Document pBaQman2a55db54n4EMK9pj0k

u William R. Bradley and Associates \ INVIRONMKNTAl HEALTH COHSULTAHTS 1 GREEN Slktn NtWAKK. N. | o 7 i o 2 iut 6ii424A October .'3, 196H Mr. S. H. Thomas Director of Environmental Control Owens Corning Piberglas Corporation P. O. Box 901 Toledo, Ohio 43601 He: .-Swironmental Health Investigation Owens Corning Fiberrlas Corporation ______ Berlin, N. J. Plant___________ Studies on employee work environment were conducted at the Berlin, New .Jersey Plant of Owens Corning fioerc.las Corporation September 23 through September 27, 1S68. Yhis punt processes initallation for flat surlaces and for pipes in various sizes ami thicknesses, using asbestos, silica, diatomlte and cement as main increments. .'he opjration is known 33 the Kaylo process. Samples of work room air were collected to determine the concentration of asbestos dust3 and measurements were made of noise intensity at various octave band frequencies. PLAINTIFF'S EXHIBIT A dust exposure oAi-it-j for employees unload me. uo.. -cars of diatomite shipped in paper bays. The supplier should be urged to use a multi-wall paper bac of heavier strength and one with a dust proof seal. More care should be taken in the loading of box cars to prevent broken bags. There is a potential dust exposure at the second floor batch mix area during bag dumping. It is recommended that the hopper where bags are dumped be enclosed on three sides and mechanically exhausted to the bag collectors. The handling of empty bags is a source of dust. It is suggested that empty bags be placed in a mechanically exhausted bin. Oust counts in the area of the flatware line where tho product is boxed or stacked on pallets are higher than uisjrable. It is suggested that cartons to tie loaded, travel on a roller conveyor that passes throuch a mechanically exhausted booth enclosure. The design of dust collection hoods on the integrated line sawing stations should be improved in order to provide more complete enclosure. (Xist counts are excessive at these stations, and it is recommended that employees wear oi.piratory protection until onvironnental control has been installed. Oust control at the two band sawing stations for pipe needs improvement. Operators are exposed to high dust concentrations. The two band saw stations should have a separate dust collecting system rather than being "tied in" to one of the existing systems. Hood design for dust con trol should be Improved. work environment around the entrance to the Sid Cylinder is bound to be quite warm and to have high humidity due to escaping steam. Sngineerinc studies should be made to en close an exhaust steam to the outdoors. *n air sample in the uowthenn boiler room shows that thire is no exposure to bowtherm. Measurements for noise throu<hout tne plant show a nuisance level of noise being created by the release of conpressed air without the benefit of muffles, r- high noise level exists in front of tne Sid Cylinder due to escaping steam. rhis noise source adds to the background noise level of nearby areas of the plant.. Noise on the flatware sanding line is borderline and employees here should be monitored periodically with audiometric testinq. Undesirable noise levels eKist on the integrated line sawing equipment. Enclosure of the sound source with accoustical paneling is desirable. The Rotoblast equipment in the Mold Shop is noisy, but the main shop sound pressures e::ist in the lower octave band frequencies. The problem is mainly one of nuisance sound intensity. ( ; > d Villiam R. Bradley M QL'sr srMt'L,:s jample No. Location Millions of Fiirticlcc Per Cubic Foot of / 11 1 Breathing zone level of workmen in 18.0 box car while unloading paper bags of diatomite (Eagle Pitcher "Celatom"). "2 Batch mix floor while charging asbestos 7B, K3, S33, scrap, lime, iron chromite into west asbestos tank. 6.0 ^ 3 4 Batch mix floor while charging into south hydropulper. Charging lime and diatomite by hand, cement and silica being charged by screw conveyor. No. 2 line stripping area. 5.0 L-" 3.1 ^ S No. 2 line pouring end. 2.2 U' 6 *7 No. 1 line pourin<. end. No. 1 line stripping end. 2.3 ^ 3.5 ^ *8 Discharge area of pre-hardener during fork lift truck unloading. 3.6 9 In front of No. 9 Sid Condenser. 2.6 10 Operator's desk at rear of No. 9 Sid Condenser. 1.9 11 Flatware sanding at feed operator's station. (K-17) 4.2 ^ 12 Flatware line at top sander station. (K-17) 5.2 <-- -5- LAJS r (continueo) .Sample No. Location *+ 13 Boxing flatware and packing on skids. (K-17) Millions of Particles Per Cubic Foot of ir 6.0 ^14 Feeder's station on billet line. 3.3 ( J IS Packer's station on billet line. 3.1 **16 Integrated line sawing station on pipe halves. *" *** 12.9 u'' ** 17 Flatware finishing line, packing station. K-10 product sizes 2 x 6 x 36 and 2 x 12 x 36. 7.7 _ ** 18 Flatware finishing line, packing station. K-10 product size 3 x 6 x 36. 6.8 19 Shipping area at end of flatware line. K-10 product size 3 x 6 x 36. Carton closing and cluing. 1.4 20 J 21 Integrated line, 3awiny K-10 product size 12 x 3 x 36 and 10 x l.S x 36. ' Integrated line wrapping and packing station. 13.6 . o 22 Integrated line carton sealing area. 2.2 23 Special assembly laminating jigs. Pipe area. 2.3 **24 Band sawing, pipe area 3/8 x 2 1/2. 8.7 6 J DUST S^PLES (continued) ..uni. 80, Location Millions of Particles far cublc_root of nr 25 Center of warehouse. 1.3 V 26 Outdoors 20 feet west of No. 3 end No. 4 beg collectors. 3.0 * 27 Mold shop et discharge end of Rotoblast. 3.5 t-- 28 Mold shop entrance to Rotoblast unit. 2.9 A-- 29 Mold shop repair area, disc sanding and arc welding. 2.4 ^ - 30 Maintenance Shop, center of area. 1.6 31 Dowtherm boiler room. 0.9 32 Box car loading 2 x 6 x 36 pipe covering. 2.3 ' 33 entrance to No. 2-B drier. Fork lift truck unloading in drier, flatware and pipe. 3.0 34 Outdoor sample collected in salary staff 1.1 parking lot. ^33. A* a****. 7 ( NOISK ^c~ SUR Sample Overall A NO. Level Scale 31 63 125 250 500 1000 2000 4000 8000 1 90 86 81 80 80 81 78 77 78 86 72 2 91 89 80 82 82 82 80 80 80 86 70 3 95 89 8S 84 86 90 91 82 79 73 73 4 92 83 83 84 82 87 81 78 74 72 76 5 93 90v 85 81 83 81 89 11 75 74 76. 6 90 85 82 82 86 82 80 78 75 74 76 7 100 99 82 82 82 84 84 90 88 88 97 8 96 92 *' 84 84 84 82 81 82 86 85 92 $ 101 iooy 83 82 83 83 82 86 92 98 96 10 93 91 J 80 80 79 77 78 80 84 84 89 11 97 94^ 80 81 80 93 84 84 88 88 87 12 95 93\, 00 86 82 86 85 85 91 87 92 13 91 86 81 80 77 87 77 78 80 76 78 14 89 87 80 86 79 78 78 76 76 74 82 15 88 85 78 81 77 77 74 73 73 72 85 16 99 95v 86 86 85 85 87 87 89 96 89 17 91 89 80 82 78 82 80 87 84 77 75 13 91 89 80 82 78 82 80 87 84 77 75 -8 o NQIS Mu'SUi: JM a IS (continued) Sample Overall A No. Level Scale 31 63 125 2 50 500 1000 2000 4000 6000 19 93 92 *- 81 83 60 82 82 85 90 82 82 20 86 94 1 81 84 84 87 86 87 8? 89 53 21 84 75 76 76 74 81 78 84 72 70 70 22 82 78 74 73 70 79 74 70 70 68 68 23 82 76 73 71 69 68 66 76 68 66 68 24 90 88 75 74 70 68 71 82 70 74 87 25 98 90 * 84 95 89 89 50 86 86 87 79 26 98 91 ^ 79 94 92 90 88 87 88 84 80 27 95 85 79 92 84 83 83 80 76 76 70 28 84 75 72 81 76 70 72 70 66 60 70 29 94 89 86 90 84 86 83 81 81 61 82 30 92 84 88 80 82 83 74 74 74 75 77 LOC'TION OF NOIS ^Ul: JMtlNTS Samole No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Location Batch mix floor while charging asbestos 7B, K3, S33, scrap, line, iron chromite into west asbestos tank. Batch mix floor while charging into south hydropulper. Charging line and diatomite by hand, cement and silica being charged by screw conveyor. No. 2 line stripping area. No. 2 line pouring end. No. 1 line pouring end. No. 1 line stripping end. No. 1 line stripping end, use of compressed air. Discharce area of pre-hardener during fork lift truck unloading. In front of No. 9 Sid Condenser. Operator's desk at rear of N0. 9 Sid Condenser. Flatware sanniny at feed operator's station. (K-17) Flatware line at top sander station. (K-17) Boxing flatware and packing on skids. (K-17) -10- LOCATION OF NOISe: M SUKJM--NVf, (continueo) Sample Mo. 14 15 16 17 18 19 20 21 22 23 24 25 26 Location Feeder's station on billet line. Packer's station on billet line. Integrated line sawing station on pipe halves. Flatware finishing line, packing station. K-10 product sizes 2 x 6 x 36 and 2 x 12 x 36. Flatware finishing line, packing station. K-10 product size 3 x 6 x 36. Shipping area at end of flatware line. K-10 product size 3 > 6 x .16. Carton closing and gluing. Integrated line, sawing K-10 product size 12 x 3 x 3l> and 10 x 1.5 x 36. Integrated line wrapping and packing station. Integrated line carton sealing area. Special assembly laminating Jigs. Pipe area. Band sawing, pipe area 3/8 x 2 1/2. Mold shop at discharge end of Rotoblast. Mold shop entrance to Rotoblast unit. > .11. LOC.1*Tic:: OF NOIS.: Mg'"UK^.Ml-Kr? (corn inucci) Sample No. 27 28 29 30 Location Mold shop repair area, disc sanding and arc welding. Maintenance Shop, center of area. Dowtherm boiler room. Box car loading 2 x 6 x 36 pipe covering. -12- J Ti^lPaR'TUKc "KD K.;Lj'. i'IVl itUM.T PITY rest No. Location Temperature Degrees Fahrenheit 1 Mo. 2 line stripping area. 79 2 No. 2 line pouring end. 80 3 No. 1 line pouring end. 81 4 No. 1 line stripping end. 85 5 Batch mix floor while charging 85 into south hydropulper. Charging lime and diatomite by hand, cement and silica being charged by screw conveyor. 6 Discharge area of pro-hardener 90 during fork lift truck unloading. 7 In front of No. 9 Sid Condenser. 97 8 Operator's desk at rear of No. 9 Sid Condenser. 86 % Relative Humidity 60 60 59 58 42 52 50 44 13- (' c mai:: batches as ASBESTOS J K-10 Batch K-3 or W-3 S-33 7-D 6% 6.2% 3% 15% K-10 Batch V<-3 or K-3 S-33 7-D 9*/, 3% 37. 15* Core Batch S-33 4-T 9.14 3.9,4 13''> K-20 Batch V--3 S-33 4-T 2i 10.4 20 4 rv?i CD Silica minus 325 mesh - 99i Si02 Oiatomaceous (:arth Nevada minus 325 mesh 85* S102 -14-