Document pBkrXEb4eQBzqGOXV6waGDkda

Document No: R8FQPForm-2018 R0 Effective Date: 4/5/2017 EPA Region 8 TSCA 402c Renovation, Repair and Painting Rule Recordkeeping Inspection Checklist 1 of 8 BASIC INSPECTION INFORMATION Inspection Date/Time: 3/8/2023 09:00 ICIS #: 3601516605 Presented EPA credentials to person in charge and explained purpose and scope of inspection Inspection Entry: Entry Permitted. Entry Denied. (Provide details in notes.) NOI signed by: Tony Olguin, President Facility Information Firm Name: BAHA Construction, Inc. Owner Name & Contact Information: DBA or Former Names: 1015 West 10th Street Pueblo, Colorado 81003 719-404-3367, bahagc@bahagc.com Person(s) interviewed: Tony Olguin Cathy Grasmick Firm size (# employees, annual revenues, # projects/yr): ~ 24 staff, $10-12 million/year revenue, ~ 5 projects/year Type of work (general contracting, windows, kitchen &bath,etc.): Service area: general contracting Pueblo County and surrounding areas Work done on : target housing child-occupied facilities Certified firm? Yes (copy certificate) No - give Small Entity Guide to Renovate Right and get explanatory statement If firm is certified, obtain copies of records for several properties, as applicable: Description/Scope of work (contracts, work orders, change orders, etc.) Lead testing documentation Determination that lead-based paint was/was not present on the components affected by the renovation Documentation that a certified renovator was assigned Documentation that uncertified workers were trained by a certified renovator Documentation of compliance with applicable RRP work practice standards Signed and dated receipt of Renovate Right pamphlet to owner/occupant Document No: R8FQPForm-2018 R0 Effective Date: 4/5/2017 EPA Region 8 TSCA 402c Renovation, Repair and Painting Rule Recordkeeping Inspection Checklist 2 of 8 Facility Name: BAHA Construction, Inc. Inspection Date: 03/08/2023 #1 Address of property renovated: 1520 E Ash St, Pueblo, Colorado 81001 When did the renovations occur? From 12/12/2022 to 12/12/2022 What year was the property built? 1950 Provide a detailed description of the project and/or the permit pulled. Remodel Interior Residential Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) Renovator Recordkeeping Checklist RRP Certification # #2 Address of property renovated: 205 W 21st St, Pueblo, Colorado 81003 When did the renovations occur? From 05/13/2021 What year was the property built? 1952 to 05/13/2021 Provide a detailed description of the project and/or the permit pulled. Remodel Residential Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # Document No: R8FQPForm-2018 R0 Effective Date: 4/5/2017 EPA Region 8 TSCA 402c Renovation, Repair and Painting Rule Recordkeeping Inspection Checklist 3 of 8 Facility Name: BAHA Construction, Inc. Inspection Date: 03/08/2023 #3 Address of property renovated: When did the renovations occur? From to What year was the property built? Provide a detailed description of the project and/or the permit pulled. Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # #4 Address of property renovated: When did the renovations occur? From to What year was the property built? Provide a detailed description of the project and/or the permit pulled. Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # Document No: R8FQPForm-2018 R0 Effective Date: 4/5/2017 EPA Region 8 TSCA 402c Renovation, Repair and Painting Rule Recordkeeping Inspection Checklist 4 of 8 Facility Name: BAHA Construction, Inc. Inspection Date: 03/08/2023 #5 Address of property renovated: When did the renovations occur? From to What year was the property built? Provide a detailed description of the project and/or the permit pulled. Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # #6 Address of property renovated: When did the renovations occur? From to What year was the property built? Provide a detailed description of the project and/or the permit pulled. Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # Document No: R8FQPForm-2018 R0 Effective Date: 4/5/2017 EPA Region 8 TSCA 402c Renovation, Repair and Painting Rule Recordkeeping Inspection Checklist 5 of 8 Facility Name: BAHA Construction, Inc. Inspection Date: 03/08/2023 #7 Address of property renovated: When did the renovations occur? From to What year was the property built? Provide a detailed description of the project and/or the permit pulled. Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # #8 Address of property renovated: When did the renovations occur? From to What year was the property built? Provide a detailed description of the project and/or the permit pulled. Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # Document No: R8FQPForm-2018 R0 Effective Date: 4/5/2017 EPA Region 8 TSCA 402c Renovation, Repair and Painting Rule Recordkeeping Inspection Checklist 6 of 8 Facility Name: BAHA Construction, Inc. Inspection Date: 03/08/2023 #9 Address of property renovated: When did the renovations occur? From to What year was the property built? Provide a detailed description of the project and/or the permit pulled. Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # #10 Address of property renovated: When did the renovations occur? From to What year was the property built? Provide a detailed description of the project and/or the permit pulled. Was the property tested for the presence of lead? Yes No Who conducted the test? Summary of records provided/obtained (attach to inspection report) RRP Certification # Document No: R8FQPForm-2018 R0 Effective Date: 4/5/2017 EPA Region 8 TSCA 402c Renovation, Repair and Painting Rule Recordkeeping Inspection Checklist 7 of 8 Facility Name: BAHA Construction, Inc. Inspection Date: 03/08/2023 Inspection Summary - Inspector Comments and Findings Inspector reviewed RRP Rule requirements with company representatives. Inspector provided copies of Small Entity Compliance Guide to Renovate Right booklet and the Renovate Right pamphlet. Inspector reviewed projects identified from the building permit database at 1520 East Ash Street and 205 W 21st Street. Company representative stated they were asked to secure permits by city to facilitate residential property renovations conducted by other companies. Company representative stated residential property renovations were ongoing at 1520 East Ash Street, Pueblo, Colorado. Inspector stated that compliance with the RRP Rule at 1520 East Ash Street is required. BAHA Construction, Inc. contacted property owner to complete RRP Rule compliance requirements at 1520 East Ash Street. Owner of property at 1520 East Ash Street contacted the inspector to discuss RRP Rule requirements and confirmed that BAHA Construction, Inc. was hired to provide engineering consulting, not the renovation. The property was vacant and being redeveloped for rent or sale. Owner of property at 1520 East Ash Street had BAHA Construction, Inc. conduct cleanup consistent with RRP Rule. BAHA Construction, Inc. provide documentation including Renovator Recordkeeping Checklist signed by certified renovator (Miguel Torres) indicating property was cleaned up. BAHA Construction, Inc. had only limited involvement in project at 205 W 21st Street. BAHA Construction, Inc. did not conduct any physical work on the property and could not provide RRP Rule compliance records related to work. Company certifications: BAHA Construction, Inc., NAT-F147797-2, expires 11/4/2024. Company representative provided renovator certifications: Robert Trujillo, R-I-99273-23-01221, expires 03/01/2028 Mohammed Ghamdi, R-I-99273-23-01222, expires 03/01/2028 Sam Cagnoni, R-I-99273-23-01223, expires 03/01/2028 Miguel Torres, R-I-99273-23-01224, expires 03/01/2028 Anthony Olguin,R-I-99273-23-01225, expires 03/01/2028 Document No: R8FQPForm-2018 R0 Effective Date: 4/5/2017 EPA Region 8 TSCA 402c Renovation, Repair and Painting Rule Recordkeeping Inspection Checklist 8 of 8 Facility Name: BAHA Construction, Inc. Inspection Date: 03/08/2023 RECORD OF REVIEW Inspector Inspector who prepared report: Laurence Labrie Date report completed: 05/02/2023 Signature: LAURENCE LABRIE (Affiliate) Date: 2023.05.02 09:15:16 -06'00' Digitally signed by LAURENCE LABRIE (Affiliate) Reviewed by: Britta Copt Title: Enforcement Officer Signature: Date: 05/03/2023 Reviewer Digitally signed by BRITTA COPT Date: 2023.05.03 08:42:05 -06'00'