Document pBV2D59LnYn7M7OYjO5z3xmMX

J. J. Burbage - GO C. P. Cunningham - GO W. R. Corey - GO H. S. Bergen. - GO C. D. Culberson -'GO R. J. Kozacka - GO C. W. Roos - GO G. L. Bratsch MONSANTO INDUSTRIAL CHEMICALS COMPANY APPROPRIATION REQUEST 4 TO: C. P. Cunningham Managing Director October 4, 1972 FUNCTIONAL PRODUCT GROUPS SPECIALTY PRODUCTS BUSINESS GROUP W. G. KRUMMRICH PLANT REQUEST NO. 8020 TITLE: Aroclors - Install PCB Off-Gas Scrubber New Fixed Capital $73*OOO <- wX . . /X ^ A. E ,JLeisy,Generg/l Superintendent Approved: 'G'r' L. "Bratsch, Plant Manager DiOf* H. S. Bergen, Business Director W. R. Corey, Group Director C. P. Cunningham, Managing Director DSW 250530 STLCOPCB4060589 Request No. 8020 Page 2 10/4/72 WGK FINANCIAL SUMMARY ($M) New Fixed Capital Additional Investment $73 0 Gross Investment $73 Expenses: Start-Up Dismantling Retirement Loss Modifications Repairs . $0 0 0 4 0 Total Expense $4 After-Tax Income Non-Earnings ($13.8/yr.) Additional Operating Costs I. BACKGROUND AND NEED FOR PROJECT At present, the HC1 off-gas from the chlorination process step in the production of Aroclor contains about 15-30 pounds of poly chlorinated biphenyls(PCB's) per day. The HC1 off-gas flows to the chlorosulfonic acid department where chlorosulfonic acid is produced. PCB's in the off-gas are essentially converted to sulfonyl chloride by passing through a scrubber at the acid department. Organics formed in the scrubber are sewered. Production in the Aroclor and the chlorosulfonic acid departments must be balanced such that excess HC1 off-gas from the Aroclor department which contains PCB's not be sewered. The Aroclor operation must be shut down or reduced when chlorosulfonic operations are shut down or reduced because the plant has adopted the policy not tp intentionally discharge PCB's into the environment via off-gas sewering into the plant sew?er system. Although no regulation exists at present we believe the Federal Environmental Protective Agency will establish a guideline which will limit,PCB in any receiving water stream at 0.01 ppb PCB. One pound -of PCB from the department is equivalent to about 0.001 ppb in the Mississippi River. Sewering off-gas containing 15-30# PCB per day when not producing chlorosulfonic acid would exceed the expected EPA guidelines, and Aroclor operations could not be continued with such an environmental discharge of PCB to the sewer. DSW 250531 STLCOPCB4060590 Request No. 8020 Page 3 10/4/72 WGK ' I. BACKGROUND AND NEED FOR PROJECT(Cont'd.) This project would provide HC1 off-gas scrubbing facilities in the Aroclor department where the PCB content of the HC1 off-gas could be reduced to an average value of about 2.5# PCB per day. The Aroclor department could operate independent of chlorosulfonic acid operations. When HC1 off-gas would not be required for chlorosulfonic acid production, the scrubbed off-gas from the Aroclor department could be sewered. The amount of PCB discharged to the sewer would be within the expected EPA guideline of 0.01 ppb PCB in the receiving water(Mississippi River). II. DESCRIPTION OF PROJECT This project would provide HC1 off-gas scrubbing facilities in the Aroclor department. A 15 plate valve tray column is to be provided with auxiliary scrubber liquor circulating tank and pump. Distilled residue liquor containing the higher chlorinated, low vapor pressure PCB's will serve as the scrubbing liquor. The spent scrubber liquor will be returned to the process for total recycle. Scrubbed HC1 off-gas would flow to the chlorosulfonic acid department, the adiabatic absorber for muriatic production(project in preparation) or to the sewer. III. PROFITABILITY This is a non-earnings project. This project is related to controlling the entrance of PCB's into the environment. Additional operating costs are $13*8M/yr. Utilities Repairs Laboratory Depreciation Factory Indirect Expenses $ 1,865/yr. 4,000 600 6,100 1,275 $i3,b4o/year IV. ALTERNATE COURSES 1 Alternate courses that have been considered are: I. Continue as is by operating Aroclor department in balance with chlorosulfonic acid department. Off gas passes through scrubber at chlorosulfonic department. Advantages: No capital required and PCB discharge to sewer at Aroclor department in compliance with expected EPA guidelines. Disadvantages: Aroclor operation dependent on chlorosulfonic operation. Potential problems could develop DSW 250532 STLCOPCB4060591 Request No. 8020 Page 4 10/4/72 WGK IV. ALTERNATE COURSES(Contd.) if needs were such that Aroclor had to operate to meet sales and chlorosulfonic department could not operate. During past six months the Aroclor department , was idle about 25$ of the time due to no HC1 outlet. *% II. Carbon treat HC1 off-gas in gaseous phase Advantages: Could further reduce PCB content of off-gas to essentially zero. Disadvantages: More costly and exact process not defined. The above two alternates are not recommended. V. CAPITAL ESTIMATE The estimate is based on installation with plant people. Major equipment cost based on equipment manufacturer's quotation. Proposed facilities can be installed within six months of approval. Expect to have in operation by 7/1/73. Project has been reviewed with the Corporate Engineering Department. VI. PERSONNEL No personnel changes are involved. VII. POLLUTION AND TOXICITY PROBLEMS This is a pollution control project. It is a part of the WGK strategy to continue Aroclor production at the W. G. Krummrich Plant indefinitely in such a manner to restrict knowing discharges from the manufacturing department to the lowest technical achievable level. Reduction of PCB's in the off-gas to essentially zero would be desirable. Based on limited laboratory data it appears that achieving this goal might be technically feasible, however, the economics at this time might not justify such action. Any additional PCB removal facilities beyond what is considered in this project would require this scrubber as a first step in the clean-up facilities. VIII. PRODUCTION RISKS AND HAZARDS This project will not affect the fire or explosion hazards in the department. . DSW 250533 STLCOPCB4060592 Request No. 8020 IX. PATENT PROBLEMS Does not apply. X. LEGAL Does not apply. XI. PHYSICAL DISTRIBUTION Does not apply. . XII. SUPPORTING S CHEDULES Project authority for expenditure. Page 5 10/4/72 WGK Technical Services Department cc; G. Hippe L. Sprandel N. Mayes B. Eden G. Newman DSW 250534 STLCOPCB4060593