Document pB1z1rR3xZ1qdD59MzJpavDjw

FILE NAME Corning OC DATE 1962 Feb 13 DOC OC117 DOCUMENT DESCRIPTION Internal Memo RE Kaylo Products hes tekyy AbDETeSg aoe SSN ate tt - RJ. Paoletti from O. W. Pfeifer mu ! 1.bject od KAYLO PROJECTS LUMPANT CORRESPONDENCE - ; Dato = February 13 1962 : R. S. Grant W. K. Bidwell , a) There are several places where we need the help of your engineers to get some programs under way which will help reduce offware in the Berlin Plant which in turn will increase their gross margin There is a tendency for some of these to slow down when most of the offort is directed to in- clusion of glass fibers in Kaylo slurry We are only several weeks away from incorporating glass fibers in production these others can proceed 1 2 Check the 1 molds 2 x 1 through 6 x 1 and see what has to be done and how much it would cost to cut 1/8 from each side of the core as it extends over the opening between the core and the sidewall of the shell The purpose is to increase this width by at least 1/4 or more if it can be done This vill allow for a wider opening in both the hand pouring nozzle as well as the experimental 36 pouring device which will reduce clogging from long glass and asbestos fibers The core lip cannot be entirely removed for it induces hard stripping if the screeded Kaylo is flush with top edge of core and increased breakage results Breakage of ends and edges occur when stripped when physical shrinkagies low when spacers are hard to renove when spacers are not in large size seg molds This comes from resistance to easy removal when a spacer end bar or other metal fixtures are used to pry Kaylo half section upward to secure release We began almost a year ago to try a vacuum head type of suction cup with fair success We did not have a sufficient bead of Vacuum nor did we spend enough time to develop the correct type . of head or harness for overhead handling of cups Without check- ing I would say broken corners has been an offware defect for 25 of all total offware for a long time You can readily see the savings over equipment cost and installation to be secured here by pursuing this project to a cuccessful conclusion 3 A recent audit of Kaylo products selected as to size and production and type at random resulted in an improvement of last audit This was most enoouraging One thing that stood out was the dustiness of Kaylo light density block and the auditing group recommended that this condition be corrected H. V. Saith gave us the assignment for improvement We have a method and a way to do this by using light spray of Ludor to one or both sides za the decision decision is made to do Bow to secure the space at the end of the fatvare finishing line is the problem Conveying equipment pertape to a higher level and before packing is is not a probles return through the engineering a hosting unit to set Ladox Spray work needed Spray equipment 36 Cc c e ~ i) C / R. J. Paoletti -2- February 13 1962 noma oe hee + poem Oe 4 We have contemplated the increased use of Kaylo Dust in regular light density slurry This gives adequate strengths when used with aposite asbestos We will have the 36 Bauer Hill dry fiberizing changes completed week of 2/19 This is a further advantage The more dust we can use the greater the batch extender and the lover the cost We have used 500 lbs dust on all of the recent coated glass fiber trials so these results show it can be used The engineering need is to enlarge the present dust hopper to weigh a maximum of 800 lbs from present 500 lbs The system will have to be resurveyed to make certain blowers valves etc. are large enough to move and weigh 800 lbs within the gathering time available These minutes vill have to be checked on batch floor The plant engineering and maintenance group do sufficient time to do this work hence our request for assistance not have your group'a These four projects are immediate and should be followed through as quickly as personnel and time are available for three of them 1 2 and 4 will greatly assist in reducing Berlin's plant coste which on reduced operation schedule will be of great assistance to them We can discuss at your availability All except item 3 are in our Kaylo Improve- ment Progra OU | mP rt O. Freifer Na, 37