Document pmMDN6weMOReKoKoNpGw5OxXa
Elliott Company
division op carrier corporation
Chicago, Illinois 60646
OtOO NORTH PULASKI ROAD, 312-267-7800
September 5, 1973
Marathon Oil Company Robinson, Illinois .
Attention: Mr. Leroy Gockenbaoh
Subject: March, April 1973 Turnaround
Marathon 2K1 Compressor String Elliott S.O. H-88o4 Elliott S.O. H-8005 Elliott S.O. H-4107
Marathon 3K1 Compressor String Elliott S.O. H-8027
Marathon 4K1 Compressor String Elliott S.O. H-8028
Gentlemen:
Enclosed are two (2) copies of our Service Representative's report covering the subject turnaround for your records. Additional copies have also been forwarded to those Marathon personnel shown below*
We appreciate this opportunity to be of service to you and trust that you will not hesitate to contaot us if you should have any questions or if we may be of any further assistance.
Daniel H. Barrett Senior Service Engineer
' UB/pn /fctach
Robinson, Illinois cc: Mr, Herb Norton (2 copies)
Marathon Oil Robinson, Illinois
oc: Mr. Laird Holmes (1 copy Marathon Oil Robinson, Illinois
BULLINGTON 000461
SC-ETM-3965
Section II - Pg.l
II 2K1 Turbine Inspection (S.O. H-4107)
t*
Removed turbine insulation, piping and split line bolts.
Removed steam end bearing cover and governor drive.
t
Removed thrust bearing .from retainer and found that brass slingers
had been turning with shaft,. One on thrust stub shaft was completely
machined away.
.
.
There are indications of moisture being carried In the oil.
j
Removed steam end journal bearing and there seems to be a lack of oil. The Journal surface on rotor appears to be etched. Coupling end bearing journal area not as bad. The appearance is that the
oil is not lubricating as should be.
: i
Rigged and lifted turbine casing. Transported top half of casing
. and rotor to machine shop.
'
.
First and second turbine wheels were heavily coated with carry
over from boiler. Buckets of third wheel were partially plugged.
Build-up on third wheel does not have same appearance as the
coating on first and second wheel which had a powdered appearance.
' Fourth and fifth wheel buckets have approximately l/l6" build-up
on them.
Removed diaphragms. Cleaned casings and diaphragms.
Existing interstage.labyrinths are not in the best of condition
but are being reused. Strong consideration should be directed towards their replacement when the turbine is opened next. .
Set diaphragms in top half of turbine. Repaired labyrinths for
turbine diaphragms.
. ...
Replacement rotor, was check balanced by Marathon.
'
Delivered spare turbine rotor to platform for making a check with the old bearing retainers before installing the new bearing retainer :
Made up brackets to sweep casing. Swept casing and centered bearings.. Installed diaphragms, labyrinths and rotor. .
Found that shaft was riding on the interstage labyrinths. Removed rotor. Added shims in bearing retainers as follows to raise rotor.
Added uOlO/' tQ the exhaust.-fend -bearing' detainer.Added .015'' to steam end bearing retainer.
.
Centered turbine shaft with new bearing retainers.
Catalog no. of bearings removed 'were 836246-1 and 836246-2.
BULLINGTON 000466