Document pmE6vE50bm0eYyM7Y1w9rgGew

CONTRACTORS' RESPONSIBILITIES FOR SAFETY, PLANT SECURITY, AND TRAFFIC REGULATIONS BAYTOWN REFINERY APRIL 1, 1978 Table of Contents - Continued Section 10 General Regulation! .................................................................................... ....................... Authorization te Start Work ............................................................................................ Contractor's Equipment .......................................... Explosives ............................................... .................... .......................................... Dee of linaa, Conduits, or Structures as Supports ........... ..................... Use of Stanchions or Equipment for Anchors .......................................................... Damage to Owner's Property ............................................................................................ Operating Owner's Equipment .......................................................................................... Use of special Vehicles ................................................ .............................................. .. Tirt Extinguishers ............................... Welding ........................................................................................................ Securing of Temporary lulldings ............................................. .................... .. Exit fron the Flene .................................................,............................ .................. ... Noa-Engllsh-Speaklng Personnel .................. Hurricane Precautions ...................................................................................................... Contractor Accident Reporting .......................................... Emergency Evacuation Procedure .................................... ............................................. Contractor Safety Heatings .................................................. Page 10-1 10-1 lo-l 10-1 10-1 10-1 10-1 10-2 10-2 10-2 10-2 10-3 10-3 10-3 10-3 10-3 10-4 10-4 Foreword SAFETY POLICY GENERAL Safety is an integral pari of the planning and execution of every |ob. It is the hallmark of effi cient operations. An interested management, a knowledgeable and responsible supervisory staff, and a conscientious, well-trained work force, all concerned with the elimination of accidents in the overall performance of our work, will combine to make our organization safe and affective. Exxon Managemeni recognizes its responsibility for healthful and safe working conditions and', through its technical and supervisory personnel and through various committee assignments, strives to provide those conditions. TTiis is ac complished through safe working rules based on experience, safety knowledge, and competent work direction Each employee has a personal responsibility for his own safety and for the safety of his fellow employees. He is expected to exercise good judg ment, property use and maintain the tools pro vided, adhere to the established working rules, -and follow the directions of well-grounded supervision. Information on the application of safety rules and procedures is available in this Safety' Manual, Exxon Engineering Standards, and various Pro cess and Mechanical manuals. Technical help in the application of safety principles and safety equipment to specific situations is available through the Safety Coordinator, Industrial Hygienists, the Technical Division, and the Safe Operations Committee. 1 The safety rule* contained in this manual apply to all employees of Exxon Company, U.S.A. and all contractor employers working in the Baytown Refinery, These rules specify minimum safety requirement! that matt be followed. Willful or negligent violation of any of these safety rules may result in disciplinary action, including dis charge without notice or in the cate of contractor, cancellation of the contract. Overlapping Permits Work permit procedures are established to pro mote effective communications and to insure that work is performed in a safe environment. Slice the permit is issued for the job, only one work permit should be in effect for one job In one area at one time. When more than one work group is involved on the same job in the same area, the "One Work Permit Rule" may lead to some con fusion. Therefore, the Chief Operator will deter mine which of the two following alternatives is better for controlling the work in his area. 1. Issue one work permit for the job and have each Maintenance Supervisor who will perform work on the job sign the permit. The last work group to finish or the last Maintenance Supervisor to sign must turn in rhe work permit. 2. Issue a permit for the work each work group is to perform; but in absolutely no instance, must the permits con flictfie., work on one permit mak ing work by another permit unsafe). For example, a permit to perform hot work and a permit to perform opening and blinding work. PROCEDURE FOR DEVIATING FROM THIS SAFETY MANUAL IN SPECIAL SITUATIONS Where special conditions Or situations exist that make the requirements stipulated in this manual impractical to follow on a routine basis, an altcr- 2 MM procedure may be developed. Thii alterna tive must be written, reviewed with the Safety Coordinator and approve] obtained from the Pro cess and/or Mechanical Superintendent before implementing. The approved alternate procedure must be filed in the Unit Area Section of the Pro cess Unit Instructions Manual and/or the Mechanteal Safety Notebook. PPOCEPUPK POP MAKING CHANGES TO THIS SAFETY MANUAL It is the prerogative of Management to set aside any of these roles However, before doing so, the approval of the Superintendent in charge must be obtained and tht situation discussed with the Safety Coordinatorand with tht ContractAdmin istrator in cast of contractors. The Refinery Safety Coordinator is responsible for keeping mis Safety Manual up to date, and he should be notified of desired additions or revi sions. He will arrange for the preparation of addi tions or changes and obtain Management ap proval before inclusion into the Safety Manual. 3 Section 1 GENERAL DEFINITIONS FOR SAFETY MANUAL PERSONS 1. Chief Operator -- The Process person who is responsible for Process operations in s processing area and has the authority to supervise Process personnel and issue work permits. 2. Contract Administrator -- The Exxon Mechan ical or Process supervisor assigned by the owner to assure that the contractor adheres to the plans, specifications, and Refinery safety rules. 9. Contractor -- The firm under contraet M Exxon Comfmy, U.S.A. in perforin upril at the Baytmm Refmcry The term the deludes ltu>se firms employed as subcontractors by the prime cnn/msi'Mi. e. Department Head -- The person in charge of a Process department, i.e., Fuels, Specialties, Oil Movements, Utilitiesand Environmental Control, or Baytown Fuels Expansion. 6. Maintenance Supervisor -- The Meehanleal --person, either Exxon or contractor, who has the authority to Supervise the Mechanical work crew and is responsible for their work execution. 6. Mechanical Personnel or Person -- Any of the Mechanical work crew (Supervisor, Craftsman, Trainee), either Exxon or contreetor. performing work in the Refinery. 7. Owner-- Exxon Company. U.S.A,, Baytown Refinery. i-i Operating Supervisor -- The second-line supervisor in Process and the immediate super visor of the Chief Operators. 9. Proceei Personnel orPenon -- Any of the Pro cess work crew (Chief Operator, Process Techni cian, or Process Technician Trainee) who has job responsibility for the assigned processing area. 10. Designated Representative -- An Exxon Pro cess Person, if designated by Chief Operator, or an Exxon Mechanical Person tf designated by Maintenance Supervisor. 11. Standby -- The person designated by the Chief Operator and.or the maintenance super visor to warn persons of hazardous or emergency conditions that could affect their safety. PLACES 1. Enclosed Space -- Any space that can be closed or has restricted entry or exii, such as ves sels, tanks, boilers, furnaces, etc. Also included are confined spaces, such as pits, sewars. excava tions, where the heads of personnel working rs below the top of the confined space. 2. Processing Area -- Any area under the juris diction of Process personnel 3. Refinery -- The manufacturing facilities of Exxon Company, U.5.A. located in Baytown, Texas. ACTivmes - CONDITIONS 1. Cold Work -- Any mechanical work that does not involve hot work or opening, blinding and entering processing equipment. 2. Hot Work -- Any work requiring the use of burning or welding anti brazing equipment, ex plosives, open fires, portable grinders, unat tended internal combustion engines, concrete 1-2 busters, soldering irons, nonexplosionproof electric motors (Including motor chipper*, drills, nd saws), nonexplosionproof floor or string lights, sandblasting, explosion actuated tools, electric hot plates, or any other flame- or sparkprodudrtg equipment. 3. Hot Tap -- Any connection made to a pipeline or other equipment that is under pressure or has not been cleared and prepared for tapping using conventional construction methods. 4. Opening -- Exposing the interior of any pro cessing equipment, including piping, to the at mosphere. Tnis includes removing covers, break ing flanges, pulling plugs, etc. It does not include draining or venting through a valve. S- Blinding -- Installing temporary slip blinds into piping or blind flanges onto equipment for the purpose of isolating or dosing processing equipment. 6. Flammable Material -- Any material that will ignite and continue to bum in air 1, Explosive Mixture -- Any mixture of gas or vapor that will ignite (explode) when exposed to a source of ignition. Hoi work or entry must not be permitted if tests indicate that the atmo sphere contains greater than five percent of the lower explosive concentration of the combusti ble marerial (five percent of lower explosive limit). 6, Oxygen Deficiency--Any atmosphere that has oxygen concentration of less than 19.5 per cent. 9. Toxic Materials -- Any substance (otherthan a radioactive substance) that has the capacity to produce personal injury or illness to man through ingestion, inhalation, or absorption through any body surface. U test for toxic vapors shows a 1-3 concentration greater than 10 percent of the published eight-hour limit for the substance, entry without protective equipment must nut be permitted. 10. Must and May -- "Must" is used in the man ual to Indicate mandatory compliance. "May" is used to Indicate that good judgment shall be exer cised. Section 2 SAFETY RULES PURPOSE The purpose of these personnel, equipment, and traffic* safety rules Is to specify minimum safety requirements that must be followed to prevent injury or death to persons and damage to proper ty. These rules in their entirety apply to all per sons. including Ihr contractor employee* working in Exxon Company, U.S.A.'s Baytown Refinery. Additional requiremritlf for contractors and llicir rnplayers are stioron in italic type throughout the manual DEFINITIONS Definitions of terms used throughout this manual will he found in Section 1. Special definitions that apply to a specific permit or work procedure are in the applicable section of this manual RESPONSIBILITIES 1. Supervisors are responsible for the health and safety of the people under their work di rection. They must: a- Set a good example. t. Provide adequate instruction in and require compliance with (1) Accident prevention aspects of each job. (2) Use and application of appropriate pro tective clothing, equipment, and devices. (3) Use or application of tools and equip ment- c- Cooperate with others where the safety as pects of a job require coordinating the efforts of one or more work groups. This includes, but is not limited to, the securing and/or issuing of a yellow PERMIT TO ENTER, green HOT WORK PERMIT, white OPENING AND/OR BUND ING PERMIT, blue COLD WORK PERMTT, or ELECTRICAL LOCKOUT PROCEDURES. d. Develop a safe work plan for the job to be done and see that the plan is well understood and followed, Require additional accident prevention measures, other than those contained in this safety manual, if, in any supervisor's opinion, they are necessary. In instances or situations not specifically covered herein, it is expected that tney wilt be handled within the guidelines contained in this manual. Safety is not to be sacrificed for production. 2. Individuals, Exxon and contractor, working in the Baytown Refinery arc responsible for their own aafey and for the safety of other workers and for reporting injuries to themselves or others to their appropriate supervisor. Each person must assure himself dial his work situation is safe and that he has adequate instructions, proper tools, and proper protective clothing and equipment. He must also make sure that necessary work permits have been obtained and are valid over the term of his shirt. As a minimum, each person must adhere to the following safety regulations: a. Clothing and Protective Equipment (1) Clothing contaminated with oil, hazard ous liquids, or chemicals must not be worn. If a person is inadvertently sprayed or con tacted by oils, hazardous liquid, or chemicals, the doming must be removed as quickly as practical, the affected parts washed with soap and water, and the situation reported to the mipetvisorsnd to the Exxon luperaaor in charge or Contract Administrator m case of contractor'. (2) Protective clothing that fully covers the s.t ' 2 -2 V 1 \ .' J i I V V i body (arms, legs, shoulders, feel, etc.) must be worn in work areas. This indudes long sleeves unless wearing long sleeves creates a greater hazard than not wearing them -- such as Machinists around routing equip ment or Linemen working on overhead elec trical lines on poles. The wearing of canvastype shoes, thongs, and similar type foot wear in work areas is prohibited, Exceptions must be approved by the Department Head after consultation with the Safety Coor dinator. (3) Loose clothing, loose sleeves, neckties, or gloves must not be worn where there is a probability o( their being caught in moving machinery, (*) 5af*ty hats and safety glasses must be worn in all areas of the Refinery except at certain locations specified by the Department Head after consultation with the Safety Coordinator. EXCEPTION: Welders need not wear safety hats while welding. (5) Conun lenses must not be worn inside the Refinery. Employees with unusual visual problems requiring the wearing of contact lenses must use appropriate eye protection as recommended by a medical doctor depend ing on occupational exposure. (For Exxon employees, the Medical Department will rec ommend appropriate eye protection.) (6) Goggles and/or safety glasaes with side shields must be worn in those areas where the possibility of flying objects exists. (7) Chemical goggles must be worn in those areas where exposure to chemicals or liquid hazards exist. (B) Respiratory protection must be worn 2-3 where the atmosphere of the work arsa is contaminated by hazardous dust, toxicgases, excess vapors or fumes, or where an oxygen deficiency exists (for example, a vessel blan keted with nitrogen). (B) Special protective clothing for the par ticular hazard must be worn where there is i possibility of exposure to add. caustic, or other hazardous material. (10) Blight-colored vests or equivalent highly visible attire must be worn by mem bers of survey parties when working on or adjacent roads. (11) Safety belts attached to an indepen dently supported line must be worn: (a) When working from scaffolds, plat forms, nr any other surfices that may not afford sufficient protection against falling (b) While working on any roof with a lope greater than one on four. (e) When working within six feet of the edge of any roof, (d) Where an oxygen deficiency exists or where the surrounding atmosphere is im mediately hazardous to life. (12) Approved ear protection such as ear plugs, disposable plugs, Swedish wool (coiton is unacceptable), or ear muffs must be worn when working in areas designated with warning signs as "high noise area." Ear pro tection is required when using tools marked "caution-hearing protection required when using this tool" and in areas where equip ment or tools generate sufficient noise to make normal conversation difficult. 2-4 ; b. Entering Processing Area a. Guarding No person shall enter a processing area (includ (t) Temporary openings in floors, handrails, ing firewalls of operating tanks) without the etc., must be guarded to prevent falling, Re permission of the Chief Operator or his desig store permanent handrails and guardrails nated representative, Chief Operator permis immediately after need for opening has en sion is also required when motorized equip ded. ment Initially enters a closed processing area (radio or telephone approval by dispatcher is acceptable). No further permission is required as long as mechanical work is continuous. Once (2) Open excavation* or manholes must be guarded or covered before leaving the |ob and during the job if practical, work is interrupted, such as for lunch break-, (3) Areas into whjch materials or tools are to permission must again be obtained. Vehicleentering these areas may be required to have sparkproof mufflers or their equivalent as re be deliberately dropped or thrown must be guarded nr protected quired bv the Chief Operator nr tin' Owl nit i Arii>i'mitlrnh<r in llir ow of iwifw/i'r ivlin'lo I. Housekeeping (1) Aisles, passageways, aiijrs, platform*, and ladders mu-; be kept clear of all unneces c. Working Ovor or hear Water sary obstructions, The U.S. Coast Guard approved life preservers (2) Protruding nail* that present a snag or must bo worn when working on barges or di rectly over water, such as under the docks, from a boat, above pits, etc. puncture hazard must be removed or bent down (3) Worksite must be kept dean and orderly. d. Working On or Over Machinery (1) Do not work on moving machinery or above open operating machinery unless it i impractical to shut down the equipment. In such instances, secure Maintenance Super visor's and 'or Chief Operator's approval and take necessary precautions before proceed ing, (4) Debris (including mud from wheels) that falls from transporting vehicles must be picked up. g, Smoking and Matches Smoking in the Refinery except at approved location,- I* prohibited,' "Strike-anywhere" matches must not be brought into the Refinery. (2) Do not start up machinery unless all guards are in place. EXCEPTION: In temporary situations where guards must be removed to make running adjustments, secure Maintenance Super visor's and/or Chief Operator's approval be fore proceeding. h. Hand and Power Tools -- Portable Machinery (1) Defective tools must not be used. (2) Tool* must not be subject to undue stress or used for purposes for which they are not designed. Makeshift tools must not be used. 2-5 2-6 W i o (4) Loadi nupcnded from mobile equip ment must be secured to prevent (winging (nd the hoisting operator must remain at the controls. (B) Guy lines, mooring lines, or lead lines mud not be placed in such a position that they will tighten against operating equip ment, pipelines, tanks, or machinery. (6) Inflating awiveia must be used on all bosun chairs of baskets when supporting a welder. o, Hazerdous Materials (1) Note locations of eyewash fountains and safety showers and know how they work. (2) Labeled containers must be used for handling hazardous materials. (3) Dismantled or relocated equipment that has been in "hazardous material" service must be identified by tagging or other physi cal marking. (4) Solvents for cleaning purposes must be verso), or other approved materials. (9) High boiling point materials (above 700*F) from catalytic cracking operations or other highly aromatic or toxic materials are hazardous and precautions must be taken to prevent breathing of vapor or contacting the skin. If these oils do come in contact with the skin, they must be washed off promptly with soap and water. (5) Appropriate Process Unit Instructions (PUD or Mechanical Operating Practices (MOP) must be followed when working in areas where toxic materials are present. 2-11 p. Compmand Air --Yard Syetem (1) Compressed yard air must not be used tn dean clothing or personnel except at outlets (hat are especially equipped to permit a max imum pressure of 30 psl. (2) Compressed air must not be used to open plugged sewers. (3) Compressed yard air must not be used for breathing purposes. q. Warning Signs Caution and warning signs must be obeyed including use of specified protective or safety equipment. r. Compreaaod Gat CyMndera -- Transpor tation, Storage, and Daa Observe the following in the transportation, storage, and use of compressed gss cylinders: (1) Protective caps must be in place when cylinders not in use. (S) Full cylinders (except chlorine) must be stored and transported in vertical position with caps on. Chlorine cylinders must be transported in the horizontal position. Sepa rate oxygen cylinders In Storage from fuel gas cylinders or combustible materials (espedaily oil or grease), a minimum distance of 20 feet or by a noncombustible barrier at least five feet nigh, having a fire-resistance rating of at least one-hslf hour. (3) Holden, chains, or keepers must be used to prevent overturning. (4) Empty cylinders, except acetylene, may be stored and transported in a horizontal po sition. Acetylene cylinders must be vertical at all times. 2-12 (5) Cylinder* in a vertical position must be eeaired with a writable keeper while con nected to equipment. (8) Pun oxygen and chlorine must not be allowed to contact hydrocarbons in any form. (7) Rough handling of cylinder* must be avoided. () Oxygen or acetylene must not be used for testing purposes. (9) Hazardous'compressed gases must not be released into enclosed spaces. (10) Compressed bottled gases must not be used to clean clothing or personnel. (11) Oxygen or acetylene cylinders must not be taken into enclosed spaces except into storage tanks where door sheet has been re moved. (12) Repair of leaking compressed gas cylinders must not be attempted. If cylinder car be moved, move to a safe location and allow to depressure itself. If it cannot be moved safety, clear area and allow the cylin der to depressure. If the cylinder is chlorine, evacuate the area and initiate procedure out lined in MOP-C4 If leak inroftws contractor cylinder$, the Contract Administrator must be immediately notified. t, Fire Prevention -- Fire Fighting (1) No one shall go to the scene of a fire unless directly involved or assigned to firefighting activities. Others not having operat ing duties shall evacuate the fire area. Con tractor employees must proceed to a prearranged assembly area. 2-13 (2) Fire-fighting equipment access must not be blocked by traffic or other equipment. (9) Electrical fires muat not be fought with a solid stream of water. Water fog may be applied to an electrical fire only by an Exxon fire fighter. L Working In the Vicinity of Electric Uns When it is necessary to operate cranes or der ricks or perform other work within 10 feel of open electric lines (measured radially), the Maintenance Supervisor mu si consult the Utilities Chief Operator or the Contract Adnttniy trator in the i(/->' o) contractor nvrt to determine whether the electric lines can be deenergized. No work can proceed until the electric lines have been deenergized or until guards have been installed. Install approved guards when it is necessary to install guy lines across any elec tric lines to prevent guy lines from coming in contact with the electric lines. All work on open electric lines must he done in accordance with Mechanical Safety Procedure No. 8. u. Refueling Vehicle* end Equipment Dispensing gasoline and fuel must be done through a pump and hose. 11 not possible ap proved (underwriters laboratory or Factor Manual approved container for flammable liq uid) safety cans with flexible spouts must be used. Vehicles and equipment engines must be turned off during rehieling. v. Potable Water Drink water only from potable water outlets or from authorized containers or drinking foun tains. 2-14 m. Asbettoe Cement Roof When installing ot working on an wbestos cement roof, workers must use a spreader board or roofer ladder to diltTibute their wright over a minimum of two purlins. TRAFFIC SAFETY REGULATIONS Unless covered by a specific regulation in this Safety Manual, traffics regulations for safe driv ing inside the Refinery are the same as the regu lations of the State-of Texas Motor Vehicle Laws, 1. Equipment end Identification Required on Motor Vehicles All motor vehicles in the Refinery must be in safe operating condition, When entering the Refinery, all non-company vehicles must display a valid state inspection (ticker on the windshield. As a minimum, the following equipment must be in proper working condition for the vehicle to be consid ered safe (a) brakes; (b) ligh ts--two headlights, tail lights, brake lights; (c) hom; (d) muf fler; (e) safety glass; (f) windshield wiper and tear-view minor; and (g) turn signals. Vehicles having dual wheels must be equipped with suit able flaps on each dual wheel so that objects will not be ejected past the flips to the rear when the vehicle Is in motion. Contractors' self-propelled, rubber- tired equipment must have eon tractor's nameor insignia prominently displayed an both sides of the vrhirle. 2. Driver'* License Persons operating motor vehicles in the Refinery must have a valid operator's (automobile) license as a minimum. 3. Warning Flags Red flags must be used on arty load that extends beyond the front, side, or rear of any vehicle. 2-1S 4. Traffic Signs All traffic signs and signals, whether fried or portable, mustbe obeyed; and drivers must coop erate with owner's security officers and other? appointed to direct traffic. 5. "Road Cloaad" Sign* Areas blocked by traffic barriers and/or "road doeed" signs are dosed to all traffic. Follow pro cedure specified in PUI-S5 for blocking Refinery streets 6. Speed Limit All vehides must be operated within the Refin ery's maximum speed limit of 30 miles per hour, unless a lower speed is posted. 7. Driving anti Parking Vehicles must be driven on the right side of the street and parked on the right side of the street, except when parking in designated parking areas or when directed otherwise by traffic signs at during emergende*. Vehides must not be parked on streets or roadways in such a manner as to slow down, hinder, or interfere with the free flow of traffic. Vehides must not be parked so as to block or interfere with the use of tire hydrants or fire equipment. . RIgM-ot-Way Ail motor vehicles mutt give the right-of-way to pedestrians, ambulances, fire-fighting equip ment and firamen (who wiB be idaitified by driv ing with lights on and hom sounding), and bi'cydes. Vehicles must puD to one sideand be brought to a complete atop when approached from any direction try an aoibulance or fire equipment and firemen. Ordinary driving courtesy must be prac ticed by all drivers of motor vehicles. 2-1S 9. Passengers "V. a.Pasaengen muat be limited to a reasonable 12. Windshield or Window Obstruction number so that vehicles will not be over Vehicles hiving nontransparent materials that in crowded. terfere with clear visibility through any side win b. Driven of motor vehicles must not permit passengers to ride on fenders, running boards, lops, or bumpers of motor vehicles. Passengers dow or windshield must not be operated in the Refinery. All vehicles must be equipped with ad equate rear-view devices. must keep all parts of their bodies inside the ear or body of vehicles and must be seated while vehicle is in motion. 13. Failure To Comply With Regulations Any person may have his in-plant driving privileges canceled or be Subject to disciplinary c. Drivers of mobile equipment must not permit action, or both, for failure to comply with these passengers unless special accommodations traffic regulations or for the improper use of his nave been provided. vehicle. d. Passengers must not get on or off a vehicle while it is in motion. 10. Vehicles Prohibited Motor bicycles or motorcycles are not permitted inside the Refinery except to and from the desig nated "motorcycle only" parking areas provided near gates. Campers and recreational vehicles arc not peimitted in the Refinery if loaded with gear or il they are otherwise difficult to inspect Pressurized fuel containers shall be disconnected from refrigerators, stoves, etc., when a camper or recreational vehicle is in the Refinery. It. Vehicle Entry into Processing Areas Vehicles must not enter processing areas, includ ing tank firewalls, without the permission of the Chief Operator or his dsignated representative. EXCEPTION: Roadways through processing areas where entry is not prohibited by a sign or barrier may be used without permission of the Chief Operator. 2-17 2-18 l I Section 3 CONTRACTOR'S SAFETY RESPONSIBILITIES PURPOSE Till1 purpose of tht personnel and equipment safety regulations contained in ilia section is to set out safety requirements for rmtfrormrj, which are in addition to those contained in oilier sections of this manual. Each contractor must take any additional precautions neces sary or proper under the circumstances to (invent htjury or death to persons (tr damofte to properry SPECIAL DEFINITIONS 1. Owner - For purpose; of these safety reputations, "miner" shall mean Exxon Company, U.S.A. ta divi sion of Exxon Corporation!. 2. Contract Administrator - The person assignt-d by the owner to assure contractor adherence to the contract prm'isions. 3. Contractor - The fmn Ihai lias been contrack'd by the Exxon Cumjxiiiy, US A. to perform work at tlie Baytmen Refinery. The terni also includes those linns employed as sktifraitwhir; to the prime contraeler. a.Maintenance Supervisor - The Mechanical /nr-- son, cither Exxon or eon/raeior, who has the authority to supervise the Mechanical work crew and the respon sibility for their uvrk execution. As used ui this scelion. the Maintenance Suprnuh'r refers specifically to the contractor first line supemser. RESPONSIBILITIES 1. Contractor, as an indcpmdmt contractor, is re sponsible for fierfunnmg uwrk under the contract in a healthful and safe manner mcludini protecting the safety and welfare iif other contractors and the owner's (icrsonnel and equipment. These regulations arc to hi' ronfiA'red as an addition to any safety rules or regu lations of the contractor. Neither compliance with Ihe 3-1 regulations by contractor nor owner's approval ofany actions or procedures of contractor os provided therm shall refine contractor of its oWifatiorr always it use due cert m performing work. a. The contractor ta responsible for informing his employees of tht required safety rules and that the employees adhere to said rules. I). The prime contractor is responsible far assuring compliance with these regulations by all subcon trac tors and their employees. Contractor must notify its employees, its suecontraciors. end the employees of its subcontractor} of that precisions of Ihe regu lations and shall secure complionce therewith by all such parties; and contractor must not allow any of such persons to begin work inside the Baytoum Refinery until such notification has hem given them. C, Contractor must observe and comply with the Texas Occupational Safety Act (Article SlS2a, V.C.S.I and wilh all safety and health standards promulgated by the Secretary of Labor under Section 107 of Ihe Contract Work Hours and Standards Acl, published in 29 CFR Part 1926 and adopted by the Secretary of Labor as occupational safety and health standards under the Wilhams-Steigrr Occupational Safety and Health Act of 1970, and to any other legislation enacted for the safely and health ef con tractor employees. Such safety and health standards apply to all subcontractors and their employees as well as to the contractor and its employees, d. Nothing contained in these regulations shall be interpreted to enlarge Ihe legal duty of Ihe owner to the contractor, his agents, employees, nrsubcm trac tors, 2. Maintenance Supervisor? are responsible for Ihe safe conduct of their jabs and for the safety of ihe persons under their direction. Specific supervisory re sponsibilities are contained in Section 1-2 of this man ual. Each Maintenance Supervisor is responsible for assuring that each individual under hr; direction un- 3-2 derstands and adheres to the safety rules cmlainat in Section I-2 if this manual. 3. Individual person Joins work in Ihe Refinery must assure himself thalthc uionsituation is safe and that he has the proper instructions, tools, and proieelwc equipment. Each person must become familiar with and adhere to the safety rules contained in Section ] 2 ofthis manual. 4. Contract Administrator will monitor the contrac tor's performance ffl assure safe execution of the uxirt specified m /lie contract. He will, on proper request. assist the Contractor in dealing with other owner perstmnel to obtain safety permits and In implement other safety related procedures. He will insure llial all con tractor's Maintenance Supervisors are pro/wrly indoetrinated in the relevant safely regulations. PROCEDURES 1. Work Execution All u<ork in pnKessing areas must he performed with the approval of the Chief Qirerntur responsible for the area. The Maintenance Sii/Kri'isor must coordinate Ins u>M through the Chief Operator and must Ivfji him in(onned as to the number, location, and aethhtief of contract personnel. Any work performed afhr normal working hours and c'/i weekends and holidays requires authonwhon by Ihe awner, Such authorisation toil] h> ohlamed hy the Contract Administrator. 2. Required Work Permits end Procedures Before b<#inrim# airy work in processing areas, an ap propriate permit must he obtained from Ihe Chief Operator or his designated representative. Required work permits and procedures arc e. Electrical Lockout Procedures - Section 4. b. Hot Work Permits - Section 5. C, Permit to Enter Enclosed Spaces - Section 6. 3-3 <1. Opening or Blinding Permit - Section 7 e. Cold Work Permit - Srciion 8, Other work procedures may be specified in specialized work situations such as hot tap procedure, procedurefor cleaning tanks, etc. 3. Oil end Chemical Split* Any hydrocarbon or chemical spill, whether accidental or otherwise, must be reported to Ihe Chief Operator and Ihe Contract Administrator. 4. Connection* into Owner'* Utilities Syetems Permission must he obtained from Contract Adminis trator pimr to connecting into owner's utility system such as, but not limited to, water, air, nitrogn, and Steam system*. Each connection Shall be guarded by a dieckvalve. When taking water from fire hydrants, the center nah'r mutl If opened completely. 5. Contractor s Equipment t.All equipment brought into the Refinery by contractors must be iii safe operating condition. Au thorized owner /vrsonnrl may at any time inspect contractor's equipment. Such inspection or failure lt> inspect does mil rchnv the contractor of its respon sibilities for llir safe cornlrtien of its equipment I. b. Equipment must be operated only by properly licensed persons. C. Load limits for the Son laeinto Street overpa*s are a maximum axle load Of 32,000 pounds and a maximum gross had of 72,000 pounds. A tandem axle load vehicle will be nmjidrred as being a single axle. 6. Working Over or Near Water . Ring Buoys until at least 90 feel of finr muSf h' readily anatlaMe for rescue operations. Distance be tween ring buoys must not exertd 200 fivi. b. A life savin# skiff must h immedialely'arainble 3-4 kI ) at locations where persons an working over or adja cent water. 7. Wofc Involving Ua* of Ionising Radiation Contractors mast net perform any work involving the use of ionizing radiation without notification to the Exxon Supervisor in charge or the Contract Adminis trator. A COLD WORK PERMIT must be obtained if radio isotopes are used, a HOT WORK PERMIT it required ifan Industrial Xray Unit is used to perform this type work in processing amts. Contractors must comply with "Teros Regulations for Control of Radia tion," latest edition, Texas Stale Department ofHealth. Division of Occupational Health and Radiation Con trol, Austin, Texas, together with all future amend ments, additions, and revisions to said regulations and standards. Owner reserves the right to conduct inde pendent and unannounced radiation enentrgy surveys of contractor's equipment and their uses an owner's premises. 3-5 -s\ ; Section 4 electrical lockout PROCEDURES ELECTRICAL CIRCUITS AND ELECTRICALLY POWERED EQUIPMENT PURPOSE The purpose of these procedure* is to protect anyone who works on either electrical circuits or electrically powered equipment from injury or death. SPECIAL DEFINITIONS Electrical circuits and electrically powered equipment do not include U) lighting circuits for the purpose of relamping. (2) circuits of less than 100 volts, or (3) circuits that must remain ener gized. For circuits that must remain energized, a blue COLD WORK PERMIT may be required (see section 6). RESPONSIBILITIES 1. Process person is responsible for isolating and preparing the equipment to assure it is in sale condition for mechanical work. 2. Person performing work is responsible for as suring himself that the equipment is safe for him io do his prescribed work, and that he has tagged and locked out the equipment in accordance with the electrical lockout procedures. 3. Contractor Administrator rr the nmfrartir'scuutact i/>ifli Process fiersmnel /nr /irr/nrrnmy iitir/t wirier Ihr electrical lockout /irtk'idiiri1. PROCEDURE 1, Lockout Procedures -- Before anyone works on electrical circuits or electrically powered equipment where they could be endangered, the ao electrical supply must be turned off and locked out in accordance with the following procedures: a. Shut Equipment Down -- The Process xrson must shut the equipment down at the I xal start-stop switch or local "Hand-Off-Auto" switch. In case there are remote start-stop switches on this equipment, he must notify other operating personnel responsible for oper ating the remote start-stop switches and re quest that a white DO NOT OPERATE tag be placed on the start-slop switches. If the scanstop switch is located on a control panel, than it must be covered with a section of DO NOT OPERATE pressure-sensitive cape. b. Lock and Tag Disconnect Switch--The Pro cess person must turn the disconnect switch to the off position, lock it with a Process lock, and tag it with the white DO NOT OPERATE tag. If a Process or another person is to work on the equipment, the Process person must use a mul tiple lockout adapter. The Process operations lock must be in the position closest to the switch. All Process locks will be identical, and the same key will unlock ill of them. C. Check Disconnect and Tag -- The Process person must try the local pushbutton station to be sure the correct disconnect switch is locked out. When the local control station is a "Hand-Off-Auto" selector switch the process person must lock the switch in the "Off' posi tion. He must then tag the pushbutton or selec tor switch with a while DO NOT OPERATE tag. d. Enter in Log -- The Process person must enter the "lockout" in the Process log book. e. Apply Mechanical Lock -- Before mechani cal work is performed on equipment, a mechan ical lock must be applied by the person perform ing the work. 4-2 (1) Mechanical Person -- Etch Mechanical person who works on the equipment must tint add his own lock and a ted DO NOT OPERATE ag on which he will write his name, skill, and the date. H is the responsibil ity of each person working on the equipment to assure his own safety by keeping nis tag and individual lock on me disconnect switch while he works on the equipment. If two or more people in the same craft are working together on the equipment, only one mechanical lock and red DO NOT OPERATE tag are required- Ifa cmtractoremployee if doinp Ihe uert, he must use m Exxon mechanical-type loci and ihe appropriate electrical lockout proce dures tag obtained from the Contract Adminis trator. fie must write on the lag his name and Ihe name of the contractor firm. (2| Process Person -- When a Process person is to perform work on the equipment, he must obtain his individual mechanical-type lock and key from the supply in the control room or center and then follow the above procedures in eft). f. Remove Lock and Tag -- Locks and DO NOT OPERATE tags must be removed is follows: (1) Remove Mechanical Lock and Tag -- As each person finishes his work, he must re move hie own lock and red DO NOT OPER ATE tag. At the end of his work shift, he must remove his lock and tig whether his work is finished or not. This does not include the original Process lock or white DO NOT OP ERATE tag. (2) Remove Process Lock or Locks and Tags --The Process lock orlocks mustbe the last to be removed. When the locai control station is a "Hand-off-Auu" selector switch the lock or this selector switch must be the lest re moved. The Process person, after determin- 4-3 mg that it is safe to do so, must remove the Process lode or locks and white DO NOT OPERATE tags and must notify other operat ing personnel to remove the white DO NOT OPERATE tags or DO NOT OPERATE pressure-sensitive tape from remote startstop switches. He must then enter the lock removal in the log book. (9) Emergency Lock Removal^-If itbecomes necessary to remove a lock by other than the Mechanical person who installed it, only the Shift Superintends^ is allowed to remove it. Upon removal of the lock, the Shift Superin tendent must send a note to the Department Heads of the Process and Mechanical De partments stating whose lock was removed, where it was located, and why It was re moved. A log of the same information must be maintained in the Shift Superintend art's office, A master key for the mechanical per son's locks must be kept at the Shift Superin tendent's office only. 2. Wiring Disconnect Procedures -- for some types of work, the lockout procedure alone is not adequate. Such work includes, but is not re stricted to, the following: (1) work on fans inside cooling towers, (Z) work inside confined spaces containing electrically powered equipment such as mixers or filters or electrodes (desalters), and (3) work on equipment where the switch controls more than the one piece of equipment. In such cases, this wiring disconnect procedure must be followed: a. Lockout Equipment -- The disconnect switch must be locked out fat accordance with the electrical lockout procedure in Paragraph 4a of this section. b. Check and Disconnect Circuit -- After mak ing sure the dicult is dear by cheeking with a voltage tester, the Mechanical or Process per son must disconnect the wires and tape them together. c.Tag Circuit-- The Mechanical or Process person must tag the disconnect switch with a yellow WIRING DISCONNECTED tag. On the tag. he must note where the wiring is discon nected and musl sign and date the tag. d. Remove Lock and Red DO NOT OPERATE Tag -- After rhe wiring has been disconnected, and Uped together, the Mechanical or Process person must remove his Individual lock and red DO NOT OPERATE tag unless he must do other work on the equipment. Do not remove the yellow WIRING DISCONNECTED tag. . Wiring Reconnect--The Mechanical or Pro cess person who reconnects the wiring must place his individual lock and red DO NOT OP ERATE tag on the disconnect switch, reconnect the wiring, and then remove his luck and the red DO NOT OPERATE and yellow WIRING DISCONNECTED tags. II a contactor employee i.doing the tonrk. he must obtain /lie required lag* from the Contract Administrator and follow the shone totring dtsnnincci prnetduiw a through e. He must also include on the lag* Ihe nauie of the (oii/mcioi ' firm ~9. Abnormal Condition Procedures -- Condi tions may exist that appear normal but actually arc not. The following are examples of such abnormal conditions that require use of the pink ABNOR MAL ELECTRICAL CONDITION tag. Such ab normal conditions include but are not limited to the following: (1) temporary power to equipment; (2) inside plastic handle broken off switch so out side handle will not operate switch; (3) one pushbutton inoperative but another will operate equipment; (4) a switch is left energized but a part of the equipment supplied by it is disconnected. 4-5 (MOVs) supplied by one circuit breaker and (5) a switch is off and tagged out but a separate circuit is still supplying power to the switch housing for controls, lights, heaters, etc. Application of Pink ABNORMAL ELEC TRICAL CONDITION Tag -- Before a Me chanical Person leaves electrical equipment with temporary wiring connected or with any other abnormal condition existing, he must tag dte equipment with pink ABNORMAL ELEC TRICAL CONDmON tags; he must place one tag on the outside of the equipment and one inside on the wiring if it is practical to do so. He must describe the abnormal condition on the tags and musl sign and date them. The abnor mal condition must be entered in the tog book. If a contractor rm/'ltiyA' is doing Ihe work, he mv.<! obtain Ihe lag* from ihe Contract Administrator and proceed according ioa and h. In addition, he must also include on the lag Ihe name of the contractor'' firm. b Removal of ABNORMAL ELECTRICAL CONDITION Tags -- The tags must remain in place until the equipment has been returned to Its normal condition. The Mechanical person who removed the temporary wiring or elimi nates the abnormal condition must remove the tags and notify the Chief Operator responsible for the equipment, who must enter the action in the log book. POWER LINES PURPOSE The purpose of these procedures is to protect anyone who works on or near power Lines and on direct-connected Process equipment from injury or death. SPECIAL DEFINITIONS t. Power Lines --Those electrical lines that radiate 4-6 from generating stations and distribution substa tions. 2. Direct-Connected ProcrSl Equipment -- A piece of electrical equipment on a Process unit supplied by a single power line Hiving its electri cal oisconneet switch at an electrical substation or at a power plant. 3. Electrical Maintenance Supervisor--The Line Crew Supervisor or the Power Systems Mainte nance Supervisor or their designated representa tive. 4. Utilities Chief Operator--The Process person responsible for the operation of the power sys tem. 5. Electrical Mechanical Person -- Any line man, electrician, or Mechanical person working on the power system or on the direct-connected Process equipment. 6. Power Plant Process Person -- The Process person who operates the power plant. RESPONSIBILITIES 1. Electrical Maintenance Supervisor is respon sible for requesting that power tines be removed from service and returned to service and for de termining that the lines to be worked on are -Reenergized and tagged out. 2. Process Chief Operator or His Designated Representative is responsible for the removal and return to service of direct connected process equipment. He is also responsible for requesting the Utilities Chief Operator to deenergize the cir cuit serving the equipment and tag out. 3. Utilities Chief Operator is responsible for au thorizing the removal and return to service of the power lines to be worked on. 4. Electrical Mechanical person is responsible for assuring himself that the equipment is safe for -? him to do the prescribed work and tharthe follow ing provisions of these procedures for which he is responsible are allied out. S. power Plant Proem person is responsible for removing from service and returning to service power lines to be worked on and lor properly togpnS- PROCEDURES Procedure for Removing Power Lines or DirectConnected Process Equipment from Service. S. Request for Removal of Power Lines or Direct-Connected Process Equipment from Service: For power lines, the Electrical Mainte nance Supervisor must make his request in person to the Utilities Chief Operator. For direct-connected Process equipment, the Pro cess Chief Operator or his designated repretentative must request the Utilities Chief Op erator for removal of these particular power lines from service. If a contractor employer is to work on power lines or de electrical work cm Pntess equipment, the Contract Adminstmtor must mice the arrangement)for removing the lines from sennet and for returning them to service. b. Removal of Power Lines or DirectConnected Process Equipment from Service: The Utilities Chief Operator must make the necessary arrangements with the Power Plant Process person to remove the power lines or the direct-connected Process equipment from service. e. Check Circuit Removal before Work Be gins: For power lines, the Utilities Chief Op erator, the Electrical Maintenance Supervisor, and a representative of the group actually doing the work must personally observe that the fine has been removed from service by lowering the circuit breaker or opening the dis- 4-B connect switches at each substation and power plant involved. They trust then tag on die equipment by attaching the red POWER LINE DISCONNECT tap filed out and signed by the Utilities Chief Operator and signed by the Electrical Maintenance Supervisor on the equipment at each substation or power plant involved. If work is being done on a line by more than one group, then each group must be protected by separate red POWER LINE DISCONNECT tags. For direct connected process equipment, the Process Chief Operator or his designated rep resentative ahall notify the Utilities Chief Op erator that this equipment has been removed from service and is ready for tagging. The Utilities Chief Operator will proceed to me site of the direct connected equipment, where he will meet the Process Chiet Operator or his designated representative and a representative of the group which will actually work on the equipment. The Process Chief Operator or his designated representative will fill out and sign a red POWER LINE DISCONNECT tag and personally give Out tag to the Utilities Chief Operator, verifying the equipment is ready for tagging on. The Utilities Chief Operator will keep that tag, and along with the representa tive of the group which will actually work on the equipment ne must then proceed to the electrical substation and observe that die cir cuit serving the equipment has been removed from service by lowering the circuit breaker or opening the disconnect switches They must then tag on the appropriate circuit breaker with a red POWER LINE DISCONNECT tag filled out and signed by the Utilities Chief Operator and the representative of the group which will actually work on the equipment. After com pleting that step, they must proceed to the Power Plant ana teg on s red POWER LINE DISCONNECT teg filed ou t and signed by the Utilities Chief Operator and a representative of the group actually doing the work on the equipment to the remote switch serving the equipment. Finally, the Utilities Chie/ Open' tor and the representative of the group actually doing the work will return to the site of the direct connected process equipment and sign and teg on to the local start-stop switches the red POWER LINE DISCONNECT tig origi nally signed by the Process Chief Operator or his designated representative. After complet ing this procedure die work an begin. /n the aist of contractor personnel the contractor's Supervisor end the Centred Administrator must accompany the Utilities Chief Operator in the in spection and the Contractor's Supervisor along urith the Utilities Chief Operator must sign on the dis connect tags, Before any work is done on an open power line up to and including 13,800 volts, the line must be checked with a voltage tester and a ground chain must b* pulled across the line to assure that it is deenergized. d. Return Power Lines or Direct-Connected Process Equipment to Service: To return a power line to service, the Electrical Mainte nance Supervisor must personally report to the Utilities Chief Operator that the work has been completed and accompany the Utilities Oiief Operator to the substations and main power plants and properly teg off the power lines by signing and removing the red POWER DIS CONNECT tegs at the electrical substations and at die main power plants. The lines may 4-10 then be energised by the Power Plant Process Operator. In the case of direct connected process equip ment, the Protest Chief Operator or his desig nated representative must report to the Utilities Cnief Operator that the work has been completed. The Utilities Chief Operator and a representative of the group actually working on the equipment will proceed to the site of the equipment and personally meet with the Pro cess Chief Operator or hit designated repre sentative who will tag off the local start-stop switches by signing and removing the red POWER LINE DISCONNECT tag. He will give the tag to the Utilities Chief Operator who will also sign it. along with the representative of the group actually working on the equipment. The Utilities Chief Operator and the representative of the group actually doing the work must then proceed to the electrical substation and prop erly tag off the disconnect switches by signing and removing the red POWER LINE DIS CONNECT tags. Finally, thev must proceed to the Power Plant and tag off the remote control switch by signing and removing the red POWER LINE DISCONNECT lag from the re mote control switch. The Utilities Chief Opera tor will keep the signed tags and notify the Process Chief Operator or his designated rep resentative that the tag off procedure has been completed. In the case of Contractor personnel the Contractor's Supeniftir and the Contract Administrator must accompany the Utilities Chief OjHW/i>r in the in Sfieeliim and the Contractor's Sitih'nhsor alony with the Utilities Chief Opirator musl siyn off the illconnect lays a-n 1. Procedure for Working on or Adjacent 2,:JOOVoll Power Lines a. Tag Power Lines -- Before beginning vrork on live uninsulated 2,300-volt power lines or working adjacent to any live uninsulated power tine, the Maintenance Supervisor or his designated representative must notify the Utilities Chief Operator about the nature and location of the work to be performed. The Utilities Chief Operator musl request the appropriate Power Plant Process person to at tach a yellow CAUTION-PEOPLE WORKING ON THIS CIRCUIT tag to the switch or switches controlling the power lines. In the cafe of contractor lineman, the Cnutml Administrator must mnliicf /In' Utilities Chief Ofn-rutor. b. In Case of Circuit Trouble-- In the event of circuit trouble at the jobsite, the Mechanical Supervisor must immediately notify the Power Plant Process person, hi the cost i'f contractor Human, the Contract Administrator must cnntncl /fir Pouvr Plant Pwcsi pt-rsuui. If any switch to which a tag is attached is tripped, it must not be reclosed until the Power Plant Process person is notified that it is safe to reelosc. c. Removal of Tags -- Upon completion of the job, the Maintenance Supervisor who made the original request must notify the Power Plant Process person to remove the tags. In the case of ciHiintriiir /innrliiii, Ifu" Cmi/nu-f Adminittralormuftcoiiioi'i the PfliivrPlant Pnicesspi'wii. d-1* 'V 1 I /\ DO NOT OPERATE <1 *a, OPERATOR 4 Rad Lattaring On White Tag WIRING DISCONNECTED DO NOT OPERATE 4 Yellow Tag Rad Tag | DO NOT OPERATE JSL CAUTION Yellow Tag } oaa on TH* Circuit I Section 5 HOT WORK PERMIT PURPOSE The purpose of this permit procedure is to protect personnel end equipment from fires and/or ex plosions that could result from hot work per formed in a hazardous area. This section outlines minimum precautions for safety when perform ing hot work in any location not designated as a routine hot work area. In all such areas, a green HOT WORK PERMIT is required for all hot work. SPECIAL DEFINITIONS 1. Hot Work -- Any work requiring the use of burning, welding, or brazing equipment, explo sives, open fires, portable grinders, unattended internal combustion engines, concrete busters, soldering irons, nonexplosion proof electric motors (including motor chippcrs, drills, and saws), nonexplosionproof floor or String lights, sandblasting, explosion-actuated tools, electric hot plates, or any other flame- or sparkproducing equipment. EXCEPTION: work on energized intriniscally safe circuits, electrical instruments and electrical power circuits covered under Cold Work Permits in Section B. 2. Hot Tap -- Any connection made to a pipeline or other equipment that is under pressure or has not been cleared and prepared for tapping using conventional construction methods. RESPONSIBILITIES 1. Chief Operator is responsible for issuing the peen HOT WORK PERMIT for his equipment. He or his designated representative must desig nate boundaries within which the permit applies and must insure that all necessary safety precau- lions have been completed prior to the Chief Operator signing the permit. When hot work is to be performed on equipment passing through or adjacent one processing area, out controlled from another, die Chief Operators from both processing areas are responsible for issuing the permit. This rule applies if the hot wotk to be performed is within approximately 50 feet of operating equipment, (Example: Oil Movements tine in pipe rack adjacent a process unit.) When hot work is to be performed on equipment in a non-processing area adjacent a processing area both the Chief Operator from the adjacent processing area and the Basic Equipment Owner of the non-processing area or his authorized rep resentative are responsible for issuing the green HOT WORK PERMIT. (Example: road work adja cent a process unit.) 2. Maintenance Supervisor is primarily respon sible for seeing that only the type of work co vered by the permit is performed, and that conditions at the jobfhe are safe for the scheduled work; also that hot work is confined to the area covered by the permit. 3. Mechanical personnel performing the work are responsible for checking the green HOT WORK PERMIT to be sure it is current, valid, and prop erly signed by the Chief Operator and Mechanical Supervisor. If any of the signatures are missing, work must not begin. 4. All persons at or near the hot work site must be constantly alert for any condition that could make hot work hazardous. If such a condition develops, all hot work and machines must be stopped at once. All personnel must immediately vacate the area and notify the Chief Operator or the nearest Process person of the hazardous condition. The green HOT WORK PERMIT is no longer valid and 5-t 5-2 ) mint b* removed. All persons associated with tht work must be notified. Before work may resume, s new men HOT WORK PERMIT must be is* sued. When Mechanist personnel leave the job (such m lunch bieek), they must cheek to see that conditions hove not changed and the permit has not been removed before resuming hot work. PROCEDURES 1. Area Other than Enclosed Spaces and on Marine Docks -- Par performing hoi work in any area not designated *s safe for routine perfor mance of hoi work, the following requirements apply; a. Hot Work Planning -- The Maintenance Supervisor will advise die Chief Operator of the nature and location of the hoi work to be per formed as well as the proposed riming. Nor mally this should be done at least one day be fore hot work is scheduled to begin. b. Preparing for Hot Work --The Chief Opera tor will work with the Maintenance Supervisor to see that the area is prepared properly for hot work. The Chief Operator will see that the fol lowing work is completed: (1) Clearing and Blinding -- Check to make sure all blinding and clearing of equipment necessary for execution of hot work is com pleted. Equipment which has been removed from service for hot work and has contained flammable material or is connected to equip ment that contains flammable material must be (1) blinded inerted and vented (2) blinded and deaned or (3) disconnected and cleaned before Issuing i green hot work permit. Opening and blinding of equipment requires a white opening or bunding permit as stipu lated in Section 7. (2) Remove Flammable Material--Check to make sure that no flammable liquids or solids 3-3 are spilled ortrapped in oraround equipment at the site of the proposed hot work. (3) Prepare Scwm -- Cover all sewer catch basins and manholes in vidnity of hot work. Catch basins containing flammable material must be flushed with water before covering. Alao, check for and seal off sewer vents in the area that may present a hazard. (4) Remove Trash -- Remove other flamma ble materials such as trash, wood, or dry grass. Where hot work is to be carried out over dry grass, the area must be saturated with water before performing hot work, and a water hose left connected and readily ac cessible. (5) Provide Fire-Fighting Equipment -- Make cure that adequate fire-fighting equipment is it the jobsite. At least one fully charged (ire extinguisher of type and size designated as suitable must be provided where hot work is to be performed (B) Make Surrounding Area Safe -- Check surrounding area for possible release of flammable vapors in the not work area. Such tilings as safety valve discharges, leaks from pumps and or compressors, valve packing leaks, etc., must be identified and necessary corrective action taken. (7) Prepare for Hot Taps -- For hot taps or other jobs requiring hot work on equipment in service, all requirements of the Hot Tap Procedure Safety Standard" (Mechanical Division Safety Procedure No. 11) must be satisfied. Before the green HOT WORK PERMIT can be issued, the checklist attached to the above mentioned standard must be completed. The Chief Operator must make sure that his Operating Supervisor has ap- / ~v i, proved the work to be done and so note in the space provided on the back of the permit. Also, he must see that the Mechanical En gineering Department Inspector has checked tor adequate metal thickness and initialed the apace provided on the back side of the tag. (!) Check Other Work in Area -- the Chief erator must check for active white OPEN- aC AND/OR BLINDING PERMITS in the area of the hot work. A HOT WORK PERMIT must not be issued if work associated with existing white OPENING AND/OR BLIND ING PERMIT could create a hazard by spill or gas release All openings from which release of flammable material could occur art to be considered hazardous- The area of concern must cover the geographical limits where there is a remote possibility that sparks from hot work could come in contact with flam mable materials from any opening. If such a possibility exists in the proposed hot work area, the white OPENING AND/OR BLIND ING PERMIT must be killed. The green HOT WORK PERMIT shall not be issued until all openings from which flammable material could be released are blinded, and the area is cleared of flammable liquid or vapor. (9) Provide for Overhead Hoi Work--When hot work is to be performed in overhead lo cations, a suitable method for catching hot meul, electrode stubs, etc., must be provided where these materials would cause a fire hazard or when they would create a safety hazard when work is going on below. ft 0) Safe Location of Welding Equipment -- When electric welding is to be performed, the ground lead connection must be at tached at a point within the area covered by the permit. The welding machine must be in the same area or an adjacent area approved 5-S for nonrestricted movement of motorized equipment. (11)Perform Gas Teats ---The ChiefOperator shall perform gas tests for explosivity, oxy gen deficiency and toxic materials depend ing on the nature of the j'ob. e. Filling Out Green Card -- After completion of all items covered in b above, the Chief Opera tor must double check the hot worksite. He and the Maintenance Supervisor will determine if a Standby man or other spedal precautions are necessary. The Chief Operator or his desig nated representative will then fill out the green HOT WORK PERMIT and the checklist on the back side of the tag. d. Maintenance Supervisor Site Inspection -- The Maintenance Supervisor must also inspect die site to make sure all necessary work and checks have been completed. His signature on the green HOT WORK PERMIT indicates he checked the work area and agrees all is safe for hot work. . Chief Operator Site Inspection -- When all is considered ready by both rhr Chief Operator and Maintenance Supervisor, and the Mainte nance Supervisor has signed the permit, the Chief Operator will make a final site inspection and if all is safe lor hot work, he will sign the permit signifying that hot work can begin. t. Permit Duration and Disposition -- Before the green HOT WORK PERMIT is issued, the Chief Operator and Maintenance Supervisor must agree on the expiration time and note same in the space provided on the permit. This decision on duration as well as disposition of the permit copies must be in accordance with the following guidelines: (1) Eight-Hour Permit -- Permits to do hot 5-6 *; work in or around processing rat where flammable or trade material* exist are nor mally eight-hour permits. Such pennit is good far die shift in which it was issued It on be continued into the next mechanical shift only after the Chief Operator and Main tenance Supervisor for the new shift have inspected the site end are confident no changes have taken place. If there is any question, the Qiief Operator must make a new gtest. Hot work on the new shift must not begin until the Chief Operator and the Maintenance Supervisor have signed the audboard pardon of the green permit. They must alto sign die control center copy. If work continues into the third shift the same procedure must be followed. Eight-hour permits are void at the end of 24 hours, and a new pennit must be obtained if work is to continue. When a green HOT WORK PERMIT is issued die cardboard portion must be placed in s conspicuous location at the jobsite by the Chief Operator or his designated representa tive. The original is to be kept in the Process Permit file. At the end of the Mechanical shift or at job completion, whichever comes fast, the Mechanical Person must sign the carboard section of the permit, check appropri ate box as to job completion, and return it to the Chief Operator. Both copies must be re tained for at least 24 hours after expiration and then discarded. (2) Job Completion -- Under certain condi tions, a green HOT WORK PERMIT may be issued for the job duration. In general, It is when the job conditions at and surrounding the work area will not change and create a flammable or toc material nazard. Exam ples of such jobs ares (1) construction ofa new yr Process unit; (2) a field pipe fabrication shop in an open area; (3) construction ofa new tank in an open area; (4) during turnarounds when oil, gas, and chemical tines are blinded at the unit limits; and (5) no job completion cards can be issued inside an operating Process unit. The cardboard portion of the pennit must be placed at the Maintenance Super visor's jobsite office. The Chief Operator will keep die original on file in the Process permit file. Upon job completion, the Maintenance Supervisor must sign the cardboard section of the pennit, check appropriate box as to job completion, and return tt to the Chief Opera tor. The Operating Supervisor must approve aD job completion permits including contract jobs. fl. Hot Work Authorisation -- Only after all of the above items have been completed and green HOT WORK PERMIT has been signed by the Chief Operator and Maintenance Supervisor is hot work rathorlaed. After the QiiefOperator or his designated representative has personally hung the carboard portion of the permit in a conspicuous location at the job site, hot work can begin. 2, Marine Docks --- For performing hot work on or under Marine Docks, all provisions given in the bask procedure above shall apply. In addition, the following work shall be completed and checks made before a green HOT WORK PERMIT can be issued. Safe Tide Level -- When hot work is to be performed under a dock, the tide level must be below any pipelines at the water level to pre vent trapping oil between the pipelines, thus eliminating a possible source of combustible material. b. Avoid Falling Materials -- The hot work B-e area mutt be isolated to prevent molten metal and/or any combustible material from foiling into the water. e. Remove Crating -- Grating in the fender system must be removed in the hoi work area when work it to be performed under a dock. d. Secure Coast Guard Approval --The Docks' Operating Supervisor must secure approval of the Houston coast Guard Port Captain prior to any hot work. e. No hot work can be performed on any dock while a ship is berthed at that dock. EXCEPTION: At Dock No. 1, hot work will be permitted ISO feet or more from vessels han dling materials with a flash point of above 150F, 3. Enclosed Spaces--For performing hot work in enclosed spaces, all provisions given in the basic procedure above apply. In addition, the following work must be completed and/or checks made be fore a green HOT WORK PERMIT can be issued; a Obtain Yellow PERMIT TO ENTER -- It may be necessary to enter an enclosed space to prepare for hot work. Before entering, a yellow 'Termit to Enter" must be secured (see Section 6). Once the enclosed space has been prepared for hot work and a green "Hot Work Permit" has been issued, no yellow Permit to Enter tag is required for entering as tong as the hot work permit is valid. b. Other Requirements for Hot Work in En closed Spaces -- After entry is made into the enclosed space, applicable portions of the basic Procedure above can be completed. In addition, the following must be performed and/or checks made before a green HOT WORK PERMIT can be issued: S-9 (1)No Cylinder* In Enclosed Spaces -- Cylinders containing any type of flammable materia] must not be placed in on enclosed space where hot work is to be done. EXCEPTION; In storage tanks where door heats have been removed. (2) Thoroughly Cleon --The enclosed space, including all internals, must be thoroughly cleaned and made safe for hot work. This includes freeing the container of all flamma ble gases, liquids, and solids as well as inert atmospheres and toxic materials. (3) Provide Adequate Ventilation -- A fresh air ventilation system must be provided and shall be adequate to remove fumes and gases created by the proposed hot work. If ade quate ventilation is not possible, suitable re spiratory protection must be used. SPECIAL REQUIREMENTS 1. Work on Tank Cars -- Hot work must not be done on tank ears while located at a loading rack. 2. Venting Hollow Equipment -- Before burning into or heating any hollow vessel or equipment such as ball floats, pistons, impellers, vessels, pipes, valves, fittings, or similar equipment that has been in service of any kind, the vessel or equipment must be properly vented (unless the operation is performed under controlled condi tions so that any over-presSuring will be avoided). 3. Gas Hoses In Confined Spaces -- When gas hoses are used in connection with welding and/or burning in an enclosed space, the hoses must either (1) be removed from the enclosed space or (2) disconnected at the regulators at any tune when positive ventilation is discontinued A torch or other gas-consuming device must never be re moved from a hose while inside a confined space. When torches ire left unattended (such as lunch 5-10 period, ihift chance, etc.). Ihegaasuppty trout be poritively abut off eta point outride tneendoeed pace orthe hoaes dueonneciad at the regulators. 4, Establishment of Smoking Permits--Requires written approval by the appropriate Department Head. Procedures lor obtaining this approval are riven in the Mechanical Operating Procedures Manual (5-13) and the Process Openting Practice Manual (S-6). 5. Hoi Woric by Proceaa--When hot woric is to be performed by Process personnel the Chief Op erator will assume' the responsibilities and func tions of the Maintenance Supervisor including signing the green Hot Won Permit in space mariced Maintenance Supervisor. Groan Tog 5-11 Section 6 PROCEDURE POP ENTERING ENCLOSED SPACES PURPOSE This procedure U designed to protect personnel against such hazards as oxygen defidency, toxic materials, flammable substances, and powerdriven equipment when working in enclosed spaces, A yellow PERMIT TO ENTER tag is re quired to initially enter any andosed space If hot work is to be performed in an enclosed space, a yellow PERMIT TO ENTER tag is required to ini tially enter the enclosed space. This procedure is to be considered the minimum precautions for the safety of personnel entering enclosed spaces, SPECIAL DEFINITIONS 1. Enclosed Space -- Any space that can be dosed or has restricted entry or exit, such as vessels, tanks, boilers, furnaces, etc Also indudad are confined spaces, such as pits, sewers, excava tions, where the heads of workmen are below the top of the confined space. 2. Oxygen Deficiency -- Any atmosphere that Jus oxygen concentration of less than 19.5 per cent. 3. Standby--The person designated by the Chief Operator and/or the Maintenance Supervisor to warn persons in enclosed specs of hazardous or emergency conditions that could affect their safe ty- RESPONSIBILITIES V Chief Operator is responsible for Issuing the yellow PERMIT TO ENTER for entry into en closed specs in his processing area. He or his designated representative is responsible for insur ing that all necessary safety precautions have 6-1 been completed prior to issuance of the permit. The ChiefOperator must make the necessary gas tests forexplcnivfty, oxygen content and toxic ma terials depending upon the nature of the job. After the Maintenance Supervisor has signed the yellow Permit to Enter tag the Chief Operator must sign the penult signifying that all is safe for entry. 2. Maintenance Supervisor is responsible for ob taining the yellow PERMIT TO ENTER and assist ing in final preparation of the enclosed space for entry. He must inspect the area and sign the tag to indicate his approval of the required safety pre cautions. He must see that all proper job safety precautions are followed and be alert for changing conditions that might affect the safety of the job. 3. Individual, before entering an enclosed space, shall assure himself that the necessary safetypreparations have been made and that a current yellow PERMIT TO ENTER, properly filled oul and signed by the Chief Operator and the Main tenance Supervisor has been posted at the job site. 4. Standby is responsible for assuring the well being of persons working tn enclosed spices when breathing equipment is in use or when conditions are such that outside wanting may be necessary. PROCEDURE 1. Entering an Enclosed Space Without Protec tive Equipment a. Preparing Enclosed Spaces for Entry -- The Chief Operator will see mat the enclosed space is emptied and purged in preparation for open ing. Pro.ess personnel may also physically dis connect or blind the enclosed space in accor dance with Section 7. b. Requesting PERMIT TO OPEN AND/OR 6-2 BUND--The Maintenance Supervisor will re quest a white OPENING AND/OR BUNDING PERMIT from the Chief Operator in accordance with prevision* of Section 7. e. Isolating the Enclosed Space--Ifnot already done by Process, the Maintenance Supervisor wQ] insure ttut all connecting lines to die en closed apace in physically disconnected or blinded at a point as near to the enclosed space aa is safely practical. Double block valves with an intervening- bleeder are not considered equivalent to a blind where personnel bodily enter the space. EXCEPTION: In steam, water, and air service, die use of double block valves with an interven ing bleeder is acceptable provided the bleeder is open and clear and is at taasl one inch in sue for lines four inches and larger. The double block valves shall be locked dosed and the interven ing bleeder locked open. Mechanical-type loots must be used. d. Immobilizing of Power-Driven Equipment -- Before entry, the Maintenance Supervisor will arrange for electrical equipment to be im mobilized in accordance with the electrical lockout procedure. The power supply to other equipment driven by air. steam, internal com bustion engines, or hydraulic fluid shall be blinded or disconnected. . Cleaning and Establishing Ventilation of Enclosed Space -- The Maintenance Super visor will dean the space if necessary and es tablish and place In operation a fresh air ventilating system, EXCEPTION: No forced ventilation system is required where a natural draft is established and the Chief Operator and Maintenance Supervisor agree that entry is safe. 6-3 f. Gas Testing the Atmosphere of the Endoeed Space--The Chief Operator must satisfactorily test for exploslvity, oxygen deficiency, and toxic materials. (1) Explosivtty--Entry wtllnotbe permitted unless the test indicates safe range. (2) Oxygen Deficiency -- Entry will no! be permitted unless oxygen concentration is greater than 19.5 percept. (3) Toxic Materials -- Entry will not be per mitted unless test indicates a safe range. Additional checks art to be made as work proceeds in the endoeed space if a possibility of release of fumes or depletion of oxygen exists. g. Standby Requirement--A standby must be required and noted on the yellow PERMIT TO ENTER when the Chief Operator and/or the Maintenance Supervisor determines thnt an unsafe condition may develop during the course of the work. The standby mu.tl be equipped with a ciaxon hom and a unit radio for communications. A complete standby kit is re quired if the Chief Operator and/or the Mainte nance Supervisor believe that a breathing hazard may develop. h. Issuance of PERMIT TO ENTER -- When the Maintenance Supervisor is satisfied that all requirements and safety precautions have been completed satisfactorily, he must complete ap plicable portions of the checklist and sign the permit. The Chief Operator will complete the permit, including die checklist, and sign the permit signifying that entry can be made. He or his designated representative will then post the cardboard portion of the permit in a conspicu ous location at the jobsite end file the original paper portion in the Procws permit file. a-< I. FwbIIDnritionand Disposition--A yellow PERMIT TO ENTER wiD have the seme re quirements for duration and disposition as a men HOT WORK PERMIT excrpt that no Job Completion type permits will be allowed. At the end of the MMhanical shift or at job com pletion, whichever comes first, the Mechanical Person must sign the cardboard section of the permit, check the appropriate box as to job completion, and return it to the ChiefOperator. Z Entering en Enclosed Space with Protective Equipment Enclosed spaces to be entered with protective equipment must be emptied, cleaned of hazard* out materials, and purged, insofar as practical, prior to entry. It must be physically isolated and all power-driven equipment immobilized as re quired in Pan 1. e. Required Teats -- A yellow PERMIT TO ENTER will be issued only when the atmo sphere in the enclosed space meets the follow ing tests: (1) Explosivity--Entry will not be permitted unless the test indicates a safe rang*. (2| Oxygen Deficiency -- If oxygen level is below 19 5 percent, entry will be permitted only with a pressure-demand, hose-line air mask. (3) Toxic Materials--Entry will be permitted only with appropriate protective equipment. Additional checks are to be made as work proceeds in the enclosed space if a possibility of release of fumes exists. b. Required Protective Equipment -- All per sonnel entering enclosed apace* must wear pro tective equipment appropriate for the hazard involved. Use of respiratory masks and other M protective equipment (such as robber suits, goggles, gloves, etc.) inside closed spaces is to be determined by the Chief Operator and the Maintenance Supervisor and indicated on the yellow PERMIT TO ENTER permit. The cardboard section of the permit must be posted at a conspicuous location at the jobsite. In the case of oxygen-deficient atmospheres, pressure-demand, hose-line air masks with self-contained life lines must be used and Op erating Supervisor approval obtained for enBy. A standby is required when personnel are re quired to wear pressure-demand, hose-line air masks inside an enclosed space or the situation is such that outride warning is necessary. Scott Air-Paks are permissible in place of the pressure-demand, hose-line air masks for emergency or rescue use where life is in im mediate danger. 9. Dubes of Standby a, Accounting for personnel working in the enclosed space b- Preventing fouling oi air or life lines. c. Being alert for hazards to workers. d. Providing normal assistance in handling ma terials. tools, messages, etc. a. Evacuating the enclosed space in case of fire or disaster alarm. f. Being well trained in the operation of re spiratory equipment and administering of arti ficial respiration. g. Maintaining an adequate air supply. h. The standby should never attempt to enter the enclosed space even in an emergency until help has arrived. M V 1 ) In order for standby equipment is be svsHsble for uk, standby tab WI be diecked out at the Re finery Storehouse at toe same tone the pressuredemand, hose-bne unit is checked out for en closed span entry. SPECIAL REQUIREMENTS 1. Entry to Prepare tor Hot Work -- A yellow PERMIT TO ENTER is required to initially enter an tndoeed span where not work is to be per formed. Once the necessary requirements nave been met and a green HOT WORK PERMIT has been issued, no yellow PERMIT TO ENTER is required as Iona as a valid green HOT WORK PERMIT is in effect, 2. Entry by Process without Mechanical In volvement -- When entry is made by Process personnel without mechanical personnel in volvement, the Chief Operator will assume the responsibilities and functions of toe Maintenance Supervisor inducting signing the yeDow PERMIT --TO ENTER in the apace marked Maintenance Supervisor. 3. Entry by Process Into Enclosed Pump Pits--A Process person may enter enclosed pump pits for Process Functions without a written permit, pro vided toe Process person performs a gas test to determine that toe atmosphere is sate prior to entry. 4. Entry Into Boilers, Steam Generators, and Fur naces -- For bailers, steam generators, and fur naces. the limits of the enclosed space must be 6-7 dearly defined and agreed to by both Ovief Op erator and Maintenance Supervisor and so indi cated on the permit tag. The limits of the enclosed pace must be physical barriers which separate the enclosed Space from other parts of the boiler, team generator, or furnace. All the provisions of Section 6 "Procedure for Entering Enclosed Spaces" of the Safety Manual must be met for the defined endosed spaoe and, in addition, toe provisions of Section 6-lC "Isolating the Endosed Spec" must be met for the entire boiler, teem generator, or furnace. Yellow Tag 6-5 Section 7 OPENING AND/OP BLINDING PERMIT PURPOSE This permit procedure is designed to prevent ac cidents by insuring adequate communications be tween Process and Mechanical Personnel when opening and/or blinding equipment in a process ing area. A while OPENINC ANP'OR BLIND ING PERMIT shall be obtained before beginning such work. SPECIAL DEFINITIONS 1. Opening -- Exposing the interior of any pro cessing equipment, including piping, to the at mosphere. This includes removing covert, break ing flanges, pulling header plugs, etc. U does not include draining or venting through a valve. 2. Blinding -- Installing temporary slip blind;, into piping ot blind flanges onto equipment to isolate or close for mechanical work. RESPONSIBILITIES 1. Chief Operator is responsible (or issuing the white OPENING ANDlOR BLINDING PERMIT. He or his designated representative has the re sponsibility for preparing the equipment, deter mining if the surrounding area is safe for the pro posed work, and listing any special safety pre cautions required. 2. Maintenance Supervisor is responsible for see ing that a permit is secured to perform work in volving opening or blinding, He is also responsi ble to sec that Mechanical Personnel work within the limits of the permit and that all stipulated safety precautions are taken. 7.1 PROCEDURES 1. Requesting Permit -- The Maintenance Supervisor or his designated representative must request a permit from the Chief Operator. 2. initiating Safety Inspection -- The Chief Op erator or his designated representative must per form a safety inspection of the ares. He must cheek for other active permits, prepare the equipment, and identify all locations to be opened, if blinding is required, he must also pre pare a blinding list. 3. Blinding Requirements -- Generally all opened equipment must be blinded for hot work (see Section S), for entering (see Section 6), and piping left unattended. The installation and re moval of slip blinds and blind flanges (except daily closure blinds) shall be recorded on the blinding list. Specificblinding requirementsand excep rions are as follows: a. Pumps -- Minor repairs, such as small pip ing and seal replacement, may be performed without blinding provided (1) the suction and discharge valves are tightly closed and tagged with "DANGER -- DO NOT OPEN" tags, (2) the case has been depressured through bleed ers, (3) the driver has been properly im mobilized, and (4) the work can be complted in one shift. Pumps taking suction on vessels operating below atmospheric pressure must be blinded on the suction side. b. Compressors--Minor repairs, such as cover plate gasket and valve replacements and bear ing inspections may be performed without Minding provided (1) the compressor can be isolated by block valves, (2) block valves are tagged with "DANCER -- DO NOT OPEN" T-2 tap. (3) the eaae ii depresiured through bKedero. (4) the driver has been property im mobilized, (S) the work is continuous until completion, end (6) no more dun one cover piste end valve is open it any time. c. Driven--To perform major work on driven, the driven end must be disccmnected or blinded. Additional isolation must be as fellows: (1) Electric motors must be immobilized, using Electrical lockout Procedure (see Sec tion 4). (3) Cas engine* must be blinded and the fly wheel blodted. (3) Combustion turbines must have fuel lines blinded and the auxiliary motors im mobilized. (4) Expansion gas turbines must be blocked fry dosing the inlet and exhaust valves, tag ging the valves with 'DANCER -- DO NOT OPEN" tags, and depressuring through bleeders. (5) Steam turbines must be blocked by dos ing the inlet and exhaust valves, tagging the valves with "DANGER -- DO NOT DPEN" tap, and opening bleeders. fl. Piping -- Unattended open Piping must be isolated with slip blinds or dosed with blind flanges. EXCEPTION: Lines in water and air service of less than 100 psig may be left unattended without blinding. e. Veeaels -- Isolation blinds musl be installed as dose to the vessel as safely practical and in a manner to insure that no liquid or vapor can be happed between the blind and vessel, 7-3 t. CoolingToweri--Individual cells and stacks on cooling towers may be isolated for entry by dosing the water inlet valve to the cell. The valve must be secured with a "DANGER--DO NOT OPEN" tag attached by Process and a Mechanical lock placed on the valve by the Mechaniol person who will enter the cooling to wer. If any chemical lines an connected to the cell to be entered, the tine must be blinded or disconnected before entry. g, Cursory Inspections Equipment may be opened for cursory inspections without blind ing under the following conditions: (1) The equipment must be isolated by block valves tightly eloaed and tagged with "DANG -- DO NOT OPEN" tags. (2) The equipment must be depressund and safe to open. (9) Only one opening at a lime must be made. (4) No personnel entry allowed. (5) When applicable, proper protection must be provided for Individuals adjacent to the opening. (6) The open equipment must not be left un attended. 4. Preparing Blinding list -- Before blinding be gins, Process Personnel must prepare a blinding Ust indicating die size and location for all slip blinds and blind flanges to be Installed. 5. liming Permit--Process and Mechanical Per sonnel must make a safety tour of the job site, identify and mark the places to be opened and/or blinded, and review the limitations and safety requirement* stipulated on die permit including filling out the checklist on tne back of the cardboard section. When both Process and Me chanical Persona are satisfied that the provisions of Section S Item b(8) have been met and the task 7-4 can be safely accomplished, then both will sign the permit. The Process person must post the cardboard por tion in a conspicuous place at the job site and file the original copy in the permit file. EXCEPTIONS: Process Personnel -- Mechanical work by Pro cess may be done without a written petmil provided the Chief Operator has authorized the work. Dock Personnel -- Marine hookups on the dock may be performed by the Dock Connec tion Crew working under the direction of the Chief Operator without a written OPENING ANDlOR BLINDING permit, Unit Turnaround -- During a unit turnaround, cleared items of equipment may be opened by verbal authorization of the Process Person des ignated as the Process'Mechanical contact coordinator, provided the following conditions are met: ( All hydrocarbon and chemical lines are blinded at the unit limits. b, Opening ofequipment will not create a safety hazard for other work in progress. c. Ail hot work in the area must be suspended while the equipment is being opened. (1) If no hazard was created by the opened equipment, the Process contact coordinator may authorize the resumption of the hot work under the existing hot work permit. (2) If a hazard was created (spill of hydrocar bons, flammable gas release, etc.), the hot work permit must be terminated. To resume work after the hazard has been eliminated, a new hot work permit must be issued. 6. Blinding -- The Mechanical Person must re 7-S cord each slip blind installed by signing and dat ing the bbnoing list. At the end of the mechani cal shift or at completion of the blinding list, whichever comes first, the Mechanical Person must return the blinding Ust to the Chief Opera tor. 7. Permit Duration and Disposition -- The permit is issued for one Mechanics) shift, it may be extended into the next shift by both Process and Mechanical signing the extension Mock No blinding permit shall be valid for more than 2 hours. At the end of the Mechanical shift or at job completion, whichever comes first, the Me chanical Person must sign the cardboard section of the permit, check appropriate box as to job completion, and return it to the Chief Operator. The permit may be extended Into the next shift by bath Process and Mechanical signing the ex tension block. No blinding permit shall be valid for more than 24 hours. I. Removing Blinds--The removal of blinds re quires a new permtt unless the work at the job site is continuous and is completed in 24 hours The Process Person issuing the permit and the Me chanical Person accepting the permit must tour the area and physically identify the blinds to be removed. The Mechanical Person must sign and date the blinding list as each dip blind and blind flange is removed. After the last blind has been removed or at the end of the Mechanical shift, the Mechanical Person must sign and date the cardboard portion and return both the permit and blinding Ust to the Chief Operator. 9. Filing of Permits and Blinding Lists -- Each permit must be filed for 24 hours after its expira tion and then discarded. Blinding lists must be filed until all blinds have been removed. The blinding list may be discarded 24 hours after the Iasi blind is removed. 7-6 Whiti Tae Buff Tag Stctton 8 COLD WORK PERMIT PURPOSE This permit procedure it designed to prevent acddanta by (trine Piece** Pmonnel contrrf o*tr cold work acttviSas takbtg place In their promis ing area. To insure proper communications be tween Process and Mechanical, a blue COLD WORK PERMIT tnust be completed before work is started in a Process area. SPECIAL DEFINITIONS 1. Cold Work -- Any mechanical work on pro cessing equipment including work on intrinsically safs circuits and energized electrical instruments and electrical power circuits that does not involve opening, blinding, entering, hoi work, or electri cal lockout. RESPONSIBILITIES 1. Chief Operator or his designated representa tive is responsible for approving blue COLD WORK PERMITS. He or his designated represen tative is responsible for insuring that all safety precautions have been completed prior to is- suance of the permit. 2. Maintenance Supervisor or his designated rep resentative has the responsibility for initiating the blue COLD WORK PERMIT and securing ap proval from Process personnel. He is responsible for seeing that only the work authorized by the permit is performed. PROCEDURE 1. Initiating COLD WORK PERMIT -- The Me chanical Person assigned to perform mechanical work in a processing area must fill in the date, time, area, equipment, and description of work B-t on the blue COLD WORK PERMIT. He will then contact the Chief Operator and secure approval before starting to work. EXCEPTIONS: Blue COLD WORK PERMITS are not required: a- WiienPracettPersanne! are performing'n?dianial work. b. When the Dock Connection Crew is working in the dock area under instructions from the Chief Operator. e. When instrument technicians and electri cians who are regularly assigned to the process ing area perform routine work authorized by the Chief Operator NOTICE: A COLD WORK PERMIT is required to work on energized electrical instruments and electrical power circuits above 100 volts. d. When Technical or Laboratory personnel perform sampling and/or test work authorized by the Chief Operator. e. When janitors perform janitorial-type work in the processing area. t. WJioi contractor employees take uvrk direction from Process Personnel, g. When Mechanical performs cold work in preparation for the issuance of other work permits on the same shift. Samples of such work are covering sewers, hooking up hoses, securing fire-flgnring or safety equipment, hanging tarps, electrical lockout, etc. h,When oil, gas and chemical lines are blinded at unit l'mits during unit turnarounds and work is being performed in accordance with the turnaround procedure. fl-2 i 2. Making Safety Impaction -- The Proems Per son designsled to approve the permit must assure himself the conditions at the job site are safe for die work. He must determine if a gas test is required and may make the gas test himself. 3. Issuing Permit -- When both Process and Me chanical Persons are satisfied that the work can be safely performed in the area, each must sign die permit. 4. Posting Permit1-- The Mechanical person must display the cardboard portion in a conspicuous place at the job site. The Process Person must file the original portion in the permit file. 5. Permit Duration And Disposition -- Blue COLD WORK PERMITS are issued for one me chanical shift. At the end of the mechanical shift or at job completion, whichever comes first, the Mechanical Person must sign the cardboard sec tion of the permit, check appropriate box as to job completion, end return it to the Chief Operator. The permit must be filed for 24 hours after its expiration and then discarded. . Extension of Permit -- The permit may be ex tended by determining that the job conditions remain unchanged and by both Process and Me chanical signing the permit. No permit shall be extended beyond 24 hours' total duration. / MSaufrflHIt ft 101 SITE COLD WORK PERMIT Bioucoarwnruea ^ sxrrowh^piwtxr Suaua PWB Mi P nwnpw**C4L*mt* *mCmooi MP on* ow MTlCinUBIP ymm li rntSem u/ fm . m TM AM PM 3f&uno ST JC=.mSmtSrSE^ywS^ '*L _______i___ ~ Ktm PfiftHT 79 CHIEF OPERATOR AT JB COMPiTTmi 81 END Of UtCHAKICSL SHIFT. Light Biui Tag -3 SECTION 9 SECURITY REGULATIONS 1. firkins Locations Parking locations will bo daelgnaced for each Contractor by Owner. If Contractor daairea co park an Owner'a prsparry, all parking shall be in the lot, or area dteign*tsd. Potted ragulatlont governing the uea of the Jet shall be followed. All vehicles ea Owner's property shall be at the risk of the vahicla owner and Owner accepts no responsibility for paint or other damage to or theft of or from eueh vehicles. 2. Entrance Bate Owner will designees e gats or gates for the uee of Contractor and for the delivery of its material end supplies. Contractor and vehicles serving ths Contractor ahall use only Che designated gate for entrance and exit to and from the Connector's Job site. Contractor ahall make arrangements po chat vhido drivers will loiev which gate to anter and the eppropt late job alee location. 3. to Iks and Roadways Walks and roadways will be dtclgneted for the uee of contractor whan entering or leaving the job cits, when moving fron one eras co another, or when obcelntng aeeerlal from Owner. Contractor ahall use only designated roadways and walks, Ths use ef shortcuts or nondscignaced pathways la prohibitsd. 4. Contractor Employee Badges Contractor's employees shall vaar their Contractor's badge at all times they are in ths Plant. badges shall beer the fin's nssis and each badge shall be numbered with a different number. Contrsctor shall supply these hedges and maintain a record of badge numbers with employees' nance. Employees engsged for engineering services shall be required to wear badges furnished by Owner ahowlrg a number only. Badges oust be shown to ths gats Security Offleer each etas any cmployac of Contractor enters or leaves the Plant. Whan Subcontractors co the prime Codtractor do sot have their own badges, they may uia the prime Contractor 'a badges. Whan contract employees enter the Plant, the Contractor'* supervisor la responsible: for checking that every contract employee has a Contractor badge. -l 6. Contractor Vehicle Identification Contractor'a vehicle# aut boar tha Contractor'* name or inaicnU prominently dlepUyed, and the driver kiet hava a bedga Such vehicle* (hall be raacrlctad to tba iim of dealgnatad (trace or atraato aad flint entrance or aotraaeaa aealgnad tor uac of Contractor. All eqnipmaat an rubber tlraa, web aa mobile crane*, backhoe*, air compreeeore, vnldlag china*,'etc. wut have Contractor'* name praaloently dlapiayed on both aide* when being wad by Coataaator. i. Material Piste* All toola.asd material* that the Contractor remove* from tha riant ahall be accmparied by a a*trl*l pea* obtalnad froe tha Contract Administrator. Tha material ;tll ahall be cwpletely f 11lad out aod ahall ba algnad by a dealgnatad representative of Contractor and tba Concract Adalnletxetor. tha Contract Malnietreeor retain* ona copy, and Che original and one copy ahall accompany the material to tha gate, loch capita are to be eurrenderod to the gate Security officer. 1. Thefts owner aeespee oo roeponaihlllty or liability for the theft of any property or notorial belonging t Cenex actor or lt eaployeea. It obeli be tha reaponelblllty of Controctnr to furnleh any polio* protection It deeaa necepeary to auppleaant the guard and patrol aerviea provided by Owner. Owner aaluteins an inveeclgative aetvlec and vlll cooporat* with contractor by aeeletlag la the Invettlgatlon of all reported tbefta within the Plant. Theft* of property or autoaobllae fran Owner'a outalde policing lota should be reported to leeal low anforceaent official*. Contractor lay obtain forme for reporting thefta froa within tha Plant froa the Concract Mainletrttor. 8. (tabling All ferae of gaabllsg are prohibited on Owner'o property. 8. Business Visitors. Applicants, and Delivery Trucks Contractor ehall furnleh fleet Security with a Hat of paraena who are author 1sod to paaa biaeloeea vlaltote, aew nag>loya*e. end delivery truck# to the job cite. Plant Security mill obtain authorization froa one at theaa people before paeelag auch Individuala into tha 9-2 Flint. Special permission shall be obtained from the Concrete Adminlettrntor to Matt unlee business iscat* at safety lnepeccore other thin ton trie cor employed into tha Flint. 10. Ambulance Service Contractor, when working in Plant, shall aike any arrangements Contractor deama nceatliry lor ambulance service from in outside lira. Requests tor in ambulance shall b ceUsd in to 427-5711, intension 3600. Accident location, labulanca lira anA hotpical daalred, and Contractor's naaa .hall b* given. Plant Security will escort the ambulance to the acme of the accident. All accidents shall bs reported to the Contract Administrator as soon as possible, whether resulting In Injury to a person or dosage to the equipment of Owner or Contractor. 11. Inspection of Lunch boxes, Packages. Motor Vehicles, etc. Security Officers have the right to inspect lunch containers, packages, bundles, tools, aqulpaant, and notor vehicles In Che Plane at nny time. 12. Cameras and Photographs Unauthorised Individuals shall not be permitted to enter the Plant with a camera. When Contractor desires te have photographs taken In the Plant, approval oust ba obtained from Public Reis dons Department. 13. Liquor, Drugs, Firearms, and Explosives Any parson possessing intoxicating liquors or drugs, or who la under the influence of such, Will not be permitted to enter the Plant or loiter on Owner's property. Flreerms and explosives will not be permitted la the Plant. 14. Visiting and Loiterings Visiting and lolttrlng by Contractor's employees at or around entrance gates or othes places oo Owner's property will not bo permitted. 15. Fingerprinting If requested by Owner, Contractor shall furnish ehe Owner two sets of fingerprints on each of his employees and each of his Subcontractors' employees. 9-3 b; 1 SECTION 10 GENERAL REGULATIONS 1, Authorlxatlon to SUrt Work Contractor and Subcontractors ihall oac otorc work <mcil authorlxad by A* Coocraet dddiCMter *c tha job *lca. Such authorlMtloa doe* not conatltote authority to prseaad with *07 verb levoIvin* epee1*1 paroles * outlined In Exxon Refinery'* S*f*t7 Mosul. Controc cor aboil oloo curt approval fro* Contract Adalniitretor before *07 swiili arc delivered to job alto when tutor ill deliveriee precede Controccor' arrival on alt*. Z. Contractor's Equipment All Contractor* ovlaf trailer-type equlpaanc within tha riant ahall uaa * biteb equal Co frralcr'* eutamcic latching hitch Mo. 105 for one-ten load*, or Ha. 5BO for one-and-onehalf-ten loads, except that properly rated ball hitchar nay ba uaed i*an provided vlth safety chains. 3, Expletives Rgploeivae ahall net ba uaed without prior written approval of Owner. A, Use of Lines, Conduits, or Structures as Supports Contractor ahall not uae Owner's pipe llnae, electrical condulta, handrail*, nr etincture* am support* for loadc, for ladders, er for acaffolda without aucborlaatlen fron the Centratt Adnlniitracer. 5. Use of Stanchions or Equlpmnt for Anchors Contractor ahall aot uaa Owner'* pipe etaneblane or other sqwlpaaat for attaching uaceh bloeka, guy line*, or for other oervlcet which apply load* on equipment without written approval of tha Contract Maidstretor, 6; Duitqa to Owner's Property ti Cantraetoc daaagee any af owner'a property, er property of any other contractor 10-1 or aubeontreetei, the damage ahall ied lately b* reported to the Contract Administrator. ?. Operating toner's Equlpnent Contractor a ball not operate ary of toner'a equipment, aueh a* electric power twitches, valves, etc,, without prior specific approval of the Conerace Administrator. 6. Use of Special Vehicles Mo vehicle or piece of equipment hvln| metalllc-lugged wheel* or tracks aSail be operated oa eny hard surface acreee without adequate protection to the street, as approved by Contract Administrator. No tracked equipment having flat pavanenc treada ahall be operatad on a paved arrest without approval of the Contract Mminlatretor. 9, fire Extinguishers Melding machines and tar peta ahall have a 12-pound COj or 20-pound dry nhtslceltype fire azclnguiaher In proper working condition located adjacent to the equipment, An extinguisher ahall be locatad In each working area where "hot work" la being dene. Fire Bote -- Where fixed hose reel* are not available, tha Contractor ahall furnlah and maintain a minimum of one fire hose In each vorklng area where hoe work la being done, Each he*e ahall be 1-1/2" diameter with threaded coupling and NYC Fire Department threaded adapter aultable for ISO pal preaiure- Each hose ahall ba equipped with a 1-1/2" nombiuaClon fog, aera!ghc Stream, and shut-off nolala equal eo American LaFranee or Zlkhact 1-200. kotaa ahall be counseled co a hydrant. The Contractor ahall be rctpenslble for opening tha water eupply valve at the hydrant in full apan position while hot work la in progress, but prceSure la net to be left on hoae overnight. 10. Melding Contractor ahall not veld on oil or gas lint# or equipment In eervlee unless there le an Internal cooling agent to remove heat, ouch a flowing liquid or gaa, and there la sufficient metal, it approved by the Contract Administrator, to prevent a burn-through, Excevtloni Me hot work is to be done on air line* in service between the reciprocating corpressor discharge and the knockout drum or drier. Hot vork can be done on sir lines down stream of knockout drum or drier, or on air llnee pressured by centrifugal equipment, after a gat rest ihova the air in the line to have no hydroear bona present- 10-2 II. Saeurlng of Taponary Building* All twponry building* ahall be ctrt down by Cbe Contractor 1a accordance with the Contract Adnlaltcncor'a laatnartlnma, and applicable Anytovn taglnaeTlag Standard!, 12. Exit from the Mint Contract e^iloyaea, carnapt for the driver, eut dlaaouat and talk through the gate when leaving th* Uluty. 12. Non-Engllth-spuklng Personnel the ability tc i miiiIisti with Contractor employ*** ie essential to nf job execu tion. Mien eb* contract employee cannot epeek Englleh, the Job foreman wuet be able to epeek bath Englleh and the employee'* longuege fluently. If share It reeton te doubt the foreaaa'e eblllty In thli regard, a practlral demonstration is In order. Mhen the foreman cannot apeak both Englleh and tha aaployee'e language, the wplcyee mat either be placed coder ferenan who can, or he auee be prohibited fron working In the aeyeovn Refinery. 14. Hurricane Precautions The period between June 15 ead October 15 ta recognised as the hurricane eeaeon. Prior to thla tlma, all Mterlal that la not needed for the job end chat might become vind-berne In hurricane wind* should be removed. That material at111 needed aheuld be piled aa compactly aa potilbla. Frorltlon ahould be rada for tying down lightweight objects ahould the need nrlee. Scaffolds end asms open-type itruetutea ahould be dlmantled if a hurricane approaches. Thu*, there atumid be a plea fortailatad in advanca to handle nscaaaary action*, particularly la tarns af the time end maopower required. 15. Contractor Accident Reporting The contractor la renponalblc for notifying tha Contract Administrator lmaedlacaly: a. Amy time an ambulance la called; b. la the event af any Injury <*ieh could poaslbly venule la lost tins; e. In Che event of any Incident which had earloue potential, awh aa while aqnl^e&t varcnralag, equipment contacting electric supply llama, ate. 10-3 AU injuries lhall be reported on che Industrial Accident board Standard Tan for tpleyaa's Tirat Report of Injury or Illneta -- letecc revision, 16, emergency tvaeutlon Procedure An aaergency evacuation procedure lin shall be completed by eaeh Contractor prior to starting contract. An assembly point should be cbostn co provide e relatively safe, open area, la tha event at Matgsacy occur* that requires evacuation of ell or part of tbe leileery - 17, Contrictor Safely Meetings Cecb Contnccor ie strongly encouraged co bold s weekly safety aseting for his esplsyace, Eltber a conbinsd nesting of all the contractor'a eaploysts la the Refinery or atelier action for each Job or each foraaan is eulcable. i / ) 10-4