Document pmJZe2anYy9mEK4yXJjLX0p3E

jjlvl--F iu.Vl~*< c\i* i 10 -i /.' ' I'UtS-- /VI iil. v/iui/.'i* jlLuS I LARI' iXuu . . u*>u i X X*.-Xv..i >/! ii IH- Y-AR 1949 For convenience, tills report has been diviaed into the Following pai'ts: . 1. Copper neliueries ' 2. Zinc Plant 3. Rolling Fills (Anaconda -ire and Cable Company) 4. Ferromanganese Plant b. General . 6. impenditures ' 7. Slag ireating Plant, Zast Helena 1 COPI'rJv I ai'liti-t'.] 23 ' The i.lectrolytic Copper Heilnery operated at an average rate of 40.2l ox capacity, and an average current aen- sity oi 11.36 amperes per square loot, producing 129,373,464 pounds ox" cathodes. Inere -ere 200,395 pounds oi cathodes slipped during the year. in addition to the cathodes produced Irom oar own electrolytic copper Atliuery, .e received and treated in cur i urnace i.tiinery 13,277,944 pounds oi catliodes Prom Inspiration, /M'izona. .' The Anode Casting Plant operated 174 i.urnace days in 1949, producing a total oi 37,379,231 pounds oi copper anodes, oi widen 0,437,936 pounds came irom anode scrap and miscel laneous copper scrap, 10,032,434 pounds rrom :.:larai blister copper and 1,103,311 irom Ktnnecott blister copper. The no. 1 iurnace in the Furnace nexinery bepartmeiit did not operate in anode production during 1949. pMVC 00012637 The runelting ol anode scrap and blister copper lor casting it,to anodes -at troisicired iron; the old anode cast- ire; plant to tne .o. 1 furnace in the i'un.ace ncilnery i/epartiacnt vunuury a, laOr. iho anode casting plant is being con verted into a plant lor tiie production ol copper billets, ihe ;,o. 1 furnuce in the iurnace neiinery L-epartasent was equipped lor casting anoies In early laa3 but has not been operated since Jlarch 1% 1943, hen the plant #as snut dosn because of lack ol sufficient copper to Justify the operation oi a large iurnace. Tae iurnace he-iinery operated 61 days during the year, at an average rate ol <*1.1,. capacity, producing 143,180,031 pounds ol shapes, a total ol 130,333,390 pounds oi refined cop per ..as sliipped Uurin,_' the year. insu Helen t catJjoues we, e avuilaile to 'maintain a che-iurrK.ct oper-ticn on a live-day-per-wee* basis in July, August .<tid September, with the result tnat trie iurnace Pefinery jf; urtment ... as shut uouri irora July 9 to July 4, inclusive, and from August 19 to September 7, Inclusive. The scalping i lent operated 4 days in 1949, pro ducing *4,903,236 lounds oi scalptd s,irtbar. shavings amounted to ,064,376 pounds, or 9.34,. ol ..irebar scalped, which ..as retreated tid-ough the iurnace ..eiinory. s,013,031 pounds oi scalped wire-bar ..as deliver ed to the holling 1 ills at Great Tails, nd 1-3,031,3*1 pounds -.,ub shipped to the A-merican arass Company durinf.. the year, including ,30* pounds oi silver. A total ol 14,101,21s pounds oi silver-bearing copper, containing PNYC 00012638 -3- 70*818 troy ounces 01 silver, .--us p'roauced lor tne American wrass Company. 74,771 troy ounces oi silver sas used ior this production, iving a loss or 3,9u3 ounces Tor the year. Arrangements were completed with j.enuecott Copper Corporation in December, 1949 lor the rellning oi approxintitely 5,G0000o pounds or CarHeld, Utah blister copper per month at Creat 1 alls. crdpments were begun on snort notice and arrived belore we were able to lully equip our plant lor sampling and moisture ueteir.iination. .ie succeeded in securing a secondliand 'drill lor sampling and we adapted one oi our sample grinding . mills to this use so that we were able to .Keep up with the hand ling oi receipts oi this material. The distribution oi copper snipped during the year was as iollows* A.C.A. Copper Founds Fercent ol Total American crass Company (Cathodes) 00,396 American brass Company (chapes) 33,769,05o nssex -ire Corporation (Chapes; 247,578 A.C..M. Company (Electrode Holders) 54,054 A.C.PA. Company (. .armors; 96,368 creat Falls Foiling Mills ol Ana- conua '.lire a- Cubic Company 101,635,944 0.15 24.83 0.18 0.03 0.07 ' 74,74 Total 135,*83,895 lOu.OG 2. i . i All units oi the ..inc riant operated at lull lead tiJ auwi;out the year wxtu tne exception oi reduction in pc..er during the months oi July, August arid _eptester because ol atitospheric temperature. PNYC 00012639 The total production of zinc cathodes i'or the year was 337,SOu,341 pounds, or wliich 9,71,410 pounds cane from the retreatment ol zinc plant dross. 2,123,939 pounds ol cathodes was produced Iron zinc oxide recovered Iron zinc casting plant bag-house. 20,409,809 pounds or zinc, as zinc dust, was returned to the Zinc Leaching Department lor solution purification. 3,343,784 pounds or zinc dust was returned to the Purification Residue Plant for solution purification, and 1,223,681 pounds of zinc dust was used in the retreatment of purlrication residue ' ror the recovery ol cadmium. The Casting Plant treated 337,095,672 pounds or Great Falls cathodes, producing slabs in an amount of 291,530,036 pounds. No Anaconda cathodes were treated. The Casting Plant also produced 2d,932,273 pounds of zinc dust and 24,675,314 pounds of zinc dross (including taghcuse zinc oxide) containing 20,139,387 pounds of zinc. 3,317,389 pounds of zinc in dross was sold to other companies. Of the cathodes treated at the Casting Plant, ->5,343,219 pounds was Company zinc, and 242,352,403 pounds was toll zinc. From Company cathodes was produced 82,zal,238 pounds of slabs, and from toll cathodes was produced 209,233,678 pounds of slabs. The net production of 291,530,936 pounds of slabs was cast as follows: a.c.;.:. cavi'ANY POUNDS Slabs - Anaconda Llectric Slabs - High Grade Slabs - High Grade (U.S. Treasury Dept, ' fl.F.S.) Slabs - Intermediate No, 1 Slabs - Anaconda S.C. Ho. 1 Slabs - Brass Special 23,765,761 25,634,466 22,715,995 10,075,036 Total Company 32,241,253 PNYC 00012640 -5' TOLL Slabs -'Special zinc 599,893 Slabs - Frime Western Interlocking 1,254,126 Slabs - High Grade (Special Line) 1,399,836 Slabs - High Grade 165,721,666 Slabs - High Grade (Purchased by Anaconda) Slabs - High Grade (B.S.) 363,089 Slabs - Special Intermediate No. 1 2,515,495 Slabs - Intermediate 799,715 Slabs - Intermediate No. 1 799,832 Slabs - Special Zinc Alloy Slabs - Prime Western 28,553,216 Slabs - Special Intermediate 800,000 Slabs - Brass Special 200,000 Slabs - Special zinc Alloy 1,784,159 Slabs - Special Zinc Alloy - G.D.3. 4,498,651 Total Toll 209,289,-678 Total Net Production 291,530,936 The zinc shipments From the Great Falls Plant, for account ol /iiacond;. Company, for the year were distributed as Tons Percent American Brass Plants (inc. option) 454 Others 40,577 1.11 93.39 Total 41,031 100.00 The Zinc Plant produced during the year a total of 94,03*.80 tons of residues ior shipment, which contained 25,126,696 pounds ol lead, 7,869,414 pounds ol copper, 3,Bl,905.05 ounces ol silver, and 11,729.744 ounces of gold, included in this figure are 84,393.65 tons ol regular zinc plant residue, and 9,636.15 tons oi purification copper residue stepped to /uiacendu The 9,686.15 tons of purification copper residue is the result of treating purification residue from both Anaconda ana Great Falls Line Plants.' 8.47 tens of east Helena Slag Treatment Plant baghouse fume was sold locally during the year. PNYC 00012641 -6- A total oi' 20,658 tons or lead bullion, resulting Iran Great Fulls ana Anaconda Residue and Anaconda lead con centrate, as shipped to American Smelting and Aerining Company at Omaha, Nebraska, ror rex'ining and with return or refined lead to Anaconda Sales Company. The Cadmium Plant produced 1,836,604.70 pounds or metallic cadmium during 1349, or which 1,221,064.70 pounds .vas Company cadmium and 642,540.00 pounds toll cadmium. ' A total or 2,101,185.46 pounds, including that alloyed in de based zinc, was snipped during the year, or which 1,237,805.70 was lor. the Company and 363,580.76 pounds was toll cadmium. On January 1, 150 ttie re was on hand at the Great Falls Plant a total oi 51,778.67 pounds oi' rinlstied cadmium, or which 25,000.00 was Company cadmium and 26,778.67 pounds, toll cadmium. 6,100.69 tons or purchased concentrate, 145,072.22 tons cl' toll concentrate, 35,535.53 tons or baghouse rume iron the Slag Treatment Plant at aast Helena, 501.52 tons or international smelting and Kel'ining Company cadmium-bearing iume rrom Tooele, and 57,654.50 tons or zinc concentrate from Anaconda, was ' treated in the roasters during the year. The following toll concentrates were treated: TOLL iluC Cw4.CldHI1YT.55 ifu-^.TAD DAY TOP American Zinc Company (incl. Fresnillo) Federal .Vining a Smelting Company International Minerals & Petals Corp. Combined Petals induction Company U.S. Smelting Aerining * lining Co. Fhilipp Brothers, Inc. U.s. Treasury Dept., Bureau or. ' Federal supply G.s.A., Bureau of Federal Supply . 11,595.42 3,990.62 53,563.66 54,345.10 2,810.54 5,504.81 526.11 12,734.96 Total 145,072.22 PNYC 00012642 -7- Tfte calcine produced Iran these concentrates and I tune together with 54,916.98 tons ol calcine, and lu,5eu.51 tons oi' puriiication residue x'rom Anaconda was treated in the Leucidng riant, 22,50e.35 ounces or indium vas translerred Ircm in process during 1949. we had on hand at Great Falls 50,326.52 troy ounces or indium on January 1, 1949. There was also 1,000.28 troy ounces at lien York and OuQ.14 troy ounces at Perth Amboy. The sales or indium lor the year totaled 43,013.08 troy ounces. The total inventory as or January 1, 19oC, was 26,323.21 troy ounces, or which 20,322.93 was at Great Falls. 3. HQi i.lhG -diinuQ PARTbaltT (AiiAU^n^.. .1KL. >1*0 Cx-rha CcVdRnYj The ho. 1 Rod Mill operated 25 snll'ts and no. 2. Rod Mill operated la shilts during 1949. The net rod production lor the ho. 1 Mill ror the year was lua,302,043 pounds, and tat gross production ^including scrap and scale; was 106,064,006 pounds. The net rod production .a- ti.e ho. 2 Mill was 5,130,o75 pounds, and tne gross production was 5,232,194 pounds. A new record production or 5/8" rods was established on Oecember 16, 1949 vdth 1,610 bars rolled lor a total weight ol' 002,456 pounds, v/hich was a new record both lor number or bars and weight rolled in an eight-hour shirt. Trie production ox' wire, including wire- ;aade into strand, was 9,205,070 pounds. There was also produced during the year 232,536 pounds ox arawn rods, and lu,738 pounds ol twisted. Ilat v;ire, caking a total wire and drawn rod production ol 9,453,444 pounds. The strand production was 3,949,005 pounds. PNYC 00012643 We produced 50,312,950 pounds or ox-orr rods In 1949 as compered with a production or 49,049,435 pounds in 1943. 4. FiXuWFJsG.ANL5 PLANT Ferromanganese production at Great Falls was dis continued with the midnight shirt July 31, 1949 u,,d the Xurnace remained down until November 28, 1949, when operations were resumed, ' During the year 1949 the Ferromanganese Plant produced 4,647.542 long dry tons or Ferromanganese, assaying 80.35,9 manganese. Shipments amounted to 4,643.246 long dry tons. In the month or December we produced 567,18 long tons or Ferromanganese, widen is a record nigh production lor any one month oF operation oF the Furnace at Great Falls. 5. GhitLRAL The annual report or !dn>. Dahl, our Industrial Nurse, uhows that duriiig the year she made 964 house calls, 251 calls to hospitals, and averaged 3J hours per day in the North Montana Clinic OFFice, caring lor 641 patients and holding 254 baby clinics. In the homes she cared For a total or 547 patients; 136 men, 2G9 women, 130 pre-scnool children and 72 school children, Membership in the A.c.M. Club January 1, 1949 was 319 and on December 31, 1949 it was 378. The goir course orricially opened June 5, 1949. Members oF the Meadow Lark Country Club were permitted to play on the course while rebuild ing or their course was being completed. Liberal guest privi leges were also extended to personnel at the Last Base or* the U.5. Air Force. PNYC 00012644 -9- Arrangements were made lor the a,c.. howling League to bowl at Little's Lanes, alleys in the city oi Great Falls, and two shirts, on eight alleys, bowled an two nights a .\eek. Forty teams participated in regular weekly schedule. Plant tournament was held at the close ol the season, in which 31 teams took part. The games bowled during the season totaled 16,395. Twenty-two teams participated in the A.C.il. bowling tournament held in Butte. . Construction ol a new clubhouse lor Great falls employees was begun during the year and loundation work was ' completed and brick work was begun, but delivery of steel was delayed by reason oi the steel strike, so that only a limited amount oi brick work could be erected. All ol the building and rooting steel was delivered in January anl February, 1950, so tiiat construction can now go ahead without iurther interruption. The total maturity value oi bonds purchased by employees oi the Great falls Reduction Department irom January 1, 1942 to January 1, 1*50, amounted to j2,923,680.00 and the total maturity value oi bonds purchased by Great Falls employees of the Anaconda -lire and Cable Company mounted to .234,675.00 ior tiic same period, giving a total oi 3,153,355.00 In bonds pur chased through Company iacilities by the Great Falls employees. The total maturity value ol bonds purchased by employees at the hast Helena Blag Treatment riant during the same period amounted to Jll7,325.00. A total oi .'143,999.64 was subscribed in savings bonds during 1*4* with 20.67^ or the employees partici pating and amounting to 2,44,i> ol' the total payroll. PNYC 00012645 -11- mere were 44/ of this group scheduled to work on a six-uay- per-week basis, during the summer months the employment or high school and college hoys reduced our six-day-per-week employees to 12,.,. by the middle or October se had been able to make further reductions, so tliat the group of S-day-per-week employees among the C.I.O. amounted to only 2%. Of the A. F. or, L. employees (craftsmen) 9Q,i were working on a slx-day-per-week basis in mid-July, by October tills figure iiadL been reduced to 10,. and at the year's end only 4/ were -working ou a six-day-per- week basis. During tiie year 1949 we hired 1,011 employees and had 1,029 separations, leaving a net loss of 18 employees. Negotiations with the Unions lor new contracts were held during the summer months and resulted in new contracts ex piring June 3u, 1900, with no increase in wages over those in effect July 1, 1949. 6. hXrU>L'ITUh.LS AOAlii0 X All Ii0PKiATI0N5 Construction or the A.C.M. Clubhouse was 28,0 completed at an expenditure of ,,)o4,041.70. ' Building ana equipping of the new Cadmium Casting Plant was completed with an expenditure of $33,790.00. One jjiffalo No. 1/2 x 12" Throat Universal Iron Worker with motor drive v.as installed on a concrete foundation at a cost o- '3,111.08. " One Yale and Towne K41-62.' Fork Truck, 6000 pounds capacity, with adison battery of 30 Do cells was purchased at a cost of "7,970.12. , PNYC 00012S46 -12- Qne double cascade of 12 electrolytic cells bus con structed at the east end of the Zinc Plant tank room at an expenditure ol ^14,379,90. Conversion oi tr.e present anode casting plant into a copper billet plant bus begun, with an expenditure oi ,',21,709.20. Installation ol new electric hoists lor strirpirig oderations on one unit in the Zinc Plant tank room was 93,. completed with an expenditure ol v31,216,95. _ A one-unit extension to the Zinc Plant was authorized but construction aas postponed indefinitely, awaiting improve-, meat in metal markets, A total ol i;4l,80 was expended on tils item. Installation oi spare rotors lor the booster generator sets at the Zinc Plant substation was begun, but with no expendi ture by December 31, 1949, One naker Aodel J03i 40-48 4000-pounds capacity, industrial truck with H-36 ready power unit was purchased at an expenditure ol P6,399.95. . Construction and installation or two 18* diameter x 14' leach taiiks lor cadmium sponge at the Purification Residue Plant were completed at a cost ol ",11,139.7b. Installation ol a hammer mill lor oversize calcine and a conveyor Iron the RcDougal Roasters to the calcine screen was begun, with an expenditure ol '243.19. Installation or a 30-pound air compressor in correction with installation ol equipment lor separate leaching ol Last Helena lame was 77,i completed, with an expenditure ol' '13,100.07. PNYC 00012647 -13- An extension to the Line Plant change house was 55,4 completed, with an expenditure or >13,IOC.57. Installation ol equipment lor separate leaching ol East Helena iume was 40,* completed, with an expenditure or >01,430.05. Purchase and installation or a magnetic, reduced voltage starter lor a 150 H.P. motor were completed at the >>ast Helena Slug Treatment Plant at a cost ol` ,1,203.07. Installation oX a secondhand pulverizer and Ian in the Coal Pulverizing Department or the East Helena Slag Treatment Plant was completed at a cost or $11,018.21. Installation or automatic bag shakers and a one-buy extension to the bag house was 01;, completed, with an expenditure or $33,045.50. One Joy lianuTacturing Company 15 H.P., double drum electric hoist. Type AAF-212, was purchased and installed at the East Helena Slag Treatment Plant at a cost or $1,621.00. Installation or a Tioto-Clone dust separator at the coal drier in the Last Helena Slag Treatment Plant was 54,. completed at a cost of $3,433.45. The rollowing appropriations and expenditures were made at the Rolling '.'ills Departments: Purchase and installation or one .Morgan Hono-Llock wire macnine was 100,, completed at a cost or $17,834. Purchase and installation ol one exhaust lan and PNYC 00012648 14- aotor was 100% completed at a cost oX $801.78* Construction ox an extension to tne pump nouse and installation ox spare 8" centriXugal pump was 100% completed at a cost oX $5,073.89. Purchase oX miscellaneous oXXloe Xurniture and equip ment sas completed at a cost oX $1,048.58. - Construction oX an extension to tne steel platxora In tne mill building sas 100% completed at a cost oX 1,574.29, Construction oX improvements in tne ventilating system at tne billet Xurnace was 100% completed at a cost oX 1,453.15. Purchase or one quanset 40 building to be used Xor a reel repair shed was 100% completed at a cost oX $17,900.79. Purchase oX one quonset 24 building to be used Xor a reel paint shop was 100% completed at.a cost OX 8,000.04. Construction oX a garage Xor shirt Xoreman sas 100% completed at a cost oX 895.18. construction ox a steel platxors Xor electrical equip ment was 100% completed at a cost oX $1,057.65. Purchase and installation oX equipment to provide a standby oil burner on the billet heating Xurnace vas 100% completed at a cost oX $8,141.44, '' Purchase and Installation oX reversing control Xor 1 strander sas 100% completed at a cost oX 1,089.45. Purchase and Installation oX 15 industrial control units was 100% completed at a cost oX 754.65. PNYC 0001264$ -15- Enlargeaent or toe inspection laboratory was 1Q0 completed at a cost or 2,251.09. Purchase and installation or push button control ror toe riat mill was 100> completed at a cost or 2,330. Purchase and installation or one Worthington 3-DE-8 Uonobloc pump and motor was lOOjt completed at a cost or $436.83. Purchase and installation or one 10^ Tilting Arbor circular saw was lQOji completed at a cost or $356.44. - An appropriation or 1,229.00 ror one combustion air ran ror toe billet ruraace was approved but none or this money was expended in 1949. 7. 3LA.S TREATING PLANT - EAST HELENA There was treated during the year 208,735.46 tons-or molten slag and skulls, assaying 13.70136 zinc, and 14,146.92 tons or cold slag rrom the dump, assaying 12,370j6 zinc, making a total or 222,382.38 tons, assaying 13.81636 zinc. The production resulting was 33,827.03 dry tons or rume assaying 69.342;* zinc, showing a recovery or 84.14536 or zinc content or slag treated* 33,574.96 tons or rume was shipped to Great Palls ror treatment in the Zinc Plant; 21.25 dry tons was sold locally, 606.02 tons was shipped to toe American Chemet Corporation, 1,282.93 tons was shipped to ingle Plcher Lead Company, and 1,095.18 tons was shipped to toe Ozark Smelting and Mining Company. The Slag Treating Plant operated continuously through out the year except ror a rew interruptions whan the plant was shut down ror Hue cleaning and necessary repairs. pNyc 00K650