MONSANTO INDUSTRIAL CHEMICALS COMPANY APPROPRIATION REQUEST
4
TO: C. P. Cunningham Managing Director
October 4, 1972
FUNCTIONAL PRODUCT GROUPS SPECIALTY PRODUCTS BUSINESS GROUP
W. G. KRUMMRICH PLANT REQUEST NO. 8020
TITLE: Aroclors - Install PCB Off-Gas Scrubber
New Fixed Capital
$73*OOO
<- wX .
.
/X ^
A. E ,JLeisy,Generg/l Superintendent
Approved:
'G'r' L. "Bratsch, Plant Manager
DiOf*
H. S. Bergen, Business Director
W. R. Corey, Group Director
C. P. Cunningham, Managing Director
DSW 250530 STLCOPCB4060589
Request No. 8020
Page 2 10/4/72
WGK
FINANCIAL SUMMARY ($M)
New Fixed Capital Additional Investment
$73 0
Gross Investment
$73
Expenses: Start-Up Dismantling Retirement Loss
Modifications Repairs
.
$0 0 0 4
0
Total Expense
$4
After-Tax Income Non-Earnings
($13.8/yr.)
Additional Operating Costs
I. BACKGROUND AND NEED FOR PROJECT
At present, the HC1 off-gas from the chlorination process step in the production of Aroclor contains about 15-30 pounds of poly chlorinated biphenyls(PCB's) per day. The HC1 off-gas flows to the chlorosulfonic acid department where chlorosulfonic acid is produced. PCB's in the off-gas are essentially converted to sulfonyl chloride by passing through a scrubber at the acid department. Organics formed in the scrubber are sewered.
Production in the Aroclor and the chlorosulfonic acid departments must be balanced such that excess HC1 off-gas from the Aroclor department which contains PCB's not be sewered. The Aroclor operation must be shut down or reduced when chlorosulfonic operations are shut down or reduced because the plant has adopted the policy not tp intentionally discharge PCB's into the environment via off-gas sewering into the plant sew?er system.
Although no regulation exists at present we believe the Federal Environmental Protective Agency will establish a guideline which will limit,PCB in any receiving water stream at 0.01 ppb PCB. One pound -of PCB from the department is equivalent to about 0.001 ppb in the Mississippi River.
Sewering off-gas containing 15-30# PCB per day when not producing chlorosulfonic acid would exceed the expected EPA guidelines, and Aroclor operations could not be continued with such an environmental discharge of PCB to the sewer.
DSW 250531 STLCOPCB4060590
Request No. 8020
Page 3 10/4/72 WGK
' I. BACKGROUND AND NEED FOR PROJECT(Cont'd.)
This project would provide HC1 off-gas scrubbing facilities in the Aroclor department where the PCB content of the HC1 off-gas could be reduced to an average value of about 2.5# PCB per day. The Aroclor department could operate independent of chlorosulfonic
acid operations. When HC1 off-gas would not be required for chlorosulfonic acid production, the scrubbed off-gas from the Aroclor department could be sewered. The amount of PCB discharged to the sewer would be within the expected EPA guideline of 0.01 ppb PCB in the receiving water(Mississippi River).
II. DESCRIPTION OF PROJECT
This project would provide HC1 off-gas scrubbing facilities in the Aroclor department. A 15 plate valve tray column is to be provided with auxiliary scrubber liquor circulating tank and pump. Distilled residue liquor containing the higher chlorinated,
low vapor pressure PCB's will serve as the scrubbing liquor. The spent scrubber liquor will be returned to the process for total recycle.
Scrubbed HC1 off-gas would flow to the chlorosulfonic acid department, the adiabatic absorber for muriatic production(project in preparation) or to the sewer.
III. PROFITABILITY
This is a non-earnings project. This project is related to controlling the entrance of PCB's into the environment.
Additional operating costs are $13*8M/yr.
Utilities Repairs Laboratory Depreciation Factory Indirect Expenses
$ 1,865/yr. 4,000 600 6,100
1,275 $i3,b4o/year
IV. ALTERNATE COURSES 1 Alternate courses that have been considered are:
I. Continue as is by operating Aroclor department in
balance with chlorosulfonic acid department. Off
gas passes through scrubber at chlorosulfonic
department.
Advantages:
No capital required and PCB
discharge to sewer at Aroclor
department in compliance with
expected EPA guidelines.
Disadvantages:
Aroclor operation dependent on
chlorosulfonic operation.
Potential problems could develop
DSW 250532
STLCOPCB4060591
Request No. 8020
Page 4 10/4/72 WGK
IV. ALTERNATE COURSES(Contd.)
if needs were such that Aroclor
had to operate to meet sales and
chlorosulfonic department could
not operate. During past six
months the Aroclor department
, was idle about 25$ of the time
due to no HC1 outlet.
*% II. Carbon treat HC1 off-gas in gaseous phase
Advantages:
Could further reduce PCB content
of off-gas to essentially zero.
Disadvantages: More costly and exact process not
defined.
The above two alternates are not recommended.
V. CAPITAL ESTIMATE
The estimate is based on installation with plant people. Major equipment cost based on equipment manufacturer's quotation.
Proposed facilities can be installed within six months of approval. Expect to have in operation by 7/1/73.
Project has been reviewed with the Corporate Engineering Department.
VI. PERSONNEL
No personnel changes are involved.
VII. POLLUTION AND TOXICITY PROBLEMS
This is a pollution control project. It is a part of the WGK strategy to continue Aroclor production at the W. G. Krummrich Plant indefinitely in such a manner to restrict knowing discharges from the manufacturing department to the lowest technical achievable level.
Reduction of PCB's in the off-gas to essentially zero would be desirable. Based on limited laboratory data it appears that achieving this goal might be technically feasible, however, the economics at this time might not justify such action. Any additional PCB removal facilities beyond what is considered in this project would require this scrubber as a first step in the clean-up facilities.
VIII. PRODUCTION RISKS AND HAZARDS
This project will not affect the fire or explosion hazards in the
department.
.
DSW 250533
STLCOPCB4060592
Request No. 8020
IX. PATENT PROBLEMS Does not apply.
X. LEGAL Does not apply.
XI. PHYSICAL DISTRIBUTION Does not apply.
. XII. SUPPORTING S CHEDULES Project authority for expenditure.
Page 5
10/4/72 WGK
Technical Services Department
cc; G. Hippe L. Sprandel N. Mayes B. Eden G. Newman
DSW 250534 STLCOPCB4060593