PCB EMERGENCY PLAN 1. Scenario 2. Preliminary Actions 3. Emergency Plan A. Immediate B. CAC Decisions C. Follow-up 4. Telephone List
DSW 188007
STLCOPCB4051849
DSW 188008 STLCOPCB4051850
1. Scenario The plan assumes an immediate ban on production, sale or use of PCB before volume production of MCS 1238 is ready. It is recognized that the actual circumstances may vary from this scenario, so provision has been made to review the plan to assure that it fits before com mitting publicly to the indicated policies. Responsibility for verification of existence of a ban, initiation of this plan and verification of acceptance of responsibilities: R.G. Potter
DSW 188009
STLCOPCB4051851
DSW 188010
STLCOPCB4051852
2. Preliminary Actions
a. Persuade customers to accelerate MCS 1238 approval programs.
Responsibility:
D. Wood (contact by 2/15/76)
b. Confirm no continuing contractual obligations to supply.
Responsibility:
D. Wood (12/31/75) (Done)
c. Prepare survey of Askarel equipment used by Monsanto.
Responsibility:
G.L. Bratsch (request to GLB by 12/22/75) (Done)
d. List corporate sales to all dielectric customers.
Responsibility:
R.E. Hatton (MICC 1/31/76, Corp. 3/31/T6)
e. Prepare Tentative P.R. statement.
Responsibility:
D.R. Bishop (1/1/76) (Done)
f. List names of contacts to call at all customers.
Responsibility:
D. Wood (1/31/76)
g. Define detailed decontamination procedure for use at Krummrich and possible adaptation for customers.
Responsibility:
J.R. Savage (1/22/76)
h. Prepare recommendation oh advice to customers re decontami nation.
Responsibility:
D. Wood (2/15/76)
i. Develop list of publications for potential ad campaign.
Responsibility:
D.R. Bishop (12/19/75)
DSW 188011
STLCOPCB4051853
DSW 188012 STLCOPCB4051854
3. Emergency Plan A. Immediate Actions
Timing
Action
Day 1
1) Suspend chlorination operations. Suspend shipments from Krummrich Plant and warehouses (Santa Clara, Elizabeth, Los Angeles). Do not recall shipments enroute. Finish any distillation batches under way.
Responsibility: R.A. Pohl
Contacts:
Krummrich Plant A.E. Leisy R.W. Flint
Warehouses E.M. Potter C.B. Sigler
Day 1
2) Communicate to customers regarding suspension of shipments. Emphasize that this is a preliminary response pending clarification of government and corporate positions.
Responsibility:
D. Wood
Day 1
3) Make preliminary press release (pre pared in advance) stating that opera tions have been suspended and supplying background information on our PCB con trol efforts, status of replacements.
Responsibility:
D.R. Bishop
NOTE: First confirm that action (1) above is in force.
Sw 188o13
STLCOPCB4051855
Timing Day 1
Action
4) Communicate situation to other affected Monsanto operations.
-Krummrich production planning - D.T. Mayer
-Process Chemicals Marketing
(CS Acid, Muriatic)
- J.F. Winkler
-Anniston Plant (Biphenyl)
- W.E. Voss'
-Purchasing (TCB, Drums)
- B. Byrne
Responsibility:
E.M. Potter
Day 2
5) Determine precise details of ban:
Marketing (D. Wood), Product Acceptability (J.C. Weber), Washington Office (W. Easley), Legal (W. Withers/T. Bottini), and report to Business Director.
Coordinating Responsibility: D. Wood
Day 3
M
6) Review this plan to determine whether it fits the circumstances and make recommendations to the CAC on policy and implementation.
Responsibility:
R.G. Potter
DSW 188014
STLCOPCB4051856
DSW 188015 STLCOPCB4051857
B. CAC Policy Decisions
After the precise nature of the ban has been determined, recommendations will be made on the following points (revised as indicated by the nature of the ban).
Domestic
1. Date of final production.
2. Shipment of inventory.
3. Customer commitment to orders on books but unshipped.
A. Incinerator returns (maximum rate 300,000 pounds per
month).
a. All returns invoiced a price to fully cover incineration cost.
b. All customers given equal opportunity to use service.
c. COP to be set up to handle. d. Alert other incinerator services of our policy.
5. No change in policy on refusal to ship transformer makeup requirements to transformer users. They should still obtain product from transformer manufacturer.
6. What assistance we will give on customer plant decontamination.
a. Capacitor/Transformer manufacturers. b. End users -- will refer to equipment manufacturers
(let our customers know we will do this).
7. Position on replacement fluid from Monsanto.
U.S. Export
1. Recommend cease shipments two months after we cease domestic shipments.
a. Documentation/L of Credit/Import licenses involve longer lead time and possibility of legal liability if we shut off immediately.
b. Additional flexibility in inventory run down.
Ex-U.S.A.
a. Maintain U.K. production and take separate decision
within one month of a U.S. ban.
"
b. MESA should avoid commitment to long term supply
contracts.
DSW 188016
STLCOPCB4051858
DSW 188017 STLCOPCB4051859
C. Follow-up Actions After CAC Approval of Detailed Policy
Timing
Action
Day 4
1) Appoint Administrative Coordinator for 3-6 month period.
Responsibility:
R.G. Potter
Day 4
2) Briefing meeting to define policy and announce appointment of coordinator to:
a) Business Group bj COP
c) Sales Force dj Research e) P.R. f) Washington Office
Responsibility:
R.G. Potter
Day 4 Day 5
3) Notify Customers by:
a) Telephone to most senior management contact -- Marketing
3) b) Certified express letter to:
-- Office of the President -- Purchasing Manager of use locations -- Confirmation to telephone contact
(NOTE: Direct all immediate customer responses to Marketing Group.)
Responsibility:
D. Wood
Day 5
4) Notify Manufacturing, Company-wide, to minimize impact on operation of Askarel units.
.
Responsibility:
R.A. Pohl to G.L. Bratsch
qS\N 188018
STLCOPCB4051860
TimingAction
Day 5
5) Resume production and shipments as permitted by the approved policy, if
any.
Responsibility:
R.A. Pohl E.M. Potter
Day 5
6) Brief corporate marketing directors with other sales to dielectric customers on policy.
Responsibility:
D. Sliney
Day 6-8
7) Notify Federal/State agencies of policies.
Responsibility:
Washington OfficeW. Easley
Day 5 Day 6
8) a. P.R. release on policy. 8) b. P.R. prepare Q&A sheet on policy.
Day 10-15
8) c. Arrange series of paid advertisements
Responsibility:
D.R. Bishop
Day 6-7
9) Prepare form letters
a. Transformers users b. Capacitor users
Responsibility:
D. Wood
Day 8
10) Brief U.S. Export Managers on export policy.
Responsibility:
C. Paton/D. Wood
DSW188019
STLCOPCB4051861
Timing Week 2-3
Action
11) Management/Marketing meetings with customers
Responsibility:
D. Wood
Week 2
12) Notify U.S. Export customers of policy.
Responsibility:
Area Managers
Month 2
13) Upon completion of final customer ship ments, move all Monsanto PCB inventories to Krummrich incinerator.
Responsibility:
E.M. Potter
Month 2
14) Initiate decontamination of Krummrich PCB facilities (see detailed decontami
nation plan).
Responsibility:
R.A. Pohl
SVV 188020 STLCOPCB4051862
DSVV 188021
mH cS
(A
HmOzI
STLCOPCB4051863
4. PCB Emergency Plan - Telephone List
R.G. Potter
Office 4-2142
Home 469-1835
Manufa cturing
R.A. Pohl A.E. Leisy R.W. Flint D.T. Mayer W.E. Voss
4-2243
812-2019
812-2043 812-310
823-205-293
991-5455 966-5608
849-0758 618-286-3483 205-237-5834
Marketing
C. Paton D. Wood
4-2529 4-2623
227-7581 536-2161
Medical/Prdt. Acceptability
J.C. Weber Dr. G. Roush W.B. Papageorge
Legal
W.W. Withers T. Bottini
4-2027
4-2191 4-2086
961-7693 997-2234
878-3513
4-2851 4-2872
227-8345 725-0677
Distribution
E.M. Potter C.B. Sigler R.A. Sipes
4-2443 4-2428 4-2431
567-6043
618-234-9945 821-0938
Washington Office W.K. Easley
Public Relations D.R. Bishop
821-4548
301-299-9587
4-2891
469-1377
DSW 188022
STLCOPCB4051864