CLEAN AIR ACT INSPECTION REPORT General Motors Corporation Flint Assembly, Flint Metal Center, and Flint Engine Operations, Flint, Michigan
Charles Hall, Environmental Engineer AECAB (MN-OH)
Brian Dickens, Section Chief AECAB (MN-OH)
File, General Motors Corporation Flint Assembly, Flint Metal Center, and Flint Engine Operations, Flint, Michigan
BASIC INFORMATION
Facility Names: General Motors Corporation Flint Assembly, Flint Metal Center, and Flint Engine Operations, Flint, Michigan
Facility Locations:
GM Flint Assembly, G-3100 Van Slyke Road, Flint, Michigan GM Flint Metal Center, G-2238 Bristol Road, Flint, Michigan GM Flint Engine Operations, G-2100 Bristol, Flint, Michigan
Date of Inspection: 12 April 2022
EPA Inspectors: 1. Charlie Hall 2. Valeria Apolinario
Other Attendees: 1. Scott Applegate, Environmental Engineer, General Motors - Flint Assembly 2. Bob Byrnes, Michigan Department of Environment, Great Lakes, and Energy 3. Darren Dimma, Environmental Engineer, General Motors 4. Kimberly Gerlock, Environmental Engineer, General Motors 5. Julie Lenz, Environmental Engineer, General Motors 6. Madeline Mahnick, Environmental Engineer, General Motors 7. Eric Mwacalimba, Environmental Engineer, General Motors - Flint Engine Operations 8. Hannah Watts, Environmental Engineer, General Motors - Flint Metal Center
Contact Email Address: darren.dimma@gm.com
Page 1 of 8
Purpose of Inspection: inspection of pickup truck assembly plant
Facility Type: pickup truck assembly plant
Regulations Central to Inspection: Michigan VOC State Implementation Plan Rules including R 336.1225, R 336.1702(a), R 336.1910, and R 336.1213(3). MI-ROP-B1606-2020.
Arrival Time: 08:25 EDT Departure Time: 17:40 EDT
Inspection Type:
Unannounced Inspection Announced Inspection
OPENING CONFERENCE
Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet Small Business Resource Information Sheet not provided because General Motors is not
a Small Business Provided CBI warning to facility
The following information was obtained verbally from Applegate, Dimma, Gerlock, or Lenz, unless otherwise noted.
Company Ownership: The ownership of the facility has not changed in the last 5 years.
Process Description:
The facility assembles 3/4- and 1-ton pickup trucks from parts that are brought to the facility. Pickup truck body parts are stamped into their shapes on-site. In the body shop, pickup truck body parts are assembled and welded together. GM applies a corrosion protection sealant to some seams between body parts before welding. The truck bodies are conveyed to the paint shop where they are pre-treated in six consecutive dip tanks to clean the metal surfaces. After a six-step cleaning process, GM applies five layers of coatings (an electrocoated corrosion protector, a primer, two paint coats, and a clear coat) to the truck body. The emissions of volatile organic compounds from the electrocoat, primer, paint, and clear coat steps are controlled by six regenerative thermal oxidizers (RTO). The electrocoat is applied in a dip tank. The other layers are applied by robotic spray guns. Paint over spray is collected in a water bath below the spray line conveyors.
Other emission units at the facility include the following: below ground storage tanks for gasoline, diesel fuel, power steering fluid, and antifreeze; cleaning equipment for the paint spray
Page 2 of 8
guns; windshield adhesive and sealant application; a room temperature vulcanizing process; several natural gas-fired emergency generators; fire pumps; cold cleaners with non-chlorinated solvents; five 8-million British thermal unit per hour (mmBTU/hr) boilers; two 5-mmBTU/hr water heaters; and two 2.2-mmBTU/hr boilers.
Staff Interview:
Each RTO is subject to a minimum temperature limit that was established during a performance test. GM performed the most recent performance test on each RTO in May 2021. GM established a temperature set point for each RTO that is 5, 15, or 20-degrees Fahrenheit (F) above the temperature at which the RTO demonstrated compliance with the destruction efficiency standard. The RTOs with the temperature set point 15F or 20F have more variation in their VOC concentrations.
TOUR INFORMATION EPA Tour of the Facility: Yes.
Data Collected and Observations: The inspectors collected the following temperature data for the six RTOs associated with Flint Assembly.
RTO Emission Unit
Date and Time of Observation
ELPO OVEN RTO 1 EU-ECOAT ELPO OVEN RTO 2 EU-ECOAT SEALER OVEN RTO EU-SEALERS & ADHESIVES TOPCOAT OVEN RTO 1 EU_THREE WET TOPCOAT OVEN RTO 2 EU_THREE WET TOPCOAT BOOTH RTO EU_THREE WET
4/12/22 @ 11:58am 4/12/22 @ 11:58am 4/12/22 @ 12:06pm 4/12/22 @ 1:02pm 4/12/22 @ 1:05pm 4/12/22 @ 1:13pm
RTO Set Point, 3-hour average 1520F
1520F
1555F
1515F
1515F
1575F
RTO Temperature, instantaneous
1523.8F
Minimum Temperature Limit, 3-hour
average 1515F
1509.7F
1515F
1559.3F
1540F
1514.4F
1510F
1510.1F
1510F
1565.0F
1555F
Each RTO has two combustion chambers: Chamber A and Chamber B. The data acquisition system for the ELPO, Sealer, and Topcoat Oven RTOs records an instantaneous temperature reading of Chamber A and Chamber B every 5 minutes. The averaged chamber temperature is calculated from these instantaneous readings. The data acquisition system for the Topcoat Booth RTO records the averaged chamber temperature every 5 minutes. It takes the average of the two chamber temperatures and then calculates a 10-sample running average with a 1-second sampling rate. The oldest second rolls out of the calculation, and a new second rolls into the calculation.
Page 3 of 8
Inspectors also visited Flint Metal Center and Flint Engine Operations. At Flint Metal Center, inspectors observed dry fabric filters within the maintenance paint shop booth, required by the facility's ROP, which are inspected every month.
Photos and/or Videos were not taken during the inspection.
Field Measurements such as opacity and leak detection and repair data were not collected during the inspection.
RECORDS REVIEW
The inspection team did not review records onsite.
CLOSING CONFERENCE Provided U.S. EPA point of contact to the facility
Requested documents:
During the opening conference, the lead inspector requested the following documents:
An aerial diagram of the facility; A list of all comfort cooling appliances and industrial process units that contain 50 or
more pounds of an ozone depleting substance; and A process flow diagram.
Byrnes, the Michigan EGLE Auto Assembly Plant Expert, requested the following information, and Hall requested that GM provide a copy of this information to U.S. EPA:
MI-ROP-B1606-2020 SECTION 1 - FLINT ASSEMBLY April 2020 through February 2022 saleable vehicle production data by the month (can be part
of emission records). For all control equipment (RTO's) provide the most recent destruction efficiency and
operating temperature (unless they have not changed since July 2020). For capture efficiency and oven solvent loading please provide a summary of the most recent
tested values (unless no changes since July 2020). Please provide a summary of the most recent particulate testing results and/or emission
factors used in the particulate matter calculations. Please provide copies of the dry filter and water wash records for the week of February 7,
2022.
EU-PRETREATMENT Explain whether GM has changed any of the materials since July 2020. Please provide a
copy of the SDS for any material changes.
EU-ECOAT Explain how VOC content is determined.
Page 4 of 8
EU-SEALERS & ADHESIVES Explain how VOC content is determined.
EU-SOUND DAMP Explain how VOC content is determined.
EU-THREE WET Explain whether GM conducts batch verifications of the VOC contents. Explain whether GM uses any type of deodorizer or odor masking products in the Prime and
Basecoat stacks or withing the water wash system. If GM does, please provide a SDS of the material being used.
EU-GLASS INSTALL Explain how VOC content is determined.
EU-FINAL REPAIR Explain how VOC content is determined. Explain how the repair paint usage is determined.
EU-PURGE&CLEAN - records details
EU-EMERGENERATOR and EU-GAGENERATOR Please provide the most recent hour meter reading.
FG-TANKS Please provide records for each tank (ID, capacity, installation date, material stored, vapor
pressure, applicable requirements) SC VI.2.
FG-PAINT&ASSEMBLY Please provide copies of the 2020, 2021, and 2022 (if available) annual auto protocol reviews
for TE, CE, OSL, etc. Explain whether GM has conducted any other authorized projects under SC IX.3 or IX.4 in
the last 2 years. Provide a copy of the emissions summarized (VOC, PM, PM10, PM2.5, NOx and natural gas
used) for each emission unit for the months of January 2021 through February 2022. Provide a copy of the detailed emissions for the month of February 2022 for each emission
unit. Provide a copy of the monthly natural usages for Jan 2020 through December 2021.
FG-CONTROLS Copy of the O&M plan, SC III.1. Copy of the most recent repair/inspection records for the RTO's, SC VI.2. Copy of a water wash inspection records for the week of February 6, 2022.
Page 5 of 8
Copy of the 2 latest RTO bakeout records. Condensed copy of the RTO temperature records for the week of February 6, 2022. Copy of the latest thermocouple validation for each oxidizer.
FG-MACT Copy of the MACT emission report for February 2022. Monthly summary data for Jan-Dec 2021 and Jan 2022.
FG-NATGASEQUIP Copy of the NOx emission record and the million cubic feet per year record for 2020 & 2021.
FG63-5D-WTRHEATERS Copy of the most recent reporting submittal.
FG-COLD CLEANERS Provide a list of cold cleaners including information to document R285(r)(iv) and/or Rule
707 requirements.
FG-EMERGENCYENGINES Provide hours of operation for each engine, emergency and non for 2020 and 2021. Provide the latest record (if performed) of maintenance as listed SC III.1.
FG-EMERGENCYGENERATOR-1 Provide hours of operation for each engine, emergency and non for 2020 and 2021. Provide the latest record (if performed) of maintenance as listed SC VI.1.
MI-ROP-B1606-2020 SECTION 2 - FLINT METAL CENTER
FG-RULE 287(2)(c)-2 Copy of the gallons used each month for each EU for January 2020 through December 2021.
FG-COLD CLEANERS Provide a list of cold cleaners including information to document R285(r)(iv) and/or Rule
707 requirements (Id, date installed, air/vapor interface, R201 exemption, square feet, Reid vapor pressure, operating temperature, etc.).
FG-BOILER-MACT Provide a copy of the most recent tune-up. If using Liquid No2. Fuel, provide records of the hours of operation using liquid fuel No. 2.
FG-EXT-EMERGENCY Provide hours of operation for each engine, emergency and non as in SC VI.5 for 2020 and
2021. Provide the latest record (if performed) of maintenance as listed SC VI.4.
Page 6 of 8
FG-NEW-EMERGENCY Provide hours of operation for each engine, emergency and non as in SC VI.1 for 2020 and
2021.
MI-ROP-B1606-2020 SECTION 3 - FLINT ENGINE OPERATIONS
EU-SGE-RTV Provide a copy of the monthly materials used, VOC contents and VOC calculations
determining the monthly emission rate for December 2021. Provide monthly VOC summary emissions for January 2020 through December 2021.
FG-RULE290-3 Provide records for each EU identifying each contaminate emitted, controlled or
uncontrolled, carcinogenic or non-carcinogenic, the ITSL or IRSL, each material used and calculations demonstrating R290 limits are met for each month of 2021.
FG-RULE 287(2)(c)-3 Copy of the gallons used each month for each EU for January 2020 through December 2021.
FG-COLD CLEANERS-3 Provide a list of cold cleaners including information to document R285(r)(iv) and/or Rule
707 requirements (Id, date installed, air/vapor interface, R201 exemption, square feet, Reid vapor pressure, operating temperature, etc.).
FG-EMERGENCYENGINES-3 Provide hours of operation for each engine, emergency and non as in SC VI.5 for 2020 and
2021. Provide the latest record (if performed) of maintenance as listed SC VI.4.
FG-EMERGENERATOR-3 Provide the latest copy of any record of testing, manufacturer certification and maintenance
records. Provide a record of the total hours of operation and the hours of operation during non-
emergencies for each month of 2021.
4/12/22 Inspection Question During the inspection, we observed a DURR Ecoclean unit that was part of the SGE Head
Mod 2. Please explain the purpose of this unit and explain whether it uses heat provided by burning fuels or electricity. Also, please provide a copy of any SDS for materials being used within that piece of process equipment.
Page 7 of 8
Compliance Assistance: The inspectors did not provide compliance assistance to GM. Concerns: During the closing conference, the inspectors did not identify any areas of concern. DIGITAL SIGNATURES
Digitally signed by CHARLES
CHARLES HALL HALL
Report Author:
Date: 2022.06.02 12:34:46 -05'00'
Digitally signed by Brian Dickens
Brian Dickens Date: 2022.06.02 13:42:28
Section Chief:
-05'00'
Page 8 of 8