Document pegQwy1Laz5J9L7gYDLLqramE
SHAC ACTION REQUEST
DEPARTMENTAL INSPECTION PLANS September 16, 1976
The Annual Inspection (October 25th, 26th, 27th) is fast approach ing with observations and Guest Inspection results indicating much work yet to be done to place the plant in readiness for the inspec tion.
This year, as in 1975, we are asking all departments to submit individual plans containing the following:
1) Projected route which inspectors will follow when touring the department (you have already been asked separately for tour guides).
2) Action taken to correct any deficiencies noted in last year's inspection (SHAC Action Request, 8/4/76).
3) Action taken to correct deficiencies noted in recent Guest Housekeeping Inspection (final Guest Inspection is scheduled for week of October 4th).
4) Plans for involvement of hourly personnel in inspection; plus involvement on a day-to-day basis?1
5) Departmental actions and plans related to this year's theme, "Environmental Health and the New OSHA Standards".
For your reference, I am attaching to this request a copy of the "1976 Methanol Safety Program". While this memo does not cover all of our requests for Annual Inspection Plans, it is an indication of an active and effective departmental program and should serve as an excellent guide to other areas.
These plans are to be submitted to me no later than September 27th, (tour guides by September 17th). Follow-up action, as necessary, will be instituted to insure 100% response to this survey. Dis tribution is based on projected inspection areas and tour schedules.
SC 003154
^/' ^Jft
Harold Lacy * Safety and Housekeeping
Action Committee
Insert:
Areas where coffee breaks are scheduled are noted in parentheses. Personnel responsible for these facilities are reminded to make necessary arrangements.
dc
LAM004604
DISTRIBUTION DEPARTMENTAL INSPECTION PLANS
Personnel Building---------------------- E. N. Steele (note coffee break)
Ozarchuk
Reception Office/Guard House--E. R. Albritton
Cafeteria-------------------------- ---------- >-H. F. Adams
Dispensary----------------------------------- T. Ozarchuk
Fire Station--------------------------------- -J. M. Eason
Office Annex-----------------------------------W. H. Lane
F. E. Grissom
G. W. Bostick
C. A. Peters
Main Office-------------------------------------J. M. Tissue
Research I---------------
C. T. Murray --y. H. Lane
Research II---------------------
----W. H. Lane (note coffee break)
Control Lab-----------
--T. G. Lyons
<Matl. Handling Office Bldg.---W. T. Anderson
CBarge & Ship Docks 1 & 2
Stores------------- -- --------------T. W. Crump
rshops------------------
-------------------G- A. Orum (note coffee break)
(Maint. Bldgs/Garage
(Water Treating,---------------D. E. Rivero
(Power II
Instrument Shop-------------
B. J. Harrell
Dept. 19, 25, 27, 29.......................R. T. Hammann
AN Loading Rack---------------W. T. Anderson
Warehouse A, B, C------------ --'--T. W. Crump
Zone II Office-------------- -------A. W. Kuehl
Dept. 33---------- -- ---------------------- A. R. Wilson
Dept. 48/56........................................... L. J. Povse
Dept. 53...................................................T. S. Halien
Polyethylene Office--------------------R. J. Burkett (note coffee break)
PE Control Lab---------------------------- J. L. Kilfoy
Dept. 35F................................................ G. W. Hanks
Dept. 35P................................................R. W. Ceyanes
HOPE Packout/Warehousing-----------H. H. Treaccar
West Gate & Locker Bldg.----------E. R. Albritton
T. Ozarchuk
Dept. 44, 45, 46 -- -----------------------C. M. Hancock
Dept. 50------------------------------------------ B. L. Johnson
Primary Treatment-----------------------R. G. McDonnell
Zone I Office---------------------------------W. L. Riddick (note coffee break)
Dept. 10------------------------------------------ D. D. Kos
Dept. 15------------------------------------------ S. E. Knipling
Dept. 14/16........................................... S. E. Knipling
Dept. 13---------------------
J. P. Irwin
Streets & Grounds-------------------------W. L. Riddick
SC 003155
LAM004605
Monsanto
moi4io:*tion,
T. Devore - Texas City* Texas
o*{ August 2, 1976
ec
44D
vW
nrtn*<t
METHANOL-SYN GAS PLANT (DEPT. 44, 45, & 46) 1976 METHANOL SAFETY PROGRAM
TO :R. L. Stuart
J.. A. Glass C. M. Hancock
M. Lacy L. Nelson T. Ryan R. Radler
The Methanol-Syn Gas Plant 1976 Safety Program organization has been outlined. The detailed planning of the annual safety and housekeeping will begin in early August. The general timing of "Safety" organized events has also been developed. This planning work has been done with some input from the Methanol Unit hourly safety representative.
If you have any comments or questions about the attached program outline or timing, please contact me.
tg Attachment
~T71 <T?
^
M. T. Devore
SC 003156
(
LaM004606
METHANOL-SYN GAS PLANT - DEPT. 44, 45, 46 Safety Program Organization
A. Purposes
1. To promote continued interest in the Methanol Plant safety. Concentrate on improving hourly-supervisory communication.
2. To highlight and implement the plantwide NASA program.
3. To prepare for the upcoming safety and housekeeping inspection.
4. To prepare for the October# 1976 Shutdown.
B. Who Will Participate
1. Methanol Plant supervision.
2. Methanol Plant operators.
3. Guest supervisory inspectors.
4. Craftsmen assigned to Methanol Plant.
5. Methanol and other unit/craft safety representatives.
C. What Will Be Done
1. NASA (New Avenues for Safety Awareness)
a. Methanol Plant personnel looking for potential hazards. This was begun last year and will con tinue. Now looking at head knockers specifically --caused by extended valve stems.
b. Show movies quarterly with emphasis on industrial -accidents in operation areas.
c. Circulate more safety literature in control room.
d. Encourage the participation of the unit/craft safety representative.
003157
LAN100467
Methanol-Syn Gas Plant (Dept. 44, 45, & 46) Safety Program Organization - 1976
-2-
C. What Will Be Done - cont'd.
2. Prepare for Shutdown
a. Safety meeting in September specifically geared for shutdown.
b. List ball valves requiring round handles for shutdown work.
c. RV's to be pulled for inspection will be tagged.
d. Review safety items of startup and shutdown proce dures as well as work to be performed.
3. Prepare for Annual Safety and Housekeeping Inspections
a. Supervisory and hourly'inspections.
b. Unit/craft safety representative inspections.
c. Items to be highlighted--comments from 1975 inspection report. Oil storage area, bicycles, pipe identification, head bumping hazards, ladder inspection procedure.
d. Explain unit conditions since total Methanol Plant shutdown will be in progress.
e. Theme.
4. Continue monthly safety meetings.
3lSs
^04608
Methanol-Syn Gas Plant (Dept. 44, 45, & 46) Safety Program Organization - 1976
D. Timing
MTD:tg - 8-2-76
SC 003159 LiXw\oo^609