Document pmkDg90B9MnejQbpgKNE8jdnw

City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log Appendix B Exhibit Log Inspection Date: October 23, 2024 ED_019088A_00004998-00001 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log Exhibit 1 Lift Station Operational Logs (September 2024) Inspection Date: October 23, 2024 ED_019088A_00004998-00002 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log P183I001O1 R 2 2Square MetersLOCATION SILO DR / WHITE DR 21OR 2LEGACY PARK N. 6 DAYS A WEEK 460 ATE FAULT RUNRUN 3PUMP # 11 / 10'STIMEFAULT PUMP # 2 1 / 10'STIME 3039 2 3415 30451 4.3 34 20 47 3 30418 63425 1755 4 3052 B3438 L 5 3.6 3431 3. 8 6 44 7 3012 5 3438 8 3.2 3443 3071 0 34 3447 14.6 10 3076 5.6 4.6 12 13 7 14 21 15 3025 3474 18 20999.7 395 3 18 3100 C 3487 19 2.8 34.90 20 21 3113 3495 3498 22 23 3/21 3305 24 25 25 27 28 29 30 31 2024/10/23 13:53 Inspection Date: October 23, 2024 ED_019088A_00004998-00003 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log LEGACY TYPE PARK FLYGTN. S / NSTATION # 3102 PUMP 1 MODEL 060-2380113WHITE DRY PROGRESS WAY # 1 OR 2S / N PUMP 2LOCATIONPARK S VOLTAGE3102 185-1550075LEGACYA WEEK PHASE4 MODE 5 L # 0 1 OR R 26U DAY N S VOLTAGERUNPUMP # 2 1 / 10'S TIME IMP #6.5PHASE480 F FAULT PUIAR # 1 1 / 10'S TIME FAULT RPM 1883 AMP 3440 IMP # 6.5 RPM DRIVES AMP 3440/ 08 $ 25 HARD START PUMP # 1ROTO PHASE1872 INSTALLLED ON 7/30/241814 3102 060-238011332 10 1817 9 15 2.9 156 1627 17 18 2830 17 7564 23 25 25 20 2024/10/23 13:53 Inspection Date: October 23, 2024 ED_019088A_00004998-00004 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log STATION # BIG HORNSIN PUMP 2 GORMAN RUPP TYPE PUMP SINMODEL # 2& ITASCA RUN DAYS A WEEK MODEL1PUMP # 1 1 / 10'S TIME VOLTAGE 260 FAULT FAULT 230 PHASEPUMP 2 VOLTA HP GE 1/305 PHASE 5 IMP # 3091 8099 7 H RPM 1725 12 I RPM. MPU 1760 AMP 28 8115 4 3 AMP 2123 ROTO PHASE HARD START81407 DRIVES se prime 18148-7 1516314 This planej301 156 L pumplay teptime314611 Il not pumping reprimalpad138 187168 3J6 2 .4.2 8206131579 12 4/16/2482168 10.5 15181 9/24/24 82243 7.2 82379 136 518516 923371824514 N 5320 L 7/24/2482624 519 912612124 182.2 15 082178 14 18 15192 7/22/272286 4 157713 1830618 20.4 18315 7 7.1 5261 19 8327 114 204 13 2024/10/23 13:58 Inspection Date: October 23, 2024 ED_019088A_00004998-00005 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log 3053/3023 BRIDGEMOORE DR. TBYRPIED GGEOMOROMRAEN ARUCPVP SSTIANT IPOUNM P# 1L OOCRA T2IO*N* BNROITDEGE M*O*OR6E DWAEYESK RUN S / N PUMP 1 OR 2NEED TO PULLTIME MODEL #AL 9 OLF-NEED TO PULL1 / 10'S MODEL 1 OR 21 OR 2AL 13-OCF RESEA T LD R2 IV9EF RUANUL PUTM P # 2 VOLTAGE TIME 240# 1 1 / 10'S VOLTAGE PHASE FAULT PUMP PHASE HP 1989 IMP #1490 132 IMP #19RPM5 7 46 1991 86 2.31 AMP67 19 59 22 45142317 AMP 1469 1494/32 1459163 HARD STARTROTO PHASE!1460 13/415 Apuley pullDRIVES Clear1 e 416419 61 -4 77 82S 1.37 73024 wit 1 140 61 2 1/44 61. 9986 16 2 " both 1 14634 62 1500 48 146396 1505 86 156 1194665/56 6 2433 1566/99 1.13. 47 1466 06.40 150806 1.DT 18 1466 591510 39 146673 44 1511 53 1.14 23 146787 A 1513 30 146% 3350 1514 19 99 1968 82 45 26 1469/26 1515 52 22 44 1516 1968174 4211 1.A 28 1420 151920 63.89 21 12.56 1431 091.4615206 135 1471/52 432014/194 184846 1.15 Inspection Date: October 23, 2024 ED_019088A_00004998-00006 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log Exhibit 2 Lift Station Cleaning and Maintenance Logs (February 2024 to August 2024) Inspection Date: October 23, 2024 ED_019088A_00004998-00007 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log ds LIFT STATION CLEANING PROGRAM NAOCTCE SSFIBRLEE QOFU ECLNEACNIYN G ROUTE 1 TAYLOR DRIVE CHURCH STREET A CHURCH STREET B BUSINESS CENTER DR BETHEL PARK3 MON / AS NEEDED BETHEL PARK COMMENTCLEANED 3/14/24 GREASE, CLOTH MATERIAL FORREST RIDGE COLLEGE PARK COLLEGE & ALEX 9880 COLLEGE MCELROY FARMS MCELROY FARMS COMMENT 9530 COLLEGE 2 X YR CLEANED 2/22/24-MUD MITCHELL CORNER N 2 X YR MMIITTCCHHEELLLL CCOORRNNEERR NS OCUOTMHM ENT CLEANED 4/4/24-GRAVEL & SAND THE ORCHARDS SOUTHERN TRAILS S 2 X YR SOUTHERN TRAILS S COMMENT SOUTHERN TRAILS NCLEANED 4/4/24-GRAVEL & SAND MITCHELL CORNER W GWINN FARMS DAWKINS FARM COLLEGE & PAYNE COLLEGE & PAYNECOMMENT1 X YR CLEANED 2/22/24-SAND2024/10/23 13:57 Inspection Date: October 23, 2024 ED_019088A_00004998-00008 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log 129049 LIFT STA MAINT ON CALL LR 4/30 & 5/1/2022 CKS LIFT STATIONS 279431 LIFT STA MAINT ON CALL JIC 5 / 14-5 / 15 / 2022 CKD ALL LIFT STATIONS ** 129500 LIFT STA MAINT ON CALL LR 5 / 21-5 / 22 / 2022 CKD ALL LIFT STATIONS WKEND ROUT 130/11 LIFT STA MAINT ON CALL JC 7 / 02-7 / 04 / 2022 CKD ALL LIFT STATIONS WKEND ROUT 130936 LIFT STA MAINTENANCE ROUTE 1 & 2 LIFT STATIONS ICON CALL 07/16 AM * (1) 130938 LIFT STA MAINTENANCE ROUTE 3 LIFT STATIONS IC ON-CALL 07/17 AM * (JJ) 11209 UFT STA MAINT WB ON CALL PM 7/30 GERMANWOOD LS DOWN " (0) 151126 LIFT STA MAINT ICON CALL 6.15AM-9: 15PM 8/06 ROUTE 1 LIFT STATIONS * {J}} 131175 LIFT STA MAINT IC ON-CALL AM 8/07 ROUTE 3 LIFT STATIONS " (10) 131499 LIFT STA MAINT: LR ON-CALL 8/14 AM RAN ROUTE 3 LS (U) 131861 LIFT STA MAINT: LR ON-CALL 8/27 RTE 1 LS; J CATES: CK'D RTE 2 UFT STATIONS & I 15.1362 LIFT STA MAINT. J. CATES ON CALL 8/28 * CK DRTE 3 & DID MAINT. ON PUMPS (1) 132032 LIFT STA MAINT WB ON-CALL 9/8 PM CANDLE LIGHT 1 & 2, CKD FOR EXPOSED PI 132223 UFT STA MAINT, IC ON-CALL 9/14 PM " WILLOWDALE DR LS- PUMPED DOWN TO KI 132507 LIFT STA MAINT. LR ON-CALL 9/24 AM " CK'D RTE 1, PART OF RTE 2, & MAINT ( 162508 LIFT STA MAINT LR ON CALL 5/25 AM * CK D RT 2 & ALL OF RT 3, & MAINT (1) 132938 LIFT STA MAINT ICON - CALL 10/15 AM " ROUTE 1 LIFT STATIONS (0) 132939 LIFT STA MAINT. JC ON CALL 10/16 AM " ROUTE 2 LIFT STATIONS (JJ) 133166 LIFT STA MAINT. LR ON-CALL 10/29 AM * CKD ROUTE 1 & MAINTENANCE * (1) 133107 UFT STA MAINT LR ON-CALL 10/30 AM * CKD ROUTE 2 & MAINTENANCE (0 133578 LIFT STA MAINT LR ON CALL (ON CLOCK) 11/19 AM CKD ROUTE 1 & MAINTENAN 133579 LIFT STA MAINT LR ON CALL 11/20 AM * CKD RTE 2 & MAINTENANCE " (10) 139522 LIFT STA MAINT. I CATES ON-CALL 11/26 AM * CK'D RT 1 LIFT STATIONS * ( 19673 LIFT STA MAINT J CATES ON CALL 11/27 AM * CK'D RT 2 LIFT STATIONS (1) 133914 LIFT STA MAINT L REYNOLDS ON-CALL 12/10 AM CKD ROUTE 1 FOR MAINTENAN 139915 LIFT STA MAINT REYNOLDS ON CALL 12/11 AM * CK'D ROUTE 2 FOR MAINTENAN 184454 LIFT STA MAINT LR ON-CALL 12 / 31 = CK'D ROUTE 1 & MAINT (11) 234455 LIFT STA MAINT: LR ON CALL 01 / 01 / 23- CK'D ROUTE 2 & MAINT (1) 134622 LIFT STA MAINT: JC ON-CALL 01/07 AM-CK'D ROUTE 1 LIFT STATIONS (JJ) 134624 LIFT STA MAINT: IC ON-CALL 01/08 AM = CK'D ROUTE 2 LIFT STATIONS (1) 135076 LIFT STA MAINT 135105 UFT STA MAINT ICON - CALL 01/28 AM = ROUTE 1 (1) 195107 LIFT STA MAINT JC ON CALL 01/29 AM ROUTE 2 (J) 135351 LIFT STA MAINT L REYNOLDS ON-CALL 02 / 11- LIFT STATION ROUTE # 1 135352 LIFT STA MAINT REYNOLDS ON CALL 02 / 12 = LIFT STATION ROUTE # 2 139832 LIFT STA MAINT: LREYNOLDS ON-CALL 03/04 AM ROUTE # 1 U.) 135837 LIFT STA MAINT: L REYNOLDS ON-CALL 03 / 05- LIFT STATION ROUTE # 2 (11) 136106 LIFT STA MAINT: LR ON-CALL 03/18 AM ROUTE # 1 DAILY INSPECTIONS (1) 136107 LIFT STA MAINT: LR ON-CALL 03/19 AM ROUTE # 2 DAILY INSPECTIONS (J) 274464 UFT STATION MAINTENANCE: W.B. ON-CALL 04 / 21- CK DN. SHAHKOKA WAS RUN 44681 44695 44702 44/48 44758 14759 44/72 44779 44780 44787 44800 44801 44812 44818 44823 44829 44849 44850 44863 44864 44884 44385 44891 44892 44905 44906 44926 44927 44933 44934 44952 44954 44955 44968 44969 44989 44990 45003 48004 45040 05/01/2022 OB LIFT STATIONS 05/15/2022 OB LIFT STATIONS 05/22/2022 OB LIFT STATIONS 07/06/2022 OB LIFT STATIONS 07/16/2022 US ROUTE 1 & 2 07/17/2022 LS ROUTE 3 07/30/2022 GERMANWOOD LIFT ST 08/06/2022 RTE 1 LIFT STATIONS 08/07/2022 RTE 3 LIFT STATIONS 08/14/2022 LIFT STATION ROUTE 3. 08/27/2022 ROUTE 1 & 2 LIFT STATIONS 08/28/2022 ROUTE 3 LIFT STATIONS 09/08/2022 CANDLE LIGHT 1 & 2 15. 09/14/2022 WILLOWDALE DR LS 09/24/2022 LIFT STAT 1 & 2 ROUTES 09/25/2022 LS ROUTES 2 & 3 10/15/2022 ROUTE 1 LIFT STATIONS 10/16/2022 ROUTE 2 LIFT STATIONS 10/29/2022 ROUTE 1 LIFT STATIONS 10/30/2022 ROUTE 2 LIFT STATIONS 11/19/2022 UFT STATION ROUTE # 1 11/20/2022 LIFT STATION ROUTE # 21 11/26/2022 ROUTE LLIFT STATIONS 11/27/2022 ROUTE 2 LIFT STATIONS 12/10/2022 LIFT STATION ROUTE 1 12/11/2022 LIFT STATION ROUTE 2 12/31/2022 LIFT STATION ROUTE 1 01/01/2023 LIFT STATION ROUTE 2 01/07/2023 ROUTE 1 LIFT STATIONS 01/08/2023 ROUTE 2 LIFT STATIONS 01/26/2023 7735 W SHAKOKA DR 01/28/2023 ROUTE LUFT STATIONS 01/29/2023 ROUTE 2 LIFT STATIONS 02/11/2023 LIFT STATION ROUTE # 1 02/12/2023 LIFT STATION ROUTE # 2 03/04/2023 LIFT STATION ROUTE # 1 03/05/2023 LIFT STATION ROUTE # 2 03/18/2023 LIFT STATION ROUTE # 1 03/19/2023 LIFT STATION ROUTE # 2 / 04/21/2023 N SHAHKOKA LIFT STATION 2024/10/23 13:58 Inspection Date: October 23, 2024 ED_019088A_00004998-00009 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log QUAIL HOLLOW EAST STATELINEWEEKLY EAST STATELINE COMMENTCLEANED 2 / 16 / 24-LARGEAMOUNT OF WIPES EAST STATELINE COMMENTCLEANED 2/29/24-HEAVY ACCUMULATION OF WIPES EAST STATELINE COMMENT CLEANED 3/11/24-WIPES EAST STATELINE COMMENTCLEANED 3/21/24-WIPES EAST STATELINE COMMENTCLEANED 4/4/24 EXCESSIVE AMOUNT OF WIPES EAST STATELINE COMMENTCLEANED 4/17/24-WIPES EAST STATELINE COMMENTCLEANED 4/25/24-WIPES EAST STATELINE COMMENTCLEANED 5/2/24-WIPES EAST STATELINE COMMENTCLEANED 5/16/24-WIPES EAST STATELINE COMMENT CLEANED 5/30/24 WIPES EAST STATELINE COMMENTCLEANED 6/6/24-WIPES EAST STATELINE COMMENTCLEANED 6/13/24-WIPES EAST STATELINE COMMENT CLEANED 7/11/24 WIPES EAST STATELINE COMMENTCLEANED 7/25/24-WIPES AND GRIT EAST STATELINE COMMENT CLEANED 8/15/24 WIPES EAST STATELINE COMMENTCLEANED 8 / 16 / 24- WIPES EAST STATELINE COMMENT CLEANED 8/22/24 WIPES 3 X YR DAVIDSON RD.4 MON DAVIDSON RD. COMMENTCLEANED 2/29/24 HEAVY ACCUMULATION OF GREASEFORCE MAIN IS HE DAVIDSON RD. COMMENTCLEANED 8 / 22 / 24- 3 SX AYRN D AND GRIT DANNY DRIVE4 MON DANNY DRIVE COMMENTCLEANED 2 / 16 / 24-GREASE DANNY DRIVE COMMENTCLEANED 8/15/24 G2R XE YAR SE AND SLUDGE DAVIDSON PARK6 MON DAVIDSONPARK COMMENTCLEANED 2/29/24 SOME GREASE AND SLUDGE BUILDUP# 1 TOP G 2024/10/23 14:46 Inspection Date: October 23, 2024 ED_019088A_00004998-00010 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log Exhibit 3 City of Olive Branch Sewer Flows (October 2023 to September 2024) Inspection Date: October 23, 2024 ED_019088A_00004998-00011 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log DESOTO COUNTY REGIONAL UTILITY AUTHORITY FY 2024 FLOW SUMMARY September 1, 2024-September 30, 2024 City ofCity ofCity ofCity ofTown of Olive Branch Southaven Hernando Horn Lake Walls TOTAL October 143.784 23.455 56.807 10.860 6.718 241.624 2023 November 145.747 22.823 58.350 10.677 6.817 244.415 December 158.789 23.648 60.022 12.006 7.328 261.793 January 209.789 27.865 82.635 18.129 8.637 347.055 February 162.532 23.667 71.547 16.196 7.003 280.946 March 178.134 24.338 71.362 15.348 7.633 296.815 April 164.014 24.239 68.322 12.076 7.802 276.453 2024 May 166.824 24.931 70.686 14.396 7.680 284.517 June 154.542 23.562 59.788 10.641 8.433 256.967 July 156.567 24.539 63.196 13.040 9.022 266.365 August 150.977 24.912 58.781 12.704 7.456 254.830 September 148.602 28.430 75.614 9.958 7.502 270.105 Flow to Date 1,940.300 296.409 797.111 156.031 92.032 3,281.883 Pro Rata Flow to Date59.12%9.03%24.29%4.75%2.80%100.00% FY 2024 PROJECTED FLOW: Total FY 24 Projected Flow1,957.850343.300663.920189.67068 4403.213.080 To Date / Projected99.10%86.34%121.90%82.31%134.47%102.14% Notes: 1. All Figures in Million Gallons 2. Projections are based on prior year flows 3. September will need adjustment after receiving flow data for Byhalia Overflow meter 4. Walls flow #s are still being analyzed and may need adjusting Inspection Date: October 23, 2024 ED_019088A_00004998-00012 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log Exhibit 4 City of Olive Branch List of Industrial Users Inspection Date: October 23, 2024 ED_019088A_00004998-00013 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log Gallons Name Address annually View Inc12380 Kirk RD26,059,400 Ardagh Metal Beverage USA10800 Marina DR19,760,800 Plaskolite South, LLC10500 High Point RD14,841,400 Marietta Corporation dba KIK11170 Green Valley Dr8,919,400 Genlabs10905 Ridgeway Industrial DR8,787,000 Williams Sonoma7755 Polk LN3,286,000 McKesson8313 Polk LN2,573,500 J Strickland and Co10420 Desoto RD1,599,200 Parker - Hannifin Chelsea Products8225 Hack Cross RD969,600 AFCO Millwork Products11000 Green Valley DR580,200 Milwaukee Distribution Center11624 S Distribution CV451,900 WestRock10333 High Point RD344,000 Inspection Date: October 23, 2024 ED_019088A_00004998-00014 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log Exhibit 5 Sanitary Sewer Overflow Reports to MDEQ Inspection Date: October 23, 2024 ED_019088A_00004998-00015 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log WASTEWATER BYPASS REPORT TO THE MISSISSIPPI OFFICE OF POLLUTION CONTROL 1.PERMITTEE NAME:CITY OF OLIVE BRANCH II.PERMIT NUMBER:MS0029513 III. Bypass Source (i.e. manhole, pump station, etc.): Manhole across ditch from pump station IV. Source Location (i.e. street, avenue, etc.):East Stateline Rd V.Date & Time Bypass Began (estimate if necessary):10/25/23 at 1:30 PM VI.Date & Time Bypass Ended (estimate if necessary):10/26/23 at 9:15 AM VII.Volume of Wastewater Bypassed (estimate if necessary):Less than 1000 gallons VIII. State Waters Effected (i.e. river, stream, bayou, lake, etc.):Nonconnah Creek IX.Cause of Bypass:Pump 1 & Pump 2 clogged with sewer trash X.Temporary Corrective Actions Taken:Pumped well and cleaned towel debris from bottom of well XI. Cleanup Measures Taken:Spread lime XII.Permanent Corrective Actions Taken:Pulled & cleared Pump 1 & Pump 2 XIII.Number of Bypasses at this Location in the past 12 months:2 XIV.If Bypass caused due to Inflow of Rainfall, How many Inches of Rain fell in the Area? NRO: PHONE: (662) 234-3733PRINT NAME:Don Buford FAX: (662) 234-3749 ECEDF:AX: (P601H) O961N-5E674: (601) 961-5010SIGNATURE:Be Bibe CRO: PHONE: (601) 961-5656TITLE:Water Superintendent FAX: (601) 961-5619 SRO: PHONE: (228) 432-1056ADDRESS:10175 Hwy 178 FAX: (228) 432-5553 EMAILED Main: PO Box 2261Olive Branch, MS 38632 AddressJackson, MS 39225 OCT 27: 2023 PHONE NUMBER: 662.893.5249 ext 202 DATE: 10/27/2023 Inspection Date: October 23, 2024 ED_019088A_00004998-00016 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log WASTEWATER BYPASS / OVERFLOW REPORT TO THE MISSISSIPPI OFFICE OF POLLUTION CONTROL III.. P EPRMEITR NMOI.:T TEE NAME: City of Olive Branch III. Bypass source (i.e., manhole, pump station, etc.): lift Station on Davidson RP. Across from 8859 IV. Source location (i.e., street, etc.): Davidson RD 8859 V. Date / time bypass began (estimate if necessary): 8AM 3AM 10/21/24 VI. Date / time bypass ended (estimate if necessary): 10 Am 10/21/24 VII. Volume of wastewater bypassed (estimate if necessary): 1000 9A /. VIII. State waters affected (i.e., river, stream, lake, etc.): N / A IX. Cause of bypass: lift Station X. Temporary corrective actions taken: Vac truck, spread lime station XI. Permanent corrective actions taken: Dumps only hMsaash coI hupuilmndp e op erhaativnge, oithter iisn astt saholp lbeeidng gbeytr ofEinttden wo f/ apwapeteerk. Inspection Date: October 23, 2024 ED_019088A_00004998-00017 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log XII. Number of bypasses at this location in the past 12 months: 2 XIII. What actions were taken to prevent or minimize adverse environmental impact? spread lime XIV. If bayrpeaas? s caused que, inflow of rainfall, how many inches of rain fell in the Signature: Title: liff station Supervisor Address: 10175 Hwy 178 Olive Branch, us. Date: 10/21/24 Bu 38654 Inspection Date: October 23, 2024 ED_019088A_00004998-00018 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log WASTEWATER BYPASS / OVERFLOW REPORT TO THE MISSISSIPPI OFFICE OF POLLUTION CONTROL I. PERMITTEE NAME: City of Olive Branch II. PERMIT NO.: III. Bypass source (i.e., manhole, pump station, etc.): Sewer Pressure Main IV. Source location (i.e., street, etc.): Braybourne Sub V. Date / time bypass began (estimate if necessary): 10/22/24/810 Am VI. Date / time bypass ended (estimate if necessary): 10/22/24/9: 30 7m VII. Volume of wastewater bypassed (estimate if necessary): less than 1000 gal VIII. State waters affected (i.e., river, stream, lake, etc.): IX. Cause of bypass: Electric Company bored rod through Sewer Pipe. X. Temporary corrective actions taken: XI. Permanent corrective actions taken: we dug up effect area. and repaired Sewer Pipe. EMAILED OCT 24 2024 Inspection Date: October 23, 2024 ED_019088A_00004998-00019 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log XII.Number of bypasses at this location in the past 12 months:0 XIII.What actions were taken to prevent or minimize adverse environmental impact? We Clean up area and put lime down XIV. If bypass caused due to inflow of rainfall, how many inches of rain fell in the area? Signature: Willin Brom Title:Sewer Supervisor Address:10175 Hwy 78 Olive Branch ms 38654 Date:10/24/24 Inspection Date: October 23, 2024 ED_019088A_00004998-00020 City of Olive Branch - Olive Branch Wastewater Collection System Inspection Report Exhibit Log Exhibit 6 City of Olive Branch Updates Regarding Observations Inspection Date: October 23, 2024 ED_019088A_00004998-00021 From:Ondra, Todd To:ammons.brad@epa.gov; Mike Beck; James Phillips Cc:Fesmire, Cole: Swims, Andy Subject:Lift Station Action Items Date:Wednesday, October 30, 2024 10:10:56 Attachments:City of OB-Legacy Park North Lift Station - Estimate- # FST24-2570.ndf FENCING SOLUTIONS AND CONSTRUCTION LEGACY PARK NORTH IS PO # 250599 10-28-2024 $ 1500.00.pdf CAUTION: Don't open links or attachments unless you recognize the sender and know they are safe. Please see the below actions taken and the related photos - attachments concerning lift station items that were identified during last week's inspection. Perimeter fencing is being pursued and will be added to these lift station locations. Let us know if you should have any questions or if additional information is required. Thanks, Todd Ondra Chief Operating Officer Cit of Olive Branch Mobile: 662 879-7128 East Stateline Road lift station old valve pit and wet well are secured. Foliage / Grass within McElroy Farms lift station has been cut. ED_019088A_00004998-00022 The counterweight at the North Legacy Park Lift station has been reinstalled on the check valve arm. Fencing quote obtained and PO issued for perimeter fence installation. (see above attachments). The High Point Lift Station was cleaned 10-25-24. As requested, cleaning frequency is being increased scheduled at least 3 times annually. ED_019088A_00004998-00023 ED_019088A_00004998-00024