Document ppEDXqn6oYjNZnDj3n1j9xK2j
CC 149-2
%
7
PETALS DIVISION
P. 0. BOX 579 "1G25 ROYAL AVE., NIAGARA FALLS. NEW YORK K3C
To: Messrs. G.R. Adams W.B.. DeAtley R.L. Folkman E.W. Kantz+R.G. Beverly P.W. McDaniel
J.L. Myers R.W. Rebholz+F.J. Shortsleeve G. Rouse J.B. Rouse J.O. Sibley
A.G. Voress J.J. Whittlesey
Date Originating Dept.
June 4, 1980 "Calidria" Asbestos
Answering letter date
Subject
The attached report is pretty well self-explanitory but I will be glad to try to answer any questions you may have. The results show some fairly high exposures in the early days of our operations but also clearly demonstrate a long standing and effective program to reduce exposure. Although these are area concentrations, not personal exposures, they indi cate that our operations have generally been in compliance with the standards that were applicable at the time. This is not a particular issue here so it has not been emphasized in the discussion.
These data are not the kind of thing we have ordinarily released in the past, but I feel the EPA has the power to obtain it if they feel it is worth the effort. It is not particularly sensitive information so it is recommended that we provide it.
We are about two months past the time it had been expected that we would provide this information and are receiving weekly phone calls inquiring about its progress. It would be very much appreciated if you could get any comments you wish to make back to me on Friday, June 6 or to John Myers by noon on Monday, June 9 so we can release the report.
Very truly yours,
HBR:vs Attachment
H.B. Rhodes
PLAINTIFFS | EXHIBIT S UC-1599
DRAFT June 4, 1980
Dr. Richard A. Ziskand
Science Applications, Incorporated
1801 Avenue of the Stars, Suite 1205
Los Angeles, California
90067
Dear Dr. Ziskand:
The attached report provides the information you requested regarding
asbestos concentrations in the vicinity of the Union Carbide asbestos mine and
mill in California. If you have any questions please let me know. We would be
very interested to hear the results of your analysis of this data. Very truly yours.
I
7^/3,
H.B. Rhodes Technology Manager
HBRrvs Attachments
A- Go
DRAFT June 3, 1980
OUTDOOR AIRBORNE ASBESTOS CONCENTRATIONS AT THE UNION CARBIDE ASBESTOS MINING AND MILLING OPERATIONS IN CALIFORNIA
Prepared at the request of:
Science Applications, Incorporated
1801 Avenue of the Stars, Suite 1205
Los Angeles, California
90067
By
H.B. Rhodes Union Carbide Corporation Metals Division Niagara Falls, New York 14302
INTRODUCTION
Science Applications, Incorporated under contract from the Environmental Protection Agency is conducting a study of the impact of various asbestos sources in California on the surrounding population. Union Carbide Corporation was asked and agreed to provide, certain historical information on airborne asbestos at thei mine and mill. Particular emphasis was placed on property line measurements in order to estimate general population exposures.
BACKGROUND
The Union Carbide asbestos mill near King City, California started-up in 1963 and has been in essentially regular operation since that time. The mill uses a unique wet process which greatly facilitates control of both worker exposure and environmental asbestos release.
Ore is mined by a cut-and-bench procedure in the Diablo Mountains about 55 road miles away. Mining takes place for about a two-month period every three years with the mined material stockpiled at the mine.
Ore is hauled to the mill by truck for about six months each summer. Sufficient material is stored at the mill to last through the winter when rain makes the mine site impassible.
A comprehensive industrial hygiene program has been carried out at this location since 1963. The program includes worker exposure monitoring, regular medical surveillance, and worker safety and health training. Extensive efforts have been made to reduce both exposure and emissions.
ASBESTOS CONCENTRATION MEASUREMENTS
The main emphasis in the industrial hygiene program was on worker pro tection so the great majority of the concentration measurements were made in the direct proximity to the workers and were generally within the mill. Rather limited sampling was included, however, at the fence lines and occasionally at various places closer to the mill building. These data provided.
Seven sets of area samples have been collected over the years at the
mine. With one exception, these were all in the immediate vicinity of active
mining and milling operations. They are provided with the understanding that they
are not property line measurements. From 1963 through early 1969 concentrations were measured with the
t
midget impinger. The NIOSH phase contrast method was adopted in mid-1969 and
is still in use. No measurements have been made with electron microscopy pro
cedures.
When the change from midget impinger to phase contrast microscopy was made in 1969, a rather crudely documented conversion factor of 2 fibers/cc >5y per million particles per cubic foot was developed from comparative measurements. It is both well known and obvious that the conversion from particles to fibers is not a universal factor but will be considerably influenced by the characteristics of the dust cloud being sampled. A. wide range of factors have been proposed for this conversion. Since the value of 2 falls within this range and since there is not basis to adjust it to any other value, it has been used in reporting the present data.
-3-
RESULTS AND DISCUSSION
The airborne concentrations measured from 1963 through the present in the vicinity around the mill are summarized in Table I and are shown graphically in Figure 1. A layout of the mill property is provided in Figure 2.
Figure 1 gives the airborne concentrations, expressed as fibers/cc >5u, as a function of the month and year in which they were measured. The place where the measurement procedure was changed from midget impinger to optical phase contrast is also indicated. Most of the data were taken at the property boundry with that from the north fenceline indicated by an open circle and that from the south fence line by a triangle. For several of the later years a substantial number of samples were collected in close proximity to the mill and these results are shown by the solid circles.
A very approximate trend line has been included on the Figure. It is immediately evident that a reduction in concentration of about three orders of magnitude has been made since the plant started up in the early 1960's. The fence line levels are now generally below 0.1 fiber/cc which NIOSH has designated as the detection limit for the method^. As might be expected, the levels directly
around the mill tend to be higher than the fenceline but are still quite low.
The data for the concentrations during the mining and hauling of asbestos ore
are shown in Table 2 and Figure 3. It should be reiterated that these are not
property line concentrations but were measured during active operations. Here
there has been a reduction in concentration of approximately two orders of magni
tude. The levels are now well below the current occupational standard of 2 fibers/
CC >5y.
^These data are included even though there are serious technical reservations regarding the reliability of the measurement method at this apparent concentration level. This is not the place to
V-' ;
CONCENTRATIONS - UNION CARBIDE CORPORATION
t u i m * tits tu t iu r tu t t u t tn o ttrt tu t t t r j n r* tirs tv u t t r / iit a t t n tvso
T
Ou bE. A
Co cO -
T
eo oo *\=
<
2
ID U C yt ~> --o co
*> e
**
*a
u
>t
X c^
AREA AIRBORNE ASBESTOS CONCENTRATIONS
f i t ! * * / / / l l b f J ? 6 / f l b l/< # / /Z A / 8 1 6 !_/*<$/ "
i ' r r r. . m ' ' i r i l l . : . ; !r-- r---------------- 1------------------- ------------------- 1------- : - .T T r . t h : H T f . T i n
T l . 111
O lb
11 .
>1 1: . . : i "" 1 1
. --------- >
99b!
-- -- r
i
cs o <Cfii 3 X
*1 i f. TM - 1 U
+ ?bt
i:
i e"
_
\>00
Sample Location North Fence Line South Fence.Line Kill Ore Stockpile Parking Lot
Saaple Location North Fence Line South Fence Line
1963 Sept. Mppcf1 u f/ccUJ
.
.
1.7 3.4 -
TABIC 1 AlRBQftNr AREA TIUCR CONCENTRATIONS
Jan.
1966 rso rc fi
Mppcf Illc HCf USB.
72.7
24.1
.
4S.8 48.2
.
-.
-
3.8 7.6 7.0 14.0
2.6 S.2 3.2 6.4
-. --
1967 Aug.
Mppcf f/cc
16.7
18.2
. .
33.4 36.4
Jan.
1968 Dec.
Mppcf f/cc
.
mm
Hppuf f/cc
6.6 13.2 4.4 8.8
.
Jan. Mppcf(11 f/cctZ)
4.3 8.6 3.4 6.8
Feb.
1969 July
Mppcf f/cc f/cc13)
4.8 9.6
6 3
Auq. Sept. Oct. bee.
f/cc uss. f/cc m.
7.5 3 3.S
2.S 2 3.5 3
Jan. f/cc
1 1
ELl
m.
June
USB.
1970 Jul y
!IS
Auq.
f/cc
221 0
1 1.5 1 1
sept. bet.
f/cc USB.
1.5 2.5 2.5 2
Sample Location
North Fence Line South Fence Line South Edge, Tailings
Oaa
Southeast Edge, Tailings Deo
Product Storage Area
Mill Ore Stockpile
Apr. f/cc
Auq. f/cc
1971 Sept. Oct. f/cc f/cc
Nov. f/cc
2.5 2.5 4.0 6.0 2.0 3.0 2.5 4.0 3.5 2.0
.,,
.
..
..
1972
Feb. T7cc
Kar.
TTcc
Apr, Kay Sept. Oct.
T/cc fjcc f/cc 77cc
Dec. f/cc
2.0 - 3.4 0.5 . 0.17 0.17 0.06
1.5 0.4 5.1 0.3 0.07 0.06 0.24
. 0.2 _
0.2
,,
m
m
1973 Jan. Oct. f/cc f/cc
0.03 0.21
m
0.32
.
m.
.
Feb.
Ull
. -
.
Mar. Apr.
ills. me. - 0.5
..
1974
au June Hit IZH
1.7 0.17
Jul V f/cc
t
0.19
.
Sept. Oct. f/cc IZfit
0.31
..
. 1.0 2.2 0.3 -
1.7 0.7
Sample Location North Fence Line South Fence Line
197S f/cc 0.02 0.07
Parking Lot Sack of Malnt. Shop East Corner of Mill (R&-24-4) West Side of Mill (RG Surge Tank) West Side of Mill (Main Bagger) Southwest Corner (Gas Meter) Electric Substation North Loading Dock (S. Side) North Loading Dock (N. Side)
1976 July f/cc
-
0.08 0.30*
Auqust f/cc f/cc
0.08 0.15
0.20
*
f/cc
1977 October
f/cc f/cc f/cc
0.07 0.04 0.04 0.02
0.09
- 0.03 1.17
0.22 0.41
-
0.18 0.19 0.80
0.07 0.07
-
'0.19 0.20 0.78
0.05 0.09
-
0.08 0.25 0.07
f/cc 0.06
-
f/cc 0.06 0.08
* 0.12 0.10 -
0.10 0.06
1978 f/cc
1979 Auq.
UBS.
-
1980 Mar. f/cc
0.31 0.04 0.05 0.03
0.02 0.03 0.06 0.01
hear Water Tank
1. Mpp:f * MtUipns of particles per cubic foot. Mcdiurci by mteget inpingcr. Conversion factor of T ftpers/cc 5. per rilllon particles per cubu root used.
2. f/cc Fibers. longer than $ microns per cubic
3. All counts after July 1069 are by
centimeter.
mrrrrane filter method.
^- -i ur- ^o .
AIRBORNE CONCENTRATIONS OURING MINING AND HAULING OPERATIONS
Sampling Location and Operation
SEPTEMBER, 1963 Remarks
Mppcf^ ^
Alongside wobbler during loading trucks.
Variable wind direction and speed so that sampling location is upwind of dust part of time.
4.2 3.8 3.3 3.9
Riding caterpillars cleaning mine site.
Much large, nonrespirable material noted.
. 9.6 10.9 11.3 11.8
Walking across ore pile.
Light breeze (5 mph) from west and south.
3.2 3.4
Riding pick-up with windows open on road from mine.
Deep dust on portions of road.
4.7 6.0
JUNE, 1966
Beside operator of front loader (no cab) loading ore truck.
Area around truck during loading.
Contractor operator. Visible dust.
26.0 15.4
f
General area around grizzly during truck loading.
Much loose, finely divided material on ground.
14.2
AUGUST, 1967
Beside operator on caterpillar while loosening ore pile.
Not visibly dusty nor very windy.
6.3 5.0
Beside operator on front loader while loading grizzly. Conveyor system operating.
Visibly dusty but not very windy.
18.0 15.1 16.7
OCTOBER, 1967*
Self-propelled.
Short section of haul road dry and dusty, no wind.
4.4
Scraper, mining and stockpiling ore 4350 1 evel.
Road freshly watered, no wind.
2.9
Bulldozer
)
Push loading scrapers)
Ore, 4350 level
)
Freshly exposed ore, not watered. no wind.
3.0 3.4 3.9
Bulldozer clearing rocks from pit floor.
Pit floor, not watered, no wind.
4.0
Front end loader
)
Feeding screening plant)
Maneuvering area watered several hours earlier, very light breeze.
3.7 3.0
^Millions of particles per cubic foot.
...
.
a ^ -i r, 3 '
f/cc^
8.4 7.6 6.6 7.8 19.2 21.8 22.6 23.6 6.4 6.8 9.4 12.0
52.0
30.8 28.4
12.6 10.0 36.0 30.2 33.4
8.8
5.8
6.0 6.8 7.8 8.0
7.4 6.0
TABLE II
Page 2
The following description of dust control practices in effect was contained in the re port of this survey:
"The sampling was conducted on the afternoon of October 25, 1967. All samples were collected adjacent the operator of the particular equipment while performing normal operations. All haul roads and the front end loader maneuvering area adjacent to the mine stock pile had been watered in accordance with standard practice during the mining operations.
It has been practice to water down the front end loader maneuvering area on alternate days pending repair of the air conditioning system. During mining operations it is practice to have a water truck on duty continuously to water mine haul roads, dump areas and the loading area adjacent to the mine stock pile and screening plant. Scraper loading areas were not watered since the freshly exposed asbestos ore is damp. Watering overburden loading areas, however, was found at times to be necessary due to visible dust concentrations."
Sample Location and Time 1. Front end loader screening
ore - 10:10 a.m.
2. At picnic table - 10:19 a.m.
3. Same as #1 - 10:48 a.m. 4. Same as #2 - 10:55 a.m.
5. On Cat pushing ore. 6. By oil shed - 12:25 p.m. 7. Same as #6 - 12:25 p.m.
JUNE, 1972
Conditions
Slight overcast - wind 10-15 mph from north ground and ore damp cab open on loader - operator wear ing respirator - water truck work ing in area. 70F - cat working on pile.
Same as #1. Filter stained by diesel smoke from loader.
Same as #1.
Same as #1. Filter stained by diesel smoke from loader.
Same as #1.
Wind 10-15 mph fron north. No machinery operating - ground damp - 78F.
Same as #6.
ffcc 1.14
0.42
0.86 0.68
0.86 0.48 0.50
i r, n Ub
TABLE II - Page 3
MAY. 1974
Location, Time, Min. of Samp!inq, & Temp. 1. Mine pit area, east side,
11:05 a.m., 65F, 30 min.
2. Mine pit area, west side, 11:45 a.m., 65F, 15 min.
3. Screening area, 12:35 p.m 65F, 30 min.
4. Top of ore stockpile, 1:10 p.m., 65F, 30 min.
5. Top of future stockpile, 1:55 p.m., 67F, 30 min.
Conditions
1. Clear day with east-west intermittent wind about 5-10 mph.
f/cc 1.70
2. Full mining operation.
3. Sampler hand carried around the area.
1. Same as above.
2.46
2. Sample was taken for 15 min. be cause mining operation was stop ped- for lunch break.
1. Full screening operation.
2. Clear day with intermittent wind, east-west, at about 5-10 mph.
0.90 I
3. Sampler was hand-carried around the area: 0-10 min. -- Loading section 11-20 min. -- Screening section 21-30 min. -- Stockpile section
4. Full loading operation in hauling trucks.
Note:
Visible dusts were observed during the loading and screening operations, but the dust could be too big and heavy for the sampler to collect with face down.
.1 Clear day with intermittent wind of
about 5-10 mph, directions changed
to west-east.
0.90
2. Full mining operation.
.1 Same as above.
1.60
Aa i ru> ovj \^_>
ABLE II - Page 4'
AUGUST 9, 1977
Subject; Location: Conditions;
Area Samples
Joe 5 Minesite (see sketch for Location). 1) Full screening operations. 2) Dozer operation on stockpile.
3) Ore truck loading.
4) Moving oversize material. 5) 2-10 mph intermittent wind (use vind meter).
6) Weather temperature of 92 F.
Remarks: Ihe Joe 5 Mine area has been extremely dry since 8-1-77 because of the exhaustion of the "normal" year arround water supply. The Location of today's samples (see sketch) are such that maxi mum dust conditions exist whenever traffic passes.
Sample No:
Time
Remarks
1-1 11:10 AM-12:10 PM 175A performing +l" rock removal; pick-up traffic, (none*)
1-2 12:10 PM- 1:10 PM Four ore trucks and 2 leaders passed; dusty conditions, (none*)
1-3 1:10 PM- 2:10 PM Two ore trucks passed; 125A loader perfor ming +12" rock removal, (none*)
1-4 2:10 PM- 3:10 PM 125A performing +12" rock removal, (none*)
f/CCJ 0.23 0.65 0.70 0.29
Average:0.47
2-1 11:15 AM-12:15 PM 175A performing +l"-rock removal; pick-up
0.30
traffic, (none*)
2-2 12:15 PM- 1:15 PM 5 ore trucks passed; 175A loader loading
0.61
trucks; possible Diesel exhaust with sample,
(lots*)
2-3
1:15 PM- 2:15 PM 1 ore truck passed; same as above, (little
0.43
to lots*)
2-4 2:15 PM- 3:15 PM Light .traffic (Pickrup). (none*)
0.37
Average:
0.43
(*) filter discolored from diesel smoke.
A -i. U0(. J
lPo3.7Ctjtl
^PuS.T.oO A)9
TABLE II . - Page 6
AUGUST 19. 1977
Subject: Location: Conditions:
/
Area (3) air samples Joe 5 Pit (see sketch)
1. ) Full screening & Truckloading operation. 2. ) Dozer operation on stockpile. 3. ) Approximately 5 mph wind with gusty to 10 mph. 4. ) Temperature 90 P.
Remarks
Sample No. 3 upwind, approximately mile southeast of Joe 5 Pit center. Approx, elevation 4400*.
Sanole No.
Time
Remarks
1-1 1-2
1-3 1-4
11:20 AM- 12:20 PM 12:20 PM- 13:20 PM 13:20 PM- 14:20 PM 14:20 PM- 15:20 PM
No traffic. Light traffic within 50'.
II l It ft
No traffic.
2-1 2-2
2-3 2-4
11:25 AM- 12:25 PM 12:25 FM-13". 25 PM 13:25 PM- 14:25 PM 14:25 PM- 15:25 m
No traffic. Light traffic within 100'.
i it it it
No traffic.
3-1 3-2
3-3 3-4
11:40 AM- 12:40 PM 12:40 PM- 13:40 PM 13:40 PM- l4:40 PM 14:40 PM- 15:40 PM
Dormant tt M it
area,
tf
n
hill n tt
too. ft II m
f/cc
0.27 0.38 0.2Q 0.14
Average: 0.25
0.12 0.13 0.34 0.29
Average: 0.22
0.16 ' 0.10 0.12 0.05
Average: 0.11
'ow nor
3xva `