Document ppRbN7pJ8vNDE4ng5yRJMD1g7

* VINYL CHLORTDS MONOMER (VCM) EMERGENCY PLAN Conoco.Chemicals . Aberdeen, MS Plant * DEFINITION OF A VCM EMERGENCY * 4m A VCM emergency is any unexpected massive release of Vinyl * f* Chloride, such as the venting of a reactor through the vent * * line or safety disc., breakage of a VCH line, release of . liquid VCM in a building or area from a live reactor or * * ** *i * VCM line or liquid discharge of VCM from a storage tank m or tank car. PURPOSE OF THE PLAN ** #* *.* i * '* A* Prepare personnel for VCM emergencies- in order to insure ` .* * * * * * . *. - the health and safety of employees and the surrounding commu 4 '* * * B, Minimize personnel exposure to VCM, property damage and - * *.*** ***. **# . - * * . '" .. 1 f * ** * :./'}.oss of material and .provide for the resumption of ^ ^ ** * *# *_ * * ** t* i * * ** iM ^ * ***'***- *d * . *ope^tlans following a VCM emergency* ****** 'V * ** -- * t * ** * * . /. 1 * . * * * f f AREAS INVOLVEIT A--... */ * * *J ** * it % ** . V4 . % VCM.emergencies at.*-the. AAbbeerdeen Plant I^ ** h i * \. * * \ . * may occur at normal m+ the VCM .. - . ' / V ' *, . . * Tank Farm, at *d VCM tank c '* * * , * Vinyl Reactor Areas and at each Vinyl Reactor Area. The VCM * * , > emergency may expand to include other areas oi: the entire * 1 *, * ft * * ** ~~ ... + ft It / ** # t ft * A >**>*4 // ** m weather conditions during the release* *p XV. IMMEDIATE ACTION TO RE TAKEN IN THE EVENT OF A VCM EMERGENCY mas ** a procedures should be followed in most cases. * .* escape will be slightly differe ** judgement VCM have to be made in each case. In roost cases, the Vinyl * * Reactor Shift Supervisor will make the.'first determination * -i */ * . Of*what actions arc to be taken. The actions tatfen may ** * range from handling the VCM emergency with personnel present ft * *^ at the time to full alert of the Plant Disaster Organization 4 Most cases will be handled in the* following manner! ##1# VCM ft . 1. jjyftcuatc All Personnel - The Charging Operator is to ft p * * ft * ft ftM 4 * notify all utilities and other personnel of the emergency ft ft * * t and be sure that they get out of the reactors and out of /* * ^* * ft ft . * * t ft ft ** 4 *- 1 * *:* * the building. In the absence of the Charging Operator, . * . ft # the Lead Operator is to be responsible for all personnel i ..getting out of the building. . If the release is in V-ll. * * - * ,f I * the Recovery Operator is to notify the barge Reactor I *\ * * ftp * personnel and 'they are to evacuate as if the escape P "*.* . - .* V *, ***' * .* . H. * 'ft * ft* ft **ft * *A * ft ft A ! _ * vere^in their area, All operations, personnel are to ft ^ Wm * ft ft m* * ft . 4 I. *I * _ ft^ft * V* ,, / .ft' ' #^ ft ft move away .from the building and assemble at the East ft ^ * ft 4 * ''.**. * * * . 1 * * 1 * ft I *ft . .* Room) ft* Maintenance personnel who arc in the affected area * ** * * ' ^*ft ft* * ft ft ft ft % ft A * 1* The correct respiratory protection roust be worn during ft ft > l -OH*i mmmmmimp iumhmmi ft * I ft ft * ft * \I *v .. 1 * * ft ?./ yAB.0001-334414 ' i ft ft* * ^* " % %'.M *> * A ** * K . I ft** L # is ft ft i/ * / ore to return to the'Vlnyl Maintenance Shop (Including -v * p A * Utility &t Electrical - Instrument personnel).' Contract * personnel are to return to the Contractor's Shop, Meat * of the Large Reactors. All other personnel, arc to return * ft * /' * to their areas," Including personnel who arc In the Vinyl * ft Area Break Room. Ho personnel should go toward the VCM Vapor to get to his assembly area. .. :. 9 . * 2. Set Off Deluge System - Do this while leaving the building 9* * J* * t * ft 4 (If possible) if the system has not started automatically. t* * . ** p 3, Head Count - The Reactor Lead Operator or Dryer Supervisor is to make a head count to be sure that all personnel are * * m accounted for (including Large Reactor Operators, If * ** ft I A applicable). The Vinyl Maintenance Supervisor is to make *9 A head count of his employees to be sure that all are ** 4 ft . 1' accounteftd for. Hollis Martin and Jim White are. to account ft ^ for all Contractor personnel. ** 4. Turn In The Emergency Alarm For Vapor Release - Dial 62 * *. 4 ft ft *>ft . * * for`the-Vapor * 1 Release Alarm and 1* then dial 8 and announce * over the Paging .Systenv.the location and the nature of the # 4. t * * ft 1* * . . . ** * I 9* 4* ft ft ft. ft ft ft' *>; * * ft r * * ft problem. " The. *alarm will alert the guard, to stop l and-a)crt oth.cr plant personnel of * the emergency, so 'that *. . - , * ** ' . * V '. * rue *' ^ All welding and hot work in the plant is to stop immediately * ** when the Vapor Release Alarm Is sounded. . ; 5. frryftr Oas Burners - When the Vapor Release AlarmVAB is bounded, the Dryer Lead Operator, Dryer Operator or mmm ......mi pi'ftw i -- ---- ---------------------------- -- - -- ^^ t i + . t I Immediate l'y own * Dryers. (Reactor the affected area, mu 0- Provide Medical &/0r First Aid Treatment For Injured Personnel - * ^"l -.............. "P 11 ' ^ * * Standard First Aid procedures should be followed with the * extent of treatment determined by the Shift Supervisor. ** 4 ^* * Ttjc Plant Nurse or the Laboratory First Aid Attcndent * should * ass. ist * the Xf serious injury 1 Shift Surpervis- or with the has occurcd, ain ambulance *m F irst Aid. , should be called at once. _ Oxygen should be given to anyone who ** 4 i has been exposed to high VCM concentration. 9 ** * * # Relocation Of Personnel - The Vinyl Reactor Shift Supervisor * * a * * should determine from his Lead Operator and Reactor Operators 4 - i * from the affected area vihat the emergency ts. Also, at this 4# * time, he should determine the wind direction and, if necessary-,. % relocate the assembly point to the concrete pad North of #4 * V-10. He may also send a messenger to another Reactor * #- * Ar.ca or Areas to request them to evacuate to the Dryer * 44 Control Room or V-10 Pad, Y% -* * ' ** * * If necessary, n messenger r '' ' *^chqoid be* sent to the highway in front of the plant to * I . *>"*** - . * - * . etop^traffle from entering the plant road. 1i *_ . * i1 44 ** > The Vinyl Maintenance^Supervisor should check the wind direction *4 *m * *4 ** *' * and relocate his personnel at the Front Maintenance l t ta *i Shop, if necessary.' Jim White and Hollis Martin should 'check I I *4 the 4 wind ^* # direction and relocate Contractor * r .i I* *t personnel VAB.0001224416 MiiiM H ' t ............. . igTiiT imwimi lii tBIU'iiji'1 I f ' f * !i... i pf- ,vnf 2W. to the Main piant Gate, if necessary.. If further evacuation Supervisor Alarm (dial 8) and announce over the Paging System the needed relocation or m evacuation (including Compounding * * evacuation, if needed), s * and * *r i * other personnel * . % . * Miscellaneous Action Steps - For a, reactor bottom gasket ft ^ leak, vent the reactor to the atmosphere while leaving * the building, if possible. p # For.a reactor tnanhead gasket leak, blov?down the reactor * * to the atmosphere'while leaving tlie building, if possible IX) EOT BL0VJ1XR7N A HE ACTOR TF UTILITIES ARE STILL IN THE ' HEACTORS. Re-Entering building - A building or;area that has a ** * higher concentration than 3,600 p.p.m. should be entered only to rescue a person or to prevent a greater hazard * ^from occuring. When the amount of VCM has been lowered, normally 15-30 minutes, the Vinyl Reactor Shift Supervise ' .* * . * * and two other persons with Scott Air Paks, a century unit ** * *- * a*ni d*.a*n.E.x*plo-simctcr sho ul; d re,.tu rn to the ` building. O. ,nly^ ** -- % * ' -.4 i ** pne .'person should/ enter, while the others watch him from "m* * + . # *_ 1 . V ,* ' * '-the.....tyitside, '*Everyone must have a Sco1 tt-1* Air Pak on. .1 * #V** * *# wI # * 4 *\ * this, time, the person should stop the blowdown if the \ *. .. * At' * system has equalized and make any changes in the reactor *i . * '' *, ( ' I that arc necessary (i.c. take reactor off heat-up). He should check the reactor to be sure that all the pressure has been released and If the reactor pressure Is zero * and the VCM concentration Is below 20% on Exploslmctc <0 ' and shut off the.deluge system. VCM content with a Century Unit. # Check If a lower ** the building for t t * reading above 25 p.p.m.* is obtained, leave the buxlding. _ Return after ** several minutes with a Scott Air Pak and check again ** until a reading of less than 25 p.p.m. is obtained. The building should then be ventilated for 1*0-15 minutes before re-entering by the operating personnel. * 4 t4 ft . Notification Of Plant Management - During the time the * ** personnel are waiting for the release to stop, the Vinyl * ** Dryer Shift Supervisor.will call thcVinyl Reactor Operation . * * * Supervisor and the Plant Safety Director to notify them of * .`the VCM emergency. The Operations Supervisor will notify i * the Operations Superintendent, who in turn, notifies the t Plant Superintendent. The Plant Superintendent is to - notify the Plant Manager. *4 Depending on the nature of the emergency, certain members . * ;'cTf the Plant,.Management will come to the Plant, .. * * . * . ** * # *'* .* . However, * If'the ViOvl Reactor Shift Supervisor believes the VCM * / emergency to be extremely serious., he should notify the t ' j \ * * ,* *1 d %. % ory to start calling * in the Plant Disaster Organization (Sec Plant Emergency .. . Procedure for Disaster'Organization, Job Descriptions, * ** tv m ct:c,). Disaster Organization Chart and Disaster Call VAB i I** J 9 * * * *0 * *I * * l *. )- * *I * 4 # h' * .* % 4* * w XI. .1 * List arc found at the end of this Plan* #* Turn In The All Clear, When Appropriate - Dial 63. All +* . i * * ;** affected areas should be below 25 p.p.in. "celling and no -* * * potential for additional releases existing fcoforc the . I I. 4 *- k All Clear Is given. * B. VQ1 Release In The Larne Reactor Area ** 1. Evacuate Personnel - The Senior Large Reactor Operator " i " ^ - i "* 1 11 " * 1 1 ' *4 Is to notify the Large Reactor Lead Operator by radio * * *m 0 i 4 ** * 4 w (do not open the Control Room, as this, may allow VCM 4 P * 4 -- into the Control Room) and then notify all personnel * i* * in the area of the emergency and to be sure that all * 4- personnel leave the area. The Junior Large Reactor i * ^ * Operator is to go to.V-ll and notify the Lead Operator ;* or. any V-ll Reactor Operator of the emergency. h V-ll * m 4 personnel are then to be evacuated as if the VCM release * * vcrc in V-ll- All Operations Personnel (except the W h Large Reactor Lead Operator) are to move away from the * ** a .* area and assemble at the V-ll Dryer Control Room. *4 * * i * Maintenance and Contract petsonne1 arc to evacuate the * * 44 Large Reactor Area and V-ll the same as they would if the * * * * ** *4 * 4* - rL 1-- + *... emergency were a VCM release in a reactor building. A # a* * T * 2. Set Off, Deluge System - The Large Reactor Lead Operator * * u * -. *' * *. * Is to set off the Deluge System using the button under > ** * t the MSA Unit in the Control Room as soon as he io notified of the VCM release. mmmtmmmrnmmmm % 4* * *> VAB.0001224419 i 3 Turn In The Emergency Alarm ti Reactor Operator is to dial 62 and then dial 8 and announce over the paging system the location and the nature of the problem, m * * Vi. Head Count - %* make a head count and the V-ll Lead Operator is to make a head * * count to be sure that all operating personnel are accounted * v* for. The Vinyl Maintenance Supervisor and llollis Martin and h Jim White arc:.to account for the Maintenance and Contractor * personnel, respectively. m* 5- Shutdown Dryer Gas Burners - Same as Item A-5. * 6, Re-location Of Personnel Same as Item A-7, 7, Re-entering Aren - Same as Item A-9. vh 8. Notification Of Riant Management - Same as Item A-10, 9, Turn In All Clear - Dial 63. VCM Release From Tank Farm Or A VCM Tank Car 4 # * 1, Rvacunte Personnel - The Yard Operator or other personnel VCM ; . Area or a VCM Tank Car are to notify * P *^ 4 , I* >V J iL 4 * *, . 4 ^. ' ** * t * *' ****', V:<a in the. area.'Co evacuate and assemble -. % w ''+ : * * - * - * ** - * _ - j l * *p any other personnel in their other areas. * '2J "`*.*.T U --T'n: In The' Emerge.n...e..v....A....l.a..r..m.. . F"or V"a*p..o...r... Re"lease - Dial 62t and ** * 4 ** 4 " I*. * I V*`V.^.then dial 8 ;and report the location and the nature of the \ . . t *: * 1* ** * ** ** `VCM release. * +4 4 4 * ** Then proceed to the V-ll Dryer Control Room. # 1 * * ** The Vinyl Reactor Shift Supervisor is to meet the person w --- J: vho turned in the alarm at the Dryer Control Room. * " 4* )f i m. 4 1* m VAB * 3# Detcmi 4 Supervisor should determine in the alarm what the natur Also | determine direct evacuation.as needed, by again sounding the Vapor m * m Release Alarm (dial 62) and then (dial 8) and announcing the evacuation plan necessary. % * 4/ Head Count - Same as Item A-3. # # 5, Shutdown Gas Burners - Same as Item A-5. p> * - 4 0 Provide Mcdicn1 And/Or First Aid - S ame as It cm A-6 7. Re-entering The Aren - The Vinyl Shift*Supervisor and two * w other persons with Scott Air Paks, a Century OVA Meter and ** ft* * an Expl'osimeter should re-enter the area to prevent further * release of VCM. When this is done, leave the area again, * * 4. V * * ft k i ; ** until it is assumed that the area is clear.. Use a similar . * *V . * procedure to Item A-9 before all personnel re-enter. .* ft # * 8, Notification Of Plant Management - Same as Item A-10, except * * that.the Dryer Shift Supervisor is also to .call the Warehouse ft * * ft ft * f.*; Operations l' *.. ft ** * Superintendent. >ft. 9.* -.'Turn -In The All Clear - Dial 63. ** *1 _ ITM 4 *w ft *' 4* *i; * * +* m*. " 4 * * W ** * .* \* V . * - 1* -" I ' ft I k ft 4 /* A ** * V*i * V* v.*.' ' v ..V.:.';* ' .* ft' V:* 1* ' 4 * *. ; * * *p * ft * VCM Release From A VCM Line, Receiver, Filter, Etc. A . * * * ft ft 4 1# The person observing the massive release of VCM is to V. notify .* any other personnel in the lmmediat ' * .. ** * * ' ** assemble in their designated areas. * 2. Turn In The Ewe r gene, v Alarm For Vanor m* * mtmmu tmrnmm < r ^ 1* ft h $ and then dial 8 and announce over the Paging System the location and the nature of the release* Set off Deluge * System, if applicable* Then proceed to the Dryer Control Room* Supervisor v * person at the Dryer .Control Room. .3* Dctc'rmiritaion Of Evacuation - If the release is located behind w the V-ll Building, the V-ll and the Large Reactor personnel arc ** to evacuate. Remainder of this procedure is the same as Item C-3. 4, Head Count - Same as Item A-3. * * 5* Shutdown Cos Burners - Same as Item A-5. 9 t t* 6* Provide Medical And/Or First Aid Treatment - Same as Item *4 A-6. * * +* 7, .Re-entering The Area - Same as Item C-7* * * I # *8. ^W 9: Notification Of Plant: Management - Same as Item A-10* _____________________________________ ~ -- --* ' m Turn * *t 1 P E*`- YCM Release From A Reactor Vent Stack . _ -- - - -- -- -- -- ----- 11 * * 4* ft ft L* Turn In The Emergency Alarm For Vanor Release - In the event ft V ft m * ^1 * ft *. * * * *** ft * * ft ft * * ft v V* - ft ft r*'0*.'* disc, *:* * ''t - 44 *. j*h ... relief, valve *'.*'* * ' .V - . .. . system or manual venting system, rupt dial 62 . ; * i #' . . % *-* . * * , * 1 * *f * *. v " ` ' * . . . ^ * . * ..... "* theft n^'.''diai^ 8 an* d announce the location and the nature **** #+ '* # *.* * , * *1/ * l* . **** -* * *fct*^V.*'7*p V*"* *ap*o* r *R* ele* a*s;e* * . ' 1*T* h*e' Guard will then stop traffic. ofA, the ' * ; *. . . * ft * *> 4 i; m < tV ' I ft 4 *a. trt |t 1*4 || t i* ir 0/2* Shutdown Dryer Gas Burners - Dryer personnel are to push the 1 t b .emergency shutdown.button for the gas burners and exhausters 0. i* ` ** -r * on the V-10 and V-ll Dryers immediately upon hearing the Vapor ft , t i Release Alarm, (heep - beep - beep) if reactor personnel have i ta % * < \ ft i - -- nim *....... mi ft * not already done this at + V* 4 tt mm x. the V-ll and V-l?. i. * * ' ff ft h ^ ii stations* i* VAB W414ft. x' 1 ** * ft . 4 i crmtnntton - The Vinyl Reactor Shift Supervisor determine ic necessary by Operations Personnel Maintenance and Contractor personnel should evacuate to their assembly areas as soon as m i. the alarm has sounded. Further evacuation should be announced by the`Vinyl`Reactor Shift Supervisor by again sounding the alarm (dial 8) the necessary evacuation. ... Head counts are to be taken* at the assembly areas. 4* Notification Of Plant Management - Same as Item A-10 5* Turn In The All Clear - Dial 63. Power Failure *w 1. In the event of a power failure all reactor cooling water < supply and agitation will stop. Therefore, it ic very #* h 4 important to act quickly in order to'keep the reactor venting -I \ a minimum during the power outage. l 2, large Reactors - Inject h gallon Alpha-Methyl Styrene into each areactor immediately, using nitrogen, * m' . " . awayinject AMS again, as needed, +4 * 3,. Small Reactors - Inject one pint AMS * and if the reaction 4 4 * ** into each reactor 4 * runs 1 4 * * 9 4 . Immediatelystarting with the reactions most nearly # ,**:'..**'* V/ '*****', * ** *y, . .v . > .* .*.** .*. *. j ./-'complete or reactions on which the pressure is the highest. *^ J , r** i *. . j . 5 . *v ::.:/Injett Alpha-Methyl- Styrene again, as necessary. * X 4 I* * < . * - *I 4 * t Ad* dit* io* na1 l help* * 'in+; preventing venting of the reactors will be * ft 4* * * , to close the empty reactors and use them and blowdown drums *4 4 * , 4% * for extra expansion volume for reactors nearing venting conditions. i ` . .VAB.0001224423 ** * I *1 * V- I 4 t 0 N . 4. t * 4 9* t * Traffic - Guard to stop traffic and prevent all * personnel from starting cars and leaving the parking * h * ** lot* Additional help should be sent to the highway entrance and stop all except authorized personnel, sec * Disaster Plan. If venting of reactors begins, all cars must be stopped. 5* Reactor Venting - The Vinyl Reactor Shift Supervisor is * ** to follow the Procedure much possible, but send messengers to areas needed In place 4 .of usrng the Vapor Release Alarm and the Paging System v 6 Notification Of Plant Management - Same as Item A-10. 0 V. DEPARTMENT ASSEMBLY LOCATIONS * .. The Vinyl Reactor Shift Supervisor will announce the needed *4 +4 I* p evacuation over the Paging System or send a messenger to the * * 4 needed areas, except by evacuation by procedure when the alarm sounds. 4* * * A. Vin Deportment ** ** 44 Primary - East end of the V-ll Dryer Room outside the Control Room. ' * 4* ** ? . # - */ * . Secondary Concrete Pad, North of V-10 Reactor Building. 4* m* *n W 4 * *i 4* *4 ** ** Use * .\ * ** if primary - * . *. . 'i .* * 4 * J< 4* location . .* 4 ft ft *- is 'direction or'extent.of VCM 41 ** i *4 i **. V ^ 4* * .* ft * *1 declared release. unsafe due to wind A B. , Utility, Maintenance ft Electrical/industrial c In The Vinvl Aren- 4* t' 4* * fc> V ' 1*. Primary - Vinyl Maintenance .Shop. 4I -I 4 4 4 4 " Ftont Maintenance Shop. Use if primary location % t > VAB.0001224424 lit dcclmcd unsafe due to wind direction or extent of VCM release. I t * i* ft k* i. ft J + `> ft ** ti , ft - I ** * l C. Contractors ~ * -! ft 1, Primary - Contractors Shop. ft .2 Secondary * Front Gate. Use if the wind direction or extent of VCM release is declared unsafe; * . D* ..Plasticizer 1-. Training Area or Hose Finishing Area, if required E Compound 1. Training Area or Hose Finishing Area, if required. P. Dry Blend ft ft 1. Training Area or Hose Finishing Area, if required. ft ft G Main ten a tic e X. Front Maintenance Shop. % * -ft I )!. Laboratory * 1. Transportation Trailer Area * X. Warehouse ft ft * ^ * X. '.Shipping Warehouse, East Warehouse, if required'. Jt Engineering ! Main Gate Area, if required. 4* * * K,. Yard * ft ft * X. Main Gate Area, if required. * * * .** . *. * ft 1 ft .X*v Front Office ft ' 'ft ' 4 . >;. *: 4 *4 *v t w t 1 44 * 1 * 44 ft 4 4 ** l>*. Main ;(*ate Area, if .required. *ft * ** ft ft .a * *\ * 7v* t * ft ft ft ft * ft* * ft *I M Visitors r- *i ** * .* . * V - ft ft1 ft ft 4 * 4* ft , * ft ft* _ * * X. * Main Gate Area, if required, . * * ' * * 4 4 Vi. COMPLETE PLANT EVACUATION'. 44 - ai * * *. a XX evacuation of the plant work site is ordered, personnel t1 tfl'ti` * : . ,v.% l*r- f ii Mm* ,1V I> , **ft JLiIm 4i*:* - 4 \* V| 1*1' '1 f* ftftmftaWftaHiiiih h'*. w ...i t 1 4r<Fp-^ * * I * *4 ft- # / ** h * ft ft i4 VA^.0001224425 \y*rr * * Brv *;' *; ' SiJ ii *4 # ** *+ I - * * i4 ** *P b %. 4 ft- them and Area Supervisory Personnel to'determine estimated exposures He will then discuss the emergency with the Company Medical Personnel to determine what further medical *m surveillance Is needed for each person VIII REPORT TO OSHA SAFETY DIRECTOR Within twenty four (24) hours of any VG1 emergency, the Plant * Safety Director will report that'emergency to the Area OSHA -m * Safety Director. A written .report with additional information and corrective- action inay be requested by the* OSHA Safety Director. IX. PLANT REPORTING b The Plant Manager (1) Plant Superintendent (2) Chief Process 4* * * 4 4 4 Engineer (3) will report the VCM emergency, within twenty *fc W four (24) hours to Saddlcbrook Management (Manager Of * ** m * * Manufacturing or General Manager) and Houston Safety. The m Vinyl Reactor Operations Superintendent will issue a report *1 on each VCM emergency as soon as possible,, not to exceed *m twenty four (24) hours* The report is to include names of i * 4 * personnel involved in the emergency area. * 4 4 *V4 A '15 S l.VB/1/13/75 ..1, MptaMpi 4 f 9 4 *1 t * 4 . I NW 4* 4 v 1 '* * 1 I r ' , * ft _ * *I 44 t* \u4 # #* * 4* . ** t * * * , 4 1 * 4' r - #* t 4 i----L . rii^iu n . 4 X 44 i .. YhH-0001224426 1 * ^ b-r m . * L________ HW 3I . i *i HAN.-\r:KMT-:::T croup Plant Manager 4I * * plant Superintendent \i m * * i ft 4 / perations Superintendent Of The Affected Area * MESSENGER tn Lab Technician ASSISTANT DISASTER OFFICER SECURITY OFFICER -Training Supervisor r GUARDS SWITCHBOARD OPERATO l ^ * r ^* SAFETY DIRECTOR 4 ft * ift 4 I #4 *% *4 ** FIRE CHIEF lyl Reactor Shift Supervisor MECHANICAL CHIEF Mechanical Superintendent FIRST AID CHIEF & ASSISTANm TS Chief Chemist mm Laboratory Lead Technician W ASSISTANT FIRE CUTF.F Line III Shift Supervisor All MW .SUPPORT GROUP mmm mm Maintenance 6e Warehouse Personnel I * W HOSE CREW "A" dcr- Line I/Line III Compounder V.v. Automatic Ba*gge r/Scrap Uti1ity a ^4 * .* i * .*.Dry Blend i . # Utility Utility * i*. l.i . It. * * W * ' Y ** * * * 1 *: yi -* l. * m + * *. V #* Utility #t^** / vI * I l ** it 9; 1* p ** :+ I ** * * * HOSE CREW Leader - Dryer Lead Operator i .L^rge Reactor Operator. 4 *4 s* *4 ; ;-J)ryer Operator t * wDryev p* * * 4 ft ** * 4 ft Utility r [ Dryer. Utility * # M* 4a < I ft wwa * ft V VMM * ft* i Compound Line I Technician * 4 l__ f i ' -E r> r ic a ps m i: c:i **l. a nic Jviny1 Area Shift Supervisor FIIUC RUHR MECHANIC____ Area Shift Mediae ft ft P ft V I !I * V*t # M* * t* I" . \ * I IA 1 ; ftM %*b - >M . *VA.0001224$27 ft * 1/ *> * J*; w>r ^ # n* \ w / ty ->4 . . 4* * Ttie messenger will call the people on the left side of the list* unless 'he cannot reach them. He should then call the person to the top right of the person that he cannot reach. They* in turn* will call the. people .indicated to their right. 4* *1 F, Wtvhins * * (343-8832) R. N. Seymour (369-6870) * D. F. Johnson ....................... mmmm ********* (256-8279) 1.: H. Rrvnn mm (343-8814) R. J. Harrison P69-6344) G. A. Moreno (369-2748) Jerry Powell (369-4871) Nurse * prank N i 11 (369-4628) Jerald Tj plain (369-8109) J, 1). Horstmnn * P. V?. Fran tv. . -HP* (369-8308) A 1 2 1 f; I 4* . J?., I?. Couch (369-6904) jf. V?i 11 iams (963-2796) U. W. Rve tM* (369r4?30) * * R, V. Bcnurcy.fird (343-5184) *m 4 * R, r>, Camblln (369-4693) ft ^ * * C. Nl* Flvnn* k * ** 4* a' i * * (369-6209) ** ^ * \ 4" * * 4. ` .** ** 1 F. J. Refit t fe * * 4 . ft* 4 * (369-4693) ** ** 4 1- * * * .h *- ft * ** n, f*. Cox \ . ...(369-/.926) ** * ** * * *\ m f ' . * * *\ %' . *A : 1 j: r>. MnvS mmm . (369-4430) L J. B. Rtnrk (369-4289) JL-ik*h1 ir ^ i * h *. * 'i rim LjL i- t' --`'iV**' k s ^ *"1 1 -' s * p ,c ` p.x .... .< p' ; w, * A ; i-.m .. i 9 'T4 ilk n. .]' v * r 4 'r*: *# 0. .1, Knie.bt (256-7108) a fr , f I t Iz JLi r* ft ft VAB.0001224428 V if' lJ