Document peXKd755w1x4aEzmzKm0GpvJX

**:C 5^0*33 Monsanto .O-MNA^ilOCANO"! D> D> KOS - 0-11 PLAINTIFF'S EXHIBIT jujfct IIMOK! JO January 24, 1983 Minutes of Hourly Safety Committee Meeting December 28, 1983 Mark Riddle PMSB SHAC :Hourly Safety Committee Present: Gene Crain - SS8 James Nidiffer - SS10 Manuel Perez - 2PD Mike Westmoreland - AB1 Ira Rankin for Walt Middleton - SS13 Pat Walzel for Albert Solis - 2PD Absent: Pervis Cotton - 33D George Williamson - 33D Dennis Kos reviewed the December PMSB meeting. He reviewed the investigation reports on the injury and explosion in the methanol plant, chemical burn to janitor, and the December 10 IDA waste spill. The new 1983 Texas City Safety Calendars were presented and plans reviewed. HSC members were reminded that the quarterly safety and housekeeping inspection will be held the first two weeks of January. HSC members will be included as inspectors and by PMSB directive should make the inspections tough. UNFINISHED BUSINESS Physical Fitness Promotion The fitness news article has been prepared and approved for issue. This will be sent to Donna Dickson for a late January or early February issue in the Plant Newspaper. The only remaining item is to gather information on the YWCA Galveston. Dock 2 Phenol Hose Deinventory Problems o Over the last year there have been several incidents in which the Dock 2 phenol hose has accumulated phenol which could not be removed due to dip or low point. This has been addressed in the safety log book and unit/craft meetings but the action taken (use of a crane to take out the belly) does not always prevent recurrence. o Over the recent past, several improvements have been made at Dock 2 to help prevent significant accumulation of phenol in the unloading hose. The Dock 2 area was painted to provide exact spotting of each barge and the hose length and crane rigging was modified. Some concern, however, continues to be expressed that near the end of the barge unloading, a short section of hose develops a dip which can accumulate phenol. Material Handling has modified the unloading procedure to include extra rigging which should avoid this dip in the short section of hose. This will be verified at the next phenol barge unloading. sc 12326 L/MV1013521