Document pB2MZV571xmq340vQ8yNa1npD

\ ~I PLAINTIFF'S EXHIBIT PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING (SYNOPSIS) OCTOBER 19, 1983 MON-708 Present were: G.A. Danner G.W. Daues R.M. Fritz for A.H. Conrad R.T. Hammann R.S. Jackson for G.T. Ryan D.E. Kaldenberg for J.S. Hagood H.M. Lacy (Guest) B.C. Lancaster D.W. Metten L. Schwab for R.L. Hammond J.G. Trafton G.L. Tromblee G.L. Wofford I. REVIEW OF STATISTICS--R.T. Hammann A. Texas City Plant Safety Performance Summary - September 1982 SEPT YTD 1983 SEPT YTD 1983 TARGETS (A) INJURIES WITHOUT LOST WORKDAYS 1 10 0 8 (medical treatment only) (B) LOST WORKDAYS CASES 14 00 **BX RESTRICTED ACTIVITY 00 00 **b2 days AWAY FROM WORK CASES 15 00 (C) FATALITIES 00 00 11 2 -- -- -- *TOTAL RECORDABLE CASES 2 15 08 13 INJURY RATES PER 200, 000 MANHOURS SEPT YTD SEPT YTD 1983 TARGETS 1983 MFIC AUG TARGET YTD TOTAL INJURY-TIR TOTAL RECORDABLE-TRR TOTAL LOST WORKDAY-TLWR DAYS-AWAY-FROM-WORK-DAWR 12.26 1.44 0.72 0.72 9.76 1.17 0.39 0.39 12.95 0.00 0.00 0.00 11.95 0.73 0.00 0.00 ______ 0.87 0.13 -- 1.02 -- -- ____ 1.04 0.28 0.22 B. Comments on Statistics--R.T. Hammann There were no Recordable Injuries in September. There has been one recordable injury so far in October where a laboratory analyst cut his left thumb on a broken flask. This brings the number of record able injuries YTD to nine with a total recordable rate of 0.77. SC 13881 STG 2430687 LAM015670 PMSB Synopsis--October 19, 1983 Page 2 Areas having a high or increasing cumulative monthly injury rate are: Insulators Electricians Boilermakers Analysts Carpenters Dept. 44/45/46 Dept. 50 Painters Pipefitters Power 2 Areas showing much improvement in getting their injury rate under control are: Machinis ts Truckers Laborers Pumper Gaugers Areas having excellentsafety records are: Instrument Dept. - Dept. 513 - Stores - 6 months without an injury 13 months without an injury 20 months without an injury C. Contractor Safety--B.C. Lancaster There was one Loss Work Day Injury in September. A Crescent electrician slipped and fell bruising himself. & was away from work for two days. An accident occurred on October 18 to an Opel laborer while loading trash onto a truck. As he was throwing a 2x4 and some plywood into the truck, a nail cut him in the face requiring 11 stitches. D. CEP Safety--B.C. Lancaster There was one Recordable Injury in September. An oiler fell on a man's finger and broke it. This brings the total recordable injuries for the year to 11. II. REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC) - G.A. Danner A. Locks-Security--Units/Crafts have not yet depleted their inventory of locks. Therefore, there is no problem at the present time. SHAC needs to establish as a high priority project the development of procedures and policies for handling the lock system within the plant. SC 13882 5TG 2430688 LAM015671 PMSB Synopsis--October 19, 1983 ( Page 3 III. REPORT OF THE PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)-- Rose Mary Fritz for A. H. Conrad A. Plans for Annual Safety & Housekeeping Inspection 1. Theme - SAFETY AWARENESS PREVENTS ACCIDENTS This theme was selected as the majority of our accidents this year have occurred due to inattention and poor awareness on the individual's part. Inspection will be competitive with awards given to the best Unit, Craft, Laboratory and Service Area. B. Contractor Safety Information developed by Rufus Baca has been reviewed by SHAC. There is a need to form a subcommittee to develop a proposed program. C. Recordable Injury Bulletin Issued a bulletin concerning the nineth recordable injury. This occurred to a Laboratory Analyst who cut his thumb on a broken flask. IV. REVIEW OF INCIDENTS Monsanto Incidents Date Incident No. 07/22/83 83-11 (Issued) 09/09/83 83-15 (Issued) 10/07/83 83-16 (Not Issued) Sc Description Recordable Injury--Dept. 14; PT Technician was sprayed with hot PEB while sampling 14D4 feed. Sustained 1st and 2nd degreee burns to left foot. (Wise) Unit Shutdown--Water in the ben zene feed to alkylator in Dept. 13 resulting in polymer formation. Unit was shut down to clean alkylator. (Moncla) Recordable Injury--Quality Assurance Lab; Analyst cut his left thumb on a broken flask while attempting to seat the flask on a vacuum manifold. (Rolingson) STG 2430689 LAM015672 (( PMSB Synopsis--October 19, 1983 Page 4 Contractor Incidents Date Incident No. 06/21/83 C 83-03 (Not Issued) Recordable Injury/Days-Away-FromWork--Brooks Construction; Old Dept. 10 area; man was struck by pallet when unloading packing for styrene shutdown. Suffered contu sions and sprain to left ankle. (Wright) V. STATUS OF S-T-O-P PROGRAM--G.W. Daues A. Hourly Program This program will start the week of 11/7 with Mark Riddle as the principal instructor. In addition, there will be hourly participation in the presentation of the material. This will be a 3-unit course with each unit lasting approximately 1-2 hours. Plans are to hold ten sessions per unit to train 700 people. Training on Unit II will begin in December unless 16D1 is shut down. In that case. Unit II will be deferred to January. B. Administrative Support The course for non-exempt personnel will also consist of three units. Training for approximately 150 people will start in November with instructors from the Tech Center Safety Committee and Office Safety Committee. Training for this group will be conducted in the ARMS Conference Room. VI. MISCELLANEOUS--R.T. Hammann A. Emergency Procedure Plan A recent S&PP survey emphasized that we need to proceed with our plans to update this manual. Assignments for reviewing and rewriting the manual were made in the May PMSB meeting. Target date for completion of this work is December 31. B. By-Pass of Critical Alarms During the recent S&PP survey it was pointed out that many alarms had been by-passed (i.e., cards pulled, alarms deactivated, etc.). This was addressed during the rewriting of Procedure Bulletin P-0123, but apparently has not received enough emphasis in the plant. A task force will be set up by Tom Ryan, Jack Trafton, Greg Daues and Bob Hammann to review and make recommendations concerning this problem. In addition, a SHAC Alert will be issued using the recent incident of alkylator pluggage as an example. SC 13884 STG 2430690 LAM015673 PMSB Synopsis--October 19, 1983 Page 5 C. Emergency Call-Out List - Procedure Bulletin P-0105 A reminder was given to all superintendents to update this call-out list as needed. VII. PLANT MANAGER'S COMMENTS The Japanese will arrive today with E.N. Brasfield for a visit to AN-5. Gene is anxious to see how the plant looks during the Annual Safety & Housekeeping Inspection next week and will be talking to as many people as possible. Guides should be aggressive and make sure that the inspec tion is snappy and that we keep on schedule. Special emphasis will be given to the S-T-O-P Program to determine the level of awareness and see how people feel about the program. RTH:js Attachments R. T. Hammann SC 13885 STG 2430691 LAM015674