Document pp41xgOk4ry1eE5emqQ5GO8BD
FRAZER PAINT COMFAMY 2475 Hubbard Avenue Detroit, Michigan
SCHEDULE I
TRADE NAME: CATEGORY; COLOR; CUALITY;
Longwear House Paint Exterior Ready-Mixed House Fair.t White Second
Pigment; 6o Titanox A Barytes Asbestine Leaded Zinc
::*
Vehicle; u0% Stainless Raw Linseed
Heavy Bodied Linseed Oil
Drier Turpentine Mineral Spirits
Lb. Yield in Gallons Unit Cost Total
204
700 y 500 /
Weight
Per gallon
.. /
.15 .015
.01
30.60 a.50 5.0C
812 '
finished
.0725
58.87
product. Storage & handling cost
Laboratory through loss -
record la.5 lbs,
',' -.V' 1 '*
105a *
lr`
.135
141.75
14 80
40 16
.143
2.00
.07 5.80
.10 ` 4.0C
.015
--34
Storage & handling cost
through loss -
*1
J
Cost98.97 .99
153.59 4.61
Calculated Yield
Manufacturing Loss - 2k% Actual Yield
3C16
:
206.
5.2 202.8
258.16
Coat Analysis; Material cost per gallon Direct labor cost per gallon Factory overhead per gallo'n Bulk cost per gallon
Complete package cost ner gallon, including filling charge Factory cost in package per gallon
1.27 .12
1.44 -ail 1.63
PRICES
() () (c) (d) (e)
To a company owned or controlled cutlet To an independent wholesaler By company owned or controlled outlet to retail customer To an independent retailer (Dealer) To other (Industrial)
(Contractor)
Kbne
None 2.85 2.26 2.42
2.20
RtRROOUSEB AT THE MAI iw------ H1 VES s'.
OPA 16222
N 5120