DATE: 2/03/97 ON-LINE REQUISITION PRINT B'. ) PAGE: I REQUISITION: 262391 DATE PROJECT / DESCRIPTION EST.COST ORIGINATOR: ENTERED: 2/03/97 CLOSED PLANT DEMOLITION 19.750.00 WORK-CENTER: 1120 ENVIRONMENTAL OPERATIONS REQUIRED BY: 2/03/97 BLAST FCE. BAGHOUSE STACKS REQN # LN SEQ TYPE CL-ITEMNO WH DESCRIPTION / COMMENTS UNIT-COST/UOI QUANTITY EXT.COSTTAX 262391 1 DDI DI- 02 REMOVE ASBESTOS CONTAINED MASTING I9.750.000/EA CHARGE: EFN 5189 000300 100.0% 1 Ic GAP GEMCO 2 C GAP GEMCO WILL PROVIDE ALL SUPERVISION, LABOR, 3 C GAP EQUIPMENT Sc MATERIAL TO REMOVE ALL ASBESTOS 4 C GAP MASTING FROM BLAST FCE. / DROSS REV. BAGHOUSE 5 C GAP STACKS. THIS IS TO BE DONE IN ACCORDANCE WITH ALL 6 C GAP APPLICABLE EPA Sc OSHA REGULATIONS. 7 C GAP ASARCO WILL PROVIDE ROLLOFF'S FOR DISPOSAL. 1.00 19,750.00 (T) 262391 99 I `.PPROVED 2/03/97 11:30 ORIGINATOR 7G 0/00/00 00:00 TNG 0/00/00 00:00 0/00/00 00:00 A =LP 001130*