330. UCC 024559 Asbestos Monitoring - continued -2- September 18, 1987 Please commend all the employees involved in this job for an outstanding performance under difficult conditions. If you have any questions or we can be of further assistance, call us on extension 3750 or 6485. WORK BY: APPROVED BY: HJK:VES:MAP:rab 2699P Manhar A. Patel UCC 024560 Carp. Ref: W2286 W2287 W2288 W2289 W2290 W229I W2292 A58EST0S EXPOSURE MONITORING Date Sarrple Type/ Enployee Name Sampling Tine Air Cone, fibers/cc fibers/cc CCME NTS 8-2-87 8-2-87 Personal/ G. F. Sowards Area 542 min 541 min 0.013 0.013 8-2-87 Area 540 min 8-3-87 8-3-87 Personal/ J. C. Coyier Area 447 min 440 min 0.009 0.018 0.016 8-3-87 Area 438 rnin 0.014 8-4-87 8-4-87 Personal/ S. R. Erskine Area 451 min 452 min 0.020 0.012 8-4-87 Area 332 min 0.010 8-4-87 Area 121 min 0.008 0.015 0.017 -- " 0.019 Cleaning Building 77 Storeroom and equipment. Building 77 - Four feet fran east wall of maintenance shop at breathing level. Building 77 - On south wall by double doors at entrance to maintenance shop. Cleaning Building 77 Storeroom and equipment. Building 77 - Breathing zone level at entrance to decontamination chanter shop. Four feet from east wal1 of maintenance shop of Building 77 breathing zone level. Cleaning beam and overhead ledges in Building 77 maintenance shop. Four feet fran east wall of maintenance shop of Building 77 breathing zone level. Building 77 Shop - Breathing zone level at entrance to decontamination charrber. 8uilding 77 - Breathing zone level in #5 switchrack Electrical Roan aver 508 transformer after roan was cleaned and vacuuned. UCC 024561 r ASBESTOS EXPOSURE M0NIT0RIN3 (continued) Conp. Ref: W2286 W2287 W2288 W2289 W2290 W2291 W2292 Date Sarrple Type/ Eiiployee Name Sampling Time Air Cone, fibers/cc TWAg fibers/cc COMMENTS 8-5-87 Area 437 min 0.069 8-5-87 Area 453 min 8-5-87 8-10-87 Personal/ D. W. Brogan Personal/ M. L. Wallace 458 min 365 min 8-10-87 Area 365 min 8-10-87 Area 366 min 8-13-87 8-13-87 8-13-87 Personal/ M. L. Wallace Personal/ D. W. Brogan Area 444 min 445 min 446 min 8-20-87 8-20-87 Personal/ J. C. Coyner Area 440 min 445 min 0.059 0.062 0.065 0.064 0.067 0.034 0.037 0.015 0.012 0.008 - 0.059 0.042 0.032 0.035 0.011 - Building 77 - At entrance to decontamination cUsrber, breathing zone level. At breathing zone level in toolroom shop of Building 77 by door. Cleaning toolroom shop of 8uilding 77. Final cleaning in toolroom and shop area of Building 77, wire brushing and vacuuming. Backroom of Building 77 shop area at outside wall, breathing zone level. Breathing zone level at east wall of main shop area of Building 77, Cleaning area and equipment in Mezzanine of Building 77. Cleaning area and equipment in Mezzanine of Building 77. At inlet to fPA exhaust in Mezzanine of Building 77. Cleaning up slag south of Building 77 and putting in fiber paks. At breathing zone level at southwest comer of regulated area while cleaning ip slag south of Building 77. 2699P UCC 024562