_______H. S. Bergen - D2SL
" July 28, 1975
*""reT
PCD CONTINGENCY PLAN
'
rrci*rMct Your Memo July I,. 1975
TO : F. J. Fitzgerald - B3SA *
PERSONAL & CONFIDENTIAL
Attached Is our proposed worldwide PCB Contingency Plan
based on the stated premise of a government ban with a
90-day phase-out period, assuming an October 1, 1976 ban
effective 1/1/77-
.
Also attached Is a proposed PCD Contingency Plan based
on a case .which the business group feels Is possibly realistic considering present government attitudes and actions, customer responses and the "state of the art." This premise is a government ban announced 1/1/76 but with
a compliance program and the ban to be effective 1/1/78.
We have had detailed inputs from Honsanto-Europe, as well as much detailed input from our business group personnel, our plants, plus Bill Papageorge and the Law Department.
In summary, we feel these two cases "bracket" the worst potential situation. In either case, certain actions are identical -- only the timing, odds of success and the financial Impact on Monsanto are different. The two-year compliance case Is on balance,in our opinion, the optimum for the U.S.government position, the total welfare of the
population, the electrical uti1lties and other end users
and the transformer and capacitor industry position and
Monsanto's position.
We'll be glad to review this with you in detail if you desire.
Please advise If these meet with your approval for the premises
stated. There.are other premises which can be evaluated should
the occasion demand.
. '
/tl Attachments'
COMPANY CONFIDENTIAL
tRAN O35171
PLAINTIFF'S
EXHIBIT
ass'si
\ -- } --Gj
--
WATER PCB-SD0000076993
DISCUSSION OF CASE I
This case Is the worst and most unlikely to occur for the following reasons:
1. Industry does not Have thoroughly tested and approved *
replacement products for use In capacitors. At
least 18 months more time is needed.
2. Industry does not have a fire-resistant liquid transformer fluid tested or approved. At least 2 years more time Is
' needed.
3. The consumer would be exposed to dramatically different and Inferior performance standards of capacitors and
_ transformers which will affect his safety and energy costs
and aval lab11Ity. .
h. The U.S. government ts leaning towards a three-year compliance program for the toxic pollutant products. Compliance may be possible In that time frame.
5. The alleged carcinogenic properties are not proven. QA/tyfo
.6 There will be law suits against the U.S. government.
7. The odds of success are the lowest from the standpoint
of technical and commercial viewpoints.'
TRAN 035172
This case Is the worst economically for Monsanto and industry. There Is very little chance of our successfully developing a transformer replacement product In this case. It would be dlfftcut to successfully
Introduce non-PCB products to other world areas outside of Canada as long
as those governments allowed PCBs to be used.
WATER PCB-SD0000076994
CASE I - PCB COHTINGEHCYPLAN- MAJOR STEPS -7/28/75
(COMPANY. .
CONFIDENTIAL
PREMISE*
U.S.A. government tan 10/1/75 effective 1/1/76. Ho Imports allowed. U.K. government follows U.S.A.
along with OECD member countries. Eighteen month time lag behind U.S.A. Imports allowed for .18 mos.
Honsantcr-Europe follows U.S.A. Monsanto timing. European competitors lag 18 mos.
j$Most Critical Steps .
ACTION
WHO
'WHEN
ODDS OF SUCCESS
COMPLIANCE WITH U.S.A. GOVERNMENT DIRECTION
Jfl.-
Clarify exact conditions of ban with the U.S.A. government and Industry.
W. B. Papageorge W. Easley, D. Wood
A.S.A.P.
80-90*
Monsanto submit plan for phase-out to government
and CAC and formally announce Intention to cease
selling PCBs on 1/1/76.
3. Determine need for worker surveillance by OSHA.
H. S. Bergen F. J. Fitzgerald W. B. Papageorge ' P. R. Department \
W. B. Papageorge' Dr. G. Roush
10/16/75 10/16/75
100* loot
k.
5.
^6. '
From EPA, determine need for continued plant effluent surveillance.
Take action on any class action law suits or other taw suits against the government and Monsanto.
Present available toxicological and environmental data on replacement products to government.
.
CONCERN FOR CUSTOMERS
4i. ik. *3.
Appoint PC8 task force to handle:
(a) phase-out of PCBs, (b) Introduction of replacement products.
Conduct USA salesmen's seminar with selected U.S. export Honsanto reps.Invited (Europe/Latin America/ Australla/Indla/Far East).
Notify customers of government ban, terminateany contracts and explain Monsanto plan.
.
W. B. Papageorge W. Easley D. B. Hosmer Law Department
. 10/16/75
loot
As need arises loot
W. B. Papageorge W. Easley, RtD, Medical Department
10/16/75 '
.loot .
H. S. Bergen F. J. Fitzgerald
A*5 A* P .
loot
T. L. Gossags, C.Paton 10/15/75 D. Wood, RSD
loot
T. L. Gossage, C.Paton 10/16/75 \ D. Wood, Regional
M*nanrs. Sa1esmen
'90-Joot
WATER PCB-SD0000076995
idye i - Case I
_________
ACTION
A4. Hold Industry dielectric meeting In St. Louis to
answer Immediate customer questions and explain
production plans of replacement products.
`
*5. .
6.
o 9 0*7.
Ti o
o
m
2:
"O
>*8.
H -<
Visit each customer Individually to establish prellmlnary non-PCB fluid forecast and technical pro grams as well as PC8 requirements during phase-out period.
If requested by customers, prepare P.R. statement for
PCB ultimate users; I.e., utilities, transformer
"top up," etc.
Determine non-PCB market forecast. Announce Honsanto. Intention to proceed to Interim production of MCS 1238 effective 2/1/76 and also Honsanto commitment to a new plant to come onstream In 18 months to 2 years.
Establish shipping and production plan and allocation If necessary of PCB fluids as well as announcing warehouse and Incineration and return goods policies.
*3. Establish allocation of replacement fluids with
customers.
10. With Industry, develop suitable standards -- ASTM, EIA, Ctgre, OED, etc.
III. CONTINUITY & ECONOHICS OF OUR CONTINUING BUSINESS
1. See attached Table 1 for economic impact.
&2. Submit AR for non-PCB dielectric plant and-Santosol
200 plant to CAC.
'
,
V. INTERNAL HONSANTO ACTIONS
4l. Present Honsanto phase-out plan to CAC and gain approval.
*2. Gain approval for PIR for non-PCB Santosol 200 plant.
WHO..................... ' Marketing, RD and Manufacturing
Marketing and Task Force
WHEN " 11/1/75
11/8/75
/
ODDS OF " SUCCESS
90-loot
\
80-100*
Chairman-of-Task Force and P.R.
11/25/75
80-100*
Marketing and P.R. Department
e.
Marketing Task Force
1/1/76
\ .10/14/75
40* 80-100*
Marketing Task Force
MarketIng/RtD
12/15/75
1/1/76 and Continuing
40* ' 50*
H. S. Bergen F. J. Fitzgerald H. H. Bible
H. S. Bergen F. J. Fitzgerald H. H. Bible
Same
2/15/76
100*
10/13/75
100*
10/13/75 '
90-100*
TRAN 0 3 5 1 7 4
WATER PCB-SD0000076996
ACTION
WHO WHEN
Marketing Related
-.
4l. .
Obtain all needed new product Information
presentable In a commercial form. (This Includes toxicity data and product acceptability data on HCS 1238 and 153&, finished goods, ` manufacturing specifications, storage stability. tests and product application testing to date.)
( j
RSO, Kedical . Product. Accept.. Manufacturing
3/15/75
*2. No transformer replacement product Is available, j
*.
.
Manufacturing Related
'
5
f
!
4i. Inform Purchasing Department and other Monsanto |
business gropps of change of raw material require-?
ments and,most Importantly, obtain sufficient ;
allocation of toluene sulfonyl chloride from
(
Plasticizers Division to give us 1.5 M Ib/yr rata.\ (The following raw material will decline in usage: . benzene and chlorine and trichlorobenzene. The .
following products will increase In usage, at least temporarily: toluene sulfonyl chloride.
When Aroclor Is shut down, a shortage of chloro-
sulfonic acid will result which Is used to make toluene sulfonyl chloride and other products. '
. . There must be an agreed on allocation plan. Another alternative solution would be an Inventory build-up In penta. The effect of chlorine cell house operation needs to be studied.) '
No action by Marketing. RSD continue to define and develop product.
H. 3. Bergen
. . A.S.A.P.
F. J. Fitzgerald ' .
S. A. Heininger '
.
.
G. L. Bratsch
J. R. Savage
Purchasing Department
*2. .
Set up manufacturing phase-out plan for PCBs.
Develop manufacturing plan schedule for non-
.
PCB with outside converter. (HI I liken Chemical/
Anderson Development).
'
^Production to start as soon as possible and be up
to IfiOH pounds per month TXS by 2/1/76,
J. R. Savage J. R. Savage
J. R. Savage/ Outside Converter
A.S.A.P. 2/1/76
3. Plant decommissioning, decontamination of equip
ment site and tank cars and plant dismantling.
J. R. Savage/ FI int/Leisy
Begin 1/1/76
ODDS OF SUCCESS
10-20*
10*
70-80* .
100* 80-90*
.
60-70*
100*
WATER PCB-SD0000076997
Page - Casa I \
ACTION #W. Start-up of new non-PCB Santosol 200 plant.
C. Accounting Related
`
.
^1. *
Establish reserves for plant write-off and ' plant dismantling and anticipated Incineration reserve and any other anticipated needs.
#2.
Administrative reassignment of any redundant personnel.
WHO....................'
OOOS OF WHEN.................... ` SUCCESS `
J. R. Savage . Manufacturing Dept.
9/77.
^ 80-90$
A. J. Koenig l. B. Skatoff .
12/1/76 .
100$
H. S. Bergen
F. J. Fitzgerald C.A. Sweets G. L. Bratsch
. 10/1/76 .
'
' .
100$
W
\
CONFIDENTIAL
`TR N
\-
WATER PCB-SD0000076998
TABLE I SPECIALTY PRODUCTS * PCB DIELECTRIC BAN 90 DAYS FOLLOWIMG 10/1/75
PHASE-OUT COSTS S WRITEOFFS - TAKE IN 1975
I. Fixed Investment Write-off and Dismantling
.
: . $H
Krummrich Plant Newport Plant
"
'
1410 690
___$H 2100
II. Decontamination and Reassignment 44 PCB TC's
III. Decontamination - Newport
TOTAL
'
IV. Plant FIE Redistributed to Rest of Plant
Krummrich Newport
300 ' 100
*
V. Task Force to Phase-Out PCB Dielectrics ..
Domestic $ U.S. Export Ex. USA
150 -75
400 150 2650
400
225
/tl 7/28/75
COMPANY . CONFIDENTIAL
TRAN 035177
WATER PCB-SD0000076999
DISCUSSION OF CASE U
Tills case, which represents another "worse case" type situation, Is more
apt to occur and other n-'.-i.rd variations of it are more likely to occur
for the following reasons:
/;
l. The USA govcrmn.nl wauls n toxic substances law that Is
workable and accepted t>y Congress, the population and
industry. An outright PCO li.m, wl th severe time parameters -
which create oilier risks lo society, Is not conducive to
positive legislative steps. Many court cases will result.
The U.S. government Is more opt lo go along w!th any one
or a combination of the following:
.
a) a ban to be effective In a long enough time frame
to permit industry lo change over to something
else with less total risk;
b) a ban on certain PCBs -- like 125*1 and higher
homoloaH.;s -- but allow continued production and
use of MCS 1C'i3 and 1016 which are considerably , more biodegradable and which do not accumulate
In body fat to the extent of higher homologues; r .
c) a "controlled" and monitored production and use
of certain PCBs -- with effluent standards tightly
controlled.
`
.2 There are too funny other alleged carcinogens with greater
production and distribution for the U.S. government to single
out PCBs.
.
COMPANY CONFIDENTIAL
TRAN 035173
WATER PCB-SD0000077000
Page 2 '
3. -
Monsanto and-Industry will propose to the U.S. government -- prior to a "total11 ban on PCBs -- various programs which will dramatically reduce production and use of the higher homologue. (less biodegradable) PCDs with only minimum risk from all other aspects. This case would entail Monsanto offering only Aroclors 101C and 10*13 Tor transformers and capacitors and reducing the production of the "non-blodegradable" 125* by 10-12 M pounds/year. There are certain other risks here but these possibly could be resolved with only slightly higher costs and fire safety risks.
4.
The total Industry is more apt to accept It because It gives the time necessary for an "all-out" emergency changeover situation. The Industry really wants three years -- but could live with two. The .Industry Is not prepared for a 90-day ban.
5. The odds of success are considerably better than Case I.
This case Imposes a "tight" but more possible time frame for Monsanto and
Industry; it represents considerably better economics to Monsanto and gives
us a 50t chance of developing a transformer replacement product. It would
be easier to Introduce and gain acceptance of non-PCB products In other
world areas.
.* .
.. '.
.
a 7/28/75
. COMPANY ' confidential
TRAN 035179
WATER PCB-SD0000077001
i
'
PREMISE; .
CASE II - PCB CONTINGENCY PUN - MAJOR STEPS - 7/28/75
U.S.A. government ban 1/1/76 with a .compllance program and the ban to be effective 1/1/78. No Imports allowed. U.K. government follows U.S.A. along with OECD member countries. Zero to six months time lag behind U.S.A. Monsanto-Europe follows U.S.A. timing. European competitors follow'OECD compliance. Maximum six months lag.
Jfrlost Critical Steps ACTION
WHO
* WHEN
ODDS OF SUCCESS
*1 COMPANY
CONFIDENTIAL
COMPLIANCE WITH U.S.A. GOVERNMENT DIRECTION
'
.
*1.
Clarify exact conditions of ban with U.S.A. government and industry. '
W. B. Papageorge W. Easley/D. Wood
A* S *A*P a
80-30*
*z.
Monsanto submit plan for phase-out to government and
CAC and formally announce Intention to cease selling *
PCBs on 1/1/78.
.
. H. S. Bergen
1/15/76
F. J. Fitzgerald
Public Relations Dept.
W. B. Papageorge
.
- 100*
3. Determine need for worker surveillance byoSHA.
W. B. Papageorge
Dr. G. Roush
.
1/15/76
100*
TRAN 0 3 5 1 8 0
A. From EPA, determine need for continued plant effluent survel1 lance.
5. Take action on any class action law suits or other
suits against the government and Monsanto.
W.B. Papageorge . W. Easley
D. B. Hosmer Law Department
1/15/76 As need arises
100* 100*
Present available toxicological and environmental
data on replacement products to government.
.
CONCERN FOR CUSTOMERS
*
W. B. Papageorge W. Easley Medical Department RSD
1/15/76 and continuing as data develops until completed, on 8/77.
100*
*1. *2.
Conduct USA salesmen's seminar with selected U.S.
export Honsanto reps. Invited (Europe /Latin America/
Australfa/Indla/Far East).
.
Notify customers of government ban, terminate any contracts and explain Honsanto plan.
T. L. Gossage C. Paton, D. Wood RSD
T. L. Gossage C. Paton, D. Wood Regional Hanagers Salesmen
1/7/76
1/15/76
. \
100* 100*
WATER PCB-SD0000077002
Page 2 - Case 1i \ .1
'
----A---C--T--I-O--N-------------------- |----------------------------:-------------------------------------------------- -------
Ogo4433-
Hold Industry dielectric meeting In St. Louis to
answer Immediate customer questions and explain >
production plans of replacement products.
--^
Visit each customer individually to establish
m
zi
>^z
--1 _<
preliminary non-PCB fluid forecast and technical -
' programs as well as PCS requirements during phase
out period.
:
WHO Marketing, RCD Manufacturing.
Marketing
5. If requested by customers, prepare P.R. statement ' for PCB ultimate users; -l.e., utilities,.transformer
"top up," etc.
D. Wood
. P.R. Department
WHEN 1/30/76 2/15/76
.6/1/76
ODDS OF SUCCESS < 1002
$
30-1002
' 1002
S
TRAN
Determine non-PCB market forecast. Formally announce Monsanto plant start-up of new non-PCB dielectric plant.
2OJ Ul
*7*
Establish shipping and production plan and allocation If necessary of PCB fluids as well as announcing ware-
- 03
house and Incineration and return goods policies.
Marketing P.R. Department
'r Marketing
Distribution
8. With Industry, develop suitable standards - ASTH,
E1A, Clgre, OED, etc. .
'
MarketIng/R&P. .
10/1/77
' 80-302
' 6/1/77
..
1002 '
3/1/76 and Continuing
70-802
III.
CONTINUITY 6 ECONOMICS OF OUR CONTINUING BUSINESS
; 1. See attached Table II for economic impact.
\
.
1*2.
Submit AR for non-PCB dielectric plant and Sentosol
200 plant to CAC.
.
IV. INTERNAL MONSANTO ACTIONS
'
_
H, S. Bergen
F. J. Fitzgerald
H. H. Bible
.
2/15/76
1002 *
*i.
kz.
Present Monsanto phase-out plan to CAC and gain approval.
Gain approval for PIR for non-PCB Santosol 200 plant.
H. S. Bergen F. J. Fitzgerald H. H. Bible Same
1/15/76 . 1/15/76
1002 30-1002
A. Marketlnq Related
" $1. Obtain all needed new product Information presentable In a commercial form. (This '
RCD, Medical Product Accept. ManufacturIng
12/2V75
752
WATER PCB-SD0000077003
Page 3
;e II
\ ACTION
WHO
. WHEN
ODDS OF SUCCESS
Includes toxicity data and product acceptability data on HCS 1238 and 1538, finished goods, manu facturing specifications, storage stability tests and produdt application testing to date.)
ffe. R6D program on replacement transformer fluids
, . accelerated with candidates Identified, pilot, plant quantities made and customer trials made. Replacement candidate, manufacturing plan developed and tnterim manufacturing plant established. All completed by 12/31/77-
o
Manufacturing Related
R&O/Hanufacturlng HedIcal/Marketing
Start A.S.A.P.*
12/31/77 i
#1. Inform Purchasing Department and other Monsanto H.` S. Bergen .
A.S.A.P.
O
business groups of change of raw material requirements and, most Importantly, obtain
F. J.- Fitzgerald S. Hei-nlnger
\
i 52 d *<
sufficient allocation of: toluene sulfonyl chloride from Plasticizers Division to tide us over critical period of Aprllor Hay, 1976. (The following raw
G. -L. Bratsch
.
J. R. Savage
-
Purchasing Department
material will decline In usage: benzene and
chlorine and trichlorobenzene, but not as rapidly
as In the Case I. The following products will
increase In usage at least temporarily: toluene
sulfonyl chloride.)
'
50*
.
90-1 ooi:
I.
Set up manufacture phase-out plan for PCBs.
J. R. Savage
Develop manufacturing plan schedule for non-PCB .
o with outside converter tHlllIken Chem/Anderson '
u> Ul
Development). Production to start as soon as
I-* possible with rates to be based on customer needs.
03
N
ft. Plant decommissioning, decontamination of equip
Manufacturing
ment, site and tank cars and plant dismantling.
Distribution
A.S.A.P.
5/15/76
1/1/78
loot
#-
loot
1W. Start-up of new non-PCB Santosol 200 plant.
Manufacturing
9/77
80-30t
C. Accounting Related .
''
Establish reserves for plant write-offs and plant dismantling and anticipated Incineration reserve and any other anticipated needs.
A. J. Koenig l. B. Skatoff
12/1/77
! \
100t
1
.
i11:
WATER PCB-SD0000077004
.Paga 4 - Case 11 \ I
ACTION_________________ .____________ ______________________
$12.
Administrative reassignment of any redundant, personnel.
WHO
H. S. Bergen F. J. Fitzgerald C. A. Sweets C. L. Bratseh
WHEN 1/1/78
ODDS OF SUCCESS < 100
. .
j
COMPANY CONFIDENTIAL
I
7>*
Z o u>
CD
\
WATER PCB-SD0000077005
TABLE. II SPECIALTY PRODUCTS
Phase-out costs s writeoffs - take in 1977
I. Fixed Investment Write-off and Dismantling
.
Krummrich Plant Newport Plant
850 600
\kS0
11. Decontamination and Phase-out Pom. Tank Cars
3&0
III. Decontamination - Newport
' Total
150
I960
IV. Plant FIE Redistributed to Rest of Plant
KrumrarIch Newport
330 125
` ^55
V. Task Force to Phase-out PCB Dielectrics
Domestic and Export Ex. USA
150 75
-
' 225
/tl 7/28/75
COMPANY CONFIDENTIAL
^ ,.