RESEARCH AND DEVELOPMENT REPORT ANNISTON PLANT
OTHER LOCATIONS
GENERAL OFFICE
*W. 6. Engman - WGK *P. 0. deGarmo - So. 2nd
*A. E. lelsy - WGK *A. Rasmussen - WGK *E. S. Tucker - So. 2nd
D. Danna (2) *P. B. Hodges
F. J. Holzapfel R. M. Kountz
*W. B. Papageorge *W. R. Richard
*J. R. Savage
RaMft N*
Z
J.kN.,
6-5H
Dot* Anri 1 15, 1971
ANNISTON PLANT
J. T. Bell J. L. Corder J. L. Etheridge V. R. Haupt
G. 1. Jessee
J. C. Landwehr/w, F. Taffee
6. W. Hiller /E. G. Wright
TitUi
Aroclor Pollution Study
P*rt*nnl; Ishmeal Ransaw and Andrew Nelson (J. 1. Brown)
Pkl*nt
Evaluate the removal of Aroclor from the Anniston Plant effluent by carbon adsorption
JvttiluatiM! Pollution Abatement
Svmryt
In a 107 day pilot run, approximately 287,000 liters of waste water from the Aroclor sump were treated by passing through a series of four (4) packed-bed adsorbers (each adsorbs" was a five (5) Inch diameter tube packed to a beo depth of 5.5 ft. with Pittsburgh's carbon type.FI 1trasorb 3001. Test runs were made at 2 gpm/ft.z, 4 9pm/ft.z and 6 gpm/ft.z flows. During the first 20 days.of this study there were periodic indications of breakthroughs . This problem disappeared after backwashing was Initiated on a periodic basis regardless of the pressure drop across the columns.
The following conclusions may be drawn from this study:
1. The Aroclor level of waste water containing average concen trations of 4,795 ppb1 of Aroclor 1221, 1,525 ppb of Aroclor 1242 and 95 ppb of Aroclor 1254 can be reduced to <10 ppb total Aroclor upon passing through the first carbon bed at a 6 gpm/ft.z flow with an expected carbon loading capacity of 2SX (based on the first column).
2. Backwashing frequency will have to be based on a factor other than pressure drop alone. This factor Is necessary to pre vent the migration of small Aroclor-contalnlng particles
1 ppb parts per billion
z Breakthrough Indicated by effluent concentrations >10 ppb Aroclor.
Appendix sections not Included.
I MGNS 0*7503
/or Pollution Study <arch and Development Report
Summary: (cont*d.)
Z. through the carbon bed. The backwash water contains an unacceptable Aroclor concentration; hence will have to be
treated before disposal.
3. Based on an experimentally determined 251 loading capacity and 6 gpm/ft.* flow, the capital cost for treating a 200 gpm and 600 gpm Is 125,000 + 301 and $45,000 + 301, respectively. This cost does not Include pumps, engineering or other
Indlrects. The total cost becomes $99,000 + 301 for 200 gpm flow and $129,000 + 301 for 600 gpm with the Inclusion of a carbon reactivation system.
Recommendations:
It is recommended that Aroclor be removed from waste streams that contain 60 tng/1 or less solids and Aroclor concentrations not exceeding 10,000 ppb by adsorption In a fixed carbon bed.
Future:
A study Is presently in progress to evaluate the removal of Aroclor by adsorption on a less expensive adsorbent and then removing the adsorbent by flocculation.
' /dp
Ishmeal Ransaw PR40 Chemist
I MOMS 00 7504
odor Pollution Study .^search and Development Report
Page Z
BACKGROUND:
Anniston PR&D Report No. 1 (Job 4446-514, 1/15/71) describes a filtration process In which Aroclor Is removed from the waste stream by both filtra tion of neutralization pit solids and by adsorption of any residual Aroclor on the filtration media (carbon). In this study. Influent con centrations (100-8,000 ppb) were consistently reduced to <10 ppb upon passing through a four (4) Inch diameter column (packed to a bed depth of 5.5 Inches with granular carbon) at flows up to 350 cc/min. The presence of 200-1 ,000 ppm of Inert solid particles (size 1.5-25G4<) set a maximum limit on the pressure and flow at which the unit could be operated. It was concluded from this study that:
1. An evaluation should be conducted for removing Aroclor In a pilot adsorption unit, and that
2. Such a study should not be conducted on the plant stream with out some provision for removing solids.
At that point, it was determined that a solution to the PCB removal problem could be best reached by separating the study Into two phases - solids removal and Aroclor removal. Conventional solutions existed for the solids removal problem so efforts were directed toward the Aroclor removal phase. The Aroclor sump provided the best test conditions for this study as the effluent here contains Aroclor concentrations similar to the total plant effluent, but with less solids. The objective of this study is to define the optimum flow rate and leading capacity for a packed-bed adsorption system for treating the Aroclor waste water. The results of this study are reported herein.
EXPERIMENTAL:
1. Plow 01agram
Pressure gauge
f
moms
Oti7505
odor Pollution Study .esearch and Development Report
Page 3
EXPERIMENTAL; (cont'd.)
2. EquIpment Pcs c H ptlon
a. Piping - All piping was done with 1/2 Inch PVC tubing and connectors.
b. Columns - Columns {numbered 1, 2, 3 and 4 In diagram) were all Identically constructed of clear, heavy duty plastic.
Columns measured 6 ft. X 5 In. l.D. Each was equipped with a
5 In. by 1/2 In. reducing flange at the top and bottom. The bottom flange had two separate outlets; one for sampling and one for transfer to the next column. Each column was packed
to bed depth of 5.S ft. (20 pounds) with Pittsburgh carbon (Flltrasorb 300).
c. Feed Pump -- A Jabsco Model P6M6 self-priming pump equipped with a vlton head and impeller.
3. General Procedure
Effluent from the Aroclor sump was pumped downflow through the
series of packed carbon beds at an initial flow of 2 gpm/ft.z
(1,000 cc/mln.). The columns were not backwashed during the Initial
phase of testing because it was not warranted by the pressure drop
across the columns. Upon observing periodic breakthroughs, however,
It was determined that backwashing could alleviate or eliminate
this problem by exposing new carbon surface and preventing channeling.
This problem disappeared after backwashing was done periodically for
the remainder of the test perlod.regardless of pressure drop. Flow
was Increased first to 4 opm/ft. (2,000 cc/mln.) and then to
6 gpm/ft. (3,000 cc/mln.) when there was no Indication of a break
through of Aroclor. Results are tabulated In Appendix A. Design
and cost estimates based on the experimental results are reported
In Appendix B.
.
4. Samp!Inq
A 24 hour composite sample (30C ml.) was taken by catching a 100 ml sample every eight (8) hours at points A, 8, C, D and E. Point A is the Influent to Column 1. Points B, C, 0 and E are respectively
the effluents from Columns 1, 2, 3 and 4. Considerable care had to be taken to avoid contamination since the quantity of contaminants was so small. Care was especially taken to prevent the sample from coining into contact with the plastic bottle caps which are
known to adsorb Aroclor.
5. Pressure Drop
The unit was never operated at a pressure greater than 10 pslg on the head column. A pressure drop of 10 psi was used as a signal to backwash; however, this was not the only signal used for this purpose
I mons 007506
<rodor Pollution Study Research and Development Report
Page 4
EXPERIMENTAL: (cont'd.)
6. Analytical Analysis
The Aroclor was extracted from the aqueous sample into a hexane solvent. Once extracted, the hexane solution was then dried and analyzed on a EC/GC. The concentration of Aroclors 1221, 1242 and 1254 was determined by comparing the main peak height of the unknown with the height of the same peak In the chromatographs of known Aroclor solutions of pure 1221, 1242 and 1254. Not all samples were analyzed. Generally, composites caught every other day were analyzed unless some other factor necessitated running samples in between the said period. Samples not analyzed were stored for future reference. The analytical results are tabulated in Appendix A.
7. Backwashing Frequency and Rate
Each column was generally backwashed every 48 hours except during the first 20 days of operation. This operation was carried out by pumping upflow through each column at an approximate 5 gpm/ft.^ flow. This was enough flow to easily expand the compacted carbon beds by 101. However, this was not always enough flow to expend the carbon bed in the first column. The difficulty experienced in expanding the Tirst column was caused by the agglomeration of Arocio. Biphenyl, foreign solids and carbon granules at the top of the column Most of the backwashing time was spent trying to break up this apparent solid mass. The backwash water from the first adsorber was saturated with unadsorbed Aroclor and other organics. The condition of the backwash water Indicates that Aroclor is being removed by filtration and adsorption. Backwash water will have to be properly disposed of due to its Aroclor content.
PISCUSSION:
1. Test Results
The results of the 107 day pilot run with respect to the removal tt Aroclor Is tabulated in Appendix A. These results represent rn analysis of 52 sets of samples taken during the test period, imethe analysis time required to complete an analysis is quite lengtnv. only the samples considered necessary to define the problem solution were analyzed. With the exception of the brief period in October, results show that the Aroclor was reduced to <10 ppb In the first column. For this reason all calculations are based on the results <.i the first column.
2. Process Parameters
a. Influent Water Quality >- During the test period approximately ' 287,000 liters of water was treated with average Aroclor
I MQNS 037507
jclor Pollutlon Study search and Development Report
Page 5
D1SCU5S1QH: (cont'd.)
2. Process Parameters {cont'd.)
I. concentrations of 4,795 ppb of Aroclor 1221, 1,525 ppb of Aroclor 1242 and 95 ppb of Aroclor 1254. Aroclor. concentrations fluctuated from no detectable amount (NDA) to 90,000 ppb with certain com ponents without any apparent effect on the effluent water quality.
b. Loading Capacity -- Based on the averaae influent concentrations and volume treated, a minimum of four (4) pounds of Aroclor was removed by 20 pounds of carbon. This represents a 25X loading factor based on Aroclor alone. This does not take into considera tion the removal of other organics in the stream, such as Biphenyl. This loading factor could be higher at complete exhaustion since a considerable quantity of Aroclor is actually filtered out.
c. Flow Rate -- The operation of the pilot-unit over the flow profile, 2, 4 and 6 gpm/ft. , seems to have little if any effect on the product water quality. A 6 gpm/ft. flow was essentially nfl that could be realized in this unit. This flow does not necessarily represent the optimum flow. This variable probably should be evaluated further where the equipment permits.
ACKNOWLEDGEMENT
I wish to thank Mr. Don Turner, Analytical lab Technician, who conducted 11 the Aroclor analyses for this study. Further, 1 wish to extend gratitude to all the personnel of the analytical lab who helped to monitor pilot operation during off-shift.
/dp Att.
Ishmeal Ransaw
I HONS 08750b
APPENDIX A Results of Carbon Adsorption Study
087509
mons
Startup Time: 10/2/70 0 1200 hr.
P9 7
Semple No.
i .* C
E
2A C D E
Composite No. 1 2 3 1 2 3
Time of Composite
1500 2300 0700
1500 2300 0700
Date of Composlte
10/2 10/2 10/3
10/3 10/3 10/4
Flow Rate cc/mln.
1000
1000
1000
1000
1000
1000
Results Concentration of , Contaminants (ppb) 1221 1242 1254
-
3A B C D E
1 2 3
1500 2300 0700
10/4 10/4 10/5
1000 1000 1000
Grab A B C 0
E
0930
10/5
1000
NDA2
NDA NOA NOA
NOA
2000 NOA r;oA NOA
NOA
778 NOA NOA
NDA
NDA
4A B C 0
E
1 2 3
1530 2230 0615
10/5 10/5 10/6
1000 1000 1000
Grab A
B C 0 E
0900
Jppb parts per billion
10/6
1000
ZNDA - non-detectable amount
I HOMS 067510
Simple No.
5A B C 0 E
Compos 1te No.
1
2
3
Time of Comoos 1te
1400
2200
0630
Date of Compos 1te
10/6
10/6
10/7
Flow Rate cc/min.
980
800
6S0
Page 8
Results Concentration of Contaminants (ppb) 1221 1242 1254
1200 600 NOA NDA 2 NDA NOA 7 NDA 3 4 NDA 12 8 NOA
6A B C 0 c
1 2 3
1420 2200 0815
10/7 10/7 10/8
1020 860 740
347 87 NDA NDA 2 NOA
NDA 3 NDA NOA NDA NOA NDA NDA NDA
7A
B C 0
1 2 3
1600 0100 0745
10/8 10/9 10/9
1000 1000 1000
8A B
C D E
1
_
1630
_
10/9
.
1000
1841
630 NOA
17 36 NOA
31 38 NDA
NDA NDA NDA
NDA NDA NDA
Pump being repaired. on 10/12.
Columns shut down from 2015 hr. on 10/9 to 1030 hr
..
9 AfDc
C 0 E
1 ' 1600 2 2400
3 0800
10/12 10/13 10/13
1030 980 650
10 A B
C
0 E
1 2 3
1600 2400 0800
10/13 100 860 940 NOA
NDA 10 NDA
10/14 980 NDA 14 NDA
NDA 32 NOA 10/14 750 NDA 53 NOA
M0NS 087511 1
Sample No.
11 a
c
E
Composite
Time of
No. Composite
1 1600
2 ' 2400
3 OBOO
Date of Compos 1te
10/14
10/15
10/15
Flow Rate cc/mln.
1050
980
950
Page 9
Rcsults Concerttration of Contaminants (opb) 1221 1242 1254
12 A B C 0
e
1 2 3
1600 2400 0800
10/15 950 NDA 520 2000 NDA NDA NDA
10/16 950 NDA NDA NDA
NDA NDA NDA 10/16 800 NDA NDA NDA
13 A C E
1 2 3
1600 2400 0800
10/16 10/17 10/17
850 900 950
14 A B
C D E
1 2 3
1600 2400 0800
10/17 10/18 10/18
1000 950
1000
NDA NDA 102 NDA NDA NOA NDA NDA NDA
NDA NDA NDA NDA NOA NDA
15 A B C
0 E
1 2 3
1600 2400 0800
10/16 '10/19
10/19
850 1000 1000
KDA n .361 NDA 33
31 12
63 36
30 14
NDA NOA NOA
NOA NDA
16 A
8 C 0
E
1 2 3
1600 2400 0800
10/19 10/20 10/20
1000 850 850
1483 NOA
NDA NDA
NDA
283 Trace NDA NOA
NDA NDA NOA NOA
NDA NOA
MONS 007512 t
Sample No.
)7 A B C
E
Compos 1 to No.
1
2
3
Time of Compos ite
1600
2400
0830
Date of Composite
10/20
10/21
10/21
Flow Rate cc/mln.
1000
900
800
Pige 10
Results concentration of Contaminants (ppb) 1221 1242 1254
NOA 1 NOA
Grab A
B C D
E
1 2 3
0915
10/21
79 63 NDA NOA NDA NOA
NDA NDA NDA NOA NDA NDA NDA NDA NDA
Pump out. Unit shut down from 1700 on 10/21 to 1500 on 10/22
18 A 8 C D
E
1 2 3
1600 2430 0830
10/22 10/23 10/23
1000 800 600
19 A (first) 8
C D E
0930
10/23
1000
Unit shut down two hours to backwash it 0950 TO/23.
20 ABs
C D E
1 2 3
1600 2400 0600
10/23 10/24 10/24
1000 1000 1000
f MUNS 067513
Sample No.
21 A B C 0 E
Composlte No.
1
2
3
Time of Composlte
0900
2400
OBOO
Date of Composlte
10/25
10/25
10/26
Flow Rate cc/mln.
1000
1000
100
Page 11
Results Concentration of
Contaminants (ppb) 1221 1242 1254
NDA 1250
22 54
2 NDA
NDA 2
NDA
NDA NDA NDA
NDA
Unit down two hours for pump repair on 10/25. Unit down four hours to backwash,, 10/26.
22 A B
C D
1 2 3
1600 2400 0600
10/26 10/27 10/27
1500 1400 1400
NOA
NDA NDA
NDA NDA
84 Trtet 11 Trtet
2 Trtet 4 Trtet
3 Trtet
23 A B C
D E
1 2 3
1600 2400 OBOO
10/27 10/28 10/28
1360 1300 1300
230 112 108 NOA 3 NDA NOA 26 NOA NDA NDA NDA
NDA NDA NOA
Unit down one hour to backwash 10/28.
24 A B C 0 E
26 A B
C
D
e
1 2 3
i 2
3
1600 0145 0800
1600 2400 0600
10/28 '10/29
10/29
2100 2100 2100
10/29 10/30 10/30
2100 2100 2100
NDA NOA 500
NDA NDA NDA
NOA NDA NOA
NDA NOA
2
NDA NDA
2
MONS 087514
sample No.
26 A B C D c
Compos 11 No.
Time of Compos 1te
1 1600
2 0100
3.
0600
Date of ComDOSlte
10/30
10/31, l3
11/2
Flow Rate cc/mln.
2100
2100
2100
Rage 12
Results Concentration of Contaminants (ppb) 1221 1242 1254
132 174 NOA NDA NOA NOA NDA NOA NOA NDA NDA NOA NDA NOA NOA
27 A
c 0
i 2 3
1600 0600
11/2 11/3
1900 1700
Unit chut down one hour
columns backwashed.
26 A 6 C 0
1 2 3
1600 2430 0830
11/3 11/4 11/4
2100 2100 2100
Grab A
6 C 0 E
1000
11/4
2100
NOA 530 NOA NDA NDA NCA NOA NDA NOA NDA NDA NDA NDA NDA NDA
29 A
6 C
D
E
1 2 3
1600 2400 0830
. ll/ 11/5 11/5
2100 2100 2100
30 A 1
C 0
E
1 2 3
1600 2400 0830
11/5 11/6 11/6
2100 2000 2100
NOA 250 NDA NDA NDA NOA
NDA NOA NOA NDA NDA NOA NDA NDA NOA
sThe composite was continued without the realization that samples hid not been taken 11/1.
I MGNS 087515
Sample Ho.
31 A
c D E
Composite No.
i
2
3
Time of Comooslte
1600
0100
0B00
Date of Comooslte
11/6
11/7 11/7
Flow Rate cc/mln.
2100
2000
2100
Page 13
Resul ts concentratf on of Contaminants (ppb > 1221 1242 1254
Unit shut down one hour to backwash columns oh'11/7.
32 A
c D E
1 2 3
1600 0100 0800
11/7 11/8 11/8
2000 2000 2000
33 A B
c 0
E
1 2 3
1600 2400 0800
11/8 11/9 11/9
2000 2000 2000
HDA 124 NDA NDA NDA NOA NDA NDA NOA NDA NOA NOA
NDA NDA NOA
34 A 8 C 0 E
35 A 5 C D E
1 2 3
.
1 2 3
1600 0100 0815
.
1600 0100 0800
11/9 11/10 11/10
_
11/10 11/11 11/11
2000
940 770 NOA
NDA 10 NDA
2000 NDA 3 NDA
NDA NOA NDA
2100
NDA NDA NOA
.
2100 2100 2100
Columns backwashed on 11/10 -- downtime, on* hour.
HONS 087516
Sample No.
36 A 6 C D E
Composite No.
1
2
Time of Composite
1600
0100
Date of Comoos 1te
11/11
11/12
Flow Rate cc/mln,
2000
2000
Rage 14
Remits concentration of Contaminants (ppb) 1221 1242 1254
NDA ISO Trace NDA NOA NDA NOA NDA NOA NDA NDA NOA NDA NDA NDA
Grab A B
C D
E
1000
11/12
2000
Columns backwashed 11/12 -- one hour downtime.
37 A B C D E
1 2 3
1600 0100 0830
11/12 11/13 11/13
2100 2100 2100
38 A
B C
D E
1 2 3
1600 2400
oeoo
11/13 11/14 11/14
2100 2000 2000
NOA 3060 Trace
NDA NDA NOA NOA NDA NDA
NOA NDA NDA NOA NOA NDA
39 A B
C D E
1
2
3
.
1600
2400
0800
_
U/l 11/15 11/15
2060 2000 2100
Unit down one hour. Columns backwashed on 11/15.
.
HONS 08751* 1
Semple No.
40 A B C D E
Composlte No.
1
2
3
Time of Comoos1te
1600
2400
0B30
Flow
Oete of
Rate
Composite cc/mln.
11/15
2100
11/16
2000
11/16
2100
fi9 i 5
Results Concert tret i on of Contemlnents (ppb) 1221 1242 1254
NDA 78 NOA NDA NDA NDA NOA NOA NOA NDA NDA NDA NOA NOA NDA
41 A 8 C D
E
1 2
3
1600 2400
0815
11/16 11/17
11/17
2000 1900
2000
42 A 8 C D E
43 A 8 C D E
1 2 3
1 2 3
1600 2400 0830 1535 2400 .
11/17 11/18 11/18 n/iB 11/19
2000 1900 2000 2000 1900
NDA NDA NDA NOA NDA
-
5200 NDA NDA
NDA NDA
Trect NOA NDA NDA NDA
-
44 A
8 C 0
E
1 2 3
1600 2400 0810
11/19 11/20
11/20
200Q 1900 2000
NOA 1875 Trect NDA NDA NDA NDA NDA NDA
NDA 9 NDA NDA NDA NDA
Columns beckweshtd on 11/19. One hour downtime.
45 A
I C
D
1 2 3
1600 2400 0800
11/20 11/21 11/21
1670 1670 1670
HONS 007518
. Sample
Wo.
46 A B C 0 E
Composite
Time of . Date of
No.Composite Composite
1
1600
11/21
2
2400
11/22
3
oeoo
11/22
Flow Rate cc/mln,
1670
1670
1670
Page 16
Results Concentrate on of Contaminants (ppb) 1221 1 242 1 254
NOA 640 Tree* NDA NOA NOA NOA NOA NOA NOA NDA NOA NDA NOA NOA
47 A B C D
E
1 2 3
1600 2400 0800
11/22 11/23 . 11/24
1800 1800 1800
Grab A
B C
0 E
1600
11/24
1800
Columns down five hours on 11/25. Columns backwashed,, pump repaired.
48 A 8
C 0
E
1 2 3
1600 2400 0800
11/25 11/26 11/26
3000 3000 3000
NOA 36 80 NOA NDA NOA
NOA NDA NDA NDA NOA NDA NOA NOA NDA
49 A B C 0 E
60 A 8 C 0 E
1 2 3
1 2 3
1700 2400 0900
1700 2400 0800
11/26 11/27 11/27
11/27 11/28 11/28
3000 3000 3000
2800 2650 2750
NDA 10,800
NOA 14 NDA NDA NDA NDA NOA NOA
NOA
NOA NOA NDA NOA
NDA NDA NDA NOA NDA NOA NOA NDA NDA NDA NOA NOA
NDA NOA NOA
%
\
HONS 087519
Semple Ho.
St A
C
Compost te Ho.
1
Time of Composite
1700
2 0200
3 0730
Date of Compost te
11/28
11/29
n/2
Flow Rate cc/mtn.
2S00
2300
3000
P*9 17
Heulti Concentration of Contaminants (ppb) 1221 1242 1254
52 A
e c
D E
1
2
3
1730 0130 0800
11/29 11/30 11/30
2400 2400 2400
NDA NDA 212
NDA NDA NDA NDA NDA NDA NDA NDA NDA NDA NDA NOA
Columns backwashed -- two hour downtime.
S3 A
1
1600
11/30
CnD 2 E3
2400 0800
12/1 12/1
3300 3000 3000
54 A
B C D E
1 2 3
1600 2400 0800
12/1 12/2 12/2
3000 2700 2700
NDA 310 240
NDA NDA NDA NDA 9 4
No sample NDA . NDA NDA
65 A
8 C
D E
1 2 3
1600 0100 1000
12/2 12/3 12/3
3200 2800 3000
1383 137 NOA NOA NOA NOA NDA NDA NOA
NDA NDA NOA NDA NDA NDA
Columns backwashed on 12/2. Two hours downtime.
l MQNS 06 7520
Sample No.
56 A 8 C 0 E
Compost te No.
1
2
3
Time of Compos 1te
1600
2400
0800
Date of Compost te
12/3
12/4
12/4
Flow Rate cc/mln.
3200
2600
3000
Pt9 18
Results concentration of Contaminants (ppb) 1221 1242 1254
400 86 NDA NOA NOA NDA NOA NOA NOA NOA NOA NOA NDA NOA NOA
Grab A B
C D E
1100
12/5
3000
Columns backwashed on 12/4 -- one hour downtime.
57 A
6 C
D E
1 3
1600 0800
12/S 12/6
2800 1500
Pump out on 12/6. One hour downtime.
88 A 6 C D
t
1 3
1600 0800
12/6 12/7
3000 3100
58 A 6
C
D l
1 2 3
1600 0100 0800
12/7 12/8 12/8
3100 3Q00 3000
9000 NDA
NOA
NOA NOA
11SO NDA
NDA 3
3
NOA NDA
NDA NOA NOA
Columns backwashed on 12/7. Two hours downtlM.
I HONS 087521
Sample No.
60 A B C D E
Composlte
Time of
Date of
No. Comoos1te Compos 1te
2
0100
12/9
3
0800
12/9
Flow Bate cc/mln.
3000 2850
Page 19
Results ConcenTratTon of Contaminants (ppb) 1221 1242 1254
Columns backwashed on 12/9 -- 1 .5 hours downtime.
61 A
B C D E
1 2
1600 0100
12/9 12/10
3000 1500
490 820 NOA NOA NOA NDA NOA NOA NOA NDA NDA NOA NDA NOA NDA
Puop repaired -- three hours downtime on 12/10.
62 A
B
C D
E
1 2 3
1600 0100 0800
12/10 12/11 12/11
3300 3000
-
Columns backwashed. Two hours downtime on 12/11.
63 A 8 C
D E
1 2 3
1700 2400
12/11 12/12
3500 3200
NDA 430 Trace NDA NDA NDA NDA NDA NOA
NOA NDA NOA
NOA NOA NOA
64 A 8
C 0
E
1 2
1600 0100
12/12 12/13
3300 3200
i MUNS 0875^2
Sample No.
65 A 8 C 0 E
Composite No.
1
2
3
Time of Comooslte
1600
2400
0800
Date of Compos 1 to
12/13
12/14
12/14
FI ow Rate CC/mln.
3500
3300
3300
P*9* 20
Results Uoncanfration of Contaminants (ppb) 1221 1242 1254
2850 NOA NDA NOA
NDA
3100 NDA NDA NOA
NOA
Trace NOA NOA NOA
NOA
Columns backwashed. Two hours downtime on 12/14.
66 A 8
C D E
1 2 3
1600 2430 0800
12/14 12/15 12/15
3100 3200 3100
8400
NDA NDA NDA NDA
1800
NDA NOA
NDA NDA
NOA
NOA NDA
NOA NOA
67 A
8 C D E
1 2 3
1600 2400 0800
12/15 12/16 12/16
3000 3300 3100
5100 NDA NOA NDA
NDA
1183 NDA NDA NDA NDA
Trace NOA NOA NDA
NOA
Columns backwashed -- 1.5 hours downtime on 12/16.
66 A 8
C D E
1 2 3
1600 0100 0800
12/16 .12/17 12/17
3500 3200 3200
6500 NDA
NDA NOA NDA
1700 NDA
NDA
NOA NDA
NDA
NOA NOA NOA NOA
Grab A
8 C D E
_
08C0
12/18 _ .
3000
15,250 NDA NDA
NDA NDA
3850 NDA NOA
NDA NDA
NOA NDA NDA
NDA NOA
MONS 0875i3
Sample No.
Compos 1te No.
Time of Compos 1te
Oate of Compos 1te
Flow
Rate cc/mln.
Columns backwashed -- two hours downtime on 12/18.
Ptft 21
Rasults concentration of Contaminants (ppb) 1221 1242 1254
69 A
C D E
1 2
1600 0200
12/18 12/19
3400 3300
70 A
C D E
1 2
1600 0300
12/19 12/20
3300 3100
71 A 1 C 0
E
1 2 3
1600 0400 0800
12/20 12/21 12/21
3200 3300 2800
4900
NOA NDA NOA NDA
450 Trace NDA NOA HDA NOA
NDA NOA
NOA NDA
Columns backwashed. Two hours downtime on 112/20.
72 A B
C 0
t
1 3
1600 0800
12/21
3300
12/22
3500
9S0 84 Trace NOA NDA NDA NDA NDA NOA NDA NOA NDA
NDA NOA NOA
79 A
B C D E
1 2 9
1600 0300 0800
12/22 12/23 12/23
3500 3500 3500
17,250
NOA NDA
NDA NOA
4150 NOA NDA NOA NDA
Trace
NOA NOA NDA NDA
MOWS 08 75.24
Sample No.
Composite No.
Time of Comoos1te
Date of Compos 1te
Flow
Rate cc/mln.
Columns backwashed on 12/22. Two hours downtime.
Pl)t 22
Results Concentration of Contaminants (PPb) 1221 1242 1254
74 A 6 C 0 E
75 A I C 0 E
1
3
1 2
1600
0900
1700 2400
12/23 12/24
3000 3000
30,000 NDA
NOA NDA NOA
9250 NOA NOA
NOA NDA
Trace NOA NDA NDA NDA
12/24 12/25
2800 1600
90,000
NOA NOA NOA NOA
6600 NDA
NDA NDA NOA
Trace NDA NOA NDA NOA
Columns backwashed,, pump repaired . Two hours downtime on 12/25.
76 A c E
1 2 3
1700 0200 0810
12/25 12/26 12/26
2500 2600 2600
77 A
6 C D E
i 2 3
1700 2400 0820
12/26 12/27 12/27
2600 2800 2800
6150 NDA
NDA NDA
NDA
1250 NOA NDA NDA
NOA
NDA NDA NDA NOA NOA
76 A
C D
1 2
1700 0300
12/27 12/28
2600 1400
HONS 08?5^5
Page 23
Sample No.
Composlte No.
Time of Comoosite
Date of Comoos 1te
Flow Rate cc/mln.
Results
Concentration of Contaminants (ppb) 1221 1242 1254
Pump repaired, columns backwashed. Two hours downtime on 12/28.
79 A
B C D
E
1 2 3
1S30 0100 0600
12/26 12/29 12/29
3100 3300 3400
5400
2 NOA NOA NOA
510
Trace NOA NOA
NOA
Trace
Trace NDA NOA NOA
80 A
6 C
0 E
1 3
1600 0815
12/29 12/30
3400 3400
9625 NDA NDA NDA NOA
246 Trace NDA NOA NDA NOA
NOA NDA NDA NOA
81 A 6
C D E
1 2 3
1530 0330 0645
12/30 12/31 12/31
3300 3000 2900
6000 NDA
NDA NDA NDA
215 Trace MOA NOA
NOA NOA NOA NOA NDA NDA
Columns backwashed on 12/31 -- '1.5 hours downtime.
62 A B C D
E
1 2 3
1530 0330 0715
12/31 . 01/1
01/1
3400 3450 3200
1150
80 917
NOA NOA NDA
NDA NDA NOA
NOA NDA NOA
NOA NDA NOA
83 A
B
c 0 E
1 2 3
1600 0700
01/1 01/2
3400 3300
*UNS 08 7526
Semple No *
84 A 8 C D E
Composite Ho.
1
2
3
Time of Comoosi te
1600
2400
0700
Date of Composite
01/2
01/3
01/3
Flow Rate cc/mln.
3200
3000
2960
P3 24
ftesul ts Concentrate Oft of Contaminants (ppb) 1221 1242 1254
85 A
8 C 0
E
1 2 3
1600 2400 0800
01/3 01/4 01/4
.
3300 3200 3000
13,500 NDA
NDA
NOA NDA
500 T race NDA NOA NOA NOA NOA NDA
NOA NOA
Columns backwashed on 1/4 -- 1.5 hours downtime.
86 A
C 0 E
1 2 3
1515 2400 0930
01/4 01/5 0T/5
3400 3200 3200
87 A
6 c D E
1 2 3
1600 2400 0800
01/5 01/6 01/6
Columns shut down at 1200 hr. on 1/6/71.
3200 3200 3200
8000 NDA NDA NDA
NDA
638 Trc NOA NDA NDA NOA NOA NOA
NDA NOA
ONS 087527 l
APPENDIX B Design and Cost Estimates Based on the Experimental Results {Reported in Appendix A) by Pittsburgh Carbons (Calgon Division) Representative. Mr. Vincent A. Brunotts.
HONS 067526
, CALCOiV
WIWUM 0> M[ftC CO.t. WA1IR MANACIMINT DIVISION CAICON COtrOltAJION CAlCON CTNTt* SOX 1J4i FITtIUURCII, FA. 1SI1B l11l 92J-U4S
March 11, 1971
Mr. Ishmeel Ransaw
Monsanto Company Annlaton, Alabama 36201
Daar Mr. Ransaw:
This Is In reply to your letter of January 20, 1971 requesting design and cost information for a waste water treatment system utilizing Calgon'a Filtrasorb granular activated carbon sized to handle flows of 200 and 600 gpm.
The design basis and cost estimates are based upon date obtained from your pilot plant operation from October 2, 1970 to January 16, 1971.
I apologise for the delay in getting this information to you. The. results f your testing are very encouraging as to the feasibility of creating your waste with Filtrasorb granular activated carbon. No doubt, you will have additional questions after you have reviewed this Information. Pleaae feel free to contect me or our Blrsinghem Office es the following address:
Calgon Corporation 25 Ueet Oxmoor Road Birminghaa, Alabama 35209 Mr. Joaeph'DICiacinto Telephone: (205) 879-4763
*-
Thank you for your interast In out products and services.
... Vary truly yours,
,
VAB:bJg Enclosure
Vincent A. Brunetts Assistant Product Managtr Filtrasorb Department
I MONS 087529
MONSANTO COMPACT - ahsistox, A1.AC.V1A
i l-SUMMARY or PILOT PLANT OPERATION
The purpose of the pilot plant ves to determine the feasibility of treating Monsanto Company's ucstc water with Filtrasorb granular activated carbon. The pilot plant was operated froa October 2, 1970 through January 16, 1971. The total waste water voluna throughput vaa approximately 267,000 liters. The pilot carbon columns vert monitored for breakthrough of contaminants identified
ae "A"* *'B" nd MC."
Contanincr.t A had a range of influent concentrations from C to 90,000 ppb. Contaminant B had o range of concentrations in the influent froa 0 to 11,361 ppb. Contaminant C had an influanc concentration ranging from 0 to 2,000 ppb. There vaa a total of 107 days operation and samples ware analyzed on 52 days. Twenty-too (22) of the 52 samples taken had a 0 concentration of contaminant A. Four (4) of tha 52 scmples taken had a 0 concentration of contaminant B. Twenty-four (24) of tha 52 samples taken had 0 concentration of contnr.lnant C. Nineteen (19) of the samples taken had a trace concentration of contaminant C. baaed on this data the avarege concentrations of contaminants A, B and C were 4,795 ppb, 1,525 ppb and 95 ppb, respectively. These average concentrations Include tha days on which there vert a 0 or trace concentrations.
The first carbon eoluorn showed o periodic breakthrough of contaminant B during tha sarly part of tha testing. However, in tha latter period of the testing there was little or no breakthrough of any contaminant. Based on this dota, it would be ssfs to aoaurr.e that nose of the organic was adsorbed in the first column, and chat
the residence time contained In the first coluan Is sufficient for treatment.
Therefore, on this basis, the total pounds of organics adsorbed in the first column
vss four pounds. The amount of carbon in the first column wee twenty pounds. Thus,
the organic loading from this date would lndicete a 25X loading. This 25% loading
Is not necessarily the ultimate loading because there was no breakthrough on the
first column. Thera Is no indication on how long th* first column would h*v* .m.
Therefore, the proposed plant design and cost estimate are bared on a 252 loading.
This loading could ba as high as 30-502 in actual operation which would be moat
beneficial to Monsanto.
F1LTRASOKD WASTEWATER TREATMSNT PUNT DESIGN BASIS
Tha following design will cover two eases. Cass 1 Is a 200 gp plant and Cass 2 Is s 600 gpm plane. It Is assumed that the waste water has identical characteristic to the pilot plant in both eases. The design parameters baaed on the pilot pl-.nc information end corresponding nssuopeionu for both coses are as fellows:
- 1-
I HONS 087530
r-ILTTASOKn KASTV.t.V'tTSR TRL.Vf;iL:iT PLANT DESIC;! LAS IS (cent.)
DESIGN PARAMETER
CASK 1
CASE 2
Flow Rate (jlpm)
Superficial Residence Tint ( minutes ) Surface Loading (tpra/ft2) Bed orco rsquirud (ft.2)
Bed depth (It.) Carbon exhaustion rate (lbs/day)
200 600 15 15 66 33 . 100 12 13 76 230
In both cases, the adsorption system would Include the following:
An adsorber constructed of rubber or epoxy lined carbon steel. The adsorber would be equipped with a rotary surface wash end appropriate underdrain system to support the carbon. The vassals would be SO psi pressure vessels equipped with inlet and outlet for downflow or upflow service. The npflow inlet and
outlet would be required for periodic backwashing. Pumps would be required for pumping of the waste stream and pumping the backwash watsr agoinst the SO pel head. The csrbcn could be ur-ed on a throwaway bonis whereby the exhausted carbon la dlacerdad and replaced with virgin carbon. Tho carbon may also be reactivated in elthor a rotary kiln or Herreshoff multiple hearth with refractory linings. If reactivation it desired* a dewatering screw, quench tank* apent and reactivated carbon storage tanks, and bJoucaae would be included in the reactivation package. The smallest efficient reactivation facility which can be supplied has the capacity to reactivate approximately 2400 pounds/day. Thus, both systems would require this, however, It would not be in operation as often In Case 1.
F1LTRAS0RS SYSTEM DESICN ALT) COST ESTIMATES
The Flltrasorb system design and "ballpark" capital and operating cost estimates for both cases would be as follows:
DESIGN/ESTIMATE
CASE 1
CASE 2
,
Adsorber also Carbon volume per adsorber
7' Die. x 8*
460 cu. ft.
11' Dla. x 21* SS 1240 cu. ft.
Pounds of carbon per adsorber
12,500
33,500
Cycle Time
164 days
146 days
Coat of edrorber installed
$25,000
$45,000
Reactivation Package Cost
$74,000
$64,000
(Tho difference in the reactivation package coeta la due to the larger
etorage tank rtqulred for Case 2)
The capital cost for Case 1 would bo $23,000 plue or minus 302 without reactivation. This cost does not include punps, engineering or other Indirect*. With reactivation, the cost for Case 1 would be $99,000 plus or minus 302 plus pumps, engineering or ether lndireets. The capital coat for Case 2 would be $45,000 plus or minus 302 not Including pumps, engineering or other lndireets without raactivatlon. Wieh reactivation the capital cost would be $129,000 plus or minus 302 plus pumps, ngineerlng or ether indirect#.
MGNS 087531
giiTRASom sys'y:j_bhsicn jc:u cost estitatls (cunt.) Tho operating co^m for Care 1 on * throwaway basis would bo $25/day for the carbon plu Ihtf labor r-.;uircd uo cr.p'.y and refill the colur.m every 164 days. Kith the r*oetiv.nU:i furnace In Case 1, Che furnace would be required to operate 5 days out of 164 in order to reactivate ell the carbon in one column. Averaged out cm e d.tU' t-sio, the operating cove vi.ll be $4/day; this cost Includes Isbor to er.pty end refill colons and startup and shutdown-the reactivation furnace. The opsracins cost for Case 2 on a throwaway basis would be fii/day for the carbon plus labor to empty ond refill the columns every 146 day. With reactivation in Case 2, the operating costs would be $17/dey this includes labor for emptying end refilling the columns end everting up end shutting down the furnoee. The reactivation furnace would be required to opivatc approximately 14 out of 146 days. The reactivation furnaee would be oporctad for 24 hours a day automatically diiing the rucckivutiwn time. Labor would only be nccesesry at the start and finish of the reactivation cycle otherwise the furnace operate by itself.