SOP-EDC-OHC-L/T STG-V WRITTEN BY: CF DATE: 01/10/91 REVIEWED BY: DKP DATE: 07/29/92
iCHECK ACTION STEPS (Capital letters) and Comments (Small letters)
DURING ANNUAL OUTAGES AT VCMII IT IS NECESSARY TO REMOVE POWER FROM THE UPS SYSTEM TO PERFORM MAINTENANCE ON THE EQUIPMENT. WHEN THIS OCCURS ALL POWER TO THE MOD III AND THE PLC WILL BE LOST. BEFORE DOING THIS SEVERAL THINGS MUST BE DONE.
1. VENTS MUST BE SENT TO THE BI INCINERATOR. THE 6016 BYPASS KEY AT VCII AND LOW TEMP CONTROL ROOM MUST BE BYPASSED. THIS WILL ALLOW POWER FROM THE WTU CONTROL ROOM TO ENERGIZE 6016. THE RED LIGHT ON THE VCII PANEL WILL NOT WORK IN THIS SITUATION BECAUSE IT GETS POWER FROM THE UPS SYSTEM. P5000 MUST BE BLOCKED IN THE FIELD.
2. ALL VALVES RECEIVING POWER FROM THE MODIII WILL GO TO THE FAILSAFE POSITION AFTER THE BACKUP BATTERIES DISCHARGE. IF THE BATTERIES ARE ALSO DISCONNECTED THE CONTROLLERS WILL LOSE POWER IMMEDIATELY.
3. ALL SPRINKLER SYSTEMS MUST BE BLOCKED IN.(SIGNAL FROM THE PLC IS LOST, CAUSING SPRINKLERS TO DUMP.) THESE MUST BE RESET AFTER POWER IS RESTORED.
4. BECAUSE THE UNIT IS DOWN AND CLEARED, ALL PROCESS UNITS SHOULD BE BLOCKED IN AND ISOLATED. IT IS VERY IMPORTANT TO DOUBLE CHECK ALL VALVING TO INSURE THAT THE UNIT IS SECURE, TO PREVENT AN UNSAFE CONDITION FROM OCCURRING AND A POSSIBLE ENVIRONMENTAL RELEASE.
5. THE ATMOSPHERIC SCRUBBER IS USUALLY LEFT IN SERVICE DURING THE OUTAGE. IT IS VERY IMPORTANT TO BLOCK IN THE H20 TO THE SCRUBBER PRIOR TO SHUTTING DOWN THE UPS SYSTEM TO PREVENT OVERFILLING OF THE SCRUBBER, WHICH WILL OVERFLOW TO THE IMPOUNDING BASIN/COVERED SEPARATOR AND COULD OVERFLOW TO THE PIGMENTS DITCH.
6. NORMALLY THE OHC REACTORS WILL BE DUMPED PRIOR TO THIS POINT IN THE OUTAGE. IF A REACTOR HAPPENS TO BE FLUIDIZED WHEN THE UPS IS TO BE DE-ENERGIZED, THE N2 TO THE MFH SHOULD BE BLOCKED IN, AND THE N2 TO THE 02 HEADER SHOULD BE BYPASSED IN THE FIELD. IF THE AIR BLOWER TRIPS OFF, THE MFH N2 WILL HAVE TO BE OPENED TO FLUIDIZE THE REACTOR. YOU WILL HAVE TO GUESS AT THE RIGHT AMOUNT OF FLOW LOOKING AT THE MFH PRESSURE GAUGE IF THE MOD III IS DOWN.
ONCE POWER IS RESTORED TO THE UPS SYSTEM ALL EQUIPMENT CAN BE
RETURNED TO ITS NORMAL SERVICES.
''
- * - ' *
SL 003589
OPERATOR'S NAME:
DATE
CHECK I ACTION STEPS (Capital letters) and Comments (Small letter
______ 1. JOB SAFETY INSTRUCTIONS REVIEWED.
______ 2. INSURE THAT YOU ARE WEARING PROPER SAFETY EQUIPMENT: HARD HAT, SAFETY GLASSES OR GOGGLES, HEARING PROTECTION (OPTIONAL).
3. OBTAIN A BLANK COPY OF THE WEEKLY CHECKLIST. The sheets are divided into two categories: A. Process operators fill out the sections in the unit itself. B. Storage operators fill out the section in the outlying bulk storage areas.
SL 003590
4. OBTAIN A WORKING METER. On HNU. meters check' the batter y to Insure. it. is charged up by turning the knob to "batt" position. You should hear the meter come on and the needle should be in the green zone. If the battery does not test good let it recharge. On the TIP meter the battery is OK if "LOBAT" is not showing.
Zero the meter you are using by turning the zero knob till it reads zero. During use, the meter should be periodically rezeroed.
5.
.ft' o 6
Vj J
> vj
1 4* i * si
t: 0 Cm -'<
U* 'J '
Ct O
un o* `: A,U3) ^--* ,'
a
IDENTIFY METER, DATE, CALIBRATION DATE, AND OPERATOR ON THE LEAK PATROL FORM.
This data is required by law to be recorded. If the meter calibration date is more than 7 days old the meter cannot be used. Obtain another meter with a valid calibration date. Notify supervision if one cannot be found.
COMPLETE INSPECTION AND PUT A CHECK BY THE EQUIPMENT THAT IS NOT LEAKING. IDENTIFY LEAKS WITH THE QUANTITY AND A DETAILED DESCRIPTION OF WHAT AND WHERE THEY ARE.
Check each individual piece of equipment on the list. Check valve packings, flanges, fittings, bleed valves, pump seals, and any other suspected areas. If any leaks are found in areas other than those listed on the log sheet note these also.
A "leak" is defined as a VCM concentration of 10 ppm or greater at a distance of six inches downwind of the source. Obviously the concentration will be higher at distances less than 6". Log only those leaks that fit the definition of a leak on the sheet.
*
7.
8.
9. 10.
REPAIR ANY LEAKS THAT CAN BE EASILY STOPPED. If the leak can be fixed with channel locks, then do so during the round. Log it as a leak but also state in the corrective action section what was done to stop the leak.
AFTER YOU REPAIR THE LEAK, SNIFF IT AGAIN WITH THE METER TO VERIFY IT IS <10 PPM MR WRITE DOWN THE READING (0-10 PPM) ON THE LEAK PATROL FORM. THIS MUST BE DONE FOR DEO VERIFICATION.
There is no reason to leave a leak for maintenance that an opera tor can fix.
If the leak is too small to qualify as a 10 ppm leat 6" but is still worth fixing, do so or log it in the maintenance log book so it can be repaired before it becomes a reportable leak.
at
Any leak that is large enough to show vapors, liquid, or icing is to be reported to supervision immediatelv so that it can be repaired.
WHEN YOU CANNOT TAKE IMMEDIATE CORRECTIVE ACTION, LOG DOWN THE INITIATIVE TAKEN TO STOP THE LEAK. REFERENCE MUST BE_ MADE TO ALL OTHER DOCUMENTS USED IN THE FOLLOW-UP AND CORRECTION TO THE LEAK.
If the leak cannot be stopped by you, log down in the corrective action section what action was taken that will eventually stop the leak. Examples of this are statements noting that the leak was repaired using the maintenance log or a work order.
AFTER THE LEAK IS REPAIRED, WHAT WAS DONE MUST BE NOTED ON THE LEAK PATROL FORM WHERE THE LEAK WAS FIRST REPORTED. ALSO NOTE THE DATE THE REPAIR WAS MADE AND INITIAL YOUR COMMENTS.
Also, remonitor the leak again with a meter to verify that it is <10 ppm and write down the reading (0-10 ppm) on the leak patrol form. This must be done for DEO veri fication.
SL 003591
CONFIDENTIAL: Subject to Protective. Order Of 14th Judicial District Court
No. SI-1145'
SOP-VC-LT/STG
REVISED BY: F33 REVISED: 04/15/92 APPROVED BY: DKP REVIEWED: 04/15/92
OPERATOR'S NAME:
DATE
CHECK ACTION STEPS (Capital letters) and Comments (Small letters)
1. WHEN AN AIR MONITOR ALARM IS RECEIVED, THE APPROPRIATE OPERATOR OR LEAD OPERATOR IS TO GO OUT AND INVESTIGATE THE LEAK IMMEDIATELY. It is your responsibility to investigate, correct, and report on any alarms that occur. Our ambient air monitoring records are reviewed by the La. DEQ. To convince them that we are handling VCM correctly, our records must be complete.
2. TAKE CORRECTIVE ACTION TO STOP THE LEAK IF ONE IS FOUND. RESPIRATORY PROTECTION MUST BE WORN.
0 - 50 ......................... ppm COMFO-II HALF MASK 50 - 250 .................... ppm COMFO-II FULL FACE MASK >250 OR UNKNOWN . ppm AIR PACK OR BREATHING AIR
3. NOTE THE FOLLOWING INFORMATION IN THE LOGBOOK FOR EACH ALARM OF GREATER THAN 5 PPM: (NOTE: Steps a - d are to be done for every alarm needing response. Repeated alarms at the same point are not acceptable; use of an HNU or tip is required on repeat alarms.)
(a) WHEN THE ALARM WAS RECEIVED. Write time in military form.
(b) WHAT MEANS OR INSTRUMENTATION WAS USED TO SEARCH FOR OR
FIND THE LEAK.
CM
o> to (c) RESULTS OF THE LEAK CHECK INCLUDING AN INSTRUMENT CO READING. O O
(d) WHAT WAS FOUND. Even if nothing was found, write
"nothing found." CO
(e) WHAT CORRECTIVE ACTION WAS TAKEN TO STOP THE LEAK.
4. IF THE AIR MONITOR SYSTEM APPEARS TO BE MALFUNCTIONING ON
BACK SHIFT, IMMEDIATELY CONTACT THE SHIFT SUPERVISOR TO CALL
OUT THE ANALYZER GROUP TO REPAIR THE SYSTEM. If analyzer i
found to be malfunctioning before 05:00 a.m., the analyzer
group must be called out. After 05:00 a.m., the lead man
s.hou'lcT'pass on to his relief that the analyzer group should
be called1 out at 07:30 a.m. :; .
CONFIDENTIAL: Subject to Protective Order
' , of I4th Judicial District Court
No. 91-1145
5. PULL THE AIR MONITOR REPORT AFTER IT PRINTS OUT AT 7 AM. VC LEAD MAN IS RESPONSIBLE. If for some reason it is lost, pull the alarm point data logger for the 24 hour period 7 AM to 7 AM.
6. TRANSFER THE RESPONSES TO THE ALARMS FOR EACH POINT FROM THE LOGBOOKS TO THE AIR MONITOR REPORT. Alarms will appear in columns <R3 and >R3, The <R2 columns are not for alarms.
MAKE RESPONSES IN SUCH A MANNER AS TO LEAVE NO DOUBT OR
CONFUSION ABOUT WHAT WAS DONE. Since the alarm is to be
checked immediately, the response on the air monitor
report should contain a phrase stating so. An example of
this is "operator checked at alarm time
Make every
effort to check the alarm as soon as possible. If for
some reason we are unable to do so, note as such and give a
reason. The remainder of the response should clearly state
what was found and what corrective action was taken.
Examples of this are: "...checked with leak-detek, found a
sample coil fitting leak and tightened it up and the leak
stopped.", "...checked with HNU, tip and found nothing",
and, "...checked with HNU and found a leaking flange.
Cleared the piping to stop the leak and wrote it up in the
maintenance logbook to be repaired."
7. IF THE RESPONSE IN THE LOGBOOK IS INCOMPLETE OR MISSING, THE YC LEAD MAN IS RESPONSIBLE FOR TRACK ING DOWN THE ANSWERS. Write notes in the appropriate logbooks if necessary.
8. PUT THE COMPLETED REPORT ON THE DESK OF THE SUPERVISOR IN CHARGE OF THE AIR MONITOR REPORT FILE.
9. THE VCM-I AIR MONITOR ALARMS ALSO PRINT OUT AT VCM-I I. VCMII IS RESPONSIBLE FOR CHECKING OUT POINTS 9-12 IN THE SAME MANNER AS DESCRIBED ABOVE. THE FINDINGS MUST BE NOTED IN THE STORAGE LOGBOOK AND MUST BE COMMUNICATED BACK TO THE VCM-I CONTROL ROOM TO BE LOGGED ONTO THEIR AIR MONITOR REPORT.
Points:
1 -8 VC loading rack 9 S-1,2 transfer pumps
10 Day tank transfer pumps 1 1 Piperack south of VC-I maintenance 12 S-1,2 tank car loading pumps
When points 1-8 alarm, VCM-1 I must call the VC rack to verify their acknowledgment. On backshifts, when shipping is not loading, it is VCM-1 I's responsibility to check the alarm and report the findings to the VC-I control room to be logged onto their report. All alarms should be reported to the Shipping shift foreman.
SL 003593
SOP-EDC-OHC-VC-L/T WRITTEN BY: DKP APPROVED BY: DKP DATE: 02/28/92
STG
CHECK ACTION STEPS (Capital letters) and Comments (Small letters)
The Derivatives inter-unit spec book contains a list of the transfer streams between the various control rooms in Derivatives. For each stream the following information is listed:
Customer(s) Supplier(s) Specifications Telephone contacts
(Receiver)
These specifications are reviewed periodically and updated by the affected customers and suppliers. The Derivatives secretary maintains the master list and administers the updating process.
When significant changes to specifications occur, or if a reminder is needed, the VCM-II area supervisor will put the specification form in the Change manual and indicate who must*read the new- specs,
All Derivatives units are expected to conform to the specs. If situations arise which require operation outside the specifications, a deviation approval form should be filled out. Blank forms are located in the back of the inter-unit spec book. On day shift, operators should contact the appropriate unit supervisor to get the form approved; on back shifts, operators should work through the
shift supervisor.
The spec book is kept on the control room desk or in the control room bookshelf.