ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY
A
MONTH OF: DATE OF REPORT:
January
February 13, 1981
c: CLM, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, JLC, AHS T. G. Grumbles - Houston 0. D. Stef fey - ^Ponca City
ALL SAMPLE RESULTS:
Chemical VCM Lead Antimony Total Particulates
< PEL No.
%
67 100 4 67 6 100 5 100
>PEL
OVEREXPOSURES
No.
*
%
00
2 33
0i 0 00
OVEREXPOSURES:
Job Class
Line Compounder Color Weigh Compounder
Exposure
Lead: 94.7 micrograms per Nr
Lead: 149.0*micrograms per \r
Source
Charging Blenders with Cyastab 523
Weighing Hal base 100 EP and Cyastab 988
* Respiratory Protection Worn. JVU:2/8l
VAB.0001040309
ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY
MONTH OF: February DATE OF REPORT: March 10, 1981
c: CLM, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, JLC, AHS T. G. Grumbles - Houston 0. D. Steffey - Ponca City
ALL SAMPLE RESULTS:
Chemical VCM Lead Antimony Total Particulates
Job Class Chief Operator
Chief Operator
4 PEL No.
%
73 92 19 95 20 100
8 100
Expos ure VCM: 1.1 ppm
VCM: 3.8* ppm
Vinyl Shift Supervisor
VCM: 4.3 ppm
Vinyl Operator
VCM: 10.4* ppm
>PEL OVEREXPOSURES
No. %_
68
15
00
00
Source
Worked near leaking compres sor seal.
Worked near leaking valve-MBlowdownn tank in new unit.
Worked near leaking valve-"Blowdown" tank in new unit.
Worked near leaking recovery compressor
JVU:2/8l
?)?KboO1040310
Job Class General Mechanic
Exposure VCM: 11.7* ppm
Vinyl Operator
Color Weigh Compounder
VCM: 16.8* ppm
Lead: 80.2* Micrograms per M^
Source
Changed out compressor in VCM Tank Farm Compressor shed.
Changed filters in VCM Filter Pack.
Color weighup - no specific cause identified
* Respiratory Protection Worn.
VAB.0001040311
ABERDEEN CHEMICAL PLANT
.h
r
*
ROUTINE CHEMICAL DOSIMETRY SUMMARY
A
MONTH OF: March, 1981 DATE OF REPORT: April 10, 1981
c: CLM, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, RAM, AHS T. G. Grumbles - Houston 0. D. Steffey - Ponca City
ALL SAMPLE RESULTS:
Chemical VCM Lead Antimony Total Particulates
PEL No.
%
83 95 22 100 22 100
7 100
>PEL OVEREXPOSURES
No. %
k5
00
00
00
OVEREXPOSURES:
Job Class Vinyl Operator
"B" Instrument Technician
Exposure 1.5
1.6
1* -
Source
Vacuum pump flush line leaking old reactor area.
Specific cause not identified. Employee cleaned a flow meter near 7^3 reactor, reset a jacket cooling water valve on D-300, and did monthly P.M. on Honeywell Gas chromatographs (use of 5 ppm VCM standard gas).
CONTINUED ON BACK *
VAB.0001040312
Job Class Vinyl Operator
Vinyl Operator
Exposure 2.5*
3.8
*
* Respiratory Protection Worn.
Sou rce
Changed filters in VCM filter pack.
Cause not identified. Employee worked in old reactor area.
i
VAB.0001040313
ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY
A
MONTH OF: Apri1, 19dl
DATE OF REPORT: May 8, 1981
c: CLM, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, RAM, AHS T. G. Grumbles - Houston , 0. D. Steffey - Ponca City
ALL SAMPLE RESULTS:
-
Chemical
VCM Lead Antimony Total Particulates
PEL .. No.
83 95 36 100 36 100
5 100
> PEL (OVEREXPOSURES)
No. %
45 00
00 00
OVEREXPOSURES:
Job Class Vinyl Operator
Exposure 1.8 ppm VCM
Source Specific cause not identified.
Vinyl Operator
2.4 ppm VCM *
Changing VCM filter pack filters.
Chief Operator Vinyl Operator
7.3 ppm VCM 155.8 ppm VCM *
Specific cause not identified. Changing VCM filter pack filters.
ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY
A
MONTH OF:
May, 1981
DATE OF REPORT:
June 5 1981
c: CLM, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, RAM, AHS T. G. Grumbles - Houston, 0. D. Steffey - Ponca City
ALL SAMPLE RESULTS:
Chemical VCM Lead Antimony Total Particulates
< PEL Hoi
75 95 25 100 25 100
6 100
> PEL OVEREXPOSURES
No. %
k5
00 00
00
OVEREXPOSURES: Job Class Chief Operator
General Mechanic
Vinyl Shift Supervisor
Exposure 1.7 ppm VCM 1 .8 ppm VCM*
3*3 ppm VCM*
Source
Specific cause not identified.
Repairing minor VCM leak at VCM tank farm.
Supervised dumping of coarse, D-^00 batch.
Reactor Operator
15.3 ppm VCM*
Changed VCM filters in new unit VCM filter pack.
* Respiratory protsc&tien worn.
*
Jerald Uptain
VAB.0001040315
ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY
A
MONTH OF: June, 1981
DATE OF REPORT: July 1. 1981
c: CLM, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, RAM, AHS T. G. Grumbles - Houston , 0. D. Steffey - Ponca City
ALL SAMPLE RESULTS: Chemical
< PEL
No.
%
> PEL OVEREXPOSURES No. %
VCM Lead Antimony Total Particulates
75 95 12 100 12 100
3 100
4 0 0 0
5 0 0 0
OVEREXPOSURES:
-
Job Class Reactor Operator Dryer Operator Reactor Operator General Mechanic
Exposure 1.4 ppm VCM 2.0 ppm VCM 2.1 ppm VCM 3.7 ppm VCM
Source
Dump Sweco exhauster out of service
Specific cause not identified.
Specific cause not identified.
*^ *
Repaired caustic pump in old vinyl area. Specific cause not identified.
NONE OF THE FOUR PEOPLE WERE USING RESPIRATORY PROTECTION.
Jerald Uptain
VAB. OOO1040316
ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOSIMETRY SUMMARY
MONTH OF:
July
DATE OF REPORT:
c: CLM, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, RAM, AHS T. G. Grumbles - Houston , 0. D. Steffey - Ponca City
ALL SAMPLE RESULTS:
August 12, 1981
Chemical
VCM Lead Antimony Total Particulates
OVEREXPOSURES:
< PEL
No.
%
97 5 100 5 100 3 100
PEL 0VEREXP0SURES
No. %
33
00 00 00
v
Job Class
Exposure '
Source
Vinyl Shift Supervisor
1.1 ppm VCM
"O" ring seal blow-out on VCM f i1 ter pack.
Chief Operator
l.k ppm VCM
*
Emp1oyee removed used filters from VCM fi1 ter pack area.
Reactor Operator
3*9 ppm VCM
Specific cause not identified
None of the three people were using respiratory protection.
A
d Uptain
VAB.0001040317
ABERDEEN CHEMICAL PLANT ROUTINE CHEMICAL DOS 1METRY SUMMARY
MONTH OF: August, 1981
DATE OF REPORT: September 10, 1981
c: CLM, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, RAM, AHS T. G. Grumbles - Houston, 0. D. Steffey - Ponca City
ALL
SAMPLE
RESULTS
* *
Chemical
< PEL
No.
%
> PEL 0VEREXP0SURES
No. %
VCM Lead Antimony Total Particulates
74 90 15 94 16 100
6 86
8 10 16 00 1 14
0VEREXP0SURES:
-
Job Class
Exposure *
Source
General Mechanic
2.3 ppm VCM
-
Specific cause not identified
General Mechanic Vinyl Operations Engineer
*2.7 ppm VCM
h
2.7 ppm VCM
Employee blanked out D-500 reactor
VCM leak through sewer valve D-500
Vinyl Shift Supervisor
3.6 ppm VCM
Specific cause not identified
Vinyl Lead Operator
7.8 ppm VCM
Specific cause not identified
General Mechanic
*9.4 ppm VCM
Employee helped change VCM recovery compressor, V-ll
Vinyl Chief Operator
10.. 1 ppm VCM
Blown seal on recovered VCM charge pump.
General Mechanic
*19.1 ppm VCM
Compounder
Dry Blend Utility
*49.6 Micrograms Lead/M^
*20.1 Milligrams total Dust/M^
* Respiratory protection worn.
Changed safety discs^north south seal water separators, new vinyl unit
Specific cause not identified
Employee charged Master Batch cleaned area.
Jerald Up tain
VAB.0001040318
ABERDEEN CHEMICAL PLANT
ROUTINE CHEMICAL DOSIMETRY SUMMARY
MONTH OF: September, 1981
DATE OF REPORT: October 9, 1981
c: JF, CRM, PEM, JRM, RDJ, TBD, SJV, RAF, RAM, AHS T. G. Grumbles - Houston, 0. D. Steffey - Ponca City
ALL SAMPLE RESULTS:
Chemical
< PEL No.
%
> PEL 0VEREXP0SURES No. %
VCM Lead Antimony Total Particulates
86 92 5 100 4 100 4 100
78 00 00 00
0VEREXP0SURES:
Job Class
Exposure '
Vinyl Shift Supervisor thy
Reactor Operator
tfy
1.0 ppm VCM 1.1 ppm VCM
Reactor Operator
*1.1 ppm VCM
Chief Operator
<*/<
*1.4 ppm VCM
General Mechanic Reactor Operator Chief Operator
th
*5.2 ppm VCM *13.0 ppm VCM *13.6 ppm VCM
Source
Specific cause not identified.
Specific cause not identified.
Drained "knock-out" tank in new vinyl area. *
Employee replaced "0" ring on 0500 Lenape and corrected malfunction at "B" vacuum pump in old reactor area.
Employee helped clean VCM lines during shutdown.
Old vin*yl area recoveryit system
plugged.
Old vinyl area recovery system plugged. (Same time as 13.0 ppm sample above.)
* Respiratory prc/tection worn.
II
V
Jer Upta i n
*
VAB.0001040319
ABERDEEN CHEMICAL PLANT
ROUTINE CHEMICAL DOSIMETRY SUMMARY
MONTH OF: October, 1981
DATE OF REPORT: November 9, 1981
c: JR, CRM, PEM, RDJ, TBD, SJV, RAF, RAM, AHS T. G. Grumbles - Houston, 0. D. Steffy - Ponca City
ALL SAMPLE RESULTS:
Chemical
< PEL No.
%
^PEL 0VEREXP0SURES No. %
VCM
68 88
9
12
Lead
10 83
2
17
Antimony
12 100
0
0
Total Particulates
3 100
0
0
OVEREXPOSURES:
Job Class Compounder
Exposure 51.5* Milligrams Lead/M3
Color Weigh Compounder 55.5* Milligrams Lead/M^
General Mechanic lf/l& 1.9 ppm VCM
Yard Supervisor y l^l\ 2.1 ppm VCM
Reactor Operator ftfc 3.4 ppm VCM Maintenance Helper tC/e3 3.9 ppm VCM
Reactor Operator ielf, 4.6 ppm VCM
Chief Operator |d//d 4.7* ppm VCM
General Mechanic
4.8 ppm VCM
Chief Operator
5.9* ppm VCM
Reactor Operator
20.7* ppm VCM
* Respiratory protection worn
Source
Charging Tribase EXL (Special) to Line 3 Blenders
Employee weighed Dibasic Lead Phosphite
Specific cause unknown
Worked in VCM tankfarm area for 3 hours during VCM com pressor repair work
Specific cause not determined
Employee helped repair D-500 gearbox
Specific cause not determined
Specific cause not identified
Employee helped repair minor leaks during leak survey
Employee worked on Emission Recovery system and large reactor recovery system
Changed filters in VCM filter packs
VAB.0001040320
ABERDEEN CHEMICAL PLANT
ROUTINE CHEMICAL DOSIMETRY SUMMARY
REVI SED
MONTH OF: November, 1981
DATE OF REPORT: December 16,1981
c: JF, CRM, PEM, PJK, RDJ, WFH, SJV, RAF, RAM, AHS T. G. Grumbles - Houston, E. L. DeWhitt -- Ponca City
A
ALL SAMPLES RESULTS:
Chemical VCM Lead Antimony Total Particulates
PEL No.
%
74 96
8 100
8 100
2 100
PEL OVEREXPOSURES No. %
34 00
00
00
OVEREXPOSURES: Job Class Reactor Operator
Chief Operator
Reactor Operator
!/-
ih nit
Exposure *1.0 ppm VCM *3.1 ppm VCM
7.4 ppm VCM
Source
Employee "recovered" a VCM receiver.
4
Employee isolated VCM charge pumps and recovery compressors
Specific cause not determined.
* Respiratory protection worn.
H/t/ji'
ifraid Uptain w
tap
VAB.0001040321
f
ABERDEEN CHEMICAL PLANT
ROUTINE CHEMICAL DOSIMETRY SUMMARY
Month of
ji
Date of Report
December t 1981 January 15, 1982
c: JF, CRM, PEM, PJK, RDJ, WFH, SJV, RAF, RAM, AHS T. G. Grumbles - Houston, E. L. DeWhitt - Ponca City
ALL SAMPLE RESULTS:
Chemical
< PEL No.
%
> PEL (Overexposure s)
No. %
VCM
64 90 7
10
Lead
6 100 0
0
Antimony
6 100 0
0
Total Particulates
6 100 0
0
OVEREXPOSURES:
Job Class
Exposure
Source
- Maint. Supervisor -- Reactor Operator
Hit fcflt
1.2 ppm VCM 1.4 ppm VCM
Specific cause unknown ft II tl
General Mechanic
it ho 3.6*ppm VCM
Employee repaired recovery compressor in old vinyl unit.
_ General Mechanic
uk
6.4*ppm VCM
Employee pulled and cleaned vacuum pump.
Chief Operator -- General Mechanic
it/ii 11 hi
6.5 ppm VCM 12.6*ppm VCM
- Reactor Operator
17.l*ppm VCM
Specific Cause Not Found
Employee repaired emission
4
recovery system.
Employee sampled PVC reactor
A
im
* Respiratory protection worn
S'
/
aid V. Uptain
J
tap
VAB.0001040322