Document pmkDg90B9MnejQbpgKNE8jdnw
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
Appendix B
Exhibit Log
Inspection Date: October 23, 2024
ED_019088A_00004998-00001
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
Exhibit 1
Lift Station Operational Logs (September 2024)
Inspection Date: October 23, 2024
ED_019088A_00004998-00002
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
P183I001O1
R 2 2Square
MetersLOCATION SILO DR / WHITE DR
21OR 2LEGACY PARK N.
6 DAYS A WEEK
460 ATE FAULT RUNRUN
3PUMP # 11 / 10'STIMEFAULT PUMP # 2 1 / 10'STIME
3039
2 3415
30451 4.3 34 20 47
3 30418 63425
1755 4 3052 B3438 L
5 3.6 3431 3. 8
6 44
7 3012 5 3438
8 3.2 3443
3071 0 34 3447 14.6
10 3076 5.6
4.6
12
13 7
14 21
15 3025 3474
18 20999.7
395 3
18 3100 C 3487
19
2.8 34.90
20
21
3113 3495
3498
22
23
3/21 3305
24
25
25
27
28
29
30
31
2024/10/23 13:53
Inspection Date: October 23, 2024
ED_019088A_00004998-00003
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
LEGACY
TYPE PARK
FLYGTN.
S / NSTATION #
3102 PUMP 1
MODEL 060-2380113WHITE DRY PROGRESS WAY
# 1 OR 2S / N PUMP 2LOCATIONPARK S
VOLTAGE3102 185-1550075LEGACYA WEEK
PHASE4 MODE 5 L # 0 1 OR R 26U DAY N S
VOLTAGERUNPUMP # 2 1 / 10'S TIME
IMP #6.5PHASE480 F FAULT PUIAR # 1 1 / 10'S TIME FAULT
RPM 1883
AMP 3440 IMP # 6.5
RPM
DRIVES AMP
3440/ 08 $
25
HARD START
PUMP # 1ROTO PHASE1872
INSTALLLED
ON 7/30/241814
3102 060-238011332
10
1817
9
15 2.9
156 1627
17
18
2830 17
7564
23
25
25
20
2024/10/23 13:53
Inspection Date: October 23, 2024
ED_019088A_00004998-00004
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
STATION #
BIG HORNSIN PUMP 2
GORMAN RUPP
TYPE PUMP
SINMODEL # 2& ITASCA
RUN DAYS A WEEK
MODEL1PUMP # 1 1 / 10'S TIME
VOLTAGE 260 FAULT FAULT
230 PHASEPUMP 2
VOLTA HP
GE 1/305
PHASE 5 IMP # 3091
8099 7
H RPM 1725 12
I RPM.
MPU 1760 AMP 28 8115 4 3
AMP 2123
ROTO PHASE
HARD START81407
DRIVES se prime 18148-7 1516314
This planej301 156 L
pumplay teptime314611
Il not pumping reprimalpad138 187168 3J6 2
.4.2
8206131579 12
4/16/2482168 10.5 15181
9/24/24
82243 7.2
82379 136 518516
923371824514 N 5320 L
7/24/2482624 519
912612124 182.2 15 082178
14 18 15192
7/22/272286 4 157713
1830618 20.4
18315 7 7.1 5261 19
8327 114 204 13
2024/10/23 13:58
Inspection Date: October 23, 2024
ED_019088A_00004998-00005
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
3053/3023
BRIDGEMOORE DR.
TBYRPIED GGEOMOROMRAEN ARUCPVP SSTIANT IPOUNM P# 1L OOCRA T2IO*N* BNROITDEGE M*O*OR6E DWAEYESK
RUN
S / N PUMP 1 OR 2NEED TO PULLTIME
MODEL #AL 9 OLF-NEED TO PULL1 / 10'S
MODEL 1 OR 21 OR 2AL 13-OCF RESEA T LD R2 IV9EF RUANUL PUTM
P # 2
VOLTAGE TIME
240# 1 1 / 10'S
VOLTAGE PHASE FAULT PUMP
PHASE HP 1989
IMP #1490 132
IMP #19RPM5
7 46 1991 86 2.31
AMP67 19
59 22 45142317
AMP 1469 1494/32
1459163
HARD STARTROTO PHASE!1460 13/415
Apuley pullDRIVES Clear1 e 416419 61 -4 77 82S
1.37
73024 wit 1 140 61 2 1/44 61. 9986 16
2
" both 1 14634
62 1500
48 146396
1505 86
156 1194665/56 6 2433
1566/99 1.13.
47 1466
06.40 150806 1.DT
18
1466 591510 39
146673 44 1511 53 1.14
23 146787
A
1513 30
146% 3350
1514 19 99
1968 82 45
26 1469/26 1515 52
22 44 1516
1968174 4211 1.A
28 1420 151920 63.89 21 12.56
1431 091.4615206
135
1471/52 432014/194 184846
1.15
Inspection Date: October 23, 2024
ED_019088A_00004998-00006
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
Exhibit 2
Lift Station Cleaning and Maintenance Logs (February 2024 to
August 2024)
Inspection Date: October 23, 2024
ED_019088A_00004998-00007
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
ds
LIFT STATION CLEANING PROGRAM NAOCTCE SSFIBRLEE QOFU ECLNEACNIYN
G
ROUTE 1
TAYLOR DRIVE
CHURCH STREET A
CHURCH STREET B
BUSINESS CENTER DR
BETHEL PARK3 MON / AS
NEEDED
BETHEL PARK COMMENTCLEANED 3/14/24 GREASE, CLOTH MATERIAL
FORREST RIDGE
COLLEGE PARK
COLLEGE & ALEX
9880 COLLEGE
MCELROY FARMS
MCELROY FARMS COMMENT
9530 COLLEGE
2 X YR
CLEANED 2/22/24-MUD
MITCHELL CORNER N
2 X YR
MMIITTCCHHEELLLL CCOORRNNEERR NS OCUOTMHM
ENT CLEANED 4/4/24-GRAVEL & SAND
THE ORCHARDS
SOUTHERN TRAILS S
2 X YR
SOUTHERN TRAILS S COMMENT
SOUTHERN TRAILS NCLEANED 4/4/24-GRAVEL & SAND
MITCHELL CORNER W
GWINN FARMS
DAWKINS FARM
COLLEGE & PAYNE
COLLEGE & PAYNECOMMENT1 X YR
CLEANED 2/22/24-SAND2024/10/23 13:57
Inspection Date: October 23, 2024
ED_019088A_00004998-00008
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
129049 LIFT STA MAINT ON CALL LR 4/30 & 5/1/2022 CKS LIFT STATIONS
279431 LIFT STA MAINT ON CALL JIC 5 / 14-5 / 15 / 2022 CKD ALL LIFT STATIONS **
129500 LIFT STA MAINT ON CALL LR 5 / 21-5 / 22 / 2022 CKD ALL LIFT STATIONS WKEND ROUT
130/11 LIFT STA MAINT ON CALL JC 7 / 02-7 / 04 / 2022 CKD ALL LIFT STATIONS WKEND ROUT
130936 LIFT STA MAINTENANCE ROUTE 1 & 2 LIFT STATIONS ICON CALL 07/16 AM * (1)
130938 LIFT STA MAINTENANCE ROUTE 3 LIFT STATIONS IC ON-CALL 07/17 AM * (JJ)
11209 UFT STA MAINT WB ON CALL PM 7/30 GERMANWOOD LS DOWN " (0)
151126 LIFT STA MAINT ICON CALL 6.15AM-9: 15PM 8/06 ROUTE 1 LIFT STATIONS * {J}}
131175 LIFT STA MAINT IC ON-CALL AM 8/07 ROUTE 3 LIFT STATIONS " (10)
131499 LIFT STA MAINT: LR ON-CALL 8/14 AM RAN ROUTE 3 LS (U)
131861 LIFT STA MAINT: LR ON-CALL 8/27 RTE 1 LS; J CATES: CK'D RTE 2 UFT STATIONS & I
15.1362 LIFT STA MAINT. J. CATES ON CALL 8/28 * CK DRTE 3 & DID MAINT. ON PUMPS (1)
132032 LIFT STA MAINT WB ON-CALL 9/8 PM CANDLE LIGHT 1 & 2, CKD FOR EXPOSED PI
132223 UFT STA MAINT, IC ON-CALL 9/14 PM " WILLOWDALE DR LS- PUMPED DOWN TO KI
132507 LIFT STA MAINT. LR ON-CALL 9/24 AM " CK'D RTE 1, PART OF RTE 2, & MAINT (
162508 LIFT STA MAINT LR ON CALL 5/25 AM * CK D RT 2 & ALL OF RT 3, & MAINT (1)
132938 LIFT STA MAINT ICON - CALL 10/15 AM " ROUTE 1 LIFT STATIONS (0)
132939 LIFT STA MAINT. JC ON CALL 10/16 AM " ROUTE 2 LIFT STATIONS (JJ)
133166 LIFT STA MAINT. LR ON-CALL 10/29 AM * CKD ROUTE 1 & MAINTENANCE * (1)
133107 UFT STA MAINT LR ON-CALL 10/30 AM * CKD ROUTE 2 & MAINTENANCE (0
133578 LIFT STA MAINT LR ON CALL (ON CLOCK) 11/19 AM CKD ROUTE 1 & MAINTENAN
133579 LIFT STA MAINT LR ON CALL 11/20 AM * CKD RTE 2 & MAINTENANCE " (10)
139522 LIFT STA MAINT. I CATES ON-CALL 11/26 AM * CK'D RT 1 LIFT STATIONS * (
19673 LIFT STA MAINT J CATES ON CALL 11/27 AM * CK'D RT 2 LIFT STATIONS (1)
133914 LIFT STA MAINT L REYNOLDS ON-CALL 12/10 AM CKD ROUTE 1 FOR MAINTENAN
139915 LIFT STA MAINT REYNOLDS ON CALL 12/11 AM * CK'D ROUTE 2 FOR MAINTENAN
184454 LIFT STA MAINT LR ON-CALL 12 / 31 = CK'D ROUTE 1 & MAINT (11)
234455 LIFT STA MAINT: LR ON CALL 01 / 01 / 23- CK'D ROUTE 2 & MAINT (1)
134622 LIFT STA MAINT: JC ON-CALL 01/07 AM-CK'D ROUTE 1 LIFT STATIONS (JJ)
134624 LIFT STA MAINT: IC ON-CALL 01/08 AM = CK'D ROUTE 2 LIFT STATIONS (1)
135076 LIFT STA MAINT
135105 UFT STA MAINT ICON - CALL 01/28 AM = ROUTE 1 (1)
195107 LIFT STA MAINT JC ON CALL 01/29 AM ROUTE 2 (J)
135351 LIFT STA MAINT L REYNOLDS ON-CALL 02 / 11- LIFT STATION ROUTE # 1
135352 LIFT STA MAINT REYNOLDS ON CALL 02 / 12 = LIFT STATION ROUTE # 2
139832 LIFT STA MAINT: LREYNOLDS ON-CALL 03/04 AM ROUTE # 1 U.)
135837 LIFT STA MAINT: L REYNOLDS ON-CALL 03 / 05- LIFT STATION ROUTE # 2 (11)
136106 LIFT STA MAINT: LR ON-CALL 03/18 AM ROUTE # 1 DAILY INSPECTIONS (1)
136107 LIFT STA MAINT: LR ON-CALL 03/19 AM ROUTE # 2 DAILY INSPECTIONS (J)
274464
UFT STATION MAINTENANCE: W.B. ON-CALL 04 / 21- CK DN. SHAHKOKA WAS RUN
44681
44695
44702
44/48
44758
14759
44/72
44779
44780
44787
44800
44801
44812
44818
44823
44829
44849
44850
44863
44864
44884
44385
44891
44892
44905
44906
44926
44927
44933
44934
44952
44954
44955
44968
44969
44989
44990
45003
48004
45040
05/01/2022 OB LIFT STATIONS
05/15/2022 OB LIFT STATIONS
05/22/2022 OB LIFT STATIONS
07/06/2022 OB LIFT STATIONS
07/16/2022 US ROUTE 1 & 2
07/17/2022 LS ROUTE 3
07/30/2022 GERMANWOOD LIFT ST
08/06/2022 RTE 1 LIFT STATIONS
08/07/2022 RTE 3 LIFT STATIONS
08/14/2022 LIFT STATION ROUTE 3.
08/27/2022 ROUTE 1 & 2 LIFT STATIONS
08/28/2022 ROUTE 3 LIFT STATIONS
09/08/2022 CANDLE LIGHT 1 & 2 15.
09/14/2022 WILLOWDALE DR LS
09/24/2022 LIFT STAT 1 & 2 ROUTES
09/25/2022 LS ROUTES 2 & 3
10/15/2022 ROUTE 1 LIFT STATIONS
10/16/2022 ROUTE 2 LIFT STATIONS
10/29/2022 ROUTE 1 LIFT STATIONS
10/30/2022 ROUTE 2 LIFT STATIONS
11/19/2022 UFT STATION ROUTE # 1
11/20/2022 LIFT STATION ROUTE # 21
11/26/2022 ROUTE LLIFT STATIONS
11/27/2022 ROUTE 2 LIFT STATIONS
12/10/2022 LIFT STATION ROUTE 1
12/11/2022 LIFT STATION ROUTE 2
12/31/2022 LIFT STATION ROUTE 1
01/01/2023 LIFT STATION ROUTE 2
01/07/2023 ROUTE 1 LIFT STATIONS
01/08/2023 ROUTE 2 LIFT STATIONS
01/26/2023 7735 W SHAKOKA DR
01/28/2023 ROUTE LUFT STATIONS
01/29/2023 ROUTE 2 LIFT STATIONS
02/11/2023 LIFT STATION ROUTE # 1
02/12/2023 LIFT STATION ROUTE # 2
03/04/2023 LIFT STATION ROUTE # 1
03/05/2023 LIFT STATION ROUTE # 2
03/18/2023 LIFT STATION ROUTE # 1
03/19/2023 LIFT STATION ROUTE # 2 /
04/21/2023 N SHAHKOKA LIFT STATION
2024/10/23 13:58
Inspection Date: October 23, 2024
ED_019088A_00004998-00009
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
QUAIL HOLLOW
EAST STATELINEWEEKLY
EAST STATELINE COMMENTCLEANED 2 / 16 / 24-LARGEAMOUNT OF WIPES
EAST STATELINE COMMENTCLEANED 2/29/24-HEAVY ACCUMULATION OF WIPES
EAST STATELINE COMMENT CLEANED 3/11/24-WIPES
EAST STATELINE COMMENTCLEANED 3/21/24-WIPES
EAST STATELINE COMMENTCLEANED 4/4/24 EXCESSIVE AMOUNT OF WIPES
EAST STATELINE COMMENTCLEANED 4/17/24-WIPES
EAST STATELINE COMMENTCLEANED 4/25/24-WIPES
EAST STATELINE COMMENTCLEANED 5/2/24-WIPES
EAST STATELINE COMMENTCLEANED 5/16/24-WIPES
EAST STATELINE COMMENT CLEANED 5/30/24 WIPES
EAST STATELINE COMMENTCLEANED 6/6/24-WIPES
EAST STATELINE COMMENTCLEANED 6/13/24-WIPES
EAST STATELINE COMMENT CLEANED 7/11/24 WIPES
EAST STATELINE COMMENTCLEANED 7/25/24-WIPES AND GRIT
EAST STATELINE COMMENT CLEANED 8/15/24 WIPES
EAST STATELINE COMMENTCLEANED 8 / 16 / 24- WIPES
EAST STATELINE COMMENT CLEANED 8/22/24 WIPES
3 X YR
DAVIDSON RD.4 MON
DAVIDSON RD. COMMENTCLEANED 2/29/24 HEAVY ACCUMULATION OF GREASEFORCE MAIN IS HE
DAVIDSON RD. COMMENTCLEANED 8 / 22 / 24- 3 SX AYRN
D AND GRIT
DANNY DRIVE4 MON
DANNY DRIVE COMMENTCLEANED 2 / 16 / 24-GREASE
DANNY DRIVE COMMENTCLEANED 8/15/24 G2R XE YAR
SE AND SLUDGE
DAVIDSON PARK6 MON
DAVIDSONPARK COMMENTCLEANED 2/29/24 SOME GREASE AND SLUDGE BUILDUP# 1 TOP G
2024/10/23 14:46
Inspection Date: October 23, 2024
ED_019088A_00004998-00010
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
Exhibit 3
City of Olive Branch Sewer Flows (October 2023 to September
2024)
Inspection Date: October 23, 2024
ED_019088A_00004998-00011
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
DESOTO COUNTY REGIONAL UTILITY AUTHORITY
FY 2024 FLOW SUMMARY
September 1, 2024-September 30, 2024
City ofCity ofCity ofCity ofTown of
Olive Branch Southaven Hernando Horn Lake Walls TOTAL
October 143.784 23.455 56.807 10.860 6.718 241.624
2023 November 145.747 22.823 58.350 10.677 6.817 244.415
December 158.789 23.648 60.022 12.006 7.328 261.793
January 209.789 27.865 82.635 18.129 8.637 347.055
February 162.532 23.667 71.547 16.196 7.003 280.946
March 178.134 24.338 71.362 15.348 7.633 296.815
April 164.014 24.239 68.322 12.076 7.802 276.453
2024 May 166.824 24.931 70.686 14.396 7.680 284.517
June 154.542 23.562 59.788 10.641 8.433 256.967
July 156.567 24.539 63.196 13.040 9.022 266.365
August 150.977 24.912 58.781 12.704 7.456 254.830
September 148.602 28.430 75.614 9.958 7.502 270.105
Flow to Date 1,940.300 296.409 797.111 156.031 92.032 3,281.883
Pro Rata Flow to Date59.12%9.03%24.29%4.75%2.80%100.00%
FY 2024 PROJECTED FLOW:
Total FY 24 Projected Flow1,957.850343.300663.920189.67068 4403.213.080
To Date / Projected99.10%86.34%121.90%82.31%134.47%102.14%
Notes: 1. All Figures in Million Gallons
2. Projections are based on prior year flows
3. September will need adjustment after receiving flow data for Byhalia Overflow meter
4. Walls flow #s are still being analyzed and may need adjusting
Inspection Date: October 23, 2024
ED_019088A_00004998-00012
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
Exhibit 4
City of Olive Branch List of Industrial Users
Inspection Date: October 23, 2024
ED_019088A_00004998-00013
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
Gallons
Name Address annually
View Inc12380 Kirk RD26,059,400
Ardagh Metal Beverage USA10800 Marina DR19,760,800
Plaskolite South, LLC10500 High Point RD14,841,400
Marietta Corporation dba KIK11170 Green Valley Dr8,919,400
Genlabs10905 Ridgeway Industrial DR8,787,000
Williams Sonoma7755 Polk LN3,286,000
McKesson8313 Polk LN2,573,500
J Strickland and Co10420 Desoto RD1,599,200
Parker - Hannifin Chelsea Products8225 Hack Cross RD969,600
AFCO Millwork Products11000 Green Valley DR580,200
Milwaukee Distribution Center11624 S Distribution CV451,900
WestRock10333 High Point RD344,000
Inspection Date: October 23, 2024
ED_019088A_00004998-00014
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
Exhibit 5
Sanitary Sewer Overflow Reports to MDEQ
Inspection Date: October 23, 2024
ED_019088A_00004998-00015
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
WASTEWATER BYPASS REPORT
TO THE MISSISSIPPI OFFICE OF POLLUTION CONTROL
1.PERMITTEE NAME:CITY OF OLIVE BRANCH
II.PERMIT NUMBER:MS0029513
III. Bypass Source (i.e. manhole, pump station, etc.): Manhole across ditch from pump station
IV. Source Location (i.e. street, avenue, etc.):East Stateline Rd
V.Date & Time Bypass Began (estimate if necessary):10/25/23 at 1:30 PM
VI.Date & Time Bypass Ended (estimate if necessary):10/26/23 at 9:15 AM
VII.Volume of Wastewater Bypassed (estimate if necessary):Less than 1000 gallons
VIII. State Waters Effected (i.e. river, stream, bayou, lake, etc.):Nonconnah Creek
IX.Cause of Bypass:Pump 1 & Pump 2 clogged with sewer trash
X.Temporary Corrective Actions Taken:Pumped well and cleaned towel debris from bottom of well
XI. Cleanup Measures Taken:Spread lime
XII.Permanent Corrective Actions Taken:Pulled & cleared Pump 1 & Pump 2
XIII.Number of Bypasses at this Location in the past 12 months:2
XIV.If Bypass caused due to Inflow of Rainfall, How many Inches of Rain fell in the Area?
NRO: PHONE: (662) 234-3733PRINT NAME:Don Buford
FAX: (662) 234-3749
ECEDF:AX: (P601H) O961N-5E674:
(601) 961-5010SIGNATURE:Be Bibe
CRO: PHONE: (601) 961-5656TITLE:Water Superintendent
FAX: (601) 961-5619
SRO: PHONE: (228) 432-1056ADDRESS:10175 Hwy 178
FAX: (228) 432-5553
EMAILED
Main: PO Box 2261Olive Branch, MS 38632
AddressJackson, MS 39225
OCT 27: 2023
PHONE NUMBER: 662.893.5249 ext 202
DATE: 10/27/2023
Inspection Date: October 23, 2024
ED_019088A_00004998-00016
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
WASTEWATER BYPASS / OVERFLOW REPORT
TO THE MISSISSIPPI OFFICE OF POLLUTION CONTROL
III.. P EPRMEITR NMOI.:T
TEE NAME: City of Olive Branch
III. Bypass source (i.e., manhole, pump station, etc.): lift Station
on Davidson RP. Across from 8859
IV. Source location (i.e., street, etc.): Davidson RD 8859
V. Date / time bypass began (estimate if necessary): 8AM 3AM 10/21/24
VI. Date / time bypass ended (estimate if necessary): 10 Am 10/21/24
VII. Volume of wastewater bypassed (estimate if necessary): 1000 9A /.
VIII. State waters affected (i.e., river, stream, lake, etc.): N / A
IX. Cause of bypass: lift Station
X. Temporary corrective actions taken: Vac truck, spread
lime station
XI. Permanent corrective actions taken: Dumps
only
hMsaash coI hupuilmndp e
op erhaativnge, oithter iisn astt saholp lbeeidng gbeytr ofEinttden wo f/ apwapeteerk.
Inspection Date: October 23, 2024
ED_019088A_00004998-00017
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
XII. Number of bypasses at this location in the past 12 months: 2
XIII. What actions were taken to prevent or minimize adverse environmental impact?
spread lime
XIV. If bayrpeaas?
s caused que, inflow of rainfall, how many inches of rain fell in the
Signature:
Title: liff station Supervisor
Address: 10175 Hwy 178
Olive Branch, us.
Date:
10/21/24 Bu 38654
Inspection Date: October 23, 2024
ED_019088A_00004998-00018
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
WASTEWATER BYPASS / OVERFLOW REPORT
TO THE MISSISSIPPI OFFICE OF POLLUTION CONTROL
I. PERMITTEE NAME: City of Olive Branch
II. PERMIT NO.:
III. Bypass source (i.e., manhole, pump station, etc.): Sewer Pressure
Main
IV. Source location (i.e., street, etc.): Braybourne Sub
V. Date / time bypass began (estimate if necessary): 10/22/24/810 Am
VI. Date / time bypass ended (estimate if necessary): 10/22/24/9: 30 7m
VII. Volume of wastewater bypassed (estimate if necessary): less than
1000 gal
VIII. State waters affected (i.e., river, stream, lake, etc.):
IX. Cause of bypass: Electric Company bored rod through
Sewer Pipe.
X. Temporary corrective actions taken:
XI. Permanent corrective actions taken: we dug up effect area.
and repaired Sewer Pipe.
EMAILED
OCT 24 2024
Inspection Date: October 23, 2024
ED_019088A_00004998-00019
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
XII.Number of bypasses at this location in the past 12 months:0
XIII.What actions were taken to prevent or minimize adverse environmental impact?
We Clean up area and put lime down
XIV. If bypass caused due to inflow of rainfall, how many inches of rain fell in the
area?
Signature:
Willin Brom
Title:Sewer Supervisor
Address:10175 Hwy 78
Olive Branch ms 38654
Date:10/24/24
Inspection Date: October 23, 2024
ED_019088A_00004998-00020
City of Olive Branch - Olive Branch Wastewater Collection System
Inspection Report Exhibit Log
Exhibit 6
City of Olive Branch Updates Regarding Observations
Inspection Date: October 23, 2024
ED_019088A_00004998-00021
From:Ondra, Todd
To:ammons.brad@epa.gov; Mike Beck; James Phillips
Cc:Fesmire, Cole: Swims, Andy
Subject:Lift Station Action Items
Date:Wednesday, October 30, 2024 10:10:56
Attachments:City of OB-Legacy Park North Lift Station - Estimate- # FST24-2570.ndf
FENCING SOLUTIONS AND CONSTRUCTION LEGACY PARK NORTH IS PO # 250599 10-28-2024 $ 1500.00.pdf
CAUTION: Don't open links or attachments unless you recognize the sender and know they are safe.
Please see the below actions taken and the related photos - attachments concerning lift station items that were identified during last week's inspection. Perimeter fencing is being
pursued and will be added to these lift station locations. Let us know if you should have any questions or if additional information is required.
Thanks,
Todd Ondra
Chief Operating Officer
Cit of Olive Branch
Mobile: 662 879-7128
East Stateline Road lift station old valve pit and wet well are secured.
Foliage / Grass within McElroy Farms lift station has been cut.
ED_019088A_00004998-00022
The counterweight at the North Legacy Park Lift station has been reinstalled on the check valve arm. Fencing quote obtained and PO issued for perimeter fence installation. (see above attachments).
The High Point Lift Station was cleaned 10-25-24. As requested, cleaning frequency is being increased scheduled at least 3 times annually.
ED_019088A_00004998-00023
ED_019088A_00004998-00024