J. C. Landwehr - Anniston Plant
February 2, 171 AROCLOR REMOVAL FROM WASTE WATER
ee! J. L. Broira/I. Ransav D. Danna - General Offieor
F. Macdonzld/H. Disley Newport W. B. Papagecrre - General Offices J. R. Savage - General Offices
TO
V N. Badger - Newport ^ P. F. Cunningham - General Offices \ John Durland - Tokyo . W. G. Engnan - K. G^ Krummrich Don Pogue - General Offices H. A. Vodden - Ruabon
The attached R D Report (446-514, No. 1) is the first formal issue of
Anniston data on Aroclor removal from waste water. This covers a filtrationadsorption experiment that lead to the pilot adsorption and pilot clarifies-
C
tion studies listed under the report's Future Work Section. We are developing
capital and operating cost estimates on the alternates being studied, and
expect that differing situations will require one or anotherj or combinations
of techniques. For example, filtration may be applicable only under limited
conditions because of blinding and probably costs for cleancut cf a cctmaercial
unit. It seems now that continuous clarification following adsorption on
solids inherently present or added to a waste stream is most generally applicable
Where stream flow is within a reasonable range and solids content is low, con
ventional carbon adsorption has promise. Studies just completed indicate flow
rates and carbon capacity for Aroclors are in an economical range. This data
will-be published as soon as design and cost parameters are received from co
operating vendors. Carbon adsorption following.clarification would be the
system with greatest assurance of removal to no detectable amount by present
analytical techniques.'
At the other end of the spectrum sumps, limestone pits, and solids settling pits are adequate down to the 100-300 ppb level. Attachment 2 shows results
and cost of pumping sludge from an Anniston settling pit.
Clarification experiments started February 1. The attached report from. 3etz
Laboratories (Attachment 3) describes the flocculation''system chat will be ,
initially used. Results on jar test samples indicate very good removal of
Aroclors upon clarification.
Attachment 4 is a revised PR&D work plan which summarizes status on the work and dates for future phases to complete the program.
tkd Attachments (4)
DEPOSITION EXHIBIT
Papageorqe 63