Document pmoYvrEya1kdem6aov7ONQYEB
nix Quality Sub committee Minutes
3 February 27, 1979
4. J3T, - wind Speed and Direction Stations R. I. Wevodau recommended reaffirmation of J3L with revised prices and the subcommittee agreed. A. R. Greening is to check with R. I. Wevodau on the wording in Paragraph 3.3.
5. J4L - Instrument Methods for Analysis for Sulfur Dioxide in Ambient Air
A revised draft of J4L was circulated to the subcommittee for review. J4L will be revised and reaffirmed in the draft form if no comments are received from subcommittee members by the end c the month. L. F. Percival is to provide wording for a new Paragraph 3.1.3.5, which will provide a warning that samples shipped to outside laboratories may lose part of their original SO2 content.
C. J2i; - Odor Control J2:; was reaffirmed without revisions.
-~2? - ziscersion of Air Pollution from Isolated Sources
.1 revised version of J2? prepared by R. I. '.'evocau was approved for tycinc in finished form with minor changes. It will*be re leased for issue with author's review.
3 J4? - Evaluation of Air Pollution abatement Methods The revised draft of J4? dated January 22, 1979, prepared bv T. A. Kittleman was approved for-final typing with minor chances. It will be released for issue with author's review.
9. SllT - Priorities for Workspace Sampling for Exposure to Chemicals A draft of C. S. Kornberger's completed two-pace material data safety sheet was reviewed by the subcommittee. The two-cage material data safety sheet is beir.c used by CD&P end several ether departments and is available from Stationery and Forms, General Services Department. After discussion, the subcommittee agreed that the two-page form should be added to SllT to supplement the
existing four-cage form. C. S. Hornberger is to revise SllT to incorporate the new material data safety sheet and forward the revised standard to A. R. Greening for typing.
3. S4T - Measurement and Control of Asbestos Dust Exposure
"'reposed chances to S4T were reviewed by the subcommittee; however,
che decision on changing the standard was deferred until an
Ad Hoc Committee of I . ?. Percival, S. w. Jixon, and
J. Ra.odcich
make a general review of S4T and GS`IA 1910.1001 reruirements.
The 7-.d Hoc Committee is to have a revised draft of S4T ready
for review at the April meeting.
1. Hor. iter Inc; Devices
In regard ic the monitoring devices being developed ey FA? Qecartmen me discussed at the Beaumont meeting, a representative from Fc.? will be at the .April 5, 1979, meeting to review the oc in ions of -he subcommittee members of potential interest in these devices.
DU 062015