CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT - EL PASO, TEXAS
SPECIFICATION NO. EP-432-J February 23, 1981 (RRK) Appendix A Page 1 of 1
A.1 CONSTRUCTION DRAWINGS
'I
Title
Stub-Up Plan and Elevations of Terminal Boxes- at Control House Terminal Connection Diagram - Thermocouples Overhead Plot Plan and Elevations Schematic Conduit Layout Plan and Elevations of Overhead Conduit in Terminal Boxes Plan and Elevations of Thermocouple and Instrument TerminaT~BOxes Plan and Elevation of Terminal Box for Pneumatic Instruments Connection Diagram Alarm Terminal Box Conduit and Wire Schedule
A.2 STANDARD SPECIFICATIONS
Title
Steel Fabrication Reinforcing Steel Fbbrication. Clearing, Grading and Earthwork Placing and Curing Concrete Concrete Proportioning and Mixing Small Tools and Equipment Supplies Installation of Electrical Facilities - General Requirements
A.3 STANDARD DRAWINGS Title
Anchor Bolts Standard Conduit Support and Electrical Equipment Connection
Details
A.4 REFINERY AND ENGINEERING INSTRUCTIONS Title
Instruction to Contractors Working Within the Refinery Qualification of Welders__.