jjlvl--F iu.Vl~*< c\i* i 10 -i /.' ' I'UtS-- /VI iil. v/iui/.'i* jlLuS I LARI' iXuu . . u*>u i X X*.-Xv..i >/! ii IH- Y-AR 1949
For convenience, tills report has been diviaed into
the Following pai'ts:
.
1. Copper neliueries
' 2. Zinc Plant
3. Rolling Fills (Anaconda -ire and Cable Company)
4. Ferromanganese Plant
b. General
.
6. impenditures
' 7. Slag ireating Plant, Zast Helena
1 COPI'rJv I ai'liti-t'.] 23
'
The i.lectrolytic Copper Heilnery operated at an
average rate of 40.2l ox capacity, and an average current aen-
sity oi 11.36 amperes per square loot, producing 129,373,464
pounds ox" cathodes. Inere -ere 200,395 pounds oi cathodes slipped during the year.
in addition to the cathodes produced Irom oar own
electrolytic copper Atliuery, .e received and treated in cur
i urnace i.tiinery 13,277,944 pounds oi catliodes Prom Inspiration,
/M'izona.
.'
The Anode Casting Plant operated 174 i.urnace days in 1949, producing a total oi 37,379,231 pounds oi copper anodes,
oi widen 0,437,936 pounds came irom anode scrap and miscel laneous copper scrap, 10,032,434 pounds rrom :.:larai blister copper
and 1,103,311 irom Ktnnecott blister copper. The no. 1 iurnace
in the Furnace nexinery bepartmeiit did not operate in anode production during 1949.
pMVC 00012637
The runelting ol anode scrap and blister copper lor casting it,to anodes -at troisicired iron; the old anode cast- ire; plant to tne .o. 1 furnace in the i'un.ace ncilnery i/epartiacnt vunuury a, laOr. iho anode casting plant is being con verted into a plant lor tiie production ol copper billets, ihe ;,o. 1 furnuce in the iurnace neiinery L-epartasent was equipped lor casting anoies In early laa3 but has not been operated since Jlarch 1% 1943, hen the plant #as snut dosn because of lack ol sufficient copper to Justify the operation oi a large iurnace.
Tae iurnace he-iinery operated 61 days during the year, at an average rate ol <*1.1,. capacity, producing 143,180,031 pounds ol shapes, a total ol 130,333,390 pounds oi refined cop per ..as sliipped Uurin,_' the year.
insu Helen t catJjoues we, e avuilaile to 'maintain a che-iurrK.ct oper-ticn on a live-day-per-wee* basis in July, August .<tid September, with the result tnat trie iurnace Pefinery jf; urtment ... as shut uouri irora July 9 to July 4, inclusive, and from August 19 to September 7, Inclusive.
The scalping i lent operated 4 days in 1949, pro ducing *4,903,236 lounds oi scalptd s,irtbar. shavings amounted to ,064,376 pounds, or 9.34,. ol ..irebar scalped, which ..as retreated tid-ough the iurnace ..eiinory. s,013,031 pounds oi scalped wire-bar ..as deliver ed to the holling 1 ills at Great Tails, nd 1-3,031,3*1 pounds -.,ub shipped to the A-merican arass Company durinf.. the year, including ,30* pounds oi silver. A total ol 14,101,21s pounds oi silver-bearing copper, containing
PNYC 00012638
-3-
70*818 troy ounces 01 silver, .--us p'roauced lor tne American
wrass Company. 74,771 troy ounces oi silver sas used ior this
production, iving a loss or 3,9u3 ounces Tor the year.
Arrangements were completed with j.enuecott Copper
Corporation in December, 1949 lor the rellning oi approxintitely
5,G0000o pounds or CarHeld, Utah blister copper per month at
Creat 1 alls. crdpments were begun on snort notice and arrived
belore we were able to lully equip our plant lor sampling and
moisture ueteir.iination. .ie succeeded in securing a secondliand
'drill lor sampling and we adapted one oi our sample grinding .
mills to this use so that we were able to .Keep up with the hand
ling oi receipts oi this material.
The distribution oi copper snipped during the year was
as iollows*
A.C.A. Copper
Founds Fercent ol Total
American crass Company (Cathodes) 00,396
American brass Company (chapes) 33,769,05o
nssex -ire Corporation (Chapes;
247,578
A.C..M. Company (Electrode Holders) 54,054
A.C.PA. Company (. .armors;
96,368
creat Falls Foiling Mills ol Ana-
conua '.lire a- Cubic Company
101,635,944
0.15 24.83
0.18 0.03 0.07 ' 74,74
Total
135,*83,895
lOu.OG
2. i . i All units oi the ..inc riant operated at lull lead
tiJ auwi;out the year wxtu tne exception oi reduction in pc..er during the months oi July, August arid _eptester because ol atitospheric temperature.
PNYC 00012639
The total production of zinc cathodes i'or the year
was 337,SOu,341 pounds, or wliich 9,71,410 pounds cane from
the retreatment ol zinc plant dross. 2,123,939 pounds ol cathodes
was produced Iron zinc oxide recovered Iron zinc casting plant
bag-house. 20,409,809 pounds or zinc, as zinc dust, was returned
to the Zinc Leaching Department lor solution purification.
3,343,784 pounds or zinc dust was returned to the Purification
Residue Plant for solution purification, and 1,223,681 pounds of
zinc dust was used in the retreatment of purlrication residue
' ror the recovery ol cadmium.
The Casting Plant treated 337,095,672 pounds or Great
Falls cathodes, producing slabs in an amount of 291,530,036
pounds. No Anaconda cathodes were treated. The Casting Plant
also produced 2d,932,273 pounds of zinc dust and 24,675,314
pounds of zinc dross (including taghcuse zinc oxide) containing
20,139,387 pounds of zinc. 3,317,389 pounds of zinc in dross
was sold to other companies. Of the cathodes treated at the
Casting Plant, ->5,343,219 pounds was Company zinc, and 242,352,403
pounds was toll zinc. From Company cathodes was produced
82,zal,238 pounds of slabs, and from toll cathodes was produced
209,233,678 pounds of slabs.
The net production of 291,530,936 pounds of slabs was cast as follows:
a.c.;.:. cavi'ANY
POUNDS
Slabs - Anaconda Llectric Slabs - High Grade Slabs - High Grade (U.S. Treasury Dept,
' fl.F.S.) Slabs - Intermediate No, 1 Slabs - Anaconda S.C. Ho. 1 Slabs - Brass Special
23,765,761 25,634,466 22,715,995 10,075,036
Total Company
32,241,253
PNYC 00012640
-5'
TOLL
Slabs -'Special zinc
599,893
Slabs - Frime Western Interlocking
1,254,126
Slabs - High Grade (Special Line)
1,399,836
Slabs - High Grade
165,721,666
Slabs - High Grade (Purchased by Anaconda)
Slabs - High Grade (B.S.)
363,089
Slabs - Special Intermediate No. 1
2,515,495
Slabs - Intermediate
799,715
Slabs - Intermediate No. 1
799,832
Slabs - Special Zinc Alloy
Slabs - Prime Western
28,553,216
Slabs - Special Intermediate
800,000
Slabs - Brass Special
200,000
Slabs - Special zinc Alloy
1,784,159
Slabs - Special Zinc Alloy - G.D.3.
4,498,651
Total Toll
209,289,-678
Total Net Production
291,530,936
The zinc shipments From the Great Falls Plant, for
account ol /iiacond;. Company, for the year were distributed as
Tons Percent
American Brass Plants (inc. option)
454
Others
40,577
1.11 93.39
Total
41,031 100.00
The Zinc Plant produced during the year a total of 94,03*.80 tons of residues ior shipment, which contained
25,126,696 pounds ol lead, 7,869,414 pounds ol copper, 3,Bl,905.05
ounces ol silver, and 11,729.744 ounces of gold, included in this
figure are 84,393.65 tons ol regular zinc plant residue, and
9,636.15 tons oi purification copper residue stepped to /uiacendu
The 9,686.15 tons of purification copper residue is the result
of treating purification residue from both Anaconda ana Great
Falls Line Plants.' 8.47 tens of east Helena Slag Treatment Plant
baghouse fume was sold locally during the year.
PNYC 00012641
-6-
A total oi' 20,658 tons or lead bullion, resulting
Iran Great Fulls ana Anaconda Residue and Anaconda lead con centrate, as shipped to American Smelting and Aerining
Company at Omaha, Nebraska, ror rex'ining and with return or refined lead to Anaconda Sales Company.
The Cadmium Plant produced 1,836,604.70 pounds or metallic cadmium during 1349, or which 1,221,064.70 pounds .vas Company cadmium and 642,540.00 pounds toll cadmium. ' A total or 2,101,185.46 pounds, including that alloyed in de based zinc, was snipped during the year, or which 1,237,805.70 was lor. the Company and 363,580.76 pounds was toll cadmium. On January 1, 150 ttie re was on hand at the Great Falls Plant a total oi 51,778.67 pounds oi' rinlstied cadmium, or which 25,000.00 was Company cadmium and 26,778.67 pounds, toll cadmium.
6,100.69 tons or purchased concentrate, 145,072.22 tons cl' toll concentrate, 35,535.53 tons or baghouse rume iron the Slag Treatment Plant at aast Helena, 501.52 tons or international
smelting and Kel'ining Company cadmium-bearing iume rrom Tooele, and 57,654.50 tons or zinc concentrate from Anaconda, was ' treated in the roasters during the year. The following toll concentrates were treated:
TOLL iluC Cw4.CldHI1YT.55 ifu-^.TAD
DAY TOP
American Zinc Company (incl. Fresnillo) Federal .Vining a Smelting Company International Minerals & Petals Corp. Combined Petals induction Company U.S. Smelting Aerining * lining Co. Fhilipp Brothers, Inc. U.s. Treasury Dept., Bureau or.
' Federal supply G.s.A., Bureau of Federal Supply .
11,595.42 3,990.62
53,563.66 54,345.10
2,810.54 5,504.81
526.11 12,734.96
Total
145,072.22
PNYC 00012642
-7-
Tfte calcine produced Iran these concentrates and I tune together with 54,916.98 tons ol calcine, and lu,5eu.51 tons oi' puriiication residue x'rom Anaconda was treated in the Leucidng riant,
22,50e.35 ounces or indium vas translerred Ircm in process during 1949. we had on hand at Great Falls 50,326.52 troy ounces or indium on January 1, 1949. There was also 1,000.28 troy ounces at lien York and OuQ.14 troy ounces at Perth Amboy. The sales or indium lor the year totaled 43,013.08 troy ounces. The total inventory as or January 1, 19oC, was 26,323.21 troy ounces, or which 20,322.93 was at Great Falls.
3. HQi i.lhG -diinuQ PARTbaltT (AiiAU^n^.. .1KL. >1*0 Cx-rha CcVdRnYj The ho. 1 Rod Mill operated 25 snll'ts and no. 2. Rod
Mill operated la shilts during 1949. The net rod production lor the ho. 1 Mill ror the year
was lua,302,043 pounds, and tat gross production ^including scrap and scale; was 106,064,006 pounds. The net rod production .a- ti.e ho. 2 Mill was 5,130,o75 pounds, and tne gross production was 5,232,194 pounds.
A new record production or 5/8" rods was established on Oecember 16, 1949 vdth 1,610 bars rolled lor a total weight ol' 002,456 pounds, v/hich was a new record both lor number or bars and weight rolled in an eight-hour shirt.
Trie production ox' wire, including wire- ;aade into strand, was 9,205,070 pounds. There was also produced during the year 232,536 pounds ox arawn rods, and lu,738 pounds ol twisted. Ilat v;ire, caking a total wire and drawn rod production ol 9,453,444 pounds. The strand production was 3,949,005 pounds.
PNYC 00012643
We produced 50,312,950 pounds or ox-orr rods In 1949 as compered with a production or 49,049,435 pounds in 1943. 4. FiXuWFJsG.ANL5 PLANT
Ferromanganese production at Great Falls was dis continued with the midnight shirt July 31, 1949 u,,d the Xurnace remained down until November 28, 1949, when operations were resumed,
' During the year 1949 the Ferromanganese Plant produced 4,647.542 long dry tons or Ferromanganese, assaying 80.35,9 manganese. Shipments amounted to 4,643.246 long dry tons.
In the month or December we produced 567,18 long tons or Ferromanganese, widen is a record nigh production lor any one month oF operation oF the Furnace at Great Falls.
5. GhitLRAL The annual report or !dn>. Dahl, our Industrial Nurse,
uhows that duriiig the year she made 964 house calls, 251 calls to hospitals, and averaged 3J hours per day in the North Montana Clinic OFFice, caring lor 641 patients and holding 254 baby clinics. In the homes she cared For a total or 547 patients; 136 men, 2G9 women, 130 pre-scnool children and 72 school children,
Membership in the A.c.M. Club January 1, 1949 was 319 and on December 31, 1949 it was 378. The goir course orricially opened June 5, 1949. Members oF the Meadow Lark Country Club were permitted to play on the course while rebuild ing or their course was being completed. Liberal guest privi leges were also extended to personnel at the Last Base or* the U.5. Air Force.
PNYC 00012644
-9-
Arrangements were made lor the a,c.. howling League
to bowl at Little's Lanes, alleys in the city oi Great Falls,
and two shirts, on eight alleys, bowled an two nights a .\eek.
Forty teams participated in regular weekly schedule. Plant
tournament was held at the close ol the season, in which 31
teams took part. The games bowled during the season totaled
16,395. Twenty-two teams participated in the A.C.il. bowling
tournament held in Butte.
.
Construction ol a new clubhouse lor Great falls
employees was begun during the year and loundation work was '
completed and brick work was begun, but delivery of steel was
delayed by reason oi the steel strike, so that only a limited
amount oi brick work could be erected. All ol the building and
rooting steel was delivered in January anl February, 1950, so
tiiat construction can now go ahead without iurther interruption.
The total maturity value oi bonds purchased by
employees oi the Great falls Reduction Department irom January 1,
1942 to January 1, 1*50, amounted to j2,923,680.00 and the total
maturity value oi bonds purchased by Great Falls employees of
the Anaconda -lire and Cable Company mounted to .234,675.00 ior
tiic same period, giving a total oi 3,153,355.00 In bonds pur
chased through Company iacilities by the Great Falls employees.
The total maturity value ol bonds purchased by employees at the
hast Helena Blag Treatment riant during the same period amounted
to Jll7,325.00. A total oi .'143,999.64 was subscribed in
savings bonds during 1*4* with 20.67^ or the employees partici
pating and amounting to 2,44,i> ol' the total payroll.
PNYC 00012645
-11-
mere were 44/ of this group scheduled to work on a six-uay-
per-week basis, during the summer months the employment or
high school and college hoys reduced our six-day-per-week
employees to 12,.,. by the middle or October se had been able
to make further reductions, so tliat the group of S-day-per-week
employees among the C.I.O. amounted to only 2%. Of the A. F. or, L.
employees (craftsmen) 9Q,i were working on a slx-day-per-week
basis in mid-July, by October tills figure iiadL been reduced to
10,. and at the year's end only 4/ were -working ou a six-day-per-
week basis.
During tiie year 1949 we hired 1,011 employees and had
1,029 separations, leaving a net loss of 18 employees.
Negotiations with the Unions lor new contracts were
held during the summer months and resulted in new contracts ex
piring June 3u, 1900, with no increase in wages over those in
effect July 1, 1949.
6. hXrU>L'ITUh.LS AOAlii0 X All Ii0PKiATI0N5
Construction or the A.C.M. Clubhouse was 28,0 completed
at an expenditure of ,,)o4,041.70.
'
Building ana equipping of the new Cadmium Casting
Plant was completed with an expenditure of $33,790.00.
One jjiffalo No. 1/2 x 12" Throat Universal Iron Worker
with motor drive v.as installed on a concrete foundation at a
cost o- '3,111.08.
"
One Yale and Towne K41-62.' Fork Truck, 6000 pounds
capacity, with adison battery of 30 Do cells was purchased at a cost of "7,970.12. ,
PNYC 00012S46
-12-
Qne double cascade of 12 electrolytic cells bus con structed at the east end of the Zinc Plant tank room at an expenditure ol ^14,379,90.
Conversion oi tr.e present anode casting plant into a copper billet plant bus begun, with an expenditure oi ,',21,709.20.
Installation ol new electric hoists lor strirpirig oderations on one unit in the Zinc Plant tank room was 93,. completed with an expenditure ol v31,216,95.
_ A one-unit extension to the Zinc Plant was authorized but construction aas postponed indefinitely, awaiting improve-, meat in metal markets, A total ol i;4l,80 was expended on tils item.
Installation oi spare rotors lor the booster generator sets at the Zinc Plant substation was begun, but with no expendi ture by December 31, 1949,
One naker Aodel J03i 40-48 4000-pounds capacity, industrial truck with H-36 ready power unit was purchased at an expenditure ol P6,399.95. . Construction and installation or two 18* diameter x 14' leach taiiks lor cadmium sponge at the Purification Residue Plant were completed at a cost ol ",11,139.7b.
Installation ol a hammer mill lor oversize calcine and a conveyor Iron the RcDougal Roasters to the calcine screen was begun, with an expenditure ol '243.19.
Installation or a 30-pound air compressor in correction with installation ol equipment lor separate leaching ol Last Helena lame was 77,i completed, with an expenditure ol' '13,100.07.
PNYC 00012647
-13-
An extension to the Line Plant change house was 55,4
completed, with an expenditure or >13,IOC.57. Installation ol equipment lor separate leaching ol
East Helena iume was 40,* completed, with an expenditure or >01,430.05.
Purchase and installation or a magnetic, reduced
voltage starter lor a 150 H.P. motor were completed at the >>ast
Helena Slug Treatment Plant at a cost ol` ,1,203.07.
Installation oX a secondhand pulverizer and Ian in
the Coal Pulverizing Department or the East Helena Slag Treatment
Plant was completed at a cost or $11,018.21. Installation or automatic bag shakers and a one-buy
extension to the bag house was 01;, completed, with an expenditure
or $33,045.50.
One Joy lianuTacturing Company 15 H.P., double drum
electric hoist. Type AAF-212, was purchased and installed at the East Helena Slag Treatment Plant at a cost or $1,621.00.
Installation or a Tioto-Clone dust separator at the coal drier in the Last Helena Slag Treatment Plant was 54,.
completed at a cost of $3,433.45.
The rollowing appropriations and expenditures were made at the Rolling '.'ills Departments:
Purchase and installation or one .Morgan Hono-Llock wire macnine was 100,, completed at a cost or $17,834.
Purchase and installation ol one exhaust lan and
PNYC 00012648
14-
aotor was 100% completed at a cost oX $801.78*
Construction ox an extension to tne pump nouse and
installation ox spare 8" centriXugal pump was 100% completed
at a cost oX $5,073.89.
Purchase oX miscellaneous oXXloe Xurniture and equip
ment sas completed at a cost oX $1,048.58.
-
Construction oX an extension to tne steel platxora In
tne mill building sas 100% completed at a cost oX 1,574.29,
Construction oX improvements in tne ventilating system
at tne billet Xurnace was 100% completed at a cost oX 1,453.15.
Purchase or one quanset 40 building to be used Xor a
reel repair shed was 100% completed at a cost oX $17,900.79.
Purchase oX one quonset 24 building to be used Xor a
reel paint shop was 100% completed at.a cost OX 8,000.04.
Construction oX a garage Xor shirt Xoreman sas 100%
completed at a cost oX 895.18.
construction ox a steel platxors Xor electrical equip
ment was 100% completed at a cost oX $1,057.65.
Purchase and installation oX equipment to provide a
standby oil burner on the billet heating Xurnace vas 100%
completed at a cost oX $8,141.44,
''
Purchase and Installation oX reversing control Xor 1 strander sas 100% completed at a cost oX 1,089.45.
Purchase and Installation oX 15 industrial control units was 100% completed at a cost oX 754.65.
PNYC 0001264$
-15-
Enlargeaent or toe inspection laboratory was 1Q0
completed at a cost or 2,251.09.
Purchase and installation or push button control ror
toe riat mill was 100> completed at a cost or 2,330.
Purchase and installation or one Worthington 3-DE-8
Uonobloc pump and motor was lOOjt completed at a cost or $436.83.
Purchase and installation or one 10^ Tilting Arbor
circular saw was lQOji completed at a cost or $356.44.
-
An appropriation or 1,229.00 ror one combustion air
ran ror toe billet ruraace was approved but none or this money
was expended in 1949.
7. 3LA.S TREATING PLANT - EAST HELENA There was treated during the year 208,735.46 tons-or
molten slag and skulls, assaying 13.70136 zinc, and 14,146.92 tons or cold slag rrom the dump, assaying 12,370j6 zinc, making a total or 222,382.38 tons, assaying 13.81636 zinc.
The production resulting was 33,827.03 dry tons or rume assaying 69.342;* zinc, showing a recovery or 84.14536 or zinc content or slag treated*
33,574.96 tons or rume was shipped to Great Palls ror treatment in the Zinc Plant; 21.25 dry tons was sold locally, 606.02 tons was shipped to toe American Chemet Corporation, 1,282.93 tons was shipped to ingle Plcher Lead Company, and 1,095.18 tons was shipped to toe Ozark Smelting and Mining Company.
The Slag Treating Plant operated continuously through out the year except ror a rew interruptions whan the plant was shut down ror Hue cleaning and necessary repairs.
pNyc 00K650