Document pQ075podq7Loz36850Lb9nM6

f \ as 1 j** M./sts/ / 3&/- M CHARGEABLE TO (name OF PRODUCT) AREA TITLE WORK PROGRAM REQUEST BATON ROUGE PLANT Continuous VC1 in Air Monitors 1. DESCRIPTION of proposed work and Z. reason for expenditure program no PROBLEM NO. 1. Install Miran-2X Continuous Infrared Monitors for determination of VCl-in-air, at the following locations: --=**1 Unit - VC1 Plant, Baton Rouge 1 Unit - VC1 Plant, Houston --Units - PVC Plant, Baton Rouge 2 Units - Gulf South Research Inst., Baton Rouge 2. The primary purpose of this expenditure is to minimize personnel exposure to VClin-air at the above locations. A secondary benefit will be to monitor equipment condition and performance. <o *-( f (If eddn.cnal space required, attach plain SVfrxir* sheets) PROPOSED BY (SIGNATURE NOT REQUIRED) AREA ENGR. D. E. Park I 3 I.R. ESTIMATE 3A. HI-SPOT ESTIMATE ESTIMATED ACTUAL s sINVEST. APPROVAL 7 1. R . OPERS STOTAL sGROSS WRITE OFF NET WRITE OFF EST. BY 5 s 9 EST. BY 9 s 9 DATE COMPLETED DATE INTO OPER CONST, SUPT, _ Route IN TURN 1 stores supt . surplus material check 2. PROPOSER . ACCEPTANCE 3 ENGINEERING DATE DATE DATE DATE 4. FINANCE - INVESTMENT [ CO M PLETIO N i A. BUDGET STATEMENT 5. ECONOMIC ANALYSIS | | NOT REQUIRED p~j PREPARED AND ATTACHED 6, APPROVAL REQlJESTED 7A. DEFINITIVE ENGINEERING RECOMMENDED 7B. DEFINITIVE ENGINEERING --1 j___| APPROVED P~| DISAPPROVED REMARKS COPY FOR PROJ COORD AREA ENGR. OR HEAD. ECON. CVAL. SUPT, SEC. MGR. PLT. MGR (FOR PROJ. COMM.) DATE DATE DATE Date DATE A. *63 REV 11.61 ** MIST INOF, I*