Document pBgL8jeQZ7DqxrxagVKNVNX2X

Does your plant have an SPCC plan? Federal law now requires a written program of countermeasures for GoiruSiroBflflinig BnpBamt SpaBBs By FRED G. TROPPE, R. E. Warner and Associates, Lorain, OH ICJiX- L/e: /=p 'Dp PP- C\cL ' <Z>FF t>/-M *7?* JIL Clean Water Act--Public tl Law 92-500--established a permit program and deadlines to control the quality of wastewater discharged into the nation's waters. The permit requirements have been well publicized and have been the subject of numerous articles in this and other publications. Less well publicized is the act's mandate that regulations be issued to pre vent water pollution from oil spills. The regulations propose stiff fines and penalties (up to $5 million) for each illegal spill or discharge. Spill pievention control and countermeasure (SPCC) plans must be ptepared by any plant that stores more than 1320 gallons of oily material above ground or 42,000 gallons underground. Oily material is defined by federal regu lation 40 CTR part 110 as "oil of any kind or in any form, including, but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil." According to the Lnvironmental Protection Agency (LPA), more than 300 chemicals are covered in this definition. Es sentially any oil derivative whose formula cannot be found in a stan dard chemical reference book is in cluded. Lor example, gasoline, kerosene, and naphtha do not have a single chemical formula showing their composition, so they are sub ject to SPCC requirements. Ben zene and toluene, on the other hand, have specific formulas, so they are not included. SPCC Plan Requirements--The SPCC plan must be prepared by the owner or operator of the facil ity and must be certified by a regis tered professional engineer. The LPA regulations contain guidance on what should be included in a plan and the form in which the information should be presented, and suggest engineering practices that have been successful in the past. The guidelines are designed FILE #7M0 to provide flexibility so that even older facilities can prevent spills at a reasonable cost, Plans must try to predict where spills might occur and explain what actions have been taken to prevent or retain them. The SPCC plan does not have to be submitted to LPA unless a spill occurs. Rut the plan must be avail able for review by LPA any time the agency inspects the facility. If a plant does not have an SPCC plan, prompt action may prevent the fa cility from being fined by LPA. Deadline was July 10, 1976. Spill-Containment Techniques --The movement of oily material through a typical plant is shown in Fig. 1. Since most bulk deliveries by tank car or truck involve a minimum of 2000 gallons, proper handling of the material at unload ing sites is important, i he nature of fluid-transfer operations (con necting and disconnecting hose and pipe couplings, etc.) is such that a few gallons are inevitably spilled. If not immediately contained or cleaned up, the material will be come part of the next stormwater run-off, Ponds, sumps, traps, and curbs installed at unloading, trans fer, and storage points can contain spilled material. Subsurface reservoirs are ideal Fig. 1. Flow of oily materials through plant is typically divided between production and lubrication processes. Fig. Subsurface reservoirs are ideal foi collecting spills from tank car or truck unloading operations. \L<- 0481067 JUNE 8. 1978 PLANT ENGINEERING IS? TOWOLDMONOQ58753 Fig. 3. Dikes around storage tanks should be protected from vehicle damage by stanchions. Fig, 4. Angle-iron sections fastened to exterior of con crete curbing prevent dam age to curbing if hit by bucks, Fig. 5. Sump equipped with heating coils and tempera ture controls simplifies transfer of viscous waste. ISO t PLANT ENGINEERING JUNE 0. 1978 CREOSOTED TELEPHONE POLES -- WATER - -LEVEL AA Fig. 6. Floating, woodenplank walkway installed across narrow, slow-moving stream doubles as boom to trap oily wastes. 0461066 FILE *7S?0 TOWOLDMONOQ58754 for tank car or truck unloading sites, Fig. 2. The reservoir can be of any design, but shallow pits measuring at least the length of one car are preferred. Sump pumps, oil skimmers, and filters should also be considered for use in the pit. If the area is outdoors, rainwater can easily collect in the pit, making pe riodic emptying necessary. A shal low pit simplifies the cleaning task, Pits should be lined with rubber or some other durable material if cor rosive liquids are handled. Col lected product from a major spill can be pumped to a storage tank, cleaned (if necessary), and trans ferred to its intended point of use. Spills from storage tanks at or above ground level can be easily contained by concrete dikes. How ever, the dikes should be protected from vehicle damage by stanchions installed between the dike and ve hicle at the unloading point, Fig. 3. As a general rule, if stored prod ucts arc nonflammable, a dike sur rounding several tanks in an area should be installed that will retain about 100 percent of the largest tank's volume. If the product is flammable, dike capacity should be 110 percent. Isolated storage tanks and some manufacturing areas will also oc casionally experience oil spills. In such cases, the plant engineer must determine if localized dikes are warranted and feasible. Often, it is easier to permit spills to follow normal drainage routes, if they are channeled into settling ponds or oilwater separation equipment. Oil and water accumulations too vis cous to How--but not viscous enough to be shoveled--should be treated with sorbent materials. Ac cumulations can be collected and hauled away at required intervals. Leaky lubrication and hydraulic lines arc always troublesome. Con crete curbing can contain such leaks. Cuibing is almost always necessary if there are open floor drains in the area. Unfortunately, concrete curbing is often dillicult to keep intact. For example, it can be easily damaged when hit by lift trucks or other inplant vehicles, A recommended method of prevent ing curbing damage is to reinforce the curbing's vulnerable outer sur faces with sections of angle iron, I'ig. 4. TILE #7520 Curbing may be impractical if vehicles have to get extremely close to equipment. In such cases, a trench (moat) can be dug around the equipment and pitched to drain into a collection sump. If the waste is viscous, the sump can be equipped with heating coils and temperature controls to expedite emptying, Fig. 5. Oil-skimming de vices may also be used to remove collected oil continuously and keep sump volume to a minimum. I*CB Spills--Areas housing electrical transmission equipment arc often overlooked when spillcontrol programs are instituted. Transformers using polychlori nated biphenyls (PCB's) are espe cially critical. Although U.S. pro duction of PCB's was phased out in 1977, many plants are still using PCB's and the threat of toxicity will exist for many years. PCB spills can be very expensive to clean up. In a recent case, a 200 gallon spill cost $240,000. PCB laden soil must be removed, drummed, and encased in concrete before being disposed of in an ap proved landfill. PCB-laden soil can be decontaminated by incineration, but facilities for such processing are extremely limited. Complications can be minimized by mounting electrical equipment using PCB's and other oily mate rials on concrete pads surrounded by curbing. Any leaks or spills from damaged or ruptured equip ment will be contained. It must be remembered that disposal of any hazardous waste is the responsibil ity of the generating source--final responsibility cannot be easily transferred to a contract waste haul er. Regulations emphasizing this responsibility are now being pre pared by the EPA. Issuance of the new regulations is required by the Solid Waste Act, officially known as Public Law 94-580, the Re source Conservation and Recovery Act of 1976. Sfrcain Control--Even the most sophisticated inplant oil-spill con trol program can fail. Many plants discharge stormwater run-off and treated effluent into small, adjacent streams. Cleaning up a floating or partially submerged oil spill starts with containing it. The contain ment needed depends on the type of waterway, size of the spill, weather conditions, and techniques to be used to remove the material. A dam of baled straw can ab sorb oil and trap or filter floating materials in stationary, shallow water. In small, fast-moving streams, wire fencing can be packed with straw and placed in the stream at an angle. A series of barriers can be positioned down stream to catch any oil that escapes. Small booms with a weighted apron or shield, or earthen dikes, may be used in slow-moving streams. One novel approach in volves using a floating, wooden plank walkway of creosotcd tele phone poles. The walkway is loose ly anchored by concrete keyways on both sides of the stream. Pig. 6. The walkway, which acts as a boom, falls and rises with the wa ter level. Oil and other floating waste are trapped and forced to the side of the stream. Accumulations arc removed periodically. Spill Awareness--The attitude of people toward oil spills may be even more important than the engi neering practices used to prevent and control spills. Good observa tion and prompt action can make the difference between a minor in cident and a catastrophe. Often, a spill can be stopped by simply clos ing a valve or stopping a pump. A plant's SPCC plan should in clude the names of individuals who must be contacted if a spill occurs. The responsibilities and duties of each person should be clearly de fined. However, for a spill-control program to be truly effective, all plant personnel must participate in it. Each employee should be aware of the importance of spills and know how to report them. Spill awareness must be continu ing. The need for spill detection and prevention should be ex plained to every new employee and re-emphasized frequently to all employees, Constant alertness on the part of all employees will great ly reduce the chances of spills be cause of human errors and may protect lives and property. If prop erly conducted, spill prevention and control programs are definitely cost elfcctivc. For complimentary copy of this article circle 288 on post card 046 1069 JUNE 8, 1978 PLANT ENGINEERING 159