Document pm4Mqnk4b4G7XJqknKdkmQ30D
SUBCONTRACT
Brown ?T?ootInc.
P. O. Box 3, Houston, Tx*s 77001
_______________
PAGE 1 OF 2
EFFECTIVE DATE
8-13-79
REQUISITION NUMBER
27-14-4815
SUBCONTRACT NUMBER
27-4060-5037
CROWN * ROOT JOB NUMBER/ACCOUNTING CODE
" -'060
27-4060 (5)
PROJECT NAME
----------------
ETHYL COPLP. "GENERAL PLAJJT IMPROVEMENTS"
. .mTE CONTRACTOR'S LICENSE NUMBER (It Rgulrd)
H/A
yi
DATE OF ISSUE
S/a-:-
> TSUBCONTRACTORT
.f ^03866134
CONSTRUCTION SERVICES, INC. f` -P. 0. BOX 96407 ^HOUSTON, TEXAS 77013
THE SUBCONTRACT TERMS APPEARING BELOW TO"1 GETHER WITH THE ATTACHMENTS HERETO FORK THE
PROVISIONS OF THE EKTJRE SUBCONTRACT.
AS OF THE EFFECTIVE DATE OF THIS SUBCONTRACT, PAYMENT AND PERFORMANCE BONDS ARE NOT REI CKJIRED BUT MAY BE REQUIRED PURSUANT TO GEN-1 ERAL CONDITIONS.
El
i.
SUBLET WORK
SUBCONTRACT TERMS
1.1- SUBCONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, INSURANCE, SUr PERVISION AND ALL OTHER THINGS NECESSARY TO COMPLETE INSULATION OP TEE REACTOR BEADS AND PIPING IN AREA 1903", ETHYL CORE. PLANT, PASADENA, TEXAS.
2. e
1.2
SUBCONTRACTOR SHALL PERFORM THE SUBLET WORK IN STRICT ACCORDANCE WITH'THE DIRECTIVES OF THE GENERAL CONTRACTOR'S JOB SUPERINTENDENT OR HIS DULY AUTHORIZED REPRESENTATIVE AND SHALL MAINTAIN CONTACT WITH GDIERAL COITRACTOR'S PROJECT MANAGEMENT FOR THE PURPOSES OF COORDINATING THIS SUBCONTRACT.
SPECIFICATIONS
2.1 JACKETING SHALL BE .010 SMOOTH STAINLESS STEEL.
2.2 STAINLESS STEEL JACKETING TO BE INSTALLED ON THE BOTTOM HEADS OF R-7201-A, B & C AND R-7301-A & B.
2.3 STAINLESS STEEL FLASHING TO BE INSTALLED OVER THE INSULATION SUPPORT IN ACCORDANCE WITH GENERAL CONTRACTOR'S DIRECTIVE.
SUBCONTRACT PRICE
_
GENERAL CONTRACTOR AGREES TO PAY SUBCONTRACTOR FOR COMPLETE, SATISFACTORY, AND TIMELY
PERFORMANCE OF THE SUBLET WORK THE FOLLOWING FIRM TOTAL LUMP SUM PRICE,INCLUDES
ALL APPLICABLE SALES/USE TAXES:
FOURTEEN THOUSAND, FIFTEEN DOLLARS AND NO CENTS (WORDS)
$14,015.00 (FIGURES)
ZB od o- o Oo cs
I mas X ZZen
^
Uj
-IT
___
rrj
c
~
O<
om
4. TIKE OF PERFOKMAKCE
ac
CO
Co
SUBCONTRACTOR SHALL INITIATE AND COMPLETE SUBLET WORK IN STRICT ACCORDANCE WITH THE SCHEDULE AKD TIME FRAME AS SET BY GENERAL CONTRACTOR'S PROJECT KAKAGMENT.
(AS CHECKED)
Q P-50 GENERAL CONDITIONS Q SPECIAL CONDITIONS 0 P-7 AFFIDAVIT (2)
ED OTHER!
SJL
SUBCONTRACTOR AUTHORIZED REPRESENTATIVE
\//M
BROWN & ROOT, INC. - GENERAL CONTRACTOR
SIGNATURE
Xf/.'Lg?T
AUTHORIZED REPRESENTATIVE
DATE SIGNED
Q-ZhOtf
JOBSITE FILE COPY
F-2t (0S*7t)
00415
.PAGE NUMBER 2 OF 2
Ell-. subcontract vumser .
SUBCONTRACT/CHANGE ORDER CONTINUATION { 27-4060-5037
"
5.1
SUBCONTRACTOR SHALL FORWARD ITS INSURANCE CERTIFICATE STATING THE HAKES OF ITS INSURANCE CARRIER (S) AND CERTIFYING THAI ITS INSURANCE COVERAGE MEETS WITH THE REQUIREMENTS OF GENERAL CONDITION 21.
.-5.2 SUBCONTRACTOR INSURANCE CERTIFICATES SHALL REFERENCE THE FROJECT AND SUBCONTRACT NO., AND SHALL KAIL ONE COPY TO THE FOLLOWING ADDRESS WITH THIS SUBCONTRACT:
BROWN t ROOT, INC. ' F. 0. BOR 3 HOUSTON, TEXAS 77001
ATTN: D. L. SEIFERT (01-129G)
6. AFFIDAVIT
TWO COPIES OF THE GENERAL CONTRACTOR'S "AFFIDAVIT FOR SUBCONTRACTOR" (FORM P-7) ARE
ATTACHED. CONTRACTOR SHALL EXECUTE AND RETURN ONE COPY WITH HIS FINAL OR RETAINAGE'
INVOICE.
_
7. INVOICES
,, 7.1 SUBCONTRACTOR SHALL RENDER ALL INVOICES IN QUADRUPLICATE TO THE FOLLOWING ADDRESS:
BROWN t ROOT, INC. 209 N. MAIN , PASADENA, TEXAS 77506
.
8. SUBCONTRACTOR'S REPRESENTATIVE
ATTN: J. W. MORROW
SUBCONTRACTOR SHALL DESIGNATE A SITE REPRESENTATIVE TO TEE GENERAL CONTRAC TOR FRIO TO CCMMEHro-TERT OF AFORB*EHTIOKED WORK. HE, OR IN HIS TBMPORAEX ABSENCE, ELS DESIGNATED ASSISTANT, SHALL BE "ON CALL" AT ALL HOURS, FROM COMMENCE!CENT OF SUBLET WORE TO COMPLETION.
9. labor RELATIONS
TEE'FOLLOWING SUPPLB-EEKTS PARAGRAPH BO. lM CDF TEE GENERAL CONDITIONS.
SUBCONTRACTOR REPRESENTS THAT ITS PKB-EERI5G COLLECTIVE BARGAINING AGREEMENTS, IF ANY, CONTAIN, OR WILL CONTAIN, PROVISIONS THAT, OR SUBCONTRACTOR HAS ENTERED INTO, OR WILL ENTER INTO A PROJECT AGREEMENT MODIFYING SUCH COLLECTIVE BARGAIN ING AGREEMENT TO PROVIDE THAT THERE SHALL BE BO STRIKES, SLOW-DOWNS, PICKETING, SBCQHDARY B0YC0TT3, OR WORK STOPPAGES DURING TEE PERFORMANCE OF THE SUBLET WORK. SUBCONTRACTOR WILL FURTHER SUBCONTRACT -ONLY TO LOWER-TIER CONTRACTORS HAVING ' - SIMILAR PROVISIONS IB THEIR COLLECTIVE BARGAINING AGREEMENTS, IF ANY.
THIS SUBCONTRACT/CHANGE ORDER CONSISTS OF PAGE 1 BEARING SIGNATURES AND AS MANY ADDITIONAL NUMBERED PAGES AS_ SHOWN ABOVE. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
JOBSITE Fill COPY
MU (0t-7)
00416