Document ppQ7og60Bz07ZLwr8XYmNGKga

August 30, 1988 Greenspoint Development P. 0. BOX 96120 Houston, Texas 77213 ATTN: JOHN HERDT RE: REMOVAL OP ASBESTOS CONTAINING MATERIAL / THROUGHOUT COMPLEX AS SPECIFIED Mr. Herdt: Tricil Environmental Response Inc. proposes to provide all labor, materials, "EPA Certified" supervision, asbestos abatement insurance and documentation to remove asbestos containing material from the above referenced location for the lump sum price of: $126,420.00 . (ONE HUNDRED TWENTY SIX THOUSAND FOUR HUNDRED TWENTY DOLLARS) The removal methods for this project will be a combination of glove bag, cut, wrap and demolish methods. he following is a list of areas and QUANTITIES PROPOSED TO BE REMOVED PER AREA. AREA NO. QUANTITY OF PIPING 1. Hote'i- Top Building 2. Bar Heat Treating Building 3. Wire Mill Warehouse 4. Plate Mill & Intermediate Bldg. 5. Combination Mill 6. Engineering Office Building 7. Main Office Building 8. Instrument Shop 9. Blooming Mill Building 530 Linear Feet 2600 Linear Feet 160 Linear Feet 1015 Linear Feet; 750 Linear Feet 1200 Linear Feet 680 Linear Feet 120 Linear Feet 877 Linear Feet TOTAL 7932 Linear Feet RR?I ooy ARM000894 This price does not include decontamination of ground beneath piping or water in sumps. This price does not include re-insulation. This quote will remain in effect for thirty (30) days. Should you require further information, please call. erely, il Environmentpl Response Inc. eph Hale Estimator BRM 005 Tricll ARM000895