Document pegEwbzZXB1Z5OKeOvBbgo6GD
W'S-NTO INDUSTRIAL C . Louis, Missouri
February 8, 1S72
" * "ct T w r\ m+J
nw*w)
CALL REPORT NO. 1972-1
_
. TEXAS EASTER-1; TRANSMISSION CORP^ . Milam at McNeil ""
P. 0. Ecx 1512
Shreveport, La. 71130
cc:
C. T imi
13 * <4 r ^ -j
T. L. Gossage
J. ?. Herber
L. R. Stark
W. R. Richard
J. C. Frederiksen D. W. Stegen
H. R. Ford
P. L. Slayton
D. R. Hansen
E. L. Shimley
Date of Call: Present for Texas Eastern:
Present for Monsanto:
January 14, 1972
Walter Woods A. B. Jarnagin B. R. Purgitorio E. P. Farmer R. E. Moore D. K. Sloan E. C. Riall, Jr. Jack Slmpon J. Y. Briggs
C. L. Bradford D. W. Stegen J. G.. Frederiksen R. E. Hatton
SUMMARY:
Texas Eastern Engineering and Operational personnel were informed that Turblnol 153 will -no longer be available to
them without sigJiihg.~Sp4t"fal Agreement letter. Texas Eastern will not sign such a letter and has sufficient
material to finish out the current season. However, they will change from Turblnol 153 to another fire resistant turbine lubricant and expressed a willingness to work with Monsanto. They will provide one or more test units, pending G.E. approval, to field trial our product and to gain some
operating experience before their entire system is changed
over from Turbinol 153*
DETAILS:
....
The purpose of this call was to review with Texas Eastern Engineering and Operating personnel the situation caused by the discontinuance of Turbinol 153* Previous contact had been made with the Purchasing Department and .a copy of a proposed Agreement had been submitted.
Texas Eastern personnel had reviewed their lubricant supply situation and had determined they had at least sufficient Turbinol 153 to complete winter and summer operations. A more careful analysis will be made to determine the exact
SCAL C001S2
DEPOSmON
^ EXHIBIT StO /0?
WATER PCB-SD0000028714
Call Report Texas Easter
E Page 2
time of depletion. This will be done on a statlon-by-
station basis and include transferring new fluid around as
required. A desire wa3 expressed to order a small amount of additional fluid if it could be obtained before the deadline of signing the Agreement letter. However this was not possible and no additional fluid was supplied to Texas Eastern following our visit.
The environmental situation with the PCB containing
Turblnol 153 was discussed in detail. Texas Eastern stated
that they would not sign the special Agreement letter. They
felt they would be able to continue to operate for a
sufficient period of time to make an orderly and satis
factory changeover td another fluid.
.
We were asked concerning our replacement fluid and reviewed our total phosphate ester program aimed at providing chlorine-free hydraulic fluids and lubricants. It was stated that Information on a replacement product would be available in 1-2 weeks and would be supplied in terms of
a comparison with Turblnol 153* It was pointed out that these are relatively new products and that we do not have
a large background of service experience. They requested that we supply our test data as rapidly as possible.
One area of considerable concern was conversion procedures required to change from Turblnol 153 to any new product they select. Therefore, adequate data on compatibility between our new all phosphate ester fluid and Turblnol 153 must be obtained. It was their feeling that they could clean and drain their gas turbine units'so that about 10 of the original fluid would remain in the system.
One necessary step before conversion is General Electric approval or at least acquiescence for the particular product to replace Turblnol 153. It was Indicated that work is under way with General Electric, that they were aware of our phosphate ester program and had examined some samples of our material. Texas Eastern will also be in contact with
General Electric to determine what mechanical changes may be made necessary in existing turbines. It was Indicated that materials compatibility should be satisfactory but that the two fluids would have different densities and viscosities. Questions were asked concerning heat transfer characteristics since this is Important in sizing coolers. It was emphasized by Texas Eastern that Monsanto should work very closely with General Electric to be sure that complete
information exchange is obtained. In addition, they suggested contact with Clark, Cooper Bessemer, DeLaval and Westlnghouse for their approval on our new fluids. The
SCAi. 000193
WATER PCB-SD0000028715
viua ns^vf; no.
ci.
Texas Eastern Transmission Coro Page 3
first three companies supply the natural gas compressors which are driven by the gas turbines, both using Turbinol 153 from a common reservoir. Westinghouse has supplied one gas turbine which is lubricated with Turbinol 153.
During the discussion, the Vice President of Engineering asked his people as to what steps would be Involved in going back to petroleum fluids. Both Operating and Engineering personnel affirmed that fire resistance was the important characteristic and that they have no desire to use flammable lubricants at unmanned units. There also appeared to be a desire to cooperate with Monsanto on a new fire resistant product.
/pep
R. E. Hatton
SCAL 000194 WATER PCB-SD0000028716