Document pmE90YzGJweGBB216zjm9nKBj
PROGRESS REPORT
TECHNICAL SERVICES DEPT. --V. 0. KRUMMRICH PLANT
Ijobno.
I 91370:4286
|report ho.
I2
date 4 /30 / J1
---------------------
--
*
- - ------------ -- -- -------------------------------------------------------------------------------------------------------- ------------------------------- ----------'-- ------------------------------------------ 1------------------------------------- - - - -
W.O. KRUKNRICH PLANT
GENERAL OFFICE
______________ ..
... __
__
OTHERS
...
ElG.L. Bratsch - 0
0
`El J.R. Savage
Anniston
*0D.W. Jackson 0 *0 E2 D. Danna (4) 0 J.C. -Eandweh:
0 P.E. Heisler 0 0A.E. Leisy 0
m
*0 W.R. Richard ` . 0
G3R.M. McCutchari 0
'0
m
*E3 R.M. Blowers
*0 H.J. Horner *0 J. Gloeckner
0 0 0
'0 ' 0 . 0
` 0 0
*0
0 0 1 0 0 *0
El
<0 <
*0 *0 .
TO RECEIVE DETAIL SECTION
title:
AROCLOR QUALITY
PERSONNEL: W. A. KrUll (W. C Engman)
problem: Regain pre-October, 1970, quality levels on Aroclor 1242.
summary
Aroclor 1242 Thermal Chemical Chlorides showed a step change from 0.14 to 0.28 (Spec. 0.65, Max.) in October, 1970.
No correlation could be found between the following operating data and the step change in thermal chemical chlorides:
1. Chlorine mist eliminator pressure drop
` 2. Catalyst level
'
. 3. Maintenance records 4. Still pot temperature/pressure
V 5. Sample bottles
....
v
.......
Information on raw material purity, chlorinating temperatures and
lime addition were not available for that time period. All of these
variables except raw materials are now being monitored and are within
`
proper control limits.
............................ .....................
Future Work:
Analytical precision has been determined by J. Gloeckner and the Contrc
Lab showing the total test variability, to be + 0.05 ppm at two standard
deviations. Sampling variability was shown to be insignificant.
Reserve samples from before and after October were rerun showing the
Lab was 'able to duplicate results.
'.
1. Develop tests and data on chlorine assay, moisture, organics and sulfates.
IO
CO
To--
T" CO
2. Gather data on methylbiphenyl & napthalene in biphenyl.
<a/>
3. Continue to try to correlate changes in variables to changes in
stability.
yvo-
_ . Wayne A. Krull
/tm
COMPANY CONFIDENTIAL INFORMATION
f
rhU docu=>ent is the property of Monsanto Company and tha recipient U responsible for its safekeeping and disposition.. It contains confide
lal Information of Monsanto Company which east not be reproduced, rewaled to unauthorised persons or sont outsldo the company withe
aroptr authorization.. Either retain in aecore file* or destroy.
STLCOPCB4070152
91370:4286 (2) AR0CL0R QUALITY DEPARTMENT 246
Page 2
4/50/7r
WGK
I. BACKGROUND
Aroclor 1242 has shown a step change for the worse in Thermal
Chemical Chloride Stability during October, 1970. This is
shown by cummulative sum charts in Report #1 and has been
. confirmed using statistical methods. Other stabilities
measured (Monsanto, Westinghouse, Hydrolysis) seem to show a
poorer level but it is not as clear cut as the TCC's
~
Recent TCC's have shown considerable variation. For the five lots (455 to 460) made from April 5 to April l4, 1971* the
TCC's improved to an average of 0.19. The last two electrical grade lots (46l, 463) averaged 0.27.
This report describes primarily the checking of department
operations which was done in an attempt to discover possible
causes for a change in stability.
,
II. WORK DONE AND RESULTS
.
A. All available data from the period around the stability .change was surveyed for abnormal conditions. Present department operating conditions also were checked for abnormalities.
B. Operating Conditions
, .........
1. Chlorine Brink Mist Eliminators
.
The pressure drop across the two elements exceeded the
design pressure drop at lower than design rate. The
flow rate vs. pressure drop data was sent to the Brink
design .section of Enviro-Chem. Feedback from Enviro-
Chem indicated the system should operate at a maximum
of 15" W.C. pressure drop, but re-entrainment should
not occur until a pressure drop of 30" W.C. is reached.
At present maximum expected flow rates a pressure drop
- of about 21" W.C. would be expected. Extrapolation of
existing data indicates flow rates of about 12,000
pounds per hour would be needed to reach 30" W.C. A
plot of flow rate vs. pressure drop for the system
appears as Appendix A.
.
DSW 310166
STLCOPCB4070153
91570:4286 (2) AR0CL0R QUALITY DEPARTMENT 246
Page 5
4/50/71 WGK
II. WORK DONE AND RESULTS
B. Operating Conditions (Continued)
2. Catalyst Level
Three times per week the last chlorinator of the
series (#9) is analyzed "by the control lab for
ferric chloride content. A cumulative sum plot
.
of past data indicates a change upward in /the last
part of October, 1970. This increase' is the result
of a deliberate attempt by Production to increase the
level of catalyst trying to improve stabilities. Past
research has shown that increasing the catalyst level
in chlorination should improve the stability of Aroclor
or have no effect. A plot of catalyst concentration
vs. time appears as Appendix B.
5* Maintenance Records
_
The Master Job Reports for August, September and October, 1970, were reviewed for possible mechanical changes which could affect Aroclor stabilities. The master job report lists all mechanical repairs and construction which occurred during a particular month. No changes or repairs were noted which could affect stability.
4. Still Pot Temperature /Pressure
Pressure and temperature data from the still log sheets were plotted for the last four months of 1970. This plot shows no change during October. A change showed up in early November indicating improved con . trol of the still pressure which should not adversely effect stability.
5. October data does not exist for chlorinator tempera tures, lime charging or chlorine quality. One reserve
- sample of biphenyl was checked and found to be normal. Process key variables are now being recorded with the exception of raw materials. Key variables which could effect stability include the following:
DSW 310167 STLCOPCB4070154
91370:4286 (2) AR0CL0R QUALITY DEPARTMENT 246
*
Page 4 4/30/71 WGK
II. WORK DONE AND RESULTS
B. Operating Conditions (Continued)
. 5. (Cont'd)
a. Methylbiphenyl in biphenyl
b. Sulfates and organics in chlorine
c. Chlorination temperature
T'
d. # ferric chloride in #9 chlorinator (last in series)
e. Distillation pressure
-
f. Amount of lime added to distillation
g. Still level.
Other than raw material quality, all of the key .variables related to stability are within control limits.
6. During December, 1970, production recycled sample bottles for almost all of the month. Reserve samples, from the first part of the year were emptied, rinsed and reused. The TCC's for the month of December averaged almost as high (0.24) as in November and
January (0.28, 0.29). This is evidence that sample bottles are not the problem.
C. Precision of TCC Measurement
_
s
'
`'
Jim Gloeckner with the cooperation of the control lab has completed a statistical analysis of the normal precision of the TCC measurement in the WGK lab and a check of reserve samples from before and after October. The check of reserve samples showed the lab could duplicate results. The pre cision check on sampling and analysis showed the precision of the total test to be + 0.03 ppm at two standard devia tions with sampling not Eeing significant. Samples will be sent to Anniston to include a comparison between the two control labs.
III. CONCLUSIONS
'.
A. No documented change in Dept. 246 operations occurred during the period of the stability change.
qS\N 310168
STLCOPCB4070155
91370:4286 (2) AR0CL0R QUALITY DEPARTMENT 246
Page 5
4/50/71 WGK
III. CONCLUSIONS
'
B. Additional chlorine mist eliminator capacity is not needed.
C. The laboratory has shown that normal variability does not explain the differences in TCC's from before and after October, 1970.
,
D. Analytical tests' on reserve samples have shown the lab able to reproduce both high and low TCC's.
IV. FUTURE WORK
A. Analyze chlorine for assay, sulfates, organics and moisture. Develop methods where necessary.
B. Analyze biphenyl for methylbiphenyl and napthalene.