Document pe5oB4d7Da5E51R1NGZOmKK4B

EPA REGION 5 Enforcement and Compliance Assurance Division INSPECTION REPORT Inspection Entry Date/Time Inspection Exit Date/Time Weather Media Statute(s)/Program(s) Type of Inspection 02/21/2024 08:05 AM (ET) Announced: Yes 02/21/2024 03:15 PM (CT) Access: Granted Day 1 - 50F, Partly Cloudy Water Clean Water Act, NPDES, WWTP Combined Sewer Overflow Inspection (CSO) Permittee Name Facility or Site Name Facility/Site Physical Address City, State, Zip Code Facility GPS Coordinates City Of Clyde Water Treatment Plant City Of Clyde Water Treatment Plant 1041 S. Main St. Clyde, OH 43410 41.29284, -82.97497 FRS ID 110000538231 Permit Number(s) (If Applicable) OH0030554 SIC and/or NAICS 4941 Lead Inspector: Joseph Forth Supervisor Review: Molly Smith [Signature] EPA REGION 5 [Signature] EPA REGION 5 Forth, Joseph Digitally signed by Forth, Joseph Date: 2024.04.22 15:03:19 -05'00' Forth.Joseph@epa.gov (312) 886-7275 MOLLY SMITH Digitally signed by MOLLY SMITH Date: 2024.04.22 15:36:59 -05'00' Smith.Molly@epa.gov SECTION I - INTRODUCTION Site Entry and Inspection Objectives Joseph Forth and William Jones of US EPA Region 5 arrived at Clyde WWTP (the "plant" or the "facility"), at 8:05 AM EST on February 21, 2024, for an announced inspection. We were met by Mr. John Biggs and Ms. Amanda Powell of Clyde WWTP. EPA Staff present their credentials and stated the purpose of the inspection to investigate elements of the Clean Water Act (CWA) Section 308, implementing regulations, and the status of the September 29, 2004 Consent Decree. Opening Conference began at 8:10 AM EST. This report is based on information supplied by Clyde WWTP representatives, direct observations made by the EPA Region 5 inspectors, records and reports maintained by the permittee and other information including: photographs taken by EPA Region 5 inspector(s), physical evidence collected by the EPA Region 5 inspector(s), verbal or written statements made by information supplied by Clyde WWTP representatives during or 1 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 subsequent to the on-site Inspection, and materials, processes, data, photographs, or documents shown, demonstrated, or submitted to the EPA Region 5 inspector(s) by Clyde WWTP representatives during or subsequent to the on-site Inspection. In addition, information gathered prior to or subsequent to the Inspection from a review of EPA, State, and/or public records may be included in this report. Attendees Organization Attendee Name EPA REGION 5 EPA REGION 5 Clyde WWTP Clyde WWTP Joseph Forth William Jones John Biggs Amanda Powell Facility/Site Description Title Lead Inspector Inspector Superintendent Lab Operator Present in Opening Conf. Yes Yes Yes Yes Present in Closing Conf. Yes Yes Yes Yes EPA REGION 5 lead inspector confirmed the following facility information: Wastewater treatment at the facility begins with the influent, which is brought to the facility via two main trunk lines and one force main. The influent wastewater is then conveyed upwards by two sets of screw pumps. The lower screw pumps can both carry 1 million gallons per day (MGD). The upper screw pumps are each capable of conveying 4.8 MGD (the max designed flow of the plant). The left screw pump was operating during the inspection and was replaced in late 2023. The right screw pump was not operating at the time of inspection. The plant has plans to replace the right screw pump in late 2024 or early 2025. Influent wastewater is then sent through two draw screens. Then the waste stream goes through two grit collection units. The facility utilizes two oxidation ditches with integrated clarifiers (ODICs) for primary treatment. After going through primary treatment, the wastewater then goes through two settling clarifiers. The waste stream is then sent through two aerobic digesters. Solids are dewatered and then landfilled. Dewatering is accomplished via centrifuge. The plant has plans to eventually install a sludge press. Sludge is sent to Erie County Landfill. The facility has two settlings lagoons before final effluent. The settling lagoons are currently not operational and are in the process of being permanently deconstructed. The plant has approval from the Ohio EPA (OEPA) to reroute their waste stream through a ultraviolet (UV) treatment process, and discharging at a different point after the UV treatment. Final effluent is after UV system into Raccoon Creek. The facility's current NPDES permit identifies the settling pond as the final outfall point, not the UV outfall. The facility states it plans to modify their permit during the next permit renewal period. During wet weather events, the facility has a 1 million gallon equalization (EQ) basin that it can redirect flow to from the main plant. The EQ basin was installed and began operating in 2016. The EQ basin is equipped with its own screening system. If the wet weather event concludes without a CSO discharge, flow can be reversed from the EQ basin back into the plant for treatment. The EQ basin can be emptied within 24 hours back into the plant. The plant also has the ability to hold water in the plant itself to allow for longer residence time in the treatment process. High flow through the facility can be pumped via two pump mains through grit screens to the EQ basin. There is an 8 foot gravity weir for when the main pumps cannot handle all the flow. The weir bypasses grit screening, but Mr. Biggs stated that he has never seen the weir have flow through it. The outlet of the EQ basin is upstream of the final effluent of the plant. The facility has a SCADA system equipped with a high-level alarm. CSO pumps are automatic based on flow levels through the facility. 2 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Approximately 25% of the sewer system that connects to Clyde WWTP is cleaned every year. The section that is cleaned rotates every year, so that every part of the system gets cleaned once every 4 years. Cleaners jet and vac everything out of the sewer and then bring it to the plant in a vac truck. The facility also accepts street sweeping wastewater that is dropped off at the facility via vac truck into a pit that drains into the headworks. Facility/Site Information Responsible official John Biggs What sort of failure alarm does the plant have? SCADA system has high level alarm. How do you manage Dewatering of biosolids is done by centrifuge. Sludge is sent to Erie County Landfill. your biosolids? Have any bypasses or overflows happened at the plant or in the collection system in the last year? No overflows in the past year. Backup electrical power source, and does it turn on automatically? No, Mr. Biggs stated that he plans to eventually install a back-up power generator. What is your overflow/emergency capacity (overflow basins, holding tanks, redundancy) and do you have sufficient spare parts? EQ Basin capacity is 1 million gallons. How often do you visually inspect the outfall(s) and flow measuring devices? Weekly Type(s) of primary flow measuring device(s)? Flow Meter Industrial Users Whirlpool Are there any plans for renovation or additional equipment to allow for increased wastewater flow? The right influent screw pump is currently non-operational and will be replaced in late 2024 or early 2025. The plant can currently handle even wet weather flow with just one influent screw pump. Is there currently any Yes; Right influent screw pump and the effluent retention ponds are out of service. portion of the treatment train that is non-operational? 3 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Do you accept waste The facility accepts and stores some septage from a small community nearby, but it is from septage haulers? only a short term agreement while the community does some improvements to their If so, what problems system. No issues have occurred as a result of this agreement. have you experienced? Do you use in-house Both or contract out for laboratory analyses? (including for metals or WET testing?) Operation schedule (days of operation, # shifts/day, # operators/shift, coverage overnight, weekends & emergencies), and is staffing sufficient for proper operation? The plant operates twenty-four hours a day, seven days a week. A certified operator (Mr. Biggs) is at the facility during normal business hours Monday- Friday. Mr. Biggs has a Class 3 certification. Ms. Powell is in the process of receiving her Class 3 certification. Outfalls: (and do the numbers, locations, and receiving waters match the permit?) Outfall 001: Final Effluent to Raccoon Creek Outfall 010: CSO Discharge to Raccoon Creek WWTP Design Capacity & Average Daily Flow Max designed flow is 4.8 MGD, max designed daily flow is 1.9 MGD. Actual daily flow is 1.7-1.8 MGD. Mr. Biggs stated that the plant is in the process of being upgraded to a max daily flow of 4.9 MGD. Location(s) Location/Area/Sub-area Clyde WWTP Greater Clyde Sewer System Description The facility treatment process includes: 2 main trump mains, one force main, 2 lower influent screw pumps, 2 upper screw pumps, 2 draw screens, 2 grit collection units, 2 oxidation ditches with integrated clarifiers, 2 aerobic digestors, dewatering centrifuge, 2 settling lagoons, and a UV treatment system. All sewer systems that lead to Clyde WWTP. The sewer system is completely cleaned over the course of every 4 years. Each year 25% of the system is cleaned. The facility as a requirement of its Consent Decree, has conducted various sewer separation projects ranging from complete replacement with new separate sanitary and storm sewers and some in which sanitary inlets to storm sewers were plugged to avoid combining. SECTION II - OBSERVATIONS Location: Clyde WWTP Observation #: JF1-OB-001 Date: 04/12/2024 Weather: 4 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Facility walkthrough began at 9:50 AM EST. During the inspection, a street sweeping vac truck was dropping off some wastewater. Street sweeping wastewater goes into a pit that drains into the headworks. Mr. Biggs stated that the facility does not currently have back-up power, but is planning to install an emergency generator to avoid potential issues through loss of power. At the time of inspection, the right upper screw pump was not operational. Mr. Biggs stated that the left upper screw pump can handle the max designed flow of the plant on its own and that the right screw pump is planned to be replaced in either late 2023 or early 2024. Samples are collected via time based composite autosamplers. During the inspection, the raw influent sample refrigerator did not have a thermometer inside. Mr. Biggs stated that they would install a thermometer in the sample refrigerator soon after the inspection. Mr. Biggs also stated that are going to have a consultant audit and review their lab and sampling procedures to ensure that they are compliant with all requirements. Ms. Powell stated that the refrigerator in the Lab is kept between 0C and 6C. The final effluent sample refrigerator did have a thermometer and at the time of inspection it was reading 6C. Photo(s) 1. IMG_0298.JPG 2. IMG_0295.JPG 3. IMG_0294.JPG 4. IMG_0302.JPG 5. IMG_0303.JPG 6. IMG_0301.JPG 7. IMG_0297.JPG 8. IMG_0300.JPG 9. IMG_0299.JPG 10. IMG_0296.JPG 11. IMG_0310.JPG 12. IMG_0309.JPG 13. IMG_0305.JPG 14. IMG_0306.JPG 15. IMG_0307.JPG 16. IMG_0311.JPG 17. IMG_0308.JPG 18. IMG_0312.JPG 19. IMG_0313.JPG 20. IMG_0304.JPG 21. IMG_0314.JPG 22. IMG_0315.JPG 23. IMG_0319.JPG 24. IMG_0316.JPG 25. IMG_0317.JPG 26. IMG_0318.JPG 5 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Location: Greater Clyde Sewer System Observation #: JF1-OB-002 Date: 04/12/2024 Weather: US EPA staff and Clyde WWTP staff began visiting various locations where separation projects had been completed to view plugs in the sewers. EPA staff were also shown construction projects where sewers were completely replaced with separate storm and sanitary sewers. See Photos 27 through 36 in the Photo Log. Of the separation projects that were required by the Long Term Control Plan, we viewed in person the completed projects of the McPherson Highway Regulator (Former Outfalls 1A and 1B), CSO Outfall 2, the Vine and Mulberry project (Former CSO Outfall 5), Vine St (Former CSO Outfall 3), Buckeye Street (Former CSO Outfall 4). Based on completion dates provided in the June 2020 CSO LTCP Compliance Report, some projects were completed after the scheduled date in the LTCP: Buckeye Street Phase 2 was scheduled to be completed in 2008 and was completed in 2009, Buckeye Street Phase 3 was to be completed in 2009 and was completed in 2011, East Street Phase 2 was scheduled to be completed in 2011 and was completed in 2012, and Forest Street was scheduled to be completed in 2012 and was completed in 2013. Photo(s) 1. IMG_0320.JPG 2. IMG_0321.JPG 3. IMG_0322.JPG 4. IMG_0323.JPG 5. IMG_0328.JPG 6. IMG_0327.JPG 7. IMG_0324.JPG 8. IMG_0326.JPG 9. IMG_0325.JPG 10. IMG_0329.JPG SECTION III - RECORDS REVIEW Records may not be in sequential order. Record: Enforcement Order Milestones and Consent Decree Commitments Ref #: JF1-RR-007 Reviewed By: Joseph Forth AOC: Yes Reviewed Date: 04/22/2024 Facility provided June 2020 CSO LTCP Compliance Report. In the report, it states that the completion date for the EQ Basin was 2016. The LTCP implementation schedule had listed the completion date for the EQ Basin to be 2015. Document(s) 1. June 2020 CSO LTCP Compliance Report.pdf Record: Other - Planned Plant Upgrades Ref #: JF1-RR-006 Reviewed By: Joseph Forth AOC: No Reviewed Date: 04/16/2024 6 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Facility provided a summary of planned upgrades for the plant. Document(s) 1. WWTP Planned Upgrades.docx Record: Facility SOPs Ref #: JF1-RR-005 Reviewed By: Joseph Forth AOC: No Reviewed Date: 04/16/2024 Facility provided its CSO procedures document. Document(s) 1. CSO Procedures.docx Record: DMR Reports Ref #: JF1-RR-003 Reviewed By: Joseph Forth AOC: No Reviewed Date: 04/16/2024 Facility provided DMR reports. Document(s) 1. April 2019.pdf 2. Aug 2022.pdf 3. Aug. 2021.pdf 4. Dec 2020.pdf 5. Feb 2021.pdf 6. Feb 2023.pdf 7. July 2020.pdf 8. July 2022.pdf 9. Jun 2023.pdf 10. June 2019.pdf 11. June 2020.pdf 12. June 2022.pdf 13. March 2019.pdf 14. May 2019.pdf 15. May 2023.pdf 16. Nov 2021.pdf 17. Nov. 2022.pdf 18. Oct. 2019.pdf 19. Oct. 2020.pdf 20. Upstream & Downstream Data.pdf 21. Sept. 2020.pdf Record: Other - Sewer Cleaning Schedule Ref #: JF1-RR-002 Reviewed By: Joseph Forth AOC: No Reviewed Date: 04/15/2024 Facility provided EPA Quarterly reports which state which section of the sewer system was cleaned that year. Document(s) 1. 3RD Q EPA REPORT 2020.doc 2. 4TH Q EPA REPORT 2019.doc 7 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 3. 4TH Q EPA REPORT 2021.doc 4. 4TH Q EPA REPORT 2023.doc 5. 4TH Q EPA REPORT 2022.doc 6. CATCH BASIN CLEANING.xlsx 7. Sewer Cleaning.docx 8. Sewer Taps 2024.docx Record: Other - OEPA Approval for Effluent Stream Rerouting Ref #: JF1-RR-001 Reviewed By: Joseph Forth AOC: No Reviewed Date: 04/15/2024 Facility provided documentation of OEPA approval for rerouting the effluent stream through UV treatment instead of the settling lagoons. Document(s) 1. 2PD00004 Lagoons offline letter.TP.pdf SECTION IV - SAMPLING ACTIVITIES AND ANALYTICAL RESULTS No sampling was conducted. SECTION V - AREA OF CONCERN Area(s) of Concern may not be in sequential order. The presentation of Area(s) of Concern does not constitute a formal compliance determination or violation. AOC Reference #: JF1-OB-001 AOC: Location: Clyde WWTP During the inspection, the raw influent sample refrigerator did not have a thermometer inside. AOC Reference #: JF1-RR-007 AOC: Records Review: Enforcement Order Milestones and Consent Decree Commitments In the report, it states that the completion date for the EQ Basin was 2016. The LTCP implementation schedule had listed the completion date for the EQ Basin to be 2015. AOC Reference #: JF1-OB-002 AOC: Location: Greater Clyde Sewer System Based on completion dates provided in the June 2020 CSO LTCP Compliance Report, some projects were completed after the scheduled date in the LTCP: Buckeye Street Phase 2 was scheduled to be completed in 2008 and was completed in 2009, Buckeye Street Phase 3 was to be completed in 2009 and was completed in 2011, East Street Phase 2 was scheduled to be completed in 2011 and was completed in 2012, and Forest Street was scheduled to be completed in 2012 and was completed in 2013. Additional Notes: No modifications to the LTCP or CD were documented. 8 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 SECTION VI - CLOSING CONFERENCE AND FOLLOW UP Closing Conference The EPA REGION 5 Lead Inspector held a closing conference with Facility personnel on 02/21/2024 for the inspection. During the closing conference, EPA REGION 5 Lead Inspector discussed the observations and Area(s) of Concern identified during the inspection. Observations and Area(s) of Concern have not yet been evaluated for a formal compliance determination. Closing conference began at 2:50 PM EST. Mr. Biggs stated that Clyde WWTP were going to have a consultant come and review their lab practices to confirm that they are operating properly. The areas of concern identified during the inspection were shared and are listed above. No confidential business information was identified. Follow Up No follow up was required after exiting the facility on 02/21/2024. Communication Log No additional information received by EPA REGION 5 after exiting the Facility on 02/21/2024. SECTION VII - LIST OF APPENDICES 1. Photo Log 2. Document Log 9 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): APPENDIX 1: PHOTO LOG 02/21/2024 - 02/21/2024 Photo 1 02/21/2024 09:56 AM Clyde WWTP Photo of EQ Basin at plant. No CBI No PII IMG_0294.JPG Photographer: Joseph Forth South Photo 2 02/21/2024 10:00 AM Clyde WWTP Photo of EQ Basin at plant. No CBI No PII IMG_0295.JPG Photographer: Joseph Forth South 10 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 3 IMG_0296.JPG 02/21/2024 10:06 AM No CBI No PII Photographer: Joseph Forth Clyde WWTP North Photo of bending weir for EQ Basin overflow at 1.1 mgd flow. Photo 4 IMG_0297.JPG 02/21/2024 10:11 AM No CBI No PII Photographer: Joseph Forth Clyde WWTP North Photo of screen and inlet pipes for EQ Basin and return gate to plant. 11 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 5 IMG_0298.JPG 02/21/2024 10:13 AM No CBI No PII Photographer: Joseph Forth Clyde WWTP South Photo of two 4 MGD pumps and green bypass pump for EQ Basin. Photo 6 02/21/2024 10:18 AM No CBI Clyde WWTP Photo of lower screw pumps. No PII IMG_0299.JPG Photographer: Joseph Forth East 12 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 7 IMG_0300.JPG 02/21/2024 10:22 AM No CBI No PII Photographer: Joseph Forth Clyde WWTP East Photo of upper screw pumps, right screw pump was not operational during the inspection. Photo 8 02/21/2024 10:32 AM Clyde WWTP Photo of drum screens. No CBI No PII IMG_0301.JPG Photographer: Joseph Forth North 13 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 9 02/21/2024 10:35 AM Clyde WWTP Photo of grit collectors No CBI No PII IMG_0302.JPG Photographer: Joseph Forth North Photo 10 IMG_0303.JPG 02/21/2024 10:42 AM No CBI No PII Photographer: Joseph Forth Clyde WWTP Northwest Photo of raw influent wastewater sample collector and refrigerator. 14 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 11 02/21/2024 10:52 AM No CBI Clyde WWTP Photo of East Oxidation Ditch. No PII IMG_0304.JPG Photographer: Joseph Forth North Photo 12 02/21/2024 10:55 AM Clyde WWTP Photo of East Clarifier. No CBI No PII IMG_0305.JPG Photographer: Joseph Forth Northeast 15 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 13 02/21/2024 10:59 AM No CBI Clyde WWTP Photo of North side of ODIC. No PII IMG_0306.JPG Photographer: Joseph Forth Northeast Photo 14 02/21/2024 11:02 AM Clyde WWTP Photo of clarifier/gravity No CBI No PII IMG_0307.JPG Photographer: Joseph Forth East 16 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 15 02/21/2024 11:03 AM Clyde WWTP Photo of aerobic digester. No CBI No PII IMG_0308.JPG Photographer: Joseph Forth South Photo 16 IMG_0309.JPG 02/21/2024 11:07 AM No CBI No PII Photographer: Joseph Forth Clyde WWTP East Photo of Final Effluent Sample Collector and refrigerator. 17 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 17 02/21/2024 11:11 AM No CBI Clyde WWTP Photo of centrifuge for dewatering. No PII IMG_0310.JPG Photographer: Joseph Forth South Photo 18 02/21/2024 11:17 AM Clyde WWTP Photo of Lagoon 1. No CBI No PII IMG_0311.JPG Photographer: Joseph Forth Northwest 18 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 19 02/21/2024 11:20 AM Clyde WWTP Photo of Lagoon 2. No CBI No PII IMG_0312.JPG Photographer: Joseph Forth Northwest Photo 20 02/21/2024 11:23 AM Clyde WWTP Photo of UV System. No CBI No PII IMG_0313.JPG Photographer: Joseph Forth North 19 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 21 02/21/2024 11:24 AM No CBI Clyde WWTP Photo of Final Effluent with signage. No PII IMG_0314.JPG Photographer: Joseph Forth East Photo 22 02/21/2024 11:25 AM No CBI Clyde WWTP Photo of Raccoon Creek at Final Effluent. No PII IMG_0315.JPG Photographer: Joseph Forth North 20 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 23 02/21/2024 11:28 AM No CBI Clyde WWTP Photo of downstream sampling point. No PII IMG_0316.JPG Photographer: Joseph Forth West Photo 24 02/21/2024 11:32 AM No CBI Clyde WWTP Photo of upstream sampling point. No PII IMG_0317.JPG Photographer: Joseph Forth West 21 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 25 02/21/2024 11:35 AM No CBI Clyde WWTP Photo of CSO outfall at plant. No PII IMG_0318.JPG Photographer: Joseph Forth West Photo 26 02/21/2024 11:35 AM No CBI Clyde WWTP Photo of CSO Outfall 010 and signage. No PII IMG_0319.JPG Photographer: Joseph Forth West 22 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 27 IMG_0320.JPG 02/21/2024 12:49 PM No CBI No PII Photographer: Joseph Forth Greater Clyde Sewer System Southeast Photo of junction manhole for former Outfalls 1A and 1B. Photo 28 02/21/2024 12:52 PM No CBI Greater Clyde Sewer System Photo of former Outfall 1A. No PII IMG_0321.JPG Photographer: Joseph Forth Northwest 23 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 29 02/21/2024 12:57 PM No CBI Greater Clyde Sewer System Photo of former Outfall 1B. No PII IMG_0322.JPG Photographer: Joseph Forth North Photo 30 IMG_0323.JPG 02/21/2024 12:59 PM No CBI No PII Photographer: Joseph Forth Greater Clyde Sewer System Northwest Photo of surface view of former Outfalls 1A and 1B manholes. 24 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 31 02/21/2024 01:07 PM No CBI Greater Clyde Sewer System Photo of former CSO Outfall 2 manhole. No PII IMG_0324.JPG Photographer: Joseph Forth Northwest Photo 32 02/21/2024 01:09 PM No CBI Greater Clyde Sewer System Photo of former CSO Outfall 2 manhole. No PII IMG_0325.JPG Photographer: Joseph Forth Southwest 25 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 33 02/21/2024 01:20 PM No CBI No PII Greater Clyde Sewer System Photo of Vine and Mulberry St former CSO Outfall 5. IMG_0326.JPG Photographer: Joseph Forth East Photo 34 02/21/2024 01:25 PM No CBI No PII Greater Clyde Sewer System Photo of former CSO Outfall 3 manhole on Vine Street. IMG_0327.JPG Photographer: Joseph Forth North 26 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 Photo 35 IMG_0328.JPG 02/21/2024 01:40 PM No CBI No PII Photographer: Joseph Forth Greater Clyde Sewer System West Photo of former CSO Outfall 4 manhole on Buckeye Street. Photo 36 IMG_0329.JPG 02/21/2024 01:55 PM No CBI No PII Photographer: Joseph Forth Greater Clyde Sewer System East Photo of manholes showing sewer separation project completed at East Forest Street and South Church Street. 27 of 29 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 APPENDIX 2: DOCUMENT LOG Document Type Document Name Other - OEPA Approval for Effluent Stream Rerouting Other - Sewer Cleaning Schedule Other - Sewer Cleaning Schedule Other - Sewer Cleaning Schedule Other - Sewer Cleaning Schedule Other - Sewer Cleaning Schedule DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports DMR Reports Other - Sewer Cleaning Schedule Other - Sewer Cleaning Schedule Other - Sewer Cleaning Schedule 2PD00004 Lagoons offline letter.TP.pdf 3RD Q EPA REPORT 2020.doc 4TH Q EPA REPORT 2019.doc 4TH Q EPA REPORT 2021.doc 4TH Q EPA REPORT 2023.doc 4TH Q EPA REPORT 2022.doc April 2019.pdf Aug 2022.pdf Aug. 2021.pdf Dec 2020.pdf Feb 2021.pdf Feb 2023.pdf July 2020.pdf July 2022.pdf Jun 2023.pdf June 2019.pdf June 2020.pdf June 2022.pdf March 2019.pdf May 2019.pdf May 2023.pdf Nov 2021.pdf Nov. 2022.pdf Oct. 2019.pdf Oct. 2020.pdf CATCH BASIN CLEANING.xlsx Sewer Cleaning.docx Sewer Taps 2024.docx Contains Contains Uploaded By CBI PII No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth No No Joseph Forth 28 of 29 Date Received 04/15/2024 04/15/2024 04/15/2024 04/15/2024 04/15/2024 04/15/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/16/2024 City Of Clyde Water Treatment Plant Inspection Date(s): 02/21/2024 - 02/21/2024 DMR Reports Upstream & No No Joseph Forth Downstream Data.pdf Facility SOPs CSO Procedures.docx No No Joseph Forth DMR Reports Sept. 2020.pdf No No Joseph Forth Other - Planned Plant Upgrades WWTP Planned Upgrades.docx No No Joseph Forth Enforcement Order June 2020 CSO LTCP No No Joseph Forth Milestones and Consent Compliance Report.pdf Decree Commitments 04/16/2024 04/16/2024 04/16/2024 04/16/2024 04/22/2024 29 of 29