July 28, 1975 PCD COHTIHCENCY PUN Your Homo July I, 1975
TO F. J. Fitzgerald - B3SA
.
PERSONAL & CONFIDENTIAL
Attached Is our proposed worldwide PCB Contingency Plan based on the stated premise of a government ban with a 90-day phase-out period, assuming an October I, 1976 ban effective 1/1/77.
Also attached Is a proposed PCB Contingency Plan based on a case which the business group feels Is possibly realistic considering present government attitudes and actions, customer responses and the "state of the art." This premise Is a government ban announced 1/1/76 but with a compliance program and the ban to be effective 1/1/78,
We have had detailed Inputs from Monsanto-Europe, as well as much detailed Input from our business group personnel, our plants, plus Bill Papageorge and the Law Department,
In summary, we feel these two cases "bracket" the worst potential situation. In either case, certain actions are Identical -- only the timing, odds of success and the financial Impact on Monsanto are different. The two-year compliance case is on balance,in our opinion, the optimum for the U.S.government position, the total welfare of the population, the electrical utilities and other end users and the transformer and capacitor industry position and Monsanto's position.
We'll be glad to review this with you in detail if you desire.
Please advise If these meet with your approval for the premises
stated. There are other premises which can be evaluated should
the occasion demand.
.
/tl Attachments'
Bergen MONS 030606
DISCUSSION OF CASE I
This case Is the worst and most unlikely to occur for the following reasons:
. 1, Industry does not have thoroughly tested and approved replacement products for use In capacitors. At least 18 months more time is needed.
2. Industry does not have-a fI re-resIstnnt liquid transformer fluid tested or approved. At least 2 years more time Is
'' needed.
3. The consumer would be exposed to dramatically different and Inferior performance standards of capacitors and
, transformers which will affect his safety and energy costs and aval lab 111ty.
4. The U.S. government Is leaning towards a three-year ' compliance program for the toxic pollutant products. Compliance may be possible In that time frame.
5. The alleged carcinogenic properties are not proven.
6. There will be law suits against the U.S. government.
7. The odds of success are the lowest from the standpoint
of technical and commercial viewpoints.'
HONS 030407
This cese Is the worst economically for Monsanto and Industry. There Is very little chance of our successfully developing a transformer replacement product In this case. It would be dlfflcut to successfully Introduce non-PCB products to other world areas outside of Canada as long as those governments allowed PCBs to be used.
CASE I - PCE C0HTIM6EIICV PLAN - MAJOR STEPS - 7/28/75
MOMS 0 3 0 4 0 8
' PREMISE* U.S.A. government ban 10/1/75 effective 1/1/76. Mo Imports allowed, U.K. government follows O.S.A. along with OECO member countries. Eighteen' month time lag behind U.S.A. Imports allowed for ,18 mos.
Monsanto-Europe follows U.S.A. Monsanto timing. European competitors lag 18 mos.
latest Critical Steps .
0F* I.
ACTIOM_____________________________________________________________ IWHO .WHENSUCCESS
I. COMPLIANCE WITH U.S.A. GOVERHHEHT DIRECTION
*1. Clarify exact conditions of ban with the U.S.A. government and Industry.
W. B. Papageorge W. Easley, D. Wood
A.S.A.P.
80-90*
Monsanto submit plan for phase-out to government
and CAC and formally announce Intention to cease
selling PCBs on 1/1/76.
-
3. Determine need for worker surveillance by OSHA.
H. S. Bergen F. J. Fitzgerald W. B. Papageorge ' P. R. Department \
W. B. Papageorge Dr. G. Roush
10/16/75 10/16/75
100* loot
h. From EPA, determine need for continued plant effluent surveillance.
5. Take action on any class action law suits or other law suits against the government and Monsanto.
W. B. Papageorge W. Easley D. B. Hosmer Law Department
10/16/75
loot
As need arises toot
)(6. Present available toxicological and environmental data on replacement products to government.
CONCERN FOR CUSTOMERS
. W. B. Papageorge
10/16/75
W. Easley, RD,
Medical Department '
loot .
41.
Appoint PCS task force to handle:
(a) phase-out of PCBs, (b) Introduction of replacement products.
H. S. Bergen F. J. Fitzgerald
A.S.A.P. .
loot
Conduct USA salesmen's seminar with selected U.S. export Monsanto reps.Invited (Europe/Lattn America/ Australla/Indla/Far East).
*3. Notify custoaiers of government ban, termlnate any contracts and explain Monsanto plan.
T. L. Gossage, C.Paton 10/15/75 0. Wood, RsO
T. L. Gossage, C.Paton 10/16/75\ D. Wood, Regional Mananers. Salesmen
loot 90-100*
HONS 0 3 0 4 0 9
ACTION
*4. Hold industry dielectric meeting In St. Louis to
answer Imediate customer questions and explain
production plans of replacement products.
'
5. Visit each customer individually to establish pre liminary non-PCB fluid forecast and technical pro
grams as well as PCB requirements during phase-out
period.
.
6. If requested by customers, prepare P.R. statement for
PCB ultimate users; l.e., utilities, transformer
Mtop up,1* etc.
*7. Determine non-PCB market forecast. Announce Monsanto, intention to proceed to Interim production of MCS 1238
effective 2/1/76 and also Monsanto commitment to a new plant to come onstream In 18 months to 2 years.
48. Establish shipping and production plan and allocation
If necessary of PCB fluids as well as announcing
warehouse and Incineration and return goods policies.
9. Establish allocation of replacement fluids with customers.
10. With Industry, develop suitable standards -- ASTH, EIA, Clgre, OED, etc.
CONTINUITY S ECONOMICS OF OUR CONTINUING BUSINESS
1. See attached Table 1 for economic Impact*
62. Submit AR for non-PCB dielectric plant and Santosol
200 plant to CAC.
'
INTERNAL MONSANTO ACTIONS
4l. Present Monsanto phase-out plan to CAC and gain
approval.
*2. Gain approval for PIR for non-PCB Santosol 200 plant.
WHO.......................... Marketing, R&D and Manufacturing
Marketing and Task Force
Chairman.of-Task Force and P.R.
Marketing and P.R. Department
Marketing Task Force
Marketing Task Force Market Ing/R&O
H. S. Bergen F. J. Fitzgerald H. H. Bible
H. S. Bergen F. J. Fitzgerald H. H. Bible Same
WHEN ' 11/1/75
' SUCCESS 50-1002
11/8/75
80-1002
11/25/75 1/1/76
80-1002 402
.10/14/75
80-1002
12/15/75
1/1/76 and Continuing
402 502
2/15/76
1002
10/13/75
1002
10/13/75 '
50-1002
HONS 0 3 0 4 1 0
ACT I OH
WHO WHEN
A, Marketing Related
4i. .
Obtain all needed new product Inforaatlon presentable In a commercial form. (This Includes toxicity data and product acceptability data on MCS 1238 and 1538, finished goods, ' manufacturing specifications, storage stability, tests and product application testing to date.)
RSD, Medical .
Product. Accept. Manufacturing
9/15/75
#2. No transformer replacement product Is available, j No action by Marketing.
RSD continue to define
`
and develop product. f
B Manufacturing Related
. .J
i,4l. Inform Purchasing Department and other Monsanto
business groups of change of raw material require-?
ments and,most Importantly, obtain sufficient
j
allocation of toluene sulfonyl chloride from
('
Plasticizers Division to give us 1.5 M Ib/yr rate.
(The following raw material will decline In usage: .
benzene and chlorine and trichlorobenzene. The '
following products will increase In usage, at
least temporarily: toluene sulfonyl chloride.
When Aroclor Is shut down, a shortage of chloro-
sulfonic acid will result which Is used to make
toluene sulfonyl chloride and other products.
-
. . There must be an agreed on allocation plan.
Another alternative solution would be an Inventory
bultd-up In penta. The effect of chlorine cell
house operation needs to be studied.) *
H. S. Bergen
. . A.S.A.P.
P. J. Fitzgerald '
S. A. Heininger
.
G. L. Bratsch
J. R. Savage
Purchasing Department
H2. Set up manufacturing phase-out plan for PCBs. Develop manufacturing plan schedule for nonPCB with outside converter. (Mllliken Chemical/ Anderson Development). Production to start as soon as possible and be up to I60H pounds per month TXS by 2/1/76.
J. R. Savage J. R. Savage
J. R. Savage/ Outside Converter
A.S.A.P. 2/1/76
9 Plant decommissioning, decontamination of equip
ment site and tank cars and plant dismantling.
J. R. Savage/ Fllnt/leisy
Begin 1/1/76
0D0S OF SUCCESS 10-202
102 70-808
1002 80-302 60-702 1002
Pag* k - Cat* I \
.
ACTIOW
_____________ ,
................... ....................
WHO................. . WHEW
M. Start-up .of new non-PCB Santosol 200 plant. '
J. R. Savage
9/77
Manufacturing Dept.
C. Accounting Related
.
.
HI. '
Establish reserves for plant write-off and ' plant dismantling and anticipated Incineration reserve and any other anticipated needs.
- A. J. Koenig 1. B. Skatoff
12/1/76 .
#2. Administrative reassignment of any redundant
personnel. '
' '.
H. S. Bergen
F. J- Fitzgerald C. A. Sweets
G. L. Bratseh
. 10/1/76 '
OODS OF SUCCESS
< 80-902
1002
1002
HONS 0 3 0 4 1 1
V
TABLE I SPECIALTY PRODUCTS PCS DIELECTRIC BAN 90 DAYS FOLLOWING 10/1/75 PHASE-OUT COSTS 6 WRITEOFFS - TAKE IN 1975 I. Fixed Investment Write-off ami Dismantling
Krummrlch Plant Newport Plant
1410 690
11, Decontamination and Reassignment 44 PCB TC's
III. Decontamination - Newport TOTAL
IV. Plant FIE Redistributed to Rest of Plant
Krummrlch Newport
300' 100
V. Teak Force to Phase-Out PCB Dielectrics
Domestic * U.S. Export Ex. USA
150
2100 400
2650
400
225
tl 7/28/75
HONS 030412
DISCUSSION OF CASE II
This cose, which represent s another ''worse cose" type situation, Is more
apt to occur and other n-'i.rri variations of JU are more likely to occur
for the following reasons:
/
1. .
..
The USA government wants .V toxic substances law that Is workable and aer.upUd by Congress, the population and Industry. An outright POP li.in, with severe time parameters which create other i tsks to society. Is not conducive to positive legislative steps. Many court cases will result. The U.S. government Is more opt to go along With any one or a combination of the following: a) a ban to be effective In a long enough time frame
to permit industry to change over to something else with less total risk;
b) -
.
a ban on certain PCBs -- like 125*1 and higher homologucs -- but allow continued production and use of MCS 10*13 and 1016 which are considerably more biodegradable ami which do not accumulate In body fat to the extent of higher homotogues;
.`
c)
a "controlled" and monitored production and use
of certain PCBs -- with effluent standards tightly
controlled.
'
2. '
There are too many other alleged carcinogens with greater
production and distribution for the U.S. government to single
out PCBs.
.
MQNS 030413
Page 2 '
3.
Monsanto and Industry will propose to the U.S. government -- prior to a "total" ban on PCBs -- various programs which will dramatically reduce production and use of the higher homologue. (less biodegradable) PCDs with only minimum risk from all other aspects. This case would entail Monsanto offering only Aroclors 101C and 1043 for transformers and capacitors and reducing the production of the "non-blodegradable" 1254 by 10-12 M pounds/year. There are certain other risks here but these possibly could be resolved with only slightly higher costs and fire safety risks.
4. '
The total Industry Is more apt to accept It because It gives the time necessary for an "all-out" emergency changeover situation. The Industry really wants three years -- but could live with two. The .Industry Is not prepared for a 90-day ban.
5. The odds of success are considerably better than Case I.
This ease Imposes a "tight" but more possible time frame for Monsanto and
Industry; It represents considerably better economics to Monsanto and gives
us a 502 chance of developing a transformer replacement product. It would
be easier to Introduce and gain acceptance of non-PCB products in other
world areas.
-
7/28/75
MQNS 030414
CASE II - PC8 CONTINGENCY PLAN - MAJOR STEPS - 7/28/75
PREMISE: .
U.S.A. government ban 1/1/76 with a compliance program and the ban to be effective 1/1/78. No Imports allowed. II.K. government follows U.S.A. along with OECD member countries. Zero to six months time lag behind U.S.A. Monsanto-Europe follows U.S.A. timing. European competitors follow'OECD compliance. Maximum six months lag.
Jfatost Critical Steps
ODDS OF ACTION____________________________________________________________________________WHO_____________________ WHEN___________________SUCCESS
1. COMPLIANCE WITH U.S.A. GOVERNMENT DIRECTION
<*1. Clarify exact conditions'of ban with U.S.A. government and industry. '
W. B. Papageorge W. Easley/D. Wood
A.S.A.P.
80-30*
#Z, Monsanto submit plan for phase-out to government and CAC and formally announce Intention to cease selling PCBs on 1/1/78.
H. S. Bergen F. J. Fitzgerald
1/15/76
100* .
Public Relations Dept.
.
W. B. Papageorge
MONS 0 3 0 4 1 5
3. Determine need for worker surveillance byoSHA.
W. B. Papageorge Dr. G. Roush
1/15/76
100*
4. From EPA, determine need for continued plant effluent surveillance.
5. Take action on any class action taw suits or other suits against the government and Monsanto.
U.B. Papageorge . W. Easley
D. B. Kosmer Law Department
1/15/76 As need arises
100* loot
dH. Present available toxicological and environmental data on replacement products to government.
II CONCERN FOR CUSTOMERS
W. B. Papageorge W. Easley
Medical Department RSD
1/15/76 and continuing as data develops until completed, on 8/77.
loot
III. Conduct USA salesmen's seminar with selected U.S. export Monsanto reps. Invited (Europe /Latin America/ Australla/Indla/Far East).
*2. Notify customers of government ban, terminate any contracts and explain Monsanto plan.
T. L. Gossage C. Paton, D. Wood RSD
T. L. Gossage C. Paton, D. Wood Regional Managers Salesmen
1/7/76
1/15/76
\
loot loot
HONS 0 3 0 4 1 6
ACTION
43. Hold Industry dielectric meeting In St. Louis to
answer Immediate customer questions and explain <
production plans of replacement products.
4*. Visit each customer individually to establish
preliminary non-PCB fluid forecast and technical -
* programs as well as PC8 requirements during phase
out period.
5. - If requested by customers, prepare P.R. statement ' for PCB ultimate users; t.e., utilittes,.transformer
"top up," etc.
6. Determine non-PCB market forecast. Formally announce Monsanto plant start-up of new non-PCB dielectric plant.
7. Establish shipping and production plan and allocation If necessary of PCB fluids as well as announcing ware
house and Incineration and return goods policies.
8. With Industry, develop suitable standards - ASTM,
ElA, Clgre, OED, etc. .
'
CONTINUITY t ECONOMICS OF OUR CONTINUING BUSINESS
1. See attached Table II for economic Impact.
92. Submit AR for non-PCB dielectric plant and Santosol
200 plant to CAC.
INTERNAL MONSANTO ACTIONS
'
41. Present Monsanto phase-out plan to CAC and gain
approval.
42. Gain approval for PIR for non-PCB Santosol 200 plant.
A. Harketlnq Related
$1. _ Obtain all needed new product Information presentable In a commercial form. (This '
WHO Marketing, RSO Manufacturing.
Marketing
O. Wood P.R. Department
Marketing . P.R. Department
Marketing
-
Distribution
Marketing/R&O.
H. S. Bergen F. J. Fitzgerald H. H. Bible
H. S. Bergen F. J. Fitzgerald H. H. Bible Same
RtD, Medical Product Accept. Manufacturing
WHEN 1/30/76
SUCCESS , loot
2/15/76
30-100t
.6/1/76
loot
10/1/77 ' 6/1/77
' 80-got loot
3/1/76 and Continuing
70-80t
2/15/76
loot '
1/15/76 1/15/76
loot 30-1OOt
12/26/75
; i
75*
Nyi 3 * Casa II
;'
\
______________ ACTION '__________;________________ '
' .
.
' -__________ WHO_____________
WHEN
L V 7OCO SNOW
' Includes toxicity data and product acceptability data on HCS 1238 and 1538, finished goods, manu facturing specifications, storage stability tests and produdt application testing to date.)
fte. ,. '
ReO program on replacement transformer fluids accelerated with candidates identified, pilot. plant quantities made and customer trials made. Replacement candidate, manufacturing plan developed and Interim manufacturing plant established. Alt completed by 12/31/77.
B. Manufacturing Related
RSD/Manufacturlng Med leal/Marketing
Start A.S.A.P
12/31/77 f.
1 Inform Purchasing Department and other Monsanto - H.' S. Bergen .
A.S.A.P.
business groups of change of raw material
P. J. Fitzgerald
requirements and, most importantly, obtain '
S. f). Heininger
i
sufficient allocation of toluene suifonyl chloride 8. L. Bratsch
.
from Plasticizers Division to tide us over critical J. R. Savage
-
period of April or May, 1976. (The following raw
Purchasing Department
material will decline In usage: benzene and
j
chlorine and trichlorobenzene, but not as rapidly
ti
as In the Case I. The following products will
increase In usage at least temporarily: toluene
suifonyl chloride.)
*2 Set up manufacture phase-out plan for PCBs.
J. R. Savage
Develop manufacturing plan schedule for non-PCB
with outside converter (Miiliken Chem/Anderson
-
Development). Production to start as soon as
possible with rates to be based on customer needs.
A.S.A.P. 5/15/76
3 Plant decommissioning, decontamination of equipment, site and tank cars and plant dismantling.
Manufacturing Distribution
1/1/78
K4. Start-up of new non-PCB Santosoi 200 plant
ManufacturIng
9/77
C Accounting Related
'
<P|, Establish reserves for plant write-offs and plant dismantling and anticipated Incineration reserve and any other anticipated needs.
A. J. Koenig L. B. Skatoff
12/1/77
; \
ODDS Of SUCCESS
50* 90-1002
loot loot 80-902 loot
.Page t - Case 11 \
'
.. ACTION
..
f|2.
Administrative reassignment of any redundant personnel.
WHO
H. S. Bergen F. J. Fitzgerald C. A. Sweets G. L. Bratscb
WHEN
1/1/78
ODOS OF SUCCESS
< loot
\ 1
MONS 0 3 0 4 1 8
t \
TABLE. 11 SPECIALTY PRODUCTS PHASE-OUT COSTS t WRITEOFFS - TAKE IN 1977
I, Fixed Investment Write-off and Dismantling
.
Krummrlch Plant Newport Plant
_M_
850 600
-J.H. 1*50
II. Decontamination and Phase-out Pom. Tank Cars
360
III. Decontamination - Newport
" Total
ISO 1560
IV. Plant FIE Redistributed to Best of Plant
Krummrlch Newport
330 125
*55
V. Teak Force to Phosc-out PCB Dielectrics
Domestic and Export Ex. USA
150 75
' 225
/tl
7/28/75
MONS 030*19