Document pBY1KVvJGe4RvNdnXyzr9oVjj
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4
ATLANTA FEDERAL CENTER 61 FORSYTH STREET
ATLANTA, GEORGIA 30303-8960
ELECTRONIC MAIL CONFIRMATION OF EMAIL RECEIPT REQUESTED
Mr. John Fortenberry McInnis Electric Company 5475 I 55 South Frontage Road Byram, Mississippi 39272 John@mcinnisco.com
Re: NPDES Permit No. MS0057711, Reconnaissance Inspection Report
Dear Mr. Fortenberry:
The U.S. Environmental Protection Agency, Region 4 inspected the McInnis Electric Company (the facility) located at 5475 I-55 South Frontage Road, Byram, MS 39272, on August 3, 2021, for compliance with its National Pollutant Discharge Elimination System (NPDES) permit and the Clean Water Act (CWA). The inspections findings and recommendations are provided in the enclosed Reconnaissance Inspection Report.
The EPA appreciates your cooperation. If you have any questions about the inspection report, please contact Tristan Odekirk at 404-562-9295 or via email at Odekirk.Tristan@epa.gov.
Sincerely,
JAIRO CASTILLO
Digitally signed by JAIRO CASTILLO Date: 2021.10.01 13:56:44 -04'00'
Jairo Castillo, P.E., Chief Wastewater Enforcement Section Water Enforcement Branch
Enclosure
cc: Michelle Clark, MRClark@mdeq.gov MDEQ
Internet Address (URL) http://www.epa.gov
NPDES No. MS0057711
MO/DAY/YR 8/3/2021
United States Environmental Protection Agency
Region 4
CV-MS0057711-8-3-2021
Reconnaissance Inspection Report
SECTION A: National Data System Coding
Inspection-Type
Inspector
ROS (Reconnaissance Tristan Odekirk/Richard
without Sampling)
Elliott
Facility-Type Privately-owned sewage treatment system
SECTION B: Facility Data
Name and Location of Facility Inspected (For industrial users discharging Entry Date/Time
to POTW, also include POTW name and NPDES permit number)
8/3/2021 2:20 PM
McInnis Electric Company
Exit Date/Time
5475 I 55 South Frontage Road
8/3/2021 3:50 PM
Byram, MS 39272
Names of On-site Representative(s)/Title(s)/Phone and Fax Number(s)
Other Facility Data
John Fortenberry/ (601) 372-2014
Permit Effective Date 9/18/2018 Permit Expiration Date 8/31/2023
Name, Address of Responsible Official/Title/Phone and Fax Number John Fortenberry/ (601) 372-2014
Contacted
Yes
No
Permit
SECTION C: Areas Evaluated During Inspection (Check only those areas evaluated)
Flow Measurement
Operation &
CSO/SSO (Sewer
Maintenance
Overflow)
Records/Reports
Self-Monitoring Program
Sludge
Handling/Disposal
Pollution Prevention
Facility Site Review Compliance Schedules
Pretreatment
Multimedia
Effluent/Receiving Waters
Laboratory
Storm Water
Other:
SECTION D: Summary of Findings/Comments (Attach additional sheets of narrative and checklists as necessary)
See Section D.
Name(s) and Signature(s) of Inspector(s)
Tristan Odekirk
TRISTAN
Digitally signed by TRISTAN ODEKIRK
ODEKIRK
Date: 2021.10.04 11:55:21 -04'00'
Signature of Management QA Reviewer
Jairo Castillo
JAIRO
Digitally signed by JAIRO CASTILLO
CASTILLO
Date: 2021.10.01 13:56:18 -04'00'
Agency/Division/Phone and Fax Number EPA/ECAD/ (404) 562-9295
Agency/Division/Phone and Fax Number EPA/ECAD/ (404) 562-9257
Date 10/01/2021
Date 10/01/2021
Page 1 of 2
United States Environmental Protection Agency Region 4
CV-MS0057711-8-3-2021 Reconnaissance Inspection Report
(Continued)
Section D: Summary of Findings / Comments
On August 3, 2021, the EPA conducted a Reconnaissance Inspection (RI) at the McInnis Electric Company located in Byram, MS. EPA met with Mr. Williams and reviewed the facility's monitoring records and discussed the facility's self-monitoring program. The following is a summary of the RI findings and observations.
I. Records/Reports
According to EPA's Enforcement and Compliance History Online, the facility has had effluent exceedances for Biochemical Oxygen Demand (BOD5) and Total Suspended Solids in 1st quarter 2019 and 1st quarter 2020. The facility had monitoring records, a copy of the NPDES permit, and copies of past correspondences with the EPA and MDEQ on file at the site.
II. Facility Site Review
McInnis Electric Company has a small septic tank to receive wastewater from the company's three bathrooms. The septic tank, a concrete box located on the premise (Photo 1), discharges directly into a nearby ditch and does not make use of a leach field. The facility does not have land accessible nearby to site a leach field.
In a conversation with the facility manager, it was found that wastewater quality issues have been an issue for a considerable time. The facility representative claims that he has been in correspondence with the city of Byram to have a sewage line installed along the road leading to the facility so that it can be connected. As there is currently no sewer line along this road, none of the other locations along the road have direct sewer access.
PHOTOGRAPHIC LOG
Photo 1: Top of concrete septic tank which receives facility wastewater. END OF REPORT
Page 2 of 2