Document ppjqQ9yjmYBddbw917DoG5256

AIA FILE NUMBER 23-L Standard Specifications Gypsum Wallboard Finishes AIA FILE NUMBER 23- ASA Reg. V.S. Pat. Off. A97.1-1958 UDC 691.31 STANDARD SPECIFICATIONS for GYPSUM WALLBOARD FINISHES Approved as AMERICAN STANDARD by The American Standards Association October 29, 1958 Copyright 1959 THE AMERICAN INSTITUTE of ARCHITECTS and the GYPSUM ASSOCIATION SGP 0003249 PERSONNEL OF SECTIONAL COMMITTEE ON STANDARD SPECIFICATIONS FOR GYPSUM WALLBOARD FINISHES ASA Project A97 Sponsors: American Institute of Architects Gypsum Association Chairman: Theodore Irving Coe American Institute of Architects 1735 New York Avenue, N.W., Washington 6, D.C. Secretary: R. H. Faber Gypsum Association 201 North Wells Street, Chicago 6, Illinois American Institute of Architects......................................Theodore Irving Coe Ben H. Dyer American Society for Testing Materials............................Lawrence B. Ritter Associated General Contractors of America....................Edward B. Friel, Jr. Brotherhood of Painters, Decorators and Paperhangers of America................................................Bryce P. Holcombe Construction Specifications Institute, Inc....................................... C. J. Poiesz Gypsum Association....................................................................... D. G. Hamme C. J. Loechl J. A. Robertson R. P. Entz (Alt) C. G. Shuttleworth O. H. Storey, Jr. R. H. Faber International Drywall Contractors Association............................W. Gregorio L. Skinnerf^h) National Association of Home Builders................................M. W. Smithman National Retail Lumber Dealers Association..............................R. A. Schaub Clarence Thompson (Alt) Painting and Decorating Contractors of America....................E. S. Torrence Small Homes Council (University of Illinois).............................. R. A. Jones Southern Building Code Congress....................................Ralph W. Jones, Jr. United Brotherhood of Carpenters and Joiners of America........................................................................... Raleigh Rajoppi U. S. Navy Department........................................................Lawrence B. Ritter Veterans Administration............................................................. J- W. Williams G. A. Nelson (Alt) Members-At-Large....................................................................Charles A. Immer James T. Lendrum E. M. Lurie Liaison Member Federal Housing Administration D. Guthridge i'i i I t SGP 0003250 Approved as American Standard By the American Standards Association ASA No. A97.P-1958: UDC 691.31 October 29, 1958 AMERICAN STANDARD SPECIFICATIONS for GYPSUM WAT,EBP ARP FINISHES Note:--These specifications are intended to describe minimum requirements for application over wood nailing members. See Appendix for general information and recommenda tions pertaining to related work. 1.00 GENERAL PROVISIONS 1.10 The work includes all labor, materials, services, equip ment, scaffolding and all operations required to com plete the gypsum wallboard finishes in accordance with the drawings and these specifications. , 1.20 Scaffolding shall be constructed and maintained in strict conformity with applicable laws and ordinances, and so as to avoid interfering with the work of others. 1.30 The work shall be properly coordinated with the work of other trades. 1.40 Whenever joint treatment adhesive is being mixed or used for applying tape or for laminating one layer of board to another, the temperature in the building shall be maintained at not less than 45 degrees Fahr enheit. 2.50 Horizontal Application: Where the term "horizontal application" is used, it refers to gypsum wallboard ap plication where the paper-bound edges are applied at right angles to the nailing members. 2.60 Vertical Application: Where the term "vertical appli cation" is used, it refers to gypsum wallboard applica tion where the paper-bound edges are applied parallel to the nailing members. 2.70 Treated Joints: Where the term "treated joints" is used, it refers to joints between gypsum wallboards which are reinforced and concealed with joint treat ment. 2.80 Untreated Joints: Where the term "untreated joints" is used, it refers to joints which are left exposed in the finished work, or which may be covered by strips or mouldings. 2.90 Joint Treatment Adhesive: Where the term "adhe sive" is used, in conjunction with joint treatment, it refers to "joint cement, an adhesive." 2.00 DEFINITIONS 2.10 Gypsum Wallboard: Where the term "Gypsum Wallboard" is used it refers to gypsum wallboard as defined in A.S.T.M. Specification Cl 1-58. 2.12 Type "X" (Special Fire Retardant) Gypsum Wallboard: Wallboard which provides greater fire resist ance as defined in A.S.T.M. Specification C36-58. 2.14 Insulating Gypsum Wallboard: Either Regular or Type "X" Gypsum Wallboard, with foil laminated to the back surface, as defined in A.S.T.M. Specifi cation C36-58. 2.20 Edges: Where the term "edges" is used, it refers only to the paper-bound edges, usually the long dimension of the gypsum wallboard. 2.30 Ends: Where the term "ends" is used, it refers to the mill-cut or field-cut ends. At such cuts, the gypsum core is left exposed. 2.40 Nailing Members: Where the term "nailing members" is used, it refers to those portions of the framing, fur ring, blocking, etc., which serve as a nailing base to receive the gypsum wallboard. Unless otherwise speci fied herein, the nailing surface shall be not less than 2 inch nominal width. (See also Section A 1.00 of Ap pendix) 3.00 MATERIALS The materials shall conform to the applicable require ments of the following specifications: 3.10 Gypsum Wallboard: A.S.T.M. Designation C36-58. 3.20 Joint Treatment: Joint reinforcing and adhesive ma terials shall be as recommended by the manufacturer of the gypsum wallboard. 3.30 Laminating Adhesive: Laminating adhesive material shall be as recommended by the manufacturer of the gypsum wallboard. 3.40 Water: Shall be clean, fresh and suitable for domestic consumption. 3.50 Steel Nails: 3.52 GWB-54 (Gypsum Wallboard): Annular ringed nails complying with the requirements of A.S.T.M. Specification C380-58T. 3.54 4d 14 gage, 1-3/8 in. long, 7/32 in. flat head, dia mond point. 5d 13-1/2 gage, 1-5/8 in. long, 15/64 in. flat head, diamond point. / V 6d 13 gage, 1-7/8 in. long, 1/4 in. flat head, dia mond point. 1 SGP 0003251 3.60 Nails for single layer application: Gypsum Wallboard (Thickness) 1/4 in. (for application over ex isting surfaces) 3/8 in. Regular or Insulating 1 /2 in. Regular or Insulating 5/8 in. Regular or Insulating 1/2 in. Type "X" and Insulating Type "X" 5/8 in. Type "X" and Insulating Type "X" Nails (To framing or furring of 2 in. or greater nominal thickness) Flat head, diamond point nail of such length as to give not less than I in. penetration into the nailing members. 1-1/8 in. or 1-1/4 in. GWB-54 or 4d 1-1/4 in. GWB-54 or 5d 1-3/8 in. GWB-54 or 6d 5d 6d Nails (To 1 in. nominal thick furring over concrete or masonry) 1-1/8 in. GWB-54 or 4d 1-1/4 in. GWB-54 or 4d 1-3/8 in. GWB-54 or 5d 3.70 Nails for Multiple Layer Installation: (See Section 5.40) 4.00 DELIVERY, HANDLING AND STORAGE 4.10 All materials shall be delivered in the original pack ages, container or bundles bearing the brand name and the name of the manufacturer or the supplier for whom the product is manufactured. 4.20 All materials shall be kept dry, preferably by being stored inside the building under roof. Where neces sary to store gypsum wallboard outside, it shall be stacked off the ground, properly supported on a strong level platform and fully protected from the weather. 4.30 Gypsum wallboard shall be neatly stacked (flat), with care taken to avoid damage to edges, ends and surfaces. 5.00 APPLICATION OF GYPSUM WALLBOARD 5.10 General: Note: For framing requirements see Appen dix, Section A 1.00. 5.11 Gypsum wallboard shall be cut by scoring and breaking or by sawing, working from the face side. When cutting by scoring, the face paper shall be cut with a knife or other suitable tool. The gypsum wallboard shall then be snapped back away from the cut face. The back paper can be broken by snap ping the gypsum wallboard in the reverse direction or the back paper can be cut. All cut edges and ends of the gypsum wallboard shall be sandpapered, where necessary, in order to obtain neat jointing when the wallboard is erected. Cut-outs for pipes, fixtures, or other small openings shall be scored in outline before knocking out or shall be cut out with a saw or other suitable tool. Where gypsum wallboard meets projecting surfaces, it shall be scribed neatly. 5.13 In single layer installations, all ends and edges of all gypsum wallboard shall occur over nailing mem bers, except that this is not required for treated joints at right angles to framing members in hori zontal applications. 5.15 Gypsum wallboard shall be applied first to the ceil ing and then to the walls. Wallboards of maximum practical lengths shall be used to minimize number of end joints. Boards shall be brought into contact, but shall not be forced into place. Where ends or edges abut, they shall be neatly fitted. 5.16 Nails shall be spaced not less than s/g inch from edges and ends of wallboard. Nails shall be spaced and driven a maximum of 7 inches on centers on ceilings, and a maximum of 8 inches on centers on walls (See Figure No. la) except as shown for "Dou ble Nailing" procedure in Figure No. lb. Perimeter nailing at the top and bottom is not required. Nails shall not be staggered on adjoining edges or ends. While the nails are being driven, the wallboard shall be held in firm contact with the underlying support. Nailing preferably should proceed from central portion of the wallboard toward ends and edges. The tool used for driving nails shall have a crowned face. The nails shall be driven home with the heads slightly below the surface of the gypsum wallboard, in a dimple formed by the crowned face of the driving tool striking the last blow. A nail set shall not be used and care shall be taken to avoid breaking the paper face. SGP 0003252 SINGLE NAILING Fig. la NAILS: Nails shall be in accordance with requirements of Paragrapl 3.60. "SINGLE NAILING" SYSTEM PROCEDURE: The wallboard shall be held in firm contact with the nailing member while the nails are being driven. Nailing preferably should proceed from the central portion of each piece of wallboard towards ends and edges. Nails shall not be staggered on adjoining edges or ends. Perimeter nailing at the top and bottom is not required. DOUBLE NAILING NAILS: Nails shall be in accordance with requirements of Paragraph 3.60. "DOUBLE NAILING" SYSTEM PROCEDURE: 1. Two men are required to nail one ceiling board --one man nails rows 1, 2, 3 and 4; the other nails rows 2A, 3A and 4A. 2. Starting at center of board, nails shown by dot are applied in row 1, then rows 2 and 2A, 3 and 3A, 4 and 4A, etc., always nailing from center to edges of sheet. 3. Apply "double" nails shown by circle O in the same manner as first nails, also starting at row 1. 4. As alternate procedure, "double" nails may be applied immediately after nailing of first nails in each row is completed ac cording to step "2" above. 5. Use single nails on perimeter of board. / IMPORTANT: All three field (first) nails in each row should be applied before the "double" (second) nails are applied. It may be neces 1 sary to "hit" the first nails in each row after the second nail is applied. / 3 SGP 0003253 5.17 The maximum spacings for nailing members to re ceive gypsum wallboard constructions shall not ex ceed those shown in the following tables: Wallboard Construction NAILING ONLY Use Application IVfoximum Spacing Nailing Members 3/8" (Single or two-ply) 1 / 2" single 1 ji" single 1 /2" single 1 /2" two-ply 1/2" two-ply 5/8" single 5/8" single 5/8" single 5/8" two-ply 5/8" two-ply Wallboard Construction Ceilings Sidewalls Horizontal Horizontal or vertical Ceilings Vertical Ceilings Horizontal Sidewalls Vertical or horizontal Ceilings Horizontal Sidewalls Vertical or horizontal Ceilings Vertical Ceilings Horizontal Sidewalls Vertical or horizontal Ceilings Horizontal Sidewalls Vertical or horizontal TWO-PLY NAILING WITH ADHESIVE BETWEEN LAYERS Use Application 16" o.c. 16" o.c. 16" o.c. 24" o.c. 24" o.c. 24" o.c. 24" o.c. 16" o.c. 24" o.c. 24" o.c. 24" o.c. 24" o.c. Maximum Spacing Nailing Members Two-ply (3/8") Two-ply 1 /2" base layer 3/8" face layer Two-ply 1/2" or 5/8" Two-ply 3/8", 1/2" or 5/8" Ceilings Ceilings Ceilings Ceilings Sidewalls 5.20 Application direct to framing members or furring strips: 5.22 Joints Treated: 5.222 End joints shall be staggered and joints on op posite sides of a partition shall be arranged to occur on different studs. 5.24 Joints Untreated: 5.242 Unless otherwise specified, square edge, beveled edge and predecorated gypsum wallboard shall be applied vertically. Where the nail heads are to be treated, they shall be driven as specified in Paragraph 5.16. Where they are to be left with no further treatment, they shall be driven flush with the face of the wallboard surface without breaking the paper. 5.244 Wood grained and other predecorated gypsum wallboards shall be applied using a nail with a suitably colored head. These nails shall be driv en with a hard rubber mallet or plastic head hammer. 4 Base layer horizontal Horizontal Vertical or horizontal Base layer horizontal 16" o.c. 24" o.c. 24" o.c. 24" o.c. Horizontal or vertical 24" o.c. 5.26 Ceiling application over wood furring construc tion: When gypsum wallboard is nailed to wood cross furring on ceilings these members shall have a mini mum cross section of 2" x 2" (nominal) and be spaced in accordance with the requirements of Paragraph 5.17. 5.30 Application over existing plaster or gypsum wallboard surfaces: 5.32 Where gypsum wallboard is used over uneven exist ing plaster or gypsum wallboard surfaces and joints are to be treated, the wallboard shall be nailed to furring strips as specified in Paragraph 3.60. 5.34 Where existing plaster or gypsum wallboard sur faces are in suitably sound condition and of such nature as to permit proper nailing, the gypsum wallboard may be applie^ direct. Nails shall be so located and of such length as to penetrate into fram ing members not less than one inch. They shall be spaced and driven as specified in Paragraph 5.16. SGP 0003254 5.40 Two-Ply Gypsum Wallboard Application: 5.42 Adhesive Used Between Layers: 5.422 The two layers may be applied in opposite di rections or in parallel direction. Joints in the exposed layer need not occur over supports. If the face layer is to be permanently held in place by adhesive only, the first layer shall be applied as specified for single layer application, except that the nails shall be driven so that their top faces are flush with the surrounding wallboard surface. The adhesive to be used between the two layers of gypsum wallboard shall be spread evenly over the back surface of the face layer of the wallboard before it is erected, using a spread er of design approved by the manufacturer of the gypsum wallboard. Immediately after the adhesive has been spread, the wallboard shall be placed in position and nailed with a sufficient number of nails to hold the wallboard in place until the adhesive develops adequate bond. In lieu of nailing, the second ply of gypsum wallboard may be held in position by shoring with props and headers or other temporary supports to insure adequate pressure for bonding. 5.424 When adequate bond has developed between the wallboards, the temporary supports shall be removed, or, if temporary nailing is used, such nails shall either be: (a) driven home so that their heads are below the surrounding surface of the gypsum wallboard, in a dimple formed by the final blow of the driving tool, or (b) re moved, or (c) driven with a nail set so that heads of the nail are well below the surface of the exposed face of the gypsum wallboard. The resulting holes shall be filled flush with joint ad hesive. 5.44 No Adhesive Used Between Layers: Nails for the first layer shall be spaced a maximum of 14" on centers, and shall be of the size and type required for the particular thickness of board when used in single layer application. The face layer shall be nailed with the number of nails required for normal single layer application. Nails used for the face layer shall be long enough to penetrate at least 1-1/8 inches into nailing members. The two layers may be applied in opposite directions or in parallel directions. The nails in the first layer shall be driven home so that their heads are below the surrounding surface of the gypsum wallboard. Nails for the face layer shall be driven as specified in Paragraph 5.16. 5.50 Insulating Gypsum Wallboard: 5.51 The application of insulating gypsum wallboard shall conform to the foregoing specifications for the application of gypsum wallboard. The reflective surface shall be placed against the inside face of the nailing members. 5.52 Insulating gypsum wallboard shall not be used as the backing material in shower stalls or tub enclos ures to receive ceramic, plastic, or metal tile, or plastic finished wall panels. t Note: To obtain full efficiency as an insulating material, a minimum of 3/4 inch air space shall be provided next to the foil. 6.00 JOINT TREATMENT FOR FIELD JOINTS AND CORNERS 6.20 Treatment for field joints and corners shall be ap plied in strict accordance with the printed instruc tions of the manufacturer of the gypsum wallboard. Ample drying time shall be allowed between coats of adhesive and between finish coats and decoration. Before joint treatment is applied the installation shall be inspected to insure that (1) gypsum wallboard is properly nailed and is held tight against the nailing members, and (2) nail heads in the field of the board are slightly below the surrounding surface in dimples formed by the driving tool. 6.30 External Corners: External corners shall be pro tected and finished with reinforcing joint tape and adhesive or with an approved metal or other type corner protection. 6.40 Arches: Where gypsum wallboard is to be applied to the soffit of arches it shall be carefully bent into place. If necessary, it first shall either be dampened or be kerfed approximately one-inch on centers on the back side. In the latter case, after the core has been broken at each cut, the wallboard shall be applied to the curved contour and nailed in place. At the arrises of the arch, joint adhesive and reinforcing shall be applied in the manner specified for corners, except that the tape shall be snipped at intervals along one side to permit it to conform to the curved contour. Approved metal or other corner protection may be used at these locations. 7.00 STUDLESS SOLID GYPSUM WALLBOARD PARTITIONS 7.10 Solid gypsum wallboard partitions consisting of mul tiple layers of gypsum wallboard shall be erected in accordance with the printed directions of the manu facturer of the gypsum wallboard. 8.00 TOUCHING UP PRIOR TO DECORATION 8.10 After trim has been applied, and prior to decoration, surface damage and defects shall be corrected (See Appendix, Section A2.00). 9.00 VENTILATION ABOVE GYPSUM WALLBOARD CEILINGS 9.10 Proper ventilation shall be provided (See Appendix, Section A4.00). SGP 0003255 APPENDIX A A0.00 APPENDIX This Appendix gives general information and also suggestions for inclusion to be made elsewhere by specifier. It is not part of these specifications. A 1.00 FRAMING REQUIREMENTS The work of framing and furring is not part of these specifications. However, certain requirements cover ing framing, nailing members, spacing, etc., are es sential to provide a proper base to receive the gypsum wallboard. The following requirements should be included in the project specifications for wood fram ing and furring. A1.10 All nailing members should be straight and true and spaced not to exceed the maximum spacings shown in Paragraph 5.17. Framing and bridging members should be adequate to carry the design or code load ing. The deflection of horizontal members supporting gypsum wallboard shall not exceed 1 /360 of the span. The nailing surface of any framing or furring member should not vary more than 1/8 inch from the plane of the faces of adjacent framing or furring members. Headers should be provided as necessary for the support of fixtures. Nailing surfaces shall have a minimum width of 1-1/8 inches. A 1.30 Headers are not required to receive joints at right angles to supports in horizontal application that are to be treated with a joint reinforcing system. A1.50 All concrete or masonry surfaces that are to receive gypsum wallboard finish should be furred with at least 1" x 2" nominal nailing members. A1.70 Nailing flanges of insulating materials should not be attached to the face of the nailing member. A2.00 DECORATION A2.10 It is extremely important that the difference in ab sorption between the field of the gypsum wallboard and the adhesive over joints or nailheads be equal ized to assure uniformity of color and texture over the entire wall. After the gypsum wallboard appli cation has been completed, the surfaces should be sealed and primed as required for subsequent finish. A2.20 Wallpaper and similar materials applied adhesive ly: Wallpaper, or similar materials adhesively ap plied, should never be applied to gypsum wallboard without first sealing the surface. Sealing provides protection where wetting of the gypsum wallboard may occur. In general, latex or oleo-resinous type sealers, recommended by the gypsum wallboard manufacturer, can be used. Use of a sealer provides protection for the wallboard when removal of the wallpaper becomes necessary. A3.00 SPECIFICATIONS FOR APPLICATION OF GYPSUM WALLBOARD TO RE CEIVE CERAMIC, PLASTIC, METAL TILE, AND PLASTIC FINISHED WALL PANELS BY ADHESIVE APPLICATION A3.10 General: The work to be done in application of gypsum wallboard under this specification shall be performed in accordance with the requirements of American Standards Association, Standard Specifi cation for Gypsum Wallboard Finishes A97.1, ex cept as otherwise specified herein. A3.20 Framing: (See figures Al, A2, and A3) A3.21 Framing members shall be plumb and true. A3.22 All framing around tub enclosures and shower stalls shall allow sufficient room so that the inside lip of the tub, prefabricated receptor or hot mopped sub-pan shall be even with the face of the gypsum wallboard. This will necessitate furring out from the studs the thickness of the gypsum wallboard to be used (3/8", 1/2", 5/8") less the thickness of the lip, on each wall abutting a tub, receptor or sub-pan. A3.23 Furring of the proper thickness shall be applied as required parallel to the lip of receptor, pan or tub. The top of square cut furring, or if beveled, the start of bevel shall be flush with the upper edge of receptor, sub-pan or tub. (See Figures Al, A2 and A3). A3.24 A continuous metal spacer strip as specified under Paragraph A3.33 shall be applied with the 3/4" leg behind the furring with the apex of the angle abutting the top surface of the furring and the 3/8" leg protruding away from the stud face. If a metal spacer strip is not used, the wood furring must be beveled. (See Figures Al, A2, and A3). A3.25 For walls to be surfaced with ceramic tiles over 1/4" thick: When 3/8" gypsum wallboard is to be used on studs spaced 16" o.c. or 1 /2" or 5/8" gyp sum wallboard on studs spaced more than 16" o.c., suitable blocking shall be installed between all studs. One row of blocking shall be located ap proximately 1" above the top of the tub or recep tor and another row at the mid point between the tub and ceiling. Blocking is not required for 3/8" gypsum wallboard on studs spaced 12" o.c. or less, or for 1/2" or 5/8" gypsum wallboard on studs spaced 16" o.c. or less. A3.26 Appropriate blocking, headers or supports shall be provided to support -tub, other plumbing fix tures, and to receive soap dishes, grab bars, towel racks and similar items as may be required. A-1 SGP 0003256 A f A3.30 Materials: A3.31 Gypsum wallboard shall be 3/8", 1/2" or 5/8" in thickness and shall comply with the require ments of ASTM Designation C36 for Gypsum Wallboard. Note: Insulating (foil-backed) gypsum wallboard shall not be used as a backing material in shower stalls or tub enclosures. A3.32 Materials for treating joints and concealing nailheads shall be as recommended by the manufac f '/ turer of the gypsum wallboard. A3.33 The metal spacer strip shall be fabricated of 16 gage galvanized steel, with one leg 3/4" wide and one leg 3/8" wide bent at a 45 angle. A3.34 The surface sealer shall be either a water resistant adhesive recommended by the manufacturer of the surfacing material or a water resistant sealer as recommended by the manufacturer of the gypsum wallboard. The sealer shall not be applied until after the joints are treated. Shellac shall not be used. A3.35 The adhesive used for application of the surfacing material shall be approved by the manufacturer of the surfacing material for use over gypsum wallboard. A3.36 The surfacing material shall provide a durable surface and prevent the passage of free water to the backing material; also, it shall prevent the passage of water vapor which may lead to conden sation within or on the surface of the backing ma terial or framing members. A3.37 Waterproof receptors, pans or sub-pans shall have an upstanding lip or flange which shall be a mini mum of 1" higher than the water dam or threshold contained in the entry way to the shower. A3.40 Application: FIGURE NO. A3 A3.41 Shower pans, receptors oy^tubs shall be installed prior to the erection o( the gypsum wallboard. They shall be properly furred away from the fram ing members as specified in Paragraph A3.22, and installed so that the inside surface of the lip or A-2 SGP 0003257 upstanding leg of the receptor or pan shall be in alignment with the surface of the gypsum wallboard. A3.42 Gypsum Wallboard: A3.421 Gypsum wallboard, 3/8", 1/2", or 5/8" shall be applied horizontally with the factory edge (paper bound) abutting the top edge of the metal spacer strip or beveled furring, which shall allow a minimum of 1 /4" space between the lip of the receptor, tub or sub-pan and the gypsum wallboard. A3.422 Gypsum wallboard shall be nailed as required in the foregoing specification. Where gypsum wallboard is to receive ceramic tile over 1/4" thick, the nails used to attach the gypsum wallboard shall be spaced a maximum of 4" o.c. A3.423 All joints between adjoining pieces of wallboard, including those at all angle intersec tions, shall be treated. (See Paragraph 2.70). A3.43 Application of surfacing material: A3.431 Prior to the erection of surfacing materials, the approved type of sealer shall be applied to all gypsum wallboard areas including treated joints and angles which are to receive such surfacing materials. When the adhesive is used as a sealer, it shall be applied as a separate operation, independently of the application used to adhere the surfacing material, spread ing it in a continuous coating approximately 1/16" thick. All edges of cut-outs made in the gypsum wallboard for pipes, fixtures, etc., shall be sealed in a like manner. A3.432 Prior to the erection of surfacing materials, all openings around pipes, fixtures, etc., shall be caulked flush with waterproof, non-harden ing caulking compound. A3.433 The surfacing material shall then be applied down to the top surface or edge of the fin ished shower floor, return, or tub and in stalled so as to overlap the top lip of receptor, sub-pan or tub. A3.434 The surfacing material shall be applied so as to completely cover the following areas: (a) over tubs without shower heads--6" above the rim of the tub. (b) over tubs where showers occur--a mini mum of 5 feet above the rim or 6" above the height of the shower head, whichever is higher. (c) Shower stalls--a minimum of 6 feet above the shower dam or 6" above the shower head, whichever is higher. (d) All jambs in shower stalls shall be covered to a like height. (e) The surfacing material shall be carried to the full specified height for a distance of at least 4" beyond the external face of the tub or receptor. Areas beyond an exterior corner are excluded. A3.435 Where plastic finished wall panels are used as a surfacing material, the following precautions shall be taken: , (a) Only the type and shape of mouldings recommended by the manufacturer of the surfacing material shall be used. All in terior and exterior angles shall be treated with mouldings containing a flange pro jecting behind the surfacing material on each leg of the angle. Only recommended tub mouldings shall be used at the base where the surfacing materials abut the tub, shower floor, or curb. Such mould ings shall be set in caulking compound. (b) A bead of caulking compound shall be ap plied at the angle formed by the gypsum wallboard backing and the moulding used around the top edge of the surfacing material to prevent leakage of water be hind the moulding. A3.436 Where other types of surfacing materials are used, the following precautions shall be taken: (a) All joints shall be filled in such manner as to leave no voids for water penetra tion. (b) Nonsetting caulking compound shall be applied between the wall surfacing ma terials and the floor of the shower or rim of the tub. (c) The angle between the edge and the sur facing material shall likewise be caulked. A4.00 VENTILATION ABOVE GYPSUM WALLBOARD CEILINGS A4.10 Attics or similar unheated spaces above gypsum wallboard ceilings shall be adequately ventilated as follows: Provide effective cross ventilation for all spaces between roof and top floor ceilings by screened louvers or other approved and acceptable means. Net ventilating area for each separate space shall be not less than: A4.20 Roofs with slope 2 in 12 or greater: A4.21 1 /300 of the horizontal projection of the roof area over each space, provided that at least 1/2 of the required ventilating area is in the upper part of the ventilated space, as near the high point of roof as practicable. A4.22 1/150 of the horizontal projection of the roof area over each space if not in compliance with Para graph 4.21. A4.30 Roofs with slope less than 2 in 12: A4.31 1/300 of the horizontal projection of the roof area if a completely continuous vapor-barrier is provided. ^ A4.32 1 /150 of the horizhntalvprojection of the roof area if such a vapor-barrier is not provided. Note: A vapor-barrier is a material having a vapor permeability not exceeding one (1) perm. A-3 SGP 0003258