Document pe4pnXMJJEjq98X3Kv10KMgYd
ST0l08638
DOW CHEMICAL U.S.A.
0C-708 April 28, 1988
TEXAS OPERATIONS FREEPORT, TEXAS 77541
J. T. Barton, APB H. G. Ahlich, B-1053 A. G. Molina, A-2813 L. F. Bullard, B-101 L. R. Braden, A-1146 D. L. Rasco, B-2604 D. D. Hicks, B-101 C. R. Graves, B-1225 R. Contreras, APB L. R. Chester, A-1920
xc: J. D. Woodward, OC-708 J. R. Harrison, OC-708
R. E. Guerra, B-1225 R. L. Hansen, APB P. L. Cole, APB S. K. Henderson, B-1216 D. 0. Plunkett, 0C-707 R. E. Snelgrove, 0C-707 J. D. Wade, 0C-201 C. R. Steward, B-101 N. V. Ginn, 0C-201 0. A. Atkins, 0C-201
CATHODE CLEANING FACILITY - ASBESTOS TESTING
The Environmental Capital Projects and Planning group is preparing to conduct an environmental assessment of the surface and sub-surface of the subject property.
THIS IS AN URGENT REQUEST FOR HELP IN LOCATING ANY FILES HAVING TO DO WITH THE RESULTS OF ASBESTOS TESTING ON SOIL, AIR AND WATER SAMPLES AT THE CATHODE CLEANING FACILITY.
Conversations indicate considerable testing for asbestos was done at the site in 1987 but, as yet, I have found little actual documentation. I presently have the results of tests on NINE SOIL SAMPLES by McKee labs, on THREE of the same soil samples by Analytical Services and THREE samples of water taken during closure of the concrete lined Primary and Secondary Ponds.
PLEASE SEARCH YOUR FILES A.S.A.P. AND SEND ME ANYTHING YOU HAVE ON ASBESTOS TESTING. IT WILL COST SEVERAL THOUSAND DOLLARS TO REPRODUCE WHAT I UNDERSTAND HAS BEEN DONE.
D. M. Turner Environmental Capital
and Planning Phone 7610
Projects
DMT.47/aa
AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY
_^Quality^_Performance
Means More At Dow