Document pmm4jLYoXgxQ3KqqyGnr8o8Ed

MPNSAHTO COMPANY location s Texas City, Texas Date t December 29, 1964 Subject Monthly Production Summary VCM Plant - December, 1964 cc J. H. Chamberlin Lo B. Bullock C. H. DUhon W. F. Gabel B. B. Etarfczog <J W. Kongable T. B* Shirley -- 3m L. Price G. T. Ryan B. j. Darby VCM Supervisors To W. R. Bisbet SUMMARY VCM production was 10.1 MM lbs (121.2 M Ibs/year) 87.8% of rated edacity. Reaction was down 549 hours for lack of acetylene. Cracking was limited for 133 hours s B7 hours by Department 26 downtime, 38 hours by Department 21 downtime (10 hours concurrent with Department 26 shutdowns), and 18 hours by the HCl stripper, 22DS, reboiler switch. Quality control was poor during the month with high SCI production occurring intermittently. EDC production was 14.3 MM lbs (171.6 MS Ibs/year) 114.2% of rated capacity. Oxidative Chlorination production was 2.38 MM lbs (28.6 KBi Ibs/year) 82.436 of rated capacity. The unit was down 87 hours: 72 hours for cleaning fouled exchangers and repairs to the recycle compressor, 15 hours for instrument repairs. The unit ran the last half of the month with no feed gas analyzer, resulting in lower than standard conversions and higher caustic usage. CBY 1107235 RSV0032250 Monthly production Summary VCM Plant - December, 1964 O OPSRATIHG DETAILS ho Summary gable This Year to Scheduled Month Standard Date production VCM, MM lbs EDC, MM IbS - Dept. 23 - O.C. 10.31 13.12 2.78 10.1 14.3 2.38 Acid, gallons Acid dumped, gallons APT, % 755,000 0 96.3 On-Stream Time Cracking 100.0 Reaction 26.3 Dept. 23 96.5 Acid, absorber, % time needed . 99.8 % available When needed 94.9 Dept. 26 89.7 2l2 99.9 11.5 12.5 2.89 0 0 91.3 91.3 91.3 91.3 91.3 91.3 91.3 124.5 158.0 18.4 Yields CsH4 to EDC - Dept. - O.C. Cla to EDC EDC to VCM CaHa to VCM 23 95.0 90.0 95.0 95.0 97.0 95.0 88.5 95.0 95.0 97.0 B. Operations and Maintenance The HC1 stripper column, 22D6, reboiler was switched. She VCM redistillation column, 22D14, reboiler was switched. The Ho. 2 chlorine tank was entered and cleaned. The VCM redistillation column operated for the fourth consecutive month without fouling. CBY 1107236 RSV0032251 Monthly Production Summary VCM Plant - December, 1964 1 Page 3. QgHarntQ DBM8 (continued) the oxidative chlorination reactor catalyst tube supports appear to have worn in. Fluidizing gas was cut off three times with out any reactor pressure drop increase. The oxidative chlorination feed gas chromatograph failed at aid-month, efforts at repair wore only of limited success, and a program to develop a parallel instrument was begun by the Analytical Instrument Group. C. Personnel and Safety All new men in the unit are now qualified on one job. thus eliminating overtime average of oxidative chlorination. Safety meetings were held with all operators covering proper use of gas masks. 0. Costs December Variances* VCM BDC O.C, Raw Materials Price Performance -11.000 0 0 000 Direct Conversion Labor Repairs Catalyst - 3,000 -18,000 0 400 4- 2,000 0 400 0 0 Volume Off Scheduled Production Unscheduled capacity Total Grand Total - 2,407 -31,433 -65,840 + 3,152 + 1,636 4- 6,388 -63,937 - 3,143 - 942 - 4,485 CBY 1107237 RSV0032252 Monthly Production Summary VCM plant - December, 1964 Page 4 Opgaagms mmim (continued) Variance Explanation! VCKt Saw Materials performance Direct Conversion Labor Labor force increased by 4 men since standard was developed. Repairs Late billing of the past 2 year's charges for acid proofing cement. EDC: Labor Repairs As in VCM. Reduced corrosion. O.C.: Labor As in VCM. January Variancess VCM EDC O.C. Saw Materials Price Performance 00 0 ooo Direct Conversion Labor Repairs Catalyst i Volume ,1 Total 0 0 0 -33,100 -33,100 0 + 2,000 0 it h.WL + 3,340 + 2.665 + 2,665 RFK/qlh /.// Jr** W. H. slager CBY 110723B RSV0032253 VCM PUMP fiOMBMOf - 1964 VCM production was 124 Hi lbs (90% of rated capacity and 86.5% of budget). Rates were limited through the year by the CaH* shortage. To meet demand, 13.5 MM lbs was purchased from Sthyl and Carbide, and 13.45 MM lbs was obtained by swap and conversion arrangements with Daw end carbide. C*Ba cleanup system was put back in operation in October when economics were again favorable. Muriatic acid production totalled 5.13 MN lgallons due to lack of Cj>Bs and low on-stream time of oxidative. VCM cost was 6.6$ vs. budget of 6. It due to out-of-balance operation and oxidative performance. SDC production from CaB* and Cl* was 158.5 MM lbs (105.5% of rated capacity). Oxidative production was 18.5 MM lbs (53.4% of rated capacity). During much of the year, capacity was limited by plugged tubes and low conversion due to iron poisoning of the catalyst. Major revisions in October, including relining of the reactor and revision of the catalyst support system, corrected the source of catalyst poisoning and improved feed distribution so that capability was raised to 30 MM lbs/year. 1965 production is budgeted at 138 Hi lbs. Plans for 1965 are as follows: Capacity VCM from C3H2 VCM from BDC EDC from Cl2 EDC from BCl (O.C.) 25 MM lbs 113 MK lbs 15? MM lbs 30 Hi lbs Cost Improved yields Department 23 and 26__ __+$30,000 variance frost std. Reduce Maintenance cost 4% below sfcd. in 1965__ _jf81,000. Sold other fixed costs at standard. Reduce quantity of rerun of off-spec VCK* Safety Reduce minor impuries by 10%. CSV 1107239 RSV0032254 7> VCK Plant Summary - 1964 v> Page 2 Personnel Upgrade operator capability through increased training. Cannon itv Relations Reduce and reroute snog producing streams to eliminate our confer ibufeioru jWK/qlh CSV 1107240 RSV0032255