Document pm939dX3rOd1KBjv297Mbgk8d
Mechanical Integrity Test Results
Casing or Annulus Pressure Test
Osage Nation / Environmental Protection Agency
P. O. Box 1495
Pawhuska, OK 74056
Inspector Rick Davis
MIT Date 11/18/2019
Operator Representative Scout Energy Management
Report Sent Operator
LLC
Inject Interval 2506 - 2621
USDW 428
Time 10:08
Well Enhanced Type Recovery
Annulus Fluid Type Casing 5.5
Concentric Pkr Tubing 2.38
Packer 2214 Depth
Operator Info
Scout Energy Management LLC 4901 Lbj Freeway, Suite 300 Dallas, TX 75244 Phone: 972-865-7597
Inventory ID API Well No Lease Name
Well ID
OS2872000 35113027320000 NRU 17W1
Location NE 21 24N 07E
Type of MIT Ada Pressure Test
Test Reason
Injecting N
Injection Rate (bpd)
Tubular Lining sealtite
Time Since Ann
Filled (hrs)
MIT Due 04/22/2024
MIT Freq EVERY FIVE YEARS
Ann Press Mont
Pre-Test Initial Mid Final
Time 10:26 10:41 10:56 10:56
Test Result
Failure Type Failure Cause Engineer Signature
Review Date
Fluid Migration Test Type
Inspection Comments Inspector Signature
Supervisor Signature
Tubing Pressure 0 960 960 960
Acceptable
R Davis 11/26/2019
Annulus Pressure
Flowback Pressure Volume
0
High
0
Mid
0
Low
End
Total Volume
ADA Pressure Test - Required Test Pressure
(Fluid Column Ht * Specific Gravity * .433 / N2 Wt Fac = Required Test Pressure)
Tubing Annulus
Depth to Top Perf/Open Hole 2506
Depth to Fluid Level 667
Fluid Column Level 1839
Specific Gravity of Fluid 1.065
Nitrogen Weight Factor 1.082
Required Pressure Test 783.776
Remedial Action Type
Remedial Action Type
second half of test
Rickey Davis
GUY TIDMORE
Digitally signed by Rickey Davis DN: cn=Rickey Davis, o=US EPA, ou=6EN-WO, email=davis.rickey@epa.gov, c=US Date: 2019.12.05 15:03:29 -06'00'
Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2019.12.17 09:09:54 -06'00'