Document pnNgyOYEBJ0dMJ27VGGr861w

PnOGRfc*9 REPORT ' / Ijorho. | report no. idat* . W.O. KRUMMRICM PLANT OG.L. Bratsch B ) T.W, Dalton . B ED.W. Jackson B *DA,E, Leisy ' B E.D. Malone ' B ' *BB,W. Corlew . QD,J, O'Toole t "EJR.M. McCutchdtfi Bv. Brawley *(3W. C. Engman <B TO RICIIVI DITAIL IICTION o B m ' B B B. B J.E. Smith; * OENERAL OFFICE OTHERS B J.0. Bright R.L.Tiiese P H.C. Carder _ aim* ED R. NILLOM E D. Danna (4) BOJ.Q.^Landwehr . . P*W. Edwards So. 2nd St. B D.B. Hosmer/ B P.0. DeQarmo F.J. Holzapfel QT.M. Patrick B R.E. Howard t)J.F, Quinn W,A, ,Kuhn *B B M. P. Lux ' l<B <BM. Richard *B TJTLii AROCLOR: INCREASE AROCLOR CAPACITY ririonnili W. A. Krull (T. E. Greenman) rrorlimi Verify Design Capacity of Aroclor Expansion summary During a capacity check, the design rate of the equipment installed In the Aroclor expansion was exceeded for about a two,day period. This verifies that the Aroclor production capability at WGK is about 70 II pounds per year provided we have sufficient operator force and storage. To reach 70 M pounds, three more 22,000 gallon storage tanks and one or more operators would be needed. The 1970 cost standard indicates a capacity of 57,6 M pounds per year. The storage limitation is the lower restriction. The 197? and 1974 forecasts are for 55 and 59 M pounds respectively. This indicates a need for additional storage in 197? and that before this, no changes or additions are necessary. The capacity of the drowning Jet will be checked to see if HC1 pollution could be a problem at full rate. Quarterly capacity checks will be made to discover any restrictions that could develop due to wear. Future Work: This Job will be closed. W. 'A. Krull Technical Services Department 0190566 /tm COMPANY CONFIDENTIAL INFORMATION This document la {ha proparty of tlonaaato Company and tha recipient la reaponattrl* far ita aafafcaoplng and dlapoeltlon. It contain* coofldor tlal Information of Mona anto Company which moat not bo reproduced, toaaalad to unaothorlaod poraona or oant outalda th* company withoi propor anthorlaatlon. Either retain la aacuro filea or daatroy. *o*m wk m rev~i/m TOWOLDMONOQ45317 91370:5690 (2-Final) -2- 5/6/70 DETAILS: I. BACKGROUND A. In 1968 the Aroclor Department was expanded by a CED project, CEA l600, which was continuous and rated at AO M pounds/year. At the time the new facility was added, the existing batch plant was rated at 30 M pounds/year. B. The sales forecast dated 2/15/70 forecasts an Aroclor production for coming years in millions of pounds per year as follows: 1971 - 46.5 1972 - 50.9 1973 - 55.5 1974 - 59.2 C. Aroclor is presently produced using the continuous chlorinators for 12A2. All other Aroclors are produced in the batch chlorinators from Biphenyl. Aroclors 1248 and 1254 are distilled in one continuous still and 1242 in the other. The two batch stills are used for o,ther products (#l) and boiling down still bottoms (#2). All numbers in this report were arrived at assuming this type operation would continue. II. WORK DONE AND RESULTS A. The actual operating capacities of the major process steps were found by running the equipment at high rates. By material balances the actual rates were compared to instrument readings and the instruments found to be correct. The rates do not reflect maximums in all cases. The still rates in particular are some unknown amount less than maximum. B. The following table gives the rated and measured capa cities of the steps of the continuous expansion. Both figures use 93# on stream time. The #4 still actual capacity was based on the 1248-1254 product split. 01905&7 TOWOLDMONOQ45318 9i370:?690 (2-Final) -3 - 5/6/70 DETAILS: Eauipment Chlorlnators #3 Still #4 Still #1 Absorber #2 Absorber #3 Absorber #4 Absorber COMPARISON OF RATED AND ACTUAL CAPACITIES Product Rated Capacity H pounds/year Actual (M pounds/year) (1142) 40 46 (1242) 25 33 (1248,1254) 25 ' 36 (1242) 27 53 (1254) 27 (1248) 27 38 (1260) 27 62 C. The expansion equipment has been demonstrated to rated capacity. In the next table a comparison between demon strated rates and forecasted requirements shows the,excess capacity available. This table includes the batch plant as well as the continuous expansion. Product REQUIRED AND DEMONSTRATED CAPACITY Process Step Demonstrated 1971 1973 H #/year Forecast Forecast Forecasted % Rate in 1973 1242 1242 1242 Chlorination Distillation Absorption 46 33 53 27 33 70 27 33 100 27 33 60 Other Aroclor 1248,1254 1260,1262,1232 1248 Chlorination Distillation Distillation Absorption 26 22 9 38 19 23 90 16 19 85 3 4 45 8 9 25 1254 Absorption 35 8, 10 30 1260 Absorption 62 345 0190668 TOWOLDMONOQ45319 91570:5690 (2-Flnal) -4 - 5/6/70 DETAILS: II. WORK DONE AND RESULTS (Continued) D. The production department has indicated that one or more additional operators would be necessary if a high rate is to be maintained for a longer period of time. Also, additional storage would be necessary to run at high rates These factors restrict the capacity to 58 H pounds/year with storage being the lowest restriction. The forecast indicates a need for additional storage in 1971*. CONCLUSIONS; The capacity check and previous production records have shown that the department will be running at reduced rates through 1975. The 1242 still will be nearing capacity in 1973 even though the addi tional demonstrated capacity is not maximum. Storage and operators may be needed in 1975. From the data in the Appendix, it appears that the off-gas condensate rate is doubled when the continuous chlorinators are increased from 70$ to 100$. RECOMMENDATIONS: 1. Evaluation of drowning Jet be made to determine pollution level at full rate. , 2. No other capacity related TSD work be done until 1975 when storage should be evaluated, unless sales exceed the present forecast, 5. Quarterly checks be made to discover rate restrictions that occur. APPENDIX; The remaining pages of this report consist of data taken during capacity checks. The temperatures, pressures and levels should be typical of conditions at the various rates. /tm Att: Technical Services Department 0lq05t>q TOWOLDMONOQ45320 APPENDIX CONTINUOUS CHLORINATOR DATA Biphenyl Cat. Cl2 *8-- Densi- Feed Mix Bi 0 Pres Densi- trol Densi- Rate Ratio Temp 0 Clz Flow | sure Specific Gravity trol Set trol Min-Sec. C #6- r#7i #0 f9\ PSIG i #7 1 #9 % Point Reading 55 6 - 7 99 44 43 53 70 1.096 1.165 1.252 1.346 80 65 6-7 100 44 55 46 60 1.092 1.191 1.275 1.555 83 1.356 1.359 65 6 - 7 96 44 55 45 64 1.092 1.190 1.270 1.352 81 1.355 1.358 75 6-7 100 45, 60 47 70 25 1.082 1.186 1.266 1.339 65 1.343 1.344 75 6-7 100 45 60 50 70 27 1.088 1.184 1.258 1.343 67 1.345 1.346 85 , 6 - 7 100 50 62 59 92 27 1.088 1.182 1.258 1.345 78 1.353 1.352 85 6 - 11 99 65 71 75 68 1.098 1.190 1.286 1.354 94 1.360 1.369 85 6 - 11 99 66 73 74 70 25 1.096 1.186 1.279 1.340 88 1.359 1.361 100 6 - 14 100 99 100+ 99 72 26 1.124 1.217 1.248 1.358 72 1.350 1.350 100 6 - 14 99 75 70 75 83 26 1.109 1.204 1.295 1.351 1.343 1.343 100 6 - 14 101 90 90 90 71 26 1.110 1.198 1.282 1.352 68 1.345 1.348 100 6 14 100 90 90 85 57 27 1.116 1.222 1.306 1.347 46 1.347 1.347 TOWOLDMONOQ45321 AI TOXX: Biphenyl Feed Rate (%) 55 65 65 75 75 . 85 85 85 100 100 100 100 Chlorinator Temp (C) #6 #7 #8 #9 156 155 175 193 157 159 174 192 156 158 174 192 153 167 175 192 156 167 175 192 155 167 185 194 157 168 187 192 157 170 186 193 164 170 193 193 154 167 183 195 155 169 184 194 155 169 184 192 Off-Gas Temp (C) Conden sate Header Tank 89 44 77 38 83 45 88 41 92 43 100 43 91 40 93 41 101 41 102 41 107 42 100 40 Int. Stor. Temp C 174 180 174 168 168 170 184 176 175 178 180 180 Blow Tank Temp C 145 145 115 150 145 147 148 145 160 125 120 110 6- - TOWOLDMONOQ45322 APPENDIX: Bi phenyl Feed Rate (*) #6 Air Sneed Press 55 Slow 11 65 Slow 10.5 65 Slow 11 75 Slow Close 75 Slow Cld LTV 00 Slow 9.5 85 Slow 11 85 Slow 9.5 100 Slow Open 100 Fast 15 100 Fast 12 100 Fast 12.5 Cooler Settings #7 #e Air Sneed Press Sneed Press Slow 12 Slow 12 Slow 12 Slow 12 Slow 12 Slow 12.5 Slow 11.5 Slow 11.5 Slow 10 Slow . 11 Slow 10.5 Slow 10 Slow 8.5 Slow 8 Slow Open Slow 7 Fast 12.5 Slow Open Fast lb Fast 15 Fast 12.5 Fast 12.5 Fast 15 Fast 15 Cooler Outlet #9 ^ Temp ro Sparger Temp (C) Sneed Press #6 #7 #8 J2_ #6 #7 #8 #? Slow 12 155 152 172 190 156 155 175 191 Slow 12.5 156 155 175 190 156 157 175 190 Slow 12.5 156 156 172 190 156 157 172 190 Slow 15 155 16b 175 19.0 155 166 172 190 Slow 15 156 16b 175 191 156 166 175 190 Slow 10 155 16b 182 191 155 166 185 191 Slow 15 155 16b 185 190 157 167 185 190 Slow 15.5 155 166 182 190 157 169 184 192 Slow 15 161 16b 189 191 16b 168 191 191 Slow 15 151 16b 180 191 15b 166 181 195 Slow 15 152 16b 180 192 155 168 185 192 Slow 15 151 16b 180 192 155 168 185 190 -7- TOWOLDMONOQ45323 APPEND, ; #5 STILL DATA AbsorPer Surge Feed Tank Rate Level % 47 52 Circulating Still Still Pump Flow Level Press Press Rate (mm Hg) psig ?e 55 40 50 25 Therminol Tempi Set Temp Out Point To Ex Ex C C c 265 264 255 Still Temp C 227 Product Temp C Condenser Water Out Vapor Out Temp "C Of Into Con- Ex. Cond. denser Rec In Out 225 225 50 61 48 54 61 45 55 40 58 70 255 255 241 251 258 225 55 65 55 60 64 48 55 42 58 75 255 256 245 255 241 226 56 64 54 61 70 46 55 39 58 4o 270 270 247 255 245 228 65 71 59 68 71 51 54 42 50 40 270 268 245 255 241 228 65 75 61 70 8- - TOWOLDMONOQ45324 APFE^IX: Absorber #1 (1242) #1 (1242) #1 (1242)#1 .(1242) #2 (1254) #2 (1254) #5 (1248) #5 (1248) #4 (1260) ' #4 (1260) #4 (1260) Rate Gal/Mln 4 7 10 Open 4 6 (Open) 4 7 (Open) 4 7 10 ABSORBER DATA Temp C 65 65 65 65 100 100 87 87 156 157 135 Pump Press. 1 psig 85 85 85 85 83 83 79 79 78 77 78 Press. Into Absorber psig 40 62 34 56.5 Press* Out Absorber Ps3-S_____________ 9.5 10.0 10.5 11.5 11.0 11.5 10.5 10.5 8.0 8.5 9.0 -9- t,L<>0b \0 TOWOLDMONOQ45325